You are on page 1/ 2

PROJECT :

WORK
LOCATION :
DATE PREPARED: CONTROL No. :

REQUEST Structural Sanitary/Plumbing Elec'l/Auxiliaries Fire Protection INSPECTION DATE/TIME:

Architectural FDAS/BAS Mechanical Others : ___________________

WORK REQUEST FOR:


MATERIALS SUBMITTAL DRAWING METHODOLOGYSUBMITT
AREA/FLOOR LEVEL: PATOQ REF. NO.
REF. NO SUBMITTAL REF. NO AL REF. NO.

GRID LINE:

REQUESTED BY : MDC Subcon

(Company) (Name / Designation) Signature


SUBCONTRACTORS: Project In Charge (PIC)
We hereby certify that preceding works have been completed and accepted. REVIEWED AND CHECKED BY:
REMARKS
We certify further that we are ready to do our respective works with this (MDC FIELD QC ENGINEER)
work request.

SURVEYOR

Field Engineer Name/Signature/Date Name/Signature/Date

CIVIL/STRUCTURAL

Field Engineer Name/Signature/Date Name/Signature/Date

ARCHITECTURAL

Field Engineer Name/Signature/Date Name/Signature/Date

ELECTRICAL / AUXILIARIES

Field Engineer Name/Signature/Date Name/Signature/Date

MECHANICAL

Field Engineer Name/Signature/Date Name/Signature/Date

SANITARY / PLUMBING

Field Engineer Name/Signature/Date Name/Signature/Date

FIRE PROTECTION

Field Engineer Name/Signature/Date Name/Signature/Date

FDAS

Field Engineer Name/Signature/Date Name/Signature/Date

SAFETY

Safety Officer Name/Signature/Date Name/Signature/Date

NOTE : This form must be submitted to the QA Team, duly accomplished & signed by the corresponding Contractors' personnel in charge at least 24 hours before actual execution.

RECOMMENDING APPROVAL: APPROVED BY : APPROVED BY :


________________________________
(MDC Superintendent/Supervisor) (Project In Charge/QCM) (Quality Assurance Engr.)

COMMENTS:

DISTRIBUTION : Subcon Operation Document Controller QA


Revision No. : 002 (March2014)
PROJECT :

REQUEST FOR LOCATION :


REPLY NEEDED : RFI NO. :
DATE PREPARED :
APPROVAL
RFA-VERDIN-AR-

REQUESTED BY : CHECKED BY: NOTED BY:

Project Engineer Proj. In-Charge Const. Manager/Proj. Manager

TO : MEGAWORLD CORPORATION

ATTENTION :

TYPE: Architectural Mechanical Fire Protection


Civil / Structural Electrical Others:
Interior Design Plumbing
INFORMATION NEEDED:

**nothing follows**

ATTACHMENTS: Plans/Drawings Material Sample/s Others:


Specifications Test Results _______________________

REMARKS:

REPLY FROM:

______________________ ________________________ __________________________


(Company) (Name / Designation) (Signature)

DISTRIBUTION: Contractor Project Manager Others:

Subcontractor Quantity Surveyor

You might also like