LABOUR CONSTANT
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
SUPPLIER MATERIAL DESCRIPTION
ATKC WAREHOUSE Common Bricks (720 PCS/PALLET)
Dimension = 220mm(L) x 96mm(W) x 68mm(H).
1 Pallet = 720 Pcs.
1 Pc = ~2.2 Kg.
Unskilled man-hour
ITEM Description Unit
(hrs)
1 Surface excavation max deep n.e 0.15m (Top Soil) M2 0.35
2 Excavation to reduce level M3 1.75
3 Excavate column bases max depth n.e 0.25m M3 0.70
4 Ditto n.e 1.00m deep M3 3.50
5 Ditto n.e 2.00m deep M3 4.50
6 Excavate Trench maximum deep n.e 0.25m M3 0.50
7 Ditto n.e 1.00m deep M3 2.75
8 Ditto n.e 2.00m deep M3 4.00
Unskilled man-hour
ITEM Description Unit
(hrs)
1 Disposal 100m distance, spread & level M3 1.00
A.3 Hardcore
- Filling to make up level
Unskilled man-hour
ITEM Description Unit
(hrs)
1 not exceeding 250mm deep M2 0.50
2 Exceeding 250mm deep M3 2.00
a) Sand - 12.5 %
b) Ordinary Earth - 25%
c) Rock - 75% - 100%
d) Chalk - 50% - 60%
e) Clay - 33% - 50%
f) Gravel - 10% - 20%
A.4 Output Jengkaut
Unskilled man-hour
ITEM Description Unit
(hrs)
1 1/4 M3 8.00
2 3/8 M3 9.00
3 1/2 M3 12.00
4 3/4 M3 18.00
5 1 M3 25.00
a. Bed/Slab/Base
Item Description Unit Unskilled man-hour (hrs)
1 n.e 100mm M3 5.00
2 exc 100mm b.n.e 150mm M3 6.00
3 exc. 150mm b.n.e 300mm M3 7.00
4 exc. 300mm M3 8.00
Unskilled
Item Description Unit man-hour
(hrs)
1 Column and Beam M3 8.00
c. wall
Unskilled
Item Description Unit man-hour
(hrs)
1 n.e 100mm M3 10.00
2 exc 100mm b.n.e 150mm M3 9.00
3 ecx 150mm b.n.e 300mm M3 8.00
4 exc 300mm M3 7.00
B.3 Formwork
-Using times
ITEM Description Unit using times
1 slab, roof, wall m 4-6
2 Column and Beam m 2-3
Timbers (Quantity of Timber – m3/m2)
ITEM Description Unit QTY
1 floor and wall area of floor/wall
2 strut for wall, floor M3/m2 0.05
3 stru for beam and lintel M3/m2 0.06
4 strut for column M3/m2 0.03
Labour
i Erecting – 1 skilled worker & 1 unskilled worker
ii Dismantling – 1 unskilled worker
Constant
ITEM Description Unit Erecting Dismantling
1 wall hrs/m2 0.75 0.15
2 floor hrs/m2 0.75 0.15
3 beam, column and lintel hrs/m2 1.15 0.15
Cost of timber : RM/Tonne x 1.42 m3/t
Fast hardened
Ordinary Portland
ITEM Description portland
Cement (Day)
cement (Day)
1 Side of beams, Wall and Column 3 2
2 Floor (penyokong ditinggalkan) 4 3
3 Menanggal penyokong ke lantai 5
4 Slab under the beam (penyokong ditinggalkan) 8 5
5 Menanggal penyokong ke rasuk 21 8
Remove and
Prepare and Install/m2
ITEM Description Store (day)
Carpenter Unskilled Unskilled
1 Floor, Roof and Wall 1 hrs 0.75 hrs 0.75 hrs
Beam, Column and ambang 1.5 hrs 0.75 hrs 0.75 hrs
ARM PERUNDING SDN BHD
Tying wire
Labour
(i) Handling and unloading – unskilled worker
(ii) Cutting and Bending – skilled worker
(iii) Fixing – skilled worker
Labour
(i) Handling and unloading – unskilled worker
(ii) Fixing – skilled worker
Fixing ( hrs/t)
ITEM Description Unit 6 – 8 mm diameter
1 Floor and roof hrs/t 0.20
2 Foundation hrs/t 0.25
3 Wall hrs/t 0.33
4 Staircase hrs/t 0.50
> 25mm dia
15.00
-
D PLUMBING
d.1 Hot and cold water system ( upvc , galvanised and HDPE)
Soil, waste and vent. Pipe ( UPVC and Cast iron)
(iii) HDPE
d.2 Soil, waste and vent. Pipe ( UPVC and Cast iron)
STEEL PIPE
Upvc
ITEM Description Unit Sesiku Tee
1 < 20mm dia. Pipe hrs/no 0.08 0.12
2 25 – 32 mm dia. Pipe hrs/no 0.10 0.16
3 38 – 50 mm dia. Pipe hrs/no 0.13 0.20
E SANITARY FITTINGS
e.1 Sanitary appliances
1 skilled / 1 unskilled
ITEM Description Unit
(hrs/no)
1 Wash hand basin no 1.75
2 Sink no 1.50
3 WC – Squatting no 2.25
4 WC – Pedestal no 2.00
5 Bowl Urinal no 0.50
6 Bath tab no 3.00
F BRICKWORK
f.1 (i) Number of common bricks per m2
- One brickwall (118 pieces)
- Half brickwall (59 pieces)
(ii) Mortar
- Labour mixing (.052 hr/m3) - 2.05 hr/m3
- Mortar used per m2 area of brickwall
a) one brickwall - 0.052 m3
b) half brickwall - 0.032 m3
Number of facing bricks required per m2 of brickwork to a wall faced on one side only
G ROOF
g.1 (i) Batern and roof tile
Labour constant for batern and roof tile
Normal roof tile
Overlapping ends 1 skilled worker and 1 unskilled worker
ITEM Number of tile (No./m2) Unit Batern length
(mm) (hr/m2)
1 59.13 m/m2 9.76 60.00 0.45
2 60.61 m/m2 10.00 65.00 0.45
3 62.16 m/m2 10.26 70.00 0.46
4 63.8 m/m2 10.53 75.00 0.48
5 65.52 m/m2 10.81 80.00 0.49
6 67.34 m/m2 11.11 85.00 0.51
ITEM Maximum length per pieces (mm) Unit Small piece Large piece
h.2 Door
J FINISHES
J.1 Tile fixer
J.2 Skirting
1 plasterer and 1
ITEM Description Unit
unskilled worker
1 wall hr/m2 0.40
2 ceiling hr/m3 0.50
J.4 Tiles
hrs/piece 0.10
150 mm wide x 300 mm - 600 mm length
hr/
1 Membersih buku kayu 100.00m2 3 -
hr/
2 Menyumbat buku kayu 100.00m2 3 -
hr/
3 Mengosok dengan Kertas pasir 100.00m2 3 -
hr/
4 Menyapu cat asas 100.00m2 8 8
hr/
5 Menyapu cat alas 100.00m2 8 8
hr/
6 Menyapu cat kemas 100.00m2 9 9