Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Frank Olson Park Planning #2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 42

Public Engagement Sessions

Frank Olson Park


Design Charrette
8 - 9 November 2023
Agenda – 9 November 2023
What We heard

Business Planning

Site Program

Building Program

Aquatics Program

Preliminary Design Alternatives


What We heard
Frank Olson … what we heard
Would you be more supportive an outdoor facility that can be used
• Indoor multi-generational approximately 75 days a years or an indoor facility that can be used
360 days per year?
recreation center with aquatics
was preferred over outdoor
pool Indoor

• Ensure new facility includes


Outdoor
areas for lap swimming
Indoor
• Combination of both fitness Outdoor
and recreation water
• Add shade and tables 0 20 40 60 80
• Provide swim lessons
BUSINESS PLANNING
Business Plan 01
Development Data Collection

Process and Analysis

04 03 02

Program Community Market Analysis


Identification & Engagement
Prioritization

05 08
06 07
Building Program Capital & Financing & Business Plan
Operating Cost Operating Development
Proforma
Community Center Analysis

Operating Hours Balancing Community Use/ Program Use/ Membership/ Admission Structure
Reservations and Rentals

Utilization Schedules by Functional Staffing Levels Policy/ Procedure/ Process Review


Space and Improvement
Recommendations
Projected Multigenerational Center Proforma
DESIGN GUIDING PRINCIPLES
• Program Drives Design!
• Create Unique Experiences at Parks within SFPR System
• Forward Thinking Approach – Reflection of the Past
w/Eye on the Future
• Frank Olson – A Regional Destination and Crown Jewel of
the SFPR System
• Cost Effective, Functional, Efficient & Durable
• Wide Age Segment Appeal
• Future Partners to Invest In
SITE PROGRAM
Park Structures

Picnic Shelter Restroom, Ops & Associated Spaces


Parking & Pathways / Walks

Defined Space Interior Path


Outdoor Play

Shade Structures Play Structures

Nature Play Adult Fitness


Passive Recreation

Synthetic Multi-Use Lawn

Open Lawn

Passive Recreation
Active Recreation

Bocce
Pickleball Grass Softball Fields
Tennis

Sand Volleyball
BUILDING PROGRAM
Multi-Gen Recreation / Aquatic Program (Indoor)
CORE PROGRAM COMPONENTS / SPACE TYPE AREA SF

ATHLETICS 22,500 SF

AQUATICS 24,800 SF

HEALTH FITNESS 11, 100 SF

MULTI-USE / GENERAL PROGRAM 5,300 SF

ACTIVITY ZONES 2,700 SF

FACILITY ADMINISTRATION 1,300 SF

SOCIAL / GATHERING 2,100 SF

BUILDING SUPPORT 22,800 SF

TOTAL BUILDING AREA 79,500SF


Circulation & Social Gathering

Lobby / General Circulation


Multi-Use / General Program

Program Rooms / Kitchen


Activity Zones

Indoor Play / Adventure Play


Activity Zones

eSports / Party Room


Health / Fitness

Performance Fitness / Fitness Floor


Health / Fitness

Group X
Athletics (Gymnasium & Track)

Gymnasium
Athletics

Pickleball Batting Cages

Volleyball Basketball Gymnasium


Track
AQUATICS PROGRAM
Aquatic Program

Lap Pool Activity Pool

Lazy River / Current Channel Warm Water Program / Wellness Pool Water Slides
Outdoor Aquatics
SOUTH OPTION

Site Plan
SOUTH OPTION
NORTH OPTION

Site Plan
NORTH OPTION
INDOOR OPTION
INDOOR OPTION
OUTDOOR OPTION
OUTDOOR OPTION
CONCEPTUAL MULTI-GEN RECREATION MASSING
CONCEPTUAL MULTI-GEN RECREATION MASSING
CONCEPTUAL MULTI-GEN RECREATION MASSING
CONCEPTUAL MULTI-GEN RECREATION MASSING
Thank You

You might also like