PTW 54
PTW 54
PTW 54
6
1305
1305
SPECIFICATION FOR PRECAST WALL
150
150
NO ACCESSORIES DESCRIPTION QTY
HITECH-LAS075420
N1 LIFTING (1.4 TON EACH) 02
500
500
N2 SLEEVE 40 DIA SLEEVE 11
581.200
45
ff mf LEGENDS:
A mf mf mf - MOULD FACE ff - FAIR FACE
2819 LENGTH
REVISION DESCRIPTION
38 2707 240 T8-U-BAR
74
CLIENT -:
rf rf AUROBINDO REALTY &
mf
mf mf INFRASTRUCTURE PVT. LTD.
150 240
6 rf
38 38
75 75
150
74
STRUCTURAL
CONSULTANT -:
rf
ff
TOP VIEW DRAWING TITLE -:
1 : 30 PRECAST PLANTER BOX WALL
3D-VIEW PTW-54
(GENERAL ARRANGEMENT) (SHT. 1 OF 2)
RELEASED FOR -:
PRELIMINARY TENDER APPROVAL PRODUCTION
-(7) -(T8)
-(7) -(T8)
-ELEMENT NAME = PTW-54
A - CONCRETE GRADE = M40, CUBE
C
A
- REINF. GRADE = Fy 500
- STRIPPING STRENGTH = M 20, CUBE
T8 U-BAR @ 200 mm
T8 U-BAR @ 200 mm
T8 @ 200 mm
- ELEMENT VOLUME = 0.54 m³
T8 @ 200 mm
B1 -(20) -(T8)
- ELEMENT WEIGHT = 1.29 ton
A -(7) -(T8)
- CLEAR COVER = 30 mm
A -(7) -(T8)
- QTY. TO BE CAST = 01 Nos
B1 -(20) -(T8)
6 - MOULD FACE
TOP VIEW D
1 : 30
M_17
C
0 15-11-21 FOR PRODUCTION PK PRC
B Rev Date Description Chkd Appd.
Summary Schedule For PTW-54
REVISION DESCRIPTION
Total Bar
Bar Diameter Weight
Length B
M_00 CLIENT -:
AUROBINDO REALTY &
8 mm 116973 mm 46.21 kg
INFRASTRUCTURE PVT. LTD.
116973 mm 46.21 kg
C STRUCTURAL
CONSULTANT -:
Rebar Schedule For PTW-54
B
A PRECAST PLANTER BOX WALL
D
PTW-54
A M_00 8 mm 0 mm 2759 mm 0 mm 0 mm 0 mm 2759 mm 38626 mm 14 15.26 kg
(GENERAL ARRANGEMENT) (SHT. 2 OF 2)
B M_17 8 mm 0 mm 640 mm 74 mm 640 mm 0 mm 1321 mm 10567 mm 8 4.17 kg
B1 M_17 8 mm 0 mm 90 mm 1245 mm 90 mm 0 mm 1392 mm 55673 mm 40 22.00 kg E RELEASED FOR -:
PRELIMINARY TENDER APPROVAL PRODUCTION
C Rebar Shape 8 8 mm 467 mm 286 mm 74 mm 352 mm 399 mm 1513 mm 12107 mm 8 4.78 kg
116973 mm 70 46.21 kg DATE : 15-11-21 APPROVED BY:- PRC