Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

AS9100 Rev D All in One Sample

Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

AS9100 Rev D All-in-One Certification Package Contents

 Package Includes:
o AS9100D Quality Manual *
o AS9100D Procedures – 30 *
o AS9100 D Forms – 75 *
o AS9100D Gap Checklist *
o AS9100D Online Employee Training
o AS9100D Intro. PowerPoint Training
o AS9100 Rev D Internal Audit Checklist *
o Internal Auditor Training Materials *
o Employee Newsletters
o Risk Management Exercise
o Requirements Training Guide *
o Bonus PowerPoints
o Technical Support
The All in One Package Includes everything else you need for certification.

 30 Procedures to cover every AS9100D requirement


 75 Forms
 Quality Manual
Training

 Online training includes administrative function to assign and track users for record
keeping
 Online AS9100D Employee Training (50 people)
 Risk Management Exercise
 Introduction to AS9100D PowerPoint Training Package
 Internal Auditor Training Materials
o Guide to Internal Auditing PowerPoint (24 slides)
o Requirements of the Standard PowerPoint (148 slides)
o Steps of an Internal Audit PowerPoint (33 slides)
o Comprehensive Trainer’s Guide (154 pages)
o Student Manual (89 pages)
o Manufacturing Company Case Study Materials (48 pages)
o Internal Audit Forms to conduct the practice audit
o Customizable Certificate of Completion
Checklists
 Gap Checklist
 Internal Audit Checklist
Set of Employee Newsletters
Bonus PowerPoints
Technical Support throughout your project

Sample Included
Insert Company Name/Logo Here Quality Manual

AS 9100 D

Quality Management Systems

Quality Manual / Documented Information

Document No. QM-9100-D

Blue text throughout the Street Address


manual highlight areas
City, State, Zip
for customization.
Telephone:

Email:

Web Site:

Documents are in Microsoft Word for ease of editing.


Insert Company Name/Logo Here Quality Manual

Provides instructions on how to best implement


Instructions: your Quality Manual to fit your company needs.

This manual is used as a template in developing your AS 9100 D Quality Management System.

Methods and systems used in the development and operation of the QMS vary widely from company to
company.

The blue text and suggestions displayed in the manual are intended to offer some options and to high-
light the areas that need attention / update / replacement.

Review the text and suggestions and at a minimum replace or update them to reflect the unique / cus-
tomized information of your quality system requirements.

Delete the blue text after each task is completed. Note extra hints and suggestions
throughout the manual.

Use replace function – enter “Your Company” in find space, enter your company name in replace space
– system should make changes throughout the entire document.
Additional details and instructions in the use of the QM-9100-D manual template are included in a sepa-
rate file “QMS-Template-Instructions”.

Additional documentation review.


Similarly, the blue text and suggestions displayed in the QMS documentation (that will follow) for the pro-
cedures, instructions, attachments, forms, and flow diagrams are intended to offer some options and
to highlight the areas that require update or replacement.
Insert Company Name/Logo Here Quality Manual

Replace the name and logo


Section A Scope or the Quality Management System with your own.
General
To determine and establish the scope of the QMS, Your Company determined the boundaries and applica-
bility of the QMS and considered the external and internal issues, the requirements of relevant interested
parties, and the products and services of the company.

The scope is available and maintained as documented information stating the products and services cov-
ered by the QMS.
Your Company applies all the requirements of AS 9100 D when they are applicable within the determined
scope of the QMS.

As developed with procedure P-400 for Organizational context, include the scope of your QMS here:
_____________________________________________________________________________________
___________________________________________________________
For example, if you are a manufacturer of tires, the scope of your QMS may be:
The scope of the Quality Management System includes the major product and service categories associat-
ed with the primary functions of manufacturing landing gear tires at the Main Street location and distributing
the product to international markets.
Blue text gives guidance for customization.

Conformity to AS 9100 D may only be claimed if the requirements determined as not being applicable do
not affect the organization’s ability or responsibility to ensure the conformity of its products and services
and the enhancement of customer satisfaction.
In the event that any requirement is not applicable at Your Company, justification for any instance where a
requirement cannot be applied is documented.
Any text may be edited. Blue text provides examples
of what you may want to use. Black text is text that
describes the QMS developed by the AS9100 Store.

Your Company has determined that the following requirement(s) is/are not applicable to the operations at
this site:
_____________________________________________________________________________________
___________________________________________________________
As determined with procedure P-400, identify the requirement(s) that do not apply and document the justifi-
cation here:
_____________________________________________________________________________________
___________________________________________________________
For example, if you are a manufacturer of aircraft tires, a requirement that does not apply may be:
Clause 8.3 for design and development of products and services does not apply to the company because
the customers using the landing gear tires provide the design information and the tires are manufactured to
their requirements.
Insert Company Name/Logo Here Quality Manual

Section C Document information


The manual is divided into sections for ease
of review and edit of your Quality Manual.
a. Distribution control list

As required with procedure P-750 for Control of documented information. Related documents are
referenced.

Quality Manual latest revision: Letter: ___

Date of Issue: _______________ Issued by: ___________________________________

The status of the quality manual and/or description of changes are provided in the revision status page of this
manual.

Controlled copies are issued to:

Copy No. 1 President


Vice President

Copy No 2 Treasurer / Bookkeeper / Accountant


Administrative Officer

Copy No. 3 Quality Manager


Management representative / Quality team leader

Copy No. 4 Operations Manager


Technical Manager
Materials Manager

Copy No. 5 Human Resources Manager


Education/training Officer

The master copy is held by the Management representative / Quality team leader.

This manual is issued and controlled by the Management representative / Quality team leader.

All matters or inquiries relating to its contents or usage are to be referred to that individual.

It is the responsibility of all holders of the above controlled copies to:


Insert Company Name/Logo Here Quality Manual

Section D Document information – Form F-750-001

This list of Documented Information covers the AS 9100 D standard clauses 4


through 10 and provides the responsibility, approval date, and revision status for the
documents.

The QM designation indicates a Quality Management System Manual.


The P designation indicates Procedures.
The WI designation indicates Work Instructions.
The number following the document numbers listed in the Document column below identifies the clause of the
standard that the document is associated.

Additional documented information relevant to procedures and instructions is outlined in the spreadsheets of
Master Documentation Lists, form F-750-003.

Doc. # Description Responsibility Approve Revise Re-


date date vise
date
Quality Management System
QM-9100-D QMS Manual President
Clause 4 – Context of the Organization
P-400 Organizational context President
Clause 5 – Leadership
P-500 Leadership President
Clause 6 – Planning
P-600 Planning for the QMS Management Representative

P-612 Risk management pro- Management Representative


cess

Clause 7 – Support
P-710 Resource management Operations manager

P-715 Control of monitoring and Management representative


measuring equipment

P-720 Competence and aware- H R manager


ness

P-740 Communication Management representative

P-750 Control of documented Management representative


information

WI-750-001 Document numbering Management representative


system
Procedure Excerpt
Customize with
your information. INSERT YOUR COMPANY LOGO/NAME HERE
P-720-A
Competence and Awareness
Documents are all numbered to comply
1.0 Purpose/Scope with document control requirements.
1.1 This procedure describes the process for ensuring that employees have the
training, are aware and are competent for the work that affects quality at Your
Company.
1.2 The procedure applies to personnel whose work affects quality performance.
2.0 Responsibilities and Authorities
2.1 The Human resources manager has the prime responsibility and approval
authority for this procedure.
2.2 In support of the Human resources manager, the Quality team / AS steering
committee is responsible for identifying requirements for each position that
affects product quality.
2.3 Additional responsibilities for the Quality team leader / AS management
representative, the human resources staff, the supervisors, and employees are
detailed in relevant paragraphs of section 5.0 below.
3.0 References and Definitions
3.1 Reference
3.1.1 This document covers clause 7.2, Competence, and clause 7.3,
Awareness, of the AS 9100 D standard.
3.2 Definition
3.2.1 Competence: Ability to apply knowledge and skills to achieve intended
results.
4.0 Resources
4.1 None Requirements of the
5.0 Instructions
standard are all addressed.
5.1 The Quality team / AS steering committee determines the competence of
person(s) required for the work that affects quality performance.
5.1.1 In support of the planning procedures P-600 for Planning of the QMS and
P-810 for Operational planning and control, this procedure addresses the
competence issues dealing with:
 Ensuring that employees are competent on the basis of appropriate
education, training, or experience.
 Taking actions to acquire the necessary competence and evaluating
the effectiveness of the actions taken.
 Retaining documented information as evidence of competence.
5.1.2 In support of the planning procedures, awareness issues are addressed
with new employees. They attend orientation training and made aware of:

Competence and awareness Page 1 of 2


Date printed 12/27/16 3:35 e pasdites
INSERT YOUR COMPANY LOGO/NAME HERE
Document is in MS Word for easy Editing. P-720-A
Competence and Awareness
 The relevant QMS documented information and subsequent changes
 The quality policy
 The relevant quality objectives
 Their contribution to an effective QMS
 The benefits of improved quality performance
 The implications of not conforming to requirements of the QMS
 The importance of meeting customer requirements and the need for
ensuring customer satisfaction
 The importance of meeting regulatory, statutory requirements
 Their contribution to product safety, and conformity to products or
service
Recommendations for
 The importance of ethical behavior customization are included in
 The prevention and detection of counterfeit parts blue type.
5.1.3 Awareness training is repeated for all employees as supervisors or
management or the Quality team / AS steering committee identifies the
need to retrain employees.
5.1.4 Additional awareness and communication methods are used as defined in
the procedure P-740 for communication.
5.2 Human Resources staff maintains records of employee qualifications and
documents the education, experience and skills required for each position and
job. A job description form such as F-720-003 is used for this purpose.
5.2.1 In support of the planning procedures, the level of knowledge needed to
Related forms, records achieve product and service conformity to requirements is considered.
and documents are  Knowledge is maintained and made available through planned
referenced to comply training. Organizational knowledge can include information such as
with document control intellectual property and lessons learned.
requirements.  When addressing changing needs and trends, the current knowledge
is assessed to determine how to acquire new needed knowledge.
Knowledge is obtained as defined in procedure P-710 for Resource
management.
5.2.2 The Quality team leader / Management representative is on alert for
opportunities to improve organizational knowledge. An information center
/ library is maintained to collect and make available information that can
enhance knowledge.
5.3 Each supervisor is responsible for identifying job specific training requirements
for each position in their area and to maintain the employee training summaries
on spreadsheet, form F-720-004 or in a training database.

Competence and awareness Page 2 of 2


Date printed 12/27/16 3:35 e pasdites
QMS - PROCESS IDENTIFICATION WORKSHEET - for AS 9100 Rev-D QUALITY MANAGEMENT SYSTEM – Form F-440-001 1
_____________________________________________________________________________________________________________________________ ____________________

Example of completed worksheet


This worksheet is used to identify the processes required for the Quality Management System. It is designed to ensure that all the requirements of
the AS 9100 D standard are addressed and documented information available. In addition, the worksheet can be used as a training tool to help
interested parties, such as employees, customers, auditors, and registrar understand your QMS.

PROCESS INPUTS – AS 9100 D PROCESS OUTPUTS DOCUMENTED RESPONSIBILITY Related /


Key Processes INFORMATION for Processes Interacting
for Processes Processes
Quality management systems - Requirements
1 Scope QMS-Manual QM-9100-D President
2 Normative references Manual p.5
3 Terms and definitions Manual p.6
4 Context of the organization Context of the organization QMS-Section D ----- P-500
P-600
4.1 Understanding the organization and its context Organizational context P-400 President P-710
P-750
Context P-400 par 5.1 P-810
P-820
4.2 Understanding the needs and expectations of Needs and expectations P-400 par 5.2 P-910
interested parties P-930
4.3 Determining the scope of the quality management Scope of the QMS P-400 par 5.4 P-1010
system
4.4 Quality management system and its processes Process interactions P-400 par 5.5

Flow diagram FD-440-001

4.4.1 The organization … QMS Process Identification, this F-440-001 Management


form representative
4.4.2 To the extent …
Process support, confidence P-400, par 5.7
and documented information
5 Leadership Leadership QMS-Section D ----- P-600
P-810
5.1 Leadership and commitment Leadership P-500 President P-930

5.1.1 General Leadership and commitment P-500, par 5.1

IAQC 2015-Input-Output worksheet 1


Requirements of
AS9100D

Trainer’s Guide

©Copyright 2016 AS9100store.com


Requirements of AS9100D
Materials

This course is designed to train employees on the requirements of AS9100. The


course covers the structure, emphasis and requirements of the standard.

The course is approximately two hours long; the length may be changed by covering less
detail, or by adding the suggested group exercises.

To begin preparing for the training session:


 Print the Notes pages of the Power Point presentation. (Open the PowerPoint
presentation, select “Print”, and select “Notes Pages”).
 Print a copy of the Student Manual. You will then be able to
prepare for the presentation using this guide and reviewing the speaker notes
and student manual.

The content of the student manual matches the information in the PowerPoint slides. Let
students know this at the beginning of the presentation to make it easier for them to take
notes. The speaker notes provide additional detail.

You will need one copy of the standard for the trainer, and you may want copies for each
student to refer to for details. Standards are available electronically from
http://as9100store.com/buy-standards/

Additional Information: http://www.as9100store.com

©Copyright 2016 AS9100store.com


The requirements of AS 9100 D are described in 7 clauses or sections
Section 4 - Context of the Organization
Section 5 - Leadership
Section 6 - Planning
Section 7 - Support
Section 8 - Operation
Section 9 - Performance Evaluation
Section 10 -Improvement
INSERT COMPANY NAME/LOGO HERE
AS 9100 Rev D - Quality Management Systems – The Gap Analysis Checklist
___________________________________________________________________________________________________________________

This gap analysis checklist is prepared for use in evaluating a Quality Management System (QMS) against the requirements of the new
Aerospace standard. The AS 9100 Rev D standard includes the requirements of ISO 9001:2015 and specifies additional aviation, space, and
defense (ASD) industry requirements.
In the checklist, each requirement is expressed as a question that the user (auditor / assessor) can use to evaluate your QMS capabilities. You
will need to have copies of the AS 9100 D and ISO 9001:2015 standards to use along with this checklist so that, if required, you can refer to the
requirements and the clarification sections of Annex A.
While the structure of the AS and ISO standards are the same when comparing the contents, the additional ASD requirements are highlighted in
yellow in the relevant sections of the checklist and the intent of the main clauses of the new standard is shown in blue font.
After you have prepared an audit schedule, and assigned responsibility to your auditors for different areas or processes to audit, copy each
section of the checklist for the auditors working with that section. As you work through the checklist take notes on what is in place, and what
needs to be developed.
In the space for ‘currently in place’, list or reference the procedures or other documents, or evidence that you have reviewed and that will provide
information for the new QMS. Take notes on the status of the documents, that is, will they need to be revised for the new system, or can they be
used as is? Also note where processes are in place, but documentation is needed. Focus on what is in place, and what needs to be developed.
While you do want to know if documented information is in place and if procedures and processes are being complied with, compliance is not
your main focus for this audit. Remember that the final outcome of this audit should be a list of things that your company needs to do to comply
with AS 9100 Rev D.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

--- QUALITY MANAGEMENT SYSTEMS Currently Compliant If No - % Items


REQUIREMENTS YES / NO? Completed
in Place Needed

4 CONTEXT OF THE ORGANIZATION

Intend This first clause introduces two sub-clauses relating to the context of the organization, (1) understanding the organization and its
of context and (2) understanding the needs and expectations of interested parties. Together they require that you determine the issues
clause and requirements that can impact on the planning of the Quality Management System (QMS). In addition, the scope of the QMS and
the QMS processes along with their applicability and interactions need to be determined.

______________________________________________________________________________________________________________________________

IAQG-Oct-2016 - Audit conducted by: ________________________ Date: _____________ to ______________ Copyright © AS9100Store Page 1 of 76
INSERT COMPANY NAME/LOGO HERE
AS 9100 Rev D - Quality Management Systems – The Gap Analysis Checklist
___________________________________________________________________________________________________________________

 Do you compile the above items of the QMS in a


single source of documented information and referred
to as a quality manual?

5 LEADERSHIP

Intent This clause requires that your top management demonstrates leadership and commitment with respect to the QMS. In addition, top
of management is required to demonstrate leadership and commitment with respect to customer focus. This section also asks top
clause management to establish, implement and maintain a quality policy that is appropriate to your company and to ensure that the
responsibilities and authorities for relevant roles are assigned, communicated and understood.

5.1 Leadership and commitment

5.1.1 General

Does top management demonstrate leadership and


commitment with respect to the QMS by:

 Taking accountability for the effectiveness of the


QMS?

 Ensuring that the quality policy and quality objectives


are established for the QMS and are compatible with
the strategic direction and the context of the
organization?

 Ensuring that the quality policy is communicated,


understood and applied within the company?

 Ensuring the integration of the QMS requirements into


the company’s business processes?

______________________________________________________________________________________________________________________________

IAQG-Oct-2016 - Audit conducted by: ________________________ Date: _____________ to ______________ Copyright © AS9100Store Page 6 of 76
INSERT COMPANY NAME/LOGO HERE
AS 9100 Rev D Quality Management Systems - The Internal Audit Checklist
___________________________________________________________________________________________________________________

4.3 Determining the scope of the quality management system

To establish the scope of the QMS, does your


company determine the boundaries and applicability of
the QMS?

When determining the scope of the QMS, do you


consider the:

 External and internal issues (per above clause 4.1)?

 Requirements of relevant interested parties (per


above clause 4.2)?

 The products and services of your company?

When a requirement of AS 9100 D can be applied, is


the requirement applied by your company?

When requirements cannot be applied, and in order to


claim conformity to AS 9100 D, how do you determine
if your ability or responsibility to ensure conformity of
products and services are not affected?

Is the scope of the QMS available and maintained as


documented information?

Does the scope state the products and services


covered by the QMS?

______________________________________________________________________________________________________________________________

Audit conducted by: _____________________________ Date: _____________ to ______________ Copyright © AS9100Store Page 3 of 79
INSERT COMPANY NAME/LOGO HERE
AS 9100 Rev D Quality Management Systems - The Internal Audit Checklist
___________________________________________________________________________________________________________________

5.3 Organizational roles, responsibilities and authorities

Does the top management ensure that the


responsibilities and authorities for relevant roles are
assigned, communicated and understood within the
company?

Does top management assign the responsibility and


authority for:

 Ensuring that the QMS conforms to the


requirements of AS 9100 D standards?

 Ensuring that the processes are delivering their


intended outputs?

 Reporting on the performance of the QMS on


opportunities for improvement and for reporting to
top management?

 Ensuring the promotion of customer focus


throughout your company?

 Ensuring that the integrity of the QMS is maintained


when changes to the QMS are planned and
implemented?

Has the top management appointed a specific


member of management, identified as the
management representative, who will have the
responsibility and authority for oversight of the above
requirements?

______________________________________________________________________________________________________________________________

Audit conducted by: _____________________________ Date: _____________ to ______________ Copyright © AS9100Store Page 10 of 79
INSERT COMPANY NAME/LOGO HERE
AS 9100 Rev D Quality Management Systems - The Internal Audit Checklist
___________________________________________________________________________________________________________________

Do you consider protection from loss, unauthorized


changes, unintended alteration, corruption, & physical
damage?

NOTE: Access can imply a decision regarding the


permission to view the documented information only,
or the permission and authority to view and change
the documented information.

Additional Questions

8 OPERATION

8.1 Operational planning and control

Does your company plan, implement and control the


processes needed to meet requirements for the
provision of products and services and to implement
the actions to address risks and opportunities by:

 Determining requirements for the product and


services?

When determining the requirements for products and


services do you consider:
 Personal and product safety?
 Producibility and inspectability?
 Reliability, availability, and maintainability?

______________________________________________________________________________________________________________________________

Audit conducted by: _____________________________ Date: _____________ to ______________ Copyright © AS9100Store Page 26 of 79
AS 9100 Rev D
Internal Auditor Training

Trainer’s Guide
Overview
These course materials are meant to train people to conduct internal quality audits within
your organization, which are necessary to meet the internal audit requirements of the
AS 9100 REV D standard.

The course is divided into two sections:


1. The first section will familiarize the students with the AS 9100 REV D requirements
for quality management system.
• Allow 4 hours for this section.
2. The second section is devoted to the auditing process. The students will go through
all the steps required for an audit, with hands on involvement in performing each
step by conducting a mock audit of a fictitious company.
• Allow 8 hours for this section.

We recommend that you print this guide as you’ll need the PowerPoint speaker notes to
lead the class. This guide contains everything the instructor needs to lead the class.

Notes:
• It is assumed that the instructor has certified Lead Auditor credentials or equivalent
experience. This is not meant as a self study course.

• It is recommended that the first audit the student is involved with be under the
leadership of a lead auditor who has audit experience.

2016© Copyright AS9100Store.com


AGENDA
I. The Standard
Introduction to Auditing
0:15 Presentation: Guide to Internal Auditing AS 9100 REV D
0:15 Review Document: AS 9100 REV D
0:30 Exercise: Is it a Requirement?
2:00 Presentation: Requirements of AS 9100 REV D
0:45 Exercise: Find the Requirement
0:15 Questions

II. The Audit

0:30 Scheduling the Audit


0:30 Planning the Audit
0:45 Opening Meeting
0:45 Audit 5.2 Quality Policy
0:45 Audit 8.1 Operational planning and control
0:45 Audit 8.2 Customer Related Processes
0:45 Audit 8.4 Control of External providers
0:45 Audit 10.2 Nonconformity and Corrective Action
0:30 Audit 9.3 Management Review
0:30 Auditors Document Findings
0:30 Final Audit Report
0:30 Closing Meeting
0:30 Creating the Audit File

2016© Copyright AS9100Store.com


AS 9100 REV D Requirements
Now that the students are familiar with the organization of the standard, this section will
outline the requirements of each section – what it is really asking them to do.

Requirements of AS 9100 REV D Power Point presentation

First, there is a brief 12-page introduction to serve as a review:


 What is AS 9100 REV D?
 What are the steps for Registration?
 Benefits of Registration
 The Process Model

Second, the rest of this presentation outlines the requirements of AS 9100 REV D.
• AS 9100 REV D: Clause by Clause Review
o What does AS 9100 Require?
o What are key points of clauses?
o What should Auditors look for?
• What are the next steps?
• Appendix: Summary of Key AS 9100 REV D Requirements

If you use the speaker’s notes this review could take about 2+ hours.
• Students can take notes in their manual.
• We’ve included the presentation in this Trainer’s Guide so you can review the notes
while presenting.

2016© Copyright AS9100Store.com


The Audit
The second section is devoted to the auditing process. Normally the class size will vary
from 4 to 12, and it is recommended that you divide the class into teams of 2-3. It works
best to have an even number of teams for holding opening and closing meetings.
>>>Allow 8 hours for this section.
The students will go through all the steps required for an audit, with hands on involvement
in performing each step by conducting an audit of a fictitious company, Aero~Tech Inc or
(ATI) including:
• Scheduling the Audit
• Planning the Audit
• Opening Meeting
• Audit sections of the Aero~Tech Inc Company’s QMS:
o 5.2 Quality Policy
o 8.1 Operational Planning and Control
o 8.2 Customer Related Processes
o 8.4 Control of External Providers
o 10.2 Nonconformity and Corrective Action
o 9.3 Management Review
• Auditors Document Findings
• Final Audit Report
• Closing Meeting
• Creating the Audit File

You will lead this section using the Steps of AS 9100 REV D Internal Audit Power Point
presentation the entire time, using the materials in this package. The Speaker Notes in the
PowerPoint (beginning on the next page) will guide you along as an outline.

Note: The trainer plays the part of “Joe Sample, the ATI Quality Manager and other ATI
personnel as required.

Each team should have:


1. A copy of the AS 9100 REV D Standard.
2. A copy of the Aero~Tech Inc (ATI) Documented Information.
3. The Student Manual which allows them to:
• Follow the presentation and take notes
• View sample forms (which are presented in the PowerPoint)
• Use blank forms (CAR, etc.) to conduct their audit.

2016© Copyright AS9100Store.com


Conclusion
After the students have completed their presentations, you can:
1. Show them the final slides in the Steps of AS 9100 REV D Internal Audit Power
Point presentation outlining the nonconformances for the audit.
• Remember, there is often more than one way to look at a situation, especially in
a fictitious setting like Aero~Tech Inc. Therefore, encourage open discussion on
why they consider items a nonconformance.
• You may want to add their suggestions to the course material for next time.

2. If you feel that the student has satisfactorily understood the material, you may issue
them a certificate (this is a separate MS Word file in your package). Use your
judgment to issue this based upon:
• Participation
• Ideas
• Leadership
• Approach
• Etc.

You will need to customize the certificate to your company, name, etc.

3. Schedule an audit of your facility to reinforce the material.

2016© Copyright AS9100Store.com

You might also like