Detail Engineering Design Drawing: Rumah Pos Pengumben Nomor B-8A Dan B-8B
Detail Engineering Design Drawing: Rumah Pos Pengumben Nomor B-8A Dan B-8B
Detail Engineering Design Drawing: Rumah Pos Pengumben Nomor B-8A Dan B-8B
Geo-Environment
Architect
Daftar Gambar
1 : 100
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE
As indicated
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) SITEPLAN EKSISTING Sheet No.
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 A100
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
37.00
35.50
36.50
36.00
37
.5
0
37.721
slk
.00 36.0
0
37
50
36.
38.00
38.00
Luas Tanah = 281.28 m2
Simbol Keterangan
1 Selokan
1 : 200
0.00 Kontur mayor
1 2 3 4
1485
382
473
50
D
280
377
279
1933
1892
C
425
327
50
239
B
145
525
152
Denah Eksisting
1
123
1 : 100
Simbol Keterangan
470
415
Roof Band Elevation
270
470
415
Roof Band Elevation
270
Scale :
470
415
Roof Band Elevation
270
470
415
Roof Band Elevation
270
Scale :
4 5 6
A106 A107 A107
1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280
Taman Taman
-0.10 -0.10
Carport Carport
-0.05 -0.05
G
A
170
170
Kamar Anak Kamar Anak
250
250
+0.00 +0.00
80
80
A105
F
B
170
170
Open Space Open Space
+0.00 +0.00
E
C
Innercourt Innercourt
430
430
-0.05 -0.05
120
120
2
A105 Dapur Dapur
+0.00 +0.00
140
140
D
Kamar Utama Kamar Utama
+0.00 +0.00
Kamar Anak
Kamar Anak
+0.00
300
300
+0.00
C
E
645
645
-0.03 -0.03
3 Kamar ART Kamar ART
215
215
A106 Toilet Toilet
+0.00 +0.00
-0.05 -0.05
B
F
Toilet ART Area Servis Toilet ART
130
130
Area Servis
+0.02 -0.08 -0.05 -0.05 -0.08 +0.02
A
G
Denah Bangunan Blok B8
1 Taman Belakang Taman Belakang
1 : 100
1 2 4 6 7
Finished Facade Elevation
INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu Kamar Anak
Open Space Open Space
Kamar Anak
FLOOR
Keramik 60 x 60 cm +0.00 +0.00 +0.00 +0.00 Finished Floor Elevation
0
PONDASI
Pondasi Batu Belah Base Foundation
110 280 350 350 280 -95
Potongan 1
1
1 : 100
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm 1 3 4 5 7
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC
INTERIOR WALL
Hebel unfinished look Roof Ridge Elevation
Fin. Acian semen instan warna abu - abu
415
CEILLING
Gypsumboard 1200x2400x9mm
270
FLOOR
Keramik 60 x 60 cm
-0.05 +0.00
-0.10 +0.00 -0.05 -0.10 Finished Floor Elevation
0
PONDASI
Pondasi Batu Belah Base Foundation
Potongan 2
2
1 : 100
Scale :
1 3 4 5 7
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm Roof Ridge Elevation
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC 415
CEILLING
Gypsumboard 1200x2400x9mm Roof Band Elevation
INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu Taman Toilet Open Space Kamar ART Kamar ART Open Space Toilet Taman
FLOOR
Keramik 30 x 30 cm -0.03 +0.00 +0.00 +0.00 +0.00 -0.03
-0.10 -0.10 Finished Floor Elevation
0
PONDASI
Pondasi Batu Belah Base Foundation
-95
160 240 230 230 240 160
Potongan 3
3
1 : 100
A B D E F G
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm Finished Facade Elevation
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC 470
CEILLING
Gypsumboard 1200x2400x9mm
FLOOR
Keramik motif Kayu 50x50 cm
PARAPET Kamar Anak Open Space Kamar Anak Toilet Toilet ART Taman
Carport
-0.05 +0.00 +0.00 +0.00 -0.05 -0.08 -0.10 Finished Floor Elevation
0
PONDASI
Pondasi Batu Belah
Base Foundation
-95
Potongan 4
4
1 : 100
Scale :
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm
Penutup Atap Solid UPVC Roof Single Layer
Bumbungan UPVC
FACADE WALL C D E F
Hebel Finishing Bata Tempel
INTERIOR WALL
Hebel unfinished look Roof Band Elevation
Fin. Acian semen instan warna abu - abu
270
FLOOR
Keramik motif Kayu 50x50 cm
Carport Open Space Innercourt Kamar Utama Kamar ART Area Servis Taman
PONDASI 0
Pondasi Batu Belah
Base Foundation
-95
622 250 120 440 215
Potongan 5
5
1 : 100
A B C D E F G
STRUKTUR ATAP
Rangka Kuda-kuda CNP 125x50x20x2.3 mm
Gording CNP 60 x 30x10x1.3 mm
Penutup Atap Solid UPVC Roof Single Layer Finished Facade Elevation
Bumbungan UPVC
470
CEILLING
Gypsumboard 1200x2400x9mm Roof Ridge Elevation
FACADE WALL 415
Hebel Finishing Bata Tempel
INTERIOR WALL
Hebel unfinished look
Fin. Acian semen instan warna abu - abu
FLOOR
Keramik motif Kayu 50x50 cm Open Space Selasar Area Servis Taman
Carport
-0.05 +0.00 +0.00 -0.05 -0.10 Finished Floor Elevation
PONDASI 0
Pondasi Batu Belah
Base Foundation
-95
565 810 215
Potongan 6
6
1 : 100
Scale :
Perspektif Bangunan
1
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH LANTAI Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A111
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280
360
340
Carport Carport
L4 L4
G
A
170
170
Kamar Anak
250
250
Kamar Anak
L2 L2
80
80
F
B
170
170
Open Space Open Space
L1 L1
E
C
Innercourt Innercourt
430
430
120
120
L7 L7
Dapur Dapur
140
140
D
Kamar Utama Kamar Utama
L2 L2
Kamar Anak Kamar Anak
300
300
L2 L2
C
E
645
645
Kamar ART Kamar ART Toilet Simbol Keterangan
Toilet
215
215
L3 L3 L5
L5 L1 Keramik 60 x 60 cm
B
F L2 Keramik motif kayu 50 x 50 cm
Toilet ART Area Servis Area Servis Toilet ART L3 Homogenous tile putih 30 x 30 cm
130
130
L8 L6 L6 L8
A
G L4 Beton t = 5 cm
1
Taman Belakang L9 L9 Taman Belakang
L6 Keramik 50 x 50 cm
1 : 100
L7 Batu koral putih
1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280
462
P4B P4A
G
A
170
170
P2 P2
250
250
Kamar Anak
J1 J1
80
80
F
B
P1 P1
170
170
PJ 5 J2 J2 PJ 5
430
Innercourt Innercourt
120
120
PJ1 PJ1
Dapur Dapur
P1 PJ 4 PJ 4 P1
140
140
D
Kamar Anak
300
300
Kamar Anak
P1 P1
J1 J1
C
E
645
645
BV P3 P3 BV
Toilet
215
215
Toilet Kamar ART Kamar ART
130
BV
Toilet ART Toilet ART
A
G
1 P Pintu
1 : 100
160 75 120 45 230 230 45 120 75 160 J Jendela
BV Boven
0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PINTU Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A113
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
DETAIL PINTU (P1) DETAIL PINTU (P2) DETAIL PINTU (P3) DETAIL PINTU (P4)
80
90 120 P4A P4B
5 96 5 5 82 5
5
35
35
5
5
210 210
210
100
100
205
205
120 80
90
5 110 5 5 70 5
5 80 5
10 10 10
5 31 5 60 5 22 5 60 5
KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN - KUSEN PVC KUSEN Hollow 50 x 50 mm
DAUN PINTU Engineering Door DAUN PINTU Engineering Door DAUN PINTU PVC DAUN PINTU Plat expanded metal besi type F - 3035
FINISHING finishing HPL FINISHING finishing HPL FINISHING - FINISHING Cat
DAUN JENDELA - DAUN JENDELA - DAUN JENDELA - DAUN JENDELA -
KACA JENDELA - KACA JENDELA - KACA JENDELA - KACA JENDELA -
HANDLE 1 set HANDLE 1 set HANDLE 1 set HANDLE 1 set
ENGSEL 3 bh ENGSEL engsel Pivot 1 set ENGSEL 3 bh ENGSEL 3 bh
KUNCI 1 set dengan handle KUNCI Cylinder kunci dengan ring warna hitam KUNCI 1 set kunci slot plastik KUNCI 1 set
JUMLAH UNIT 6 bh JUMLAH UNIT 2 bh JUMLAH UNIT 4 bh JUMLAH UNIT 2 bh
PENEMPATAN Kamar Utama, kamar Anak PENEMPATAN Open Space PENEMPATAN Kamar Mandi, Kamar Mandi ART PENEMPATAN Lorong Taman
Detail Pintu
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 25
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DETAIL PINTU JENDELA 1 Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A114
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
DETAIL PINTU JENDELA (PJ 1) DETAIL PINTU JENDELA (PJ 2) DETAIL PINTU JENDELA (PJ 3) DETAIL PINTU JENDELA (PJ 4)
150
100 150
5 80 5 55 5
150
5 90 5
5 5
5 5
110
190 200
200 190
205 5
100
100
80
5
5
100 150
150 5 70 70 5
5 90 5
5 80 5 55 5 5 80 5 60
10 10
10
10
KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating
DAUN PINTU Alumunium 0.9 mm DAUN PINTU Engineering Door DAUN PINTU Engineering Door DAUN PINTU
FINISHING finishing Powder Coating FINISHING Finishing HPL FINISHING finishing HPL FINISHING -
DAUN JENDELA - DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating
KACA JENDELA Tempered 8mm KACA JENDELA Tempered 8 mm KACA JENDELA Kaca biasa 5mm KACA JENDELA Tempered 8mm
HANDLE 1 set HANDLE 1 set HANDLE 1 set HANDLE 1 set
ENGSEL 3 bh ENGSEL 3 bh ensel pintu, 1 set engsel pivot ENGSEL 3 bh engsel pintu, 2 bh engsel jendela ENGSEL 4 bh engsel jendela
KUNCI 2 set KUNCI 1 set dengan handle KUNCI 1 set dengan handle KUNCI 2 set
JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh JUMLAH UNIT 2 bh
PENEMPATAN Innercourt PENEMPATAN Dapur PENEMPATAN kamar ART PENEMPATAN Kamar Utama
5
5
190
5
5
5 50 50 50 50 5
10
5 200 5
FINISHING -
DAUN JENDELA -
HANDLE 1 set
ENGSEL 12 bh
KUNCI 4 set
DETAIL JENDELA (J1) DETAIL JENDELA BOVEN (BV) DETAIL JENDELA (J2)
60
70 5
5 50 5
5 60 5
5
5
30 40
130 120
200
70
5 60 5
5 10
5
10 5 170 5
5 50 5
60
10
5 170 5
KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating KUSEN Alumunium 0.9 mm, finishing Powder Coating
DAUN PINTU - DAUN PINTU - DAUN PINTU -
FINISHING - FINISHING - FINISHING -
DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating DAUN JENDELA Alumunium 0.9 mm, finishing Powder Coating
KACA JENDELA Kaca biasa 5mm KACA JENDELA Kaca biasa 5mm KACA JENDELA Tempered 8mm
HANDLE - HANDLE - HANDLE -
ENGSEL 2 bh ENGSEL - ENGSEL -
KUNCI 2 set KUNCI - KUNCI -
JUMLAH UNIT 4 bh JUMLAH UNIT 4 bh JUMLAH UNIT 2 bh
PENEMPATAN kamar Anak PENEMPATAN Kamar mandi, kamar mandi ART PENEMPATAN Innercourt
Detail Jendela
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH FURNITURE Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A117
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280
462
Simbol Keterangan
LF Loose Furniture
FF Fix Furniture
G
A E Elektronik
LF1 LF1
170
170
250
250
Kamar Anak
80
LF2 LF2
F
B LF1 Bed 120 x 200 cm 6
LF5 LF5 LF5 LF5
LF2 Lemari 50 x 200 cm 6
LF8 LF8 LF8 LF8
170
170
LF6 LF6
LF7 LF7 LF3 Meja belajar 60 x 80 cm 2
Open Space Open Space
E
C
LF8 LF8 LF8 LF8 LF4 Credenza 2
430
430
120
120
Innercourt Innercourt
LF5 Sofa single 4
140
FF1 E1 E1 FF1 LF7 Meja makan 120 x 80 cm 2
D
LF8 Kursi makan 8
Kamar Utama Kamar Utama
LF1 LF2 LF9 LF9 LF2 LF1
LF9 Bed 180 x 200 cm 2
Kamar Anak
Kamar Anak
300
300
LF10 Kursi rias 2
645
FF2 LF12 LF12 FF2 FF1 Kitchen set 2
Toilet
215
215
Kamar ART Kamar ART Toilet FF2 Kloset 2
FF3
LF1 LF1
FF4 FF4 FF3
FF3 Shower set 2
B
F
FF4 Wastafel 2
FF5 E2 E2 FF5
130
130
Toilet ART Area Servis Area Servis Toilet ART
FF5 Kloset jongkok 2
A
G
E1 Kulkas 2
1
1 : 100
1 2 3 4 5 6 7
250
250
B
C
430
430
D
300
300
E
215
215
F
Denah Rangka Plafond
130
130
1 G
1 : 100
Keterangan
630 630
0 100 200 300 400 500 cm
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PLAFOND Sheet No.
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 A119
CONSULTING ENGINEERS
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
630 630
280 75 45 230 230 45 75 280
170
170
G1 G1
250
250
80
80
B
170
170
C
G1 G1
430
430
120
120
140
140
D
G1 G1
300
300
G1 G1
E
645
645
215
215
G1 G1 G1
F
Simbol Keterangan
130
130
Gypsum Board 1200 x 2400 x 9mm,
G1
G Rangka Hollow 40x40mm
Denah Plafond
1
1 : 100
60
60
Detail Plafond 1
1
1 : 15 120
120
Detail Plafond 2
2
1 : 15
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH RANGKA KANOPI Sheet No. A121
CONSULTING ENGINEERS PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8
Geo-Environment PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prahista D., S.Ars Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
97 97
R
A G
100
90
R
R
G
A
250
250
R
C
430
430
D
300
300
E
215
345
F
130
270
2
A122
Detail Kanopi
1
1 : 25
STRUKTUR KANOPI 10
Double Baja Ringan Canal C 75x35x8x1.3mm 0
STRUKTUR KANOPI
Reng Baja Ringan 35x20x30x12x1mm 10
0
STRUKTUR KANOPI
Atap Solid UPVC Single Layer
DINDING
Pass. Dinding
90
BAUT
90
Dynabolt M8 x 85 mm
862
PLANTER BOX
Ukuran 20 x 20 x 20 cm
20
ROSTER
Terracotta
20
Ukuran 20 x 20 cm
PLANTER BOX
Ukuran 20 x 20 x 20 cm GERBANG
Hollow 50 x 50 mm
5 80 55 80 5 80 5 80 5 80 5
REL ATAS
Roda dia 5 cm
PENGAMAN
Hollow 50 x 50 mm
90
PAS. DINDING
Unfinished hebel EXPANDED METAL
Type F3035
RODA
Roda pagar dia 10 cm
-0.05
5 80 5 80 5 80 5 80 55 80 5
10
90
Perspektif Gerbang
Denah Gerbang 5
3
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH BESI PENGAMAN
PERUSAHAAN KOMPLEKS BULOG POS BULOG BANGUNAN BLOK B8 Sheet No. A125
CONSULTING ENGINEERS PENGUMBEN Novia Fatmawati, S.Ars Rezhania Prathista D, S.Ars Agung Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
255
250
B
C
430
430
D
300
300
E
215
345
F
130
G
Denah Besi Pengaman -
1
166
1 : 100
BESI SIKU
3 x 3 cm
tebal 3 mm
BESI
Besi Tulangan D-6 mm
2.40
1
BAUT
A126 Dynabolt M8 x 85 mm
Detail A-126
1
1:5
TITIK LAS
titik pengelasan besi tulangan
berjeda tiap 2 tulangan vertikal
dan dilakukan dengan zig -zag
pada baris horizontal
BESI
Besi Tulangan D-6 mm
Berjarak 30 x 30 cm antar tulangan
-0.10
1
A 127
3 6 4 5 4 6 3 6 3
4
12
20
KETEBALAN HURUF
1.5 cm
Carport
4
40
PLANTER BOX
Beton 3 cm
20
-
5
SIGNAGE
Plat Besi 2 mm ---
Coating Hitam
20
BESI SAMBUNGAN
Besi D - 6 mm
75
Potongan A-127 Detail Peletakan Signage
1 4
1 : 10 1 : 10
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) PERSPEKTIF STRUKTUR Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S100
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
Warna Keterangan
Sloof
Kolom
Perspektif Struktur Ringbalk
1
Pondasi Batu Kali
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH PONDASI LAJUR Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S101
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
445
445
G
170
170
420
420
80
80
F
170
170
E
2
120
120
260
260
140
140
D
3
300
300
C
215
215
B
130
130
Denah Pondasi
1 A
1 : 100
211
211
120 505 45 120
Scale :
Sloof S1 10x15 cm
Lantai Keramik
Urugan Tanah
200
Pondasi Batu Belah Tipe 1
600
Aanstamping
50100
50 600 50
Sloof S2 30x20 cm
Lantai Keramik
Urugan Tanah
20
Pondasi Batu Belah Tipe 2
600
Aanstamping
50100
50 800 50
Detail Pondasi Lajur
1
Detail Pondasi Tipe 2
3
1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION Scale
PROJECT : OWNER : DRAWING TITLE 1 : 100
No. Date Description Sign
PERENCANAAN RENOVASI RUMAH PERUSAHAAN UMUM (PERUM) DENAH SLOOF Sheet No.
PERUSAHAAN KOMPLEKS BULOG BULOG BANGUNAN BLOK B8 S103
CONSULTING ENGINEERS
Geo-Environment POS PENGUMBEN Novia Fatmawati, S.Ars Lidya Christanti D P, S.T Agung Santoso, S.T
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
S2
S1 S1
G
170
170
S1
S1
S1
S1 S1
420
420
80
80
S1 S1
F
S2
170
170
S1 S1
E
120
120
S1
S1
S1
S1
S1 S1
260
260
140
140
S1 S1
D
S1
S2
S1
300
300
S1
S1
S1 S1 S1 S1
C
215
215
S1
S1
S2
S1
S1
S1
S1 S1 S1
B
130
130
S1
S1
S1 S1
A
Denah Sloof
S2
1
1 : 100 Keterangan
1 2 3 4 5 6 7
KP 2
300
300
KP 2
130
130
KP 1 KP 1 KP 1 KP 1
G
170
170
KP 1 KP 2 KP 1
420
420
80
80
KP 1 KP 1 KP 1 KP 1
F
170
170
KP 1 KP 2 KP 1
E
120
120
KP 1 KP 2 KP 1
260
260
KP 1 KP 1
140
140
KP 1 KP 1 KP 1 KP 1
D
300
300
KP 1 KP 1 KP 1 KP 1 KP 2 KP 1 KP 1 KP 1 KP 1
C
KP 1 KP 1
215
215
KP 1 KP 1 KP 1 KP 2 KP 1 KP 1 KP 1
B
KP 1 KP 1
130
130
KP 1 KP 1 KP 1 KP 1
A
Denah Kolom
1
206
206
1 : 100 Keterangan
KP 2
1 2 3 4 5 6 7
RB 1 RB 1
G
170
170
RB 1
RB 1
250
250
RB 1 RB 1
80
80
RB 1 RB 1
F
RB 2
170
170
170
170
RB 1 RB 1
E
RB 1
RB 1
120
120
RB 1
RB 1
RB 1 RB 1
260
260
140
140
RB 1 RB 1
D
RB 1
RB 1
RB 2
RB 1
RB 1
RB 1
RB 1
300
300
RB 1 RB 1 RB 1 RB 1 RB 1 RB 1
C
RB 2
RB 1
RB 1
RB 1
RB 1
RB 1
RB 1
215
215
RB 1 RB 1 RB 1 RB 1 RB 1 RB 1
B
RB 1
RB 1
RB 1
RB 1
130
130
Denah Ringbalk A
RB 1 RB 1
1
RB 2
1 : 100
211
211
Keterangan
1 2 3 4 5 6 7
1260
139 139
RK
G
TS
170
250
RK
TS TS TS
80
F RK
TS TS
170
170
RK
E
TS TS
120
RK
260
TS TS
140
G
RK
D
TS TS TS
RK
300
TS TS
RK
C
TS TS TS
215
TS TS
RK
B
G
Denah Rangka Atap
130
G Simbol Keterangan
1 A
RK Rangka Kuda-Kuda CNP 125x50x20x2.3 mm
1 : 100
G Gording CNp 60x30x10x1.3 mm
1 2 3 4 5 6 7
A
FFL 4.150
Level 3
B
FFL 2.700
Level 2
630 630
1260
Ring Balk RB 15 x 20 cm
Warna Keterangan
1 2 3 4 5 6 7
1260
170
170
250
250
80
80
F
170
170
170
170
E
120
120
260
260
140
140
D
300
300
C
215
215
B
130
130
Denah Plat Atap A
1
1 : 100 Plat Atap 120 mm 1 Plat Atap 120 mm
200
18
5
0
21
130
A A
A
50
Ringbalk RB 1
10
10
200 130 50
Section A Section B
A B
1 : 25 1 : 25
DESIGNED BY : DRAWN BY : APPROVE BY : REVISION
PROJECT : OWNER : DRAWING TITLE Scale 1 : 100
No. Date Description Sign
PROYEK RENOVASI RUMAH DINAS PERUM PERUSAHAAN UMUM (PERUM) DENAH STOP KONTAK
BULOG POS PENGUMBEN BULOG BANGUNAN BLOK B8 Sheet No. M100
CONSULTING ENGINEERS Novia Fatmawati, S.Ars Lidya Chistanti D P, S.T Agus Santoso, S.T
Geo-Environment
Architects Revision No.
Architect Drafter Team Leader
1 2 3 4 5 6 7
250
250
AC Phase 6A Phase 6A AC
C
Innercourt Innercourt
430
430
Dapur AC AC Dapur
300
AC AC
E
215
215
Toilet Kamar ART Kamar ART Toilet
130
Toilet A.R.T Toilet A.R.T
Service Area Area Servis
1 G
1 : 100 Simbol Keterangan
Stop Kontak
1 2 3 4 5 6 7
250
B
C
430
430
Innercourt Innercourt
D
Kamar Utama Kamar Utama
300
E
215
F
Toilet ART Toilet A.R.T Simbol Keterangan
130
130
Lampu gantung
Scale : Lampu outdoor sorot LED
160 240 230 231 239 160
1 2 3 4 5 6 7
250
B
170
170
Open Space Open Space
C
Innercourt Innercourt
255
260
Dapur
Dapur
5
Kamar Anak Kamar Anak
300
E
215
Simbol Keterangan
F Lampu LED 12 W
Lampu gantung
130
130
Toilet A.R.T Service Area Area Servis Toilet A.R.T
G Lampu outdoor sorot LED
Denah Titik Lampu
Lampu LED Strip
1
1 : 100
1 2 3 4 5 6 7
280 350 350 280 IN
Air bersih dari tandon
masuk ke water heater +220 cm
280 120 230 230 120 280
+90 cm
OUT OUT
Kran Air bersih keluar dari Air bersih dari tandon
Kran
water heater masuk ke masuk ke pipa shower
pipa shower
Carport Carport
250
3 1 : 50
B
PIPA AIR BERSIH
Ketinggian 220 cm
Open Space Open Space PIPA PVC 1/2 inch
dari tandon PIPA AIR PANAS
Ketinggian 220 cm
C PIPA HDPE 1/2 inch
dari water heater
430
430
Innercourt Innercourt
Dapur Dapur
300
Kamar Anak Kamar Anak
Sumur Bor
Sumur Bor 4 inch
515
4 inch
E
Perspektif Pipa Air Panas
2
215
Toilet Kamar Anak Kamar Anak Toilet
F
Kran Kran Simbol Keterangan
130
130
Toilet Toilet
1100 Liter 1100 Liter Pipa air bersih dari sumur bor
Area Servis Area Servis
ke tandon, Pipa PVC 1/2 inch
G
Pipa air bersih dari tandon
Pipa PVC 1/2 inch
Denah Pipa Air Bersih Blok B8
1 1 : 100 Pompa Air
160 240 230 230 240 160 Pipa air panas dari water heater
Pipa HDPE 1/2 inch
200 430 430 200
Scale :
Tandon
1100 Liter
Pompa
Sumur Bor
4 inch
Simbol Keterangan
Pompa
Sumur Bor Pipa air bersih dari sumur bor
D-4 inch ke tandon, Pipa PVC 1/2 inch
Simbol Keterangan
1 2 3 4 5 6 7
280 350 350 280
55
Carport Carport
55
A
250
B
Perspektif U Ditch D-20 cm
3
170
170
Open Space Open Space
Innercourt Innercourt
3 20 3
260
260
Floor
Dapur Floor Drain Dapur
3
Drain
10
D
3
Kamar Utama Kamar Utama
300
300
Kamar Anak Kamar Anak
Floor Floor
Drain Drain
215
215
Toilet Kamar Anak Kamar Anak Toilet
Simbol Keterangan
F
U Ditch Diameter 20 cm
130
130
Toilet A.R.T Area Servis Area Servis Toilet A.R.T
Pipa pembuangan limbah cair
G Pipa PVC 4 inch
Floor Floor
Drain Drain
Denah Saluran Limbah Cair Blok B8
1 1 : 100
Simbol Keterangan
U Ditch Diameter 20 cm
1 2 3 4 5 6 7
280 350 350 280
Carport Carport
250
250
B
170
170
Open Space Open Space
Innercourt Innercourt
260
260
Dapur Dapur
300
Kamar Anak Kamar Anak
E
215
215
Toilet Kamar Anak Kamar Anak Toilet
F
130
130
Toilet A.R.T Area Servis Area Servis Toilet A.R.T
G
Simbol Keterangan
Simbol Keterangan
Pot. 2
M109
Dapur
Kamar Utama
+220 cm
Kamar Anak
Pot. 1
M108
+90 cm
Pot. 3
Kamar Anak Toilet
M109
Pot. 4
M109
+20 cm
0 cm
-20 cm
Toilet
1100 Liter
-60 cm
Simbol Keterangan
+220 cm
+120 cm
+90 cm
+80 cm
+80 cm
0 cm
0 cm 0 cm
-20 cm
-20 cm -20 cm
-40 cm
-40 cm -40 cm
Simbol Keterangan