Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

DC Inspection Report

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DC MACHINE INSPECTION REPORT

Customer Date
Work order number Priority  Standard time  Rush  Overtime

Manufacturer Model Frame

Horsepower/Kilowatt rpm Serial number

Armature Fields
Voltage Voltage Amps Ohms Series Shunt Compound
Amps
Lead labels F1 F____ F____ F____ A1 A____ S____ S____

ELECTRICAL TESTS

Commutator diameter Megohms IR Value Amps

Minimum commutator diameter 500

V-ring bolted Clamping nut Glass banded


Condition of string band
Armature

Other tests: Surge Growler High-frequency bar-to-bar


Results of above test(s)

Bar-to-bar resistance equalized? Yes No


Odd turns? Yes No

Drop test (_____ volts)


Fields (Shunt)

AC DC
500

Connected Series Series-parallel Parallel

Drop test AC DC (_____ volts)


Interpoles

500

Connected Series Series-parallel Parallel


Drop test AC DC
Series

(_____ volts) (_____ volts)


Connected Series Series-parallel Parallel
Record resistance between series and shunts

Brushes and brushholders


Quantity of brushholder arms Brush-to-holder fit OK Loose Tight
Are brushholders equalized? Yes No Spring tension within tolerance? Yes No
Quantity of brushes Remarks about spring condition

You might also like