CLASSIFIED TRAFFIC VOLUME COUNT SURVEY

NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 1 - October - 2023
DIRECTION- Nagrota To Bachwan.

TRACTOR
CAR/JEEP/ 2 WITH CYCLE ANIMAL
TIME TAXI/VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 1 1 0 0 0 2 0 0 0 1 2 1 0 0
09:00-10:00 0 0 0 0 1 0 1 0 0 0 5 0 0 0
10:00-11:00 1 0 0 0 0 2 0 0 0 1 3 0 0 0
11:00-12:00 1 1 0 0 0 1 0 0 0 0 1 0 0 0
12:00-13:00 0 1 0 0 1 0 1 0 0 1 0 0 0 0
13:00-14:00 0 0 0 0 0 1 0 0 0 1 1 2 0 0
14:00-15:00 1 0 0 0 0 2 0 0 0 1 0 0 0 0
15:00-16:00 1 0 0 0 0 1 0 0 0 0 2 0 0 0
16:00-17:00 0 1 0 0 0 1 0 0 0 1 2 0 0 0
18:00-19:00 1 1 0 0 0 2 0 0 0 0 1 0 0 0
19:00-20:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
20:00-21:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0
21:00-22:00 0 0 0 0 0 2 0 0 0 0 0 1 0 0
22:00-23:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
23:00-24:00 1 0 0 0 0 1 0 0 0 0 0 1 0 0
00:00-1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0
2:00-3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00-4:00 2 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00-5:00 1 0 0 0 1 0 0 0 0 0 0 1 0 0
5:00-6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00-7:00 0 1 0 0 0 0 0 0 0 0 2 0 0 0
7:00-8:00 1 0 0 0 0 0 1 0 0 0 0 0 0 0
TOTAL 13 6 0 0 3 20 3 0 0 6 19 6 0 0
CLASSIFIED TRAFFIC VOLUME COUNT SURVEY
NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 2 - October - 2023
DIRECTION- Nagrota To Bachwan .

CAR/ TRACTOR
JEEP/ 2 WITH CYCLE ANIMAL
TIME TAXI/VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 0 0 0 0 1 0 1 0 0 1 2 2 0 0
09:00-10:00 1 1 0 0 1 1 0 0 0 2 1 0 0 0
10:00-11:00 1 0 0 0 0 1 1 0 0 0 4 1 0 0
11:00-12:00 0 0 0 0 0 1 0 0 0 0 5 0 0 0
12:00-13:00 0 1 0 0 1 0 0 0 0 0 4 0 0 0
13:00-14:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0
14:00-15:00 0 0 0 0 0 0 0 0 0 0 1 0 0 0
15:00-16:00 0 1 0 0 0 1 0 0 0 0 0 1 0 0
16:00-17:00 1 1 0 0 0 1 0 0 0 0 0 0 0 0
18:00-19:00 0 0 0 0 0 1 1 0 0 0 1 0 0 0
19:00-20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
20:00-21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21:00-22:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
22:00-23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23:00-24:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
00:00-1:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00-3:00 2 0 0 0 0 0 0 0 0 1 2 0 0 0
3:00-4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00-5:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00-6:00 1 0 0 0 0 0 0 0 0 1 2 0 0 0
6:00-7:00 0 0 0 0 1 0 0 0 0 0 1 1 0 0
7:00-8:00 0 1 0 0 1 1 0 0 0 1 1 0 0 0
TOTAL 11 5 0 0 5 10 3 0 0 6 24 5 0 0
CLASSIFIED TRAFFIC VOLUME COUNT SURVEY
NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 3 -October- 2023
DIRECTION- Nagrota To Bachwan.
CAR/
JEEP/ TRACTOR
TAXI/ 2 WITH CYCLE ANIMAL
TIME VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 2 1 0 0 0 1 1 0 0 1 1 1 0 0
09:00-10:00 1 1 0 0 1 0 0 0 0 1 1 1 0 0
10:00-11:00 0 0 0 0 0 1 0 0 0 2 1 0 0 0
11:00-12:00 1 1 0 0 0 2 1 0 0 0 0 0 0 0
12:00-13:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0
13:00-14:00 0 2 0 0 0 1 0 0 0 0 0 0 0 0
14:00-15:00 0 0 0 0 0 0 0 0 0 0 2 0 0 0
15:00-16:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0
16:00-17:00 1 1 0 0 1 0 0 0 0 1 1 0 0 0
18:00-19:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
19:00-20:00 0 0 0 0 0 1 0 0 0 2 1 0 0 0
20:00-21:00 1 0 0 0 0 2 0 0 0 0 0 0 0 0
21:00-22:00 1 0 0 0 0 2 0 0 0 0 0 0 0 0
22:00-23:00 0 0 0 0 0 1 0 1 0 0 0 0 0 0
23:00-24:00 1 0 0 0 0 1 0 0 0 0 1 0 0 0
00:00-1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00-3:00 2 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00-4:00 0 0 0 0 0 0 0 0 0 0 0 1 0 0
4:00-5:00 1 0 0 0 0 0 0 0 0 0 1 1 0 0
5:00-6:00 0 0 0 0 0 0 0 0 0 0 1 1 0 0
6:00-7:00 0 0 0 0 0 2 0 0 0 1 2 0 0 0
7:00-8:00 1 0 0 0 0 0 1 0 0 1 0 0 0 0
TOTAL 14 7 0 0 2 16 3 1 0 9 12 5 0 0
CLASSIFIED TRAFFIC VOLUME COUNT SURVEY
NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 1 -October- 2023
DIRECTION- Bachwan To Nagrota.

TRACTOR
CAR/JEEP/ 2 WITH CYCLE ANIMAL
TIME TAXI/VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 1 1 0 0 0 0 1 0 0 1 1 0 0 0
09:00-10:00 0 0 0 0 0 1 1 0 0 0 1 1 0 0
10:00-11:00 0 0 0 0 1 1 0 0 0 1 2 0 0 0
11:00-12:00 2 0 0 0 0 0 0 0 0 1 1 0 0 0
12:00-13:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0
13:00-14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14:00-15:00 1 0 0 0 0 0 0 0 0 0 1 0 0 0
15:00-16:00 0 0 0 0 0 1 0 0 0 1 0 0 0 0
16:00-17:00 0 1 0 0 0 2 1 0 0 1 0 0 0 0
18:00-19:00 1 1 0 0 0 2 0 0 0 0 0 0 0 0
19:00-20:00 1 1 0 0 0 1 0 0 0 1 0 0 0 0
20:00-21:00 0 2 0 0 0 1 0 0 0 0 1 0 0 0
21:00-22:00 0 1 0 0 0 1 0 0 0 0 0 0 0 0
22:00-23:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
23:00-24:00 0 0 0 0 0 0 1 0 0 0 0 0 0 0
00:00-1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00-3:00 2 0 0 0 0 0 0 0 0 0 2 0 0 0
3:00-4:00 0 0 0 0 0 1 0 0 0 0 0 1 0 0
4:00-5:00 0 0 0 0 0 0 0 0 0 0 1 0 0 0
5:00-6:00 2 0 0 0 0 1 0 0 0 0 0 0 0 0
6:00-7:00 2 0 0 0 1 0 0 0 0 2 1 0 0 0
7:00-8:00 0 0 0 0 1 1 0 0 0 0 1 1 0 0
TOTAL 14 7 0 0 3 15 4 0 0 8 12 3 0 0
CLASSIFIED TRAFFIC VOLUME COUNT SURVEY

NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 2 - October - 2023
DIRECTION- Bachwan To Nagrota .
CAR/
JEEP/ TRACTOR
TAXI/ 2 WITH CYCLE ANIMAL
TIME VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 1 1 0 0 1 1 0 0 0 2 1 1 0 0
09:00-10:00 0 0 0 0 1 0 1 0 0 0 1 0 0 0
10:00-11:00 1 0 0 0 0 1 0 0 0 0 2 0 0 0
11:00-12:00 0 2 0 0 0 1 0 0 0 0 0 0 0 0
12:00-13:00 0 0 0 0 0 1 0 0 0 0 1 0 0 0
13:00-14:00 0 1 0 0 0 1 0 0 0 0 0 1 0 0
14:00-15:00 0 1 0 0 0 0 0 0 0 0 1 0 0 0
15:00-16:00 1 1 0 0 0 2 0 0 0 0 1 0 0 0
16:00-17:00 0 1 0 0 0 1 0 0 0 0 1 0 0 0
18:00-19:00 1 0 0 0 0 1 0 0 0 0 0 0 0 0
19:00-20:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
20:00-21:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0
21:00-22:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0
22:00-23:00 0 0 0 0 0 1 0 0 0 0 1 0 0 0
23:00-24:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0
00:00-1:00 1 1 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 2 0 0 0 0 2 0 0 0 0 0 0 0 0
2:00-3:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00-4:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0
4:00-5:00 2 0 0 0 0 0 0 0 0 1 1 0 0 0
5:00-6:00 0 0 0 0 0 0 0 1 0 1 2 0 0 0
6:00-7:00 1 0 0 0 0 0 1 0 0 1 1 0 0 0
7:00-8:00 1 0 0 0 0 1 0 0 0 1 2 0 0 0
TOTAL 13 9 0 0 2 18 2 1 0 6 15 2 0 0
CLASSIFIED TRAFFIC VOLUME COUNT SURVEY
NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
NAME OF LOCATION: Nagrota. Date: 3 - October - 2023
DIRECTION- Bachwan To Nagrota .

CAR/ TRACTOR
JEEP/ 2 WITH CYCLE ANIMAL
TIME TAXI/VAN WHEELER AUTO BUS MINI BUS LCV 2 AXLE 3 AXLE MAV TRACTOR TRAILOR CYCLE RIKSHAW DRAWN OTHER
08:00-09:00 0 1 0 0 1 1 0 0 0 0 2 1 0 0
09:00-10:00 1 0 0 0 0 0 0 0 0 2 1 0 0 0
10:00-11:00 0 1 0 0 1 0 0 0 0 1 1 1 0 0
11:00-12:00 2 0 0 0 0 0 0 0 0 0 1 0 0 0
12:00-13:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0
13:00-14:00 0 0 0 0 1 0 0 0 0 0 2 0 0 0
14:00-15:00 0 1 0 0 0 4 0 0 0 0 1 0 0 0
15:00-16:00 1 0 0 0 0 3 0 0 0 0 0 0 0 0
16:00-17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:00-19:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0
19:00-20:00 1 2 0 0 0 2 0 0 0 0 1 0 0 0
20:00-21:00 1 1 0 0 0 0 0 0 0 2 0 0 0 0
21:00-22:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0
22:00-23:00 0 1 0 0 0 1 0 0 0 0 0 0 0 0
23:00-24:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0
00:00-1:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00-2:00 0 0 0 0 0 1 0 0 0 0 1 0 0 0
2:00-3:00 1 0 0 0 0 1 1 0 0 0 0 0 0 0
3:00-4:00 1 0 0 0 0 2 0 0 0 0 0 0 0 0
4:00-5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00-6:00 1 0 0 0 0 0 0 0 0 2 1 0 0 0
6:00-7:00 0 0 0 0 0 0 0 0 0 1 1 0 0 0
7:00-8:00 0 0 0 0 1 2 0 0 0 1 0 0 0 0
TOTAL 10 11 0 0 4 19 1 0 0 9 12 2 0 0
Average Classified Traffic Volume Count Survey
NAME OF WORK :- Detail Project report for the construction Link Road Nagrota Bajuri Saloha Bachwan Km 0/000 To 6/500.
count station Nagrota
Up-Down
side year-2023 Trucks(2 AXLE) Tractor
Traffic Car/jeep/ 2 Bus +
Direction Date taxi/van wheeler Lcv Mini bus Laden un laiden laden un laiden Cycle Total
Nagrota To
Bachwan 1.9.2023 13 6 20 3 2 1 19 6 6 76
Bachwan
To Nagrota 1.9.2023 14 7 15 3 2 2 12 8 3 66
Nagrota To
Bachwan 2.9.2023 11 5 10 5 2 1 24 6 5 69
Bachwan
To Nagrota 2.9.2023 13 9 18 2 2 0 15 6 2 67
Nagrota To
Bachwan 3.9.2023 14 7 16 2 1 2 12 9 5 68
Bachwan
To Nagrota 3.9.2023 10 11 19 4 1 0 12 9 2 68
TOTAL 75 45 98 19 10 6 94 44 23 414
Average 3 Days 25 15 33 6 3 2.00 31 15 8 138.00
Average Classified Traffic Volume Count Survey
NAME OF WORK :- Detail Project report for the construction of samlog to Gauta i/c 1 no. Bridge.
count station Gauta
Up-Down sideyear-2022 Trucks(2 AXLE) Tractor
Traffic Directi Date Car/jeep/tax 2 wheeleLcv Bus + Mini Laden un laiden laden un laiden Cycle Total
Samlog to Gau1.5.2022 18 9 19 3 20 10 3 5 2 89
Gauta to Saml1.5.2022 8 5 5 3 14 16 4 4 2 61
Samlog to Gau2.5.2022 15 5 10 3 20 15 2 3 2 75
Gauta to Saml2.5.2022 15 5 10 3 18 12 4 2 2 71
Samlog to Gau3.5.2022 11 8 16 3 25 10 3 3 9 88
Gauta to Saml3.5.2022 9 7 21 3 12 10 2 1 4 69
TOTAL 76 39 81 18 109 73 18 18 21 453
Average 3 Days 25.333333 13 27 6 36.333333 24.333333 6 6 7 138
151
VRIDDHI ENGINEERING SERVICES &CONSULTANCY
Material Testing Lab. for civil works.
Dated :- 11/10/2023
Name of work:- C/o Link road Nagrota to Bachwan Km 0/000 to 6/500.
Name of circle:- Circle HPPWD MANDI
Name of
SARKAGHAT HPPWD SARKAGHAT
Division:-
Name of Sub-
Baldwara HPPWD Baldwara
Division:-
Soil Investigation for Flexible Pavement Design Representative sample of sub grade soil.

Type Classification/ Sieve analysis of soil by weight Sand Standard Procter CBR
Conte Atterberg Limits %age Value
S.No.Km/RD soil Nature of soil
of %age passing Test
nt ( Soaked
4.75 %age LL% PL%
2 mm 425 U 75 U PI% OMC % MDD (gm) %age
mm
1 0/500 SML Coarse Grained 71.09 65.05 42.81 16.58 54.51 26.10 22.82 3.29 9.42 2.01 7.50
2 1/000 SML Coarse Grained 75.70 99.84 52.61 44.48 31.22 29.89 22.04 7.84 12.45 2.02 6.26
3 1/450 SCL Coarse Grained 75.90 94.57 52.60 44.30 31.60 3.30 20.04 10.26 12.05 2.01 6.25
4 2/240 SCL Coarse Grained 75.70 40.03 52.10 44.30 31.40 35.07 22.28 18.79 11.86 2.01 6.25
5 3/500 SCL Coarse Grained 75.30 67.80 51.20 43.30 32.00 31.00 19.70 11.31 13.35 1.94 5.20
6 4/570 SML Coarse Grained 73.33 66.77 50.51 43.13 30.20 30.30 26.67 3.64 9.41 2.04 5.85
7 5/680 SML Coarse Grained 76.00 68.98 52.31 44.48 31.53 32.79 22.81 9.98 11.38 1.97 5.36
8 6/440 SML Coarse Grained 63.65 61.68 49.60 40.08 23.62 28.87 21.47 7.40 12.90 1.86 5.20
Average 5.98%
8.10
7.86
7.62
7.15
5.96
6.60
6.36
47.87 6.20