JSP For OHTL No. 12 Jumper Installation Works
JSP For OHTL No. 12 Jumper Installation Works
JSP For OHTL No. 12 Jumper Installation Works
Contract
Contractor Name: Project Type:
No.:
1.2 Attaching all the required Incompetent assigned personnel. Significant property and All the involved personnel dealing with all the required documents
documents such as a related Unidentified or incomplete hazards appurtenances damage shall be qualified, competent and trained.
checklist, risk assessment, and risk information. Safe work practice shall be identified to reduce the possibilities of
method statement and other accidents/incidents.
forms necessary to fulfill the Ensure that all required supporting documents shall be available as
request. per PTW requirements.
All the required related documents as identified to be attached in
PTW shall be reviewed and evaluated by issuer and receiver to
ensure that all hazard and risk is identified and complete.
1.3 Verifying the site condition as per Open areas, protruding sharp objects, Loss of production The workplace shall be pre-checked, free from any obstruction and
requirements mentioned in the falling objects limited illuminations Accident resulting serious in safe good working conditions prior to a combined verification
application of Permit to Work by and other construction hazards may injury or death to worker visit.
both the Permit Receiver and cause accidents during the All Issuer and receiver must be aware of the hazard present in the
Permit Issuer. verification visit. area and must be familiar with the ingress and egress of the
Unfamiliarity with access to the project site.
areas.
1.4 Issuance of approved Permit to Untrained personnel. Significant cost due to Permit Issuer and Receiver must be qualified, trained and
Work from Permit Issuer to Incomplete information on Permit to damages competent.
Permit Receiver. work. Permit Issuer shall ensure that the site was visited to ensure that
workplace hazards and risks are adequately identified and
mitigating measures shall be established.
Permit Issuer and Receiver shall ensure that all the information
required in the permit to work is reviewed, completed and signed.
1.5 Verifying the approved Permit to Inadequate coordination and area Governmental violation Permit to Work shall be displayed at the worksite
Work by the assigned SEC control protocol. Environmental complaint Permit Receiver shall not leave the area for the whole duration of
Consultant. Unauthorized work to be performed permit to work.
within a defined location and Work shall not proceed without the presence of approved PTW
boundary. and the Permit Receiver overseeing the activity.
Permit Receiver shall account all workers under his Permit to Work
before the start of work.
Work shall not be started until duly approved Permit to Work is
available at the site and that Safety Toolbox meeting was
conducted.
2.2 Perform physical inventory for all Ergonomics (awkward posture and Significant cost due to Proper storage and segregation of all material supplies must be
the tools, materials, and earth overreaching). damages. observed at all times.
moving equipment to be used. Exposure to sharp and pointy Muscular injuries (Back Storage racks must be properly labeled for easy identification.
materials. pain, strain, fractures) Storage areas must not be congested with materials. Space
Improper manual handling. Cuts/pinch/crash points capacity must be strictly observed.
Area congestion. resulting hand injuries Good housekeeping must always be maintained in storage and
Unorganized or poor housekeeping of Delay on target schedule working areas to avoid slip, trip, and fall.
storage area. Struck by moving Access must always be clear and free from any obstruction.
equipment can lead to Proper manual handling techniques must be always to be
injury observed.
Injury due to Slip, Trip and The worker shall lift materials closer to the body and load shall not
fall on the same level exceed half of the worker's weight.
Buddy systems shall be observed in handling bulky and heavy
materials.
All personnel must be equipped with appropriate PPEs such as (list
all applicable PPEs for the task).
2.4 Lifting and loading of tools and Unauthorized personnel. Significant cost due to Ensure that only the designated operators shall be operating the
materials onto trailer bed either Miscommunication on the operator. damages. equipment.
manually and/or mechanical Swaying of the loads. Property damage due to Only trained and certified rigger shall be giving the signal to the
handling. fall of materials operator during lifting to avoid any confusion.
Ensure that loads are attached with taglines to control the swaying
during lifting and lowering.
No person shall be allowed to stay under suspended load at any
time in any circumstances.
3. The positioning of crane and/or trailer in preparation for loading or unloading
3.1 Mobilized crane and trailer in the Congestion due to other ground Collision on other vehicle Supervisor/Foreman with the Crane/Trailer operator making a
working area. activity. or equipment can result walkthrough of the access and work area before entering the site.
Unassisted maneuvering heavy property damage and/or Supervisor/Foreman to coordinate with all personnel who will be
equipment. injuries to the worker affected by the access of heavy equipment.
Trailer blind spot Struck by moving Provide flagman and spotter to guide the trailer operator when
Unauthorized personnel entering the equipment can lead to maneuvering for its position.
equipment access area. injury Only a competent flagman/spotter shall guide the crane/trailer
Inexperienced or untrained operator. Serious accident to when going into work location.
The uneven surface of equipment personnel that may lead to Barricading the exclusion zone/ working radius where crane and
access. severe injury or fatality trailer are accessing.
Overhead / nearby obstructions. Significant property and Safety signage shall be posted to communicate the hazards and
heavy equipment damage activities.
Contact in live electrical Verification of Crane Operator’s 3rd party certification and Trailer
lines can cause property Drivers driving license before allowing them to enter the site.
damage and serious injury, Responsible Engineer and his Supervisor/ Foreman inspection of
fatality exclusion zone/staging area for compaction and level of the
ground.
Identify the required speed limit for moving heavy equipment.
Supervisor/Foreman with the Crane/Trailer operator making a
3.6 Simulate boom swing in order to Adjacent or nearby structures. Significant property and Ensure that the area is clear of any obstruction within the reach of
4.2 Attachment of lifting gears and Defective lifting gears. Accident resulting serious Pre-inspection of all lifting gears to ensure all are in a good and
tackles and tag line onto load to Underrated lifting gears. injury or death to worker safe condition.
be lifted. Unqualified personnel doing the Significant property and Ensure that SWL of all prepared lifting gears is adequate for the
rigging. appurtenances damage intended loads.
Exposure to sharp and pointy Property damage due to Only trained and certified riggers shall be doing the rigging of the
materials. fall of materials load.
All personnel must be equipped with appropriate PPEs such as (list
all applicable PPEs for the task).
4.3 Lifting, loading and unloading Unauthorized personnel. Significant cost due to Ensure that only the designated operators shall be operating the
material onto/from trailer bed Miscommunication on the operator. damages. equipment.
using mechanical handling Swaying of the loads. Property damage due to Only trained and certified rigger shall be giving the signal to the
equipment. fall of materials operator during lifting to avoid any confusion.
OHS Forms Procedure Reference Revision Number Revision Date
Page |6 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
OHS-PR-09-03-F07 (A) JOB SAFE PROCEDURE
Ensure that loads are attached with taglines to control the swaying
during lifting and lowering.
No person shall be allowed to stay under suspended load at any
time in any circumstances.
5. Attachment of man basket to the crane for jumper installation
5.1 Mobilize crane and man basket to Congestion due to other ground Significant cost due to Supervisor/Foreman to coordinate with all personnel who will be
the location of the jumper activity. damages. affected by the access of heavy equipment.
installation. Unassisted maneuvering of heavy Struck by moving Provide flagman and spotter to guide the trailer operator when
equipment. equipment can lead to maneuvering for its position.
Unauthorized personnel entering the injury Only a competent flagman/spotter shall guide the crane/trailer
equipment access area. Injury due to Slip, Trip and when going into work location.
Inexperienced or untrained operator. fall on the same level Barricading the exclusion zone/ working radius where crane and
Unleveled and un-compacted Serious accident to trailer are accessing.
ground. personnel that may lead to Safety signage shall be posted to communicate the hazards and
severe injury or fatality activities.
Verification of Crane Operator’s 3rd party certification and Trailer
Drivers driving license before allowing them to enter the site.
Responsible Engineer and his Supervisor/ Foreman inspection of
exclusion zone/staging area for compaction and level of the
ground.
Identify the required speed limit for moving heavy equipment.
Ensure that all obstructions were removed.
5.2 Position crane on the stable and Unleveled and un-compacted Struck by vehicle and traffic Only trained and certified designated operators to operate any
compacted ground with its ground. collision equipment.
outrigger fully deployed. Unassisted maneuvering. Severe physical injury Assign trained and experienced flagman to assist the operator
Defective equipment. Permanent disability during maneuvering and positioning of equipment.
Incompetent personnel. Fatality Pre-inspection of equipment and its accessories to ensure it is in
Damage to property good and safe working condition.
Ensure grounds are well leveled and compacted.
5.3 Install wire rope sling on the man Defective lifting gears. Muscular injuries (Back Pre-inspection of all lifting gears to ensure all are in a good and
basket with D-shackle. Underrated lifting gears. pain, strain, fractures) safe condition.
Incompetent personnel. Cuts/pinch/crash points Ensure that SWL of lifting gears is adequate for the intended load.
Exposure to sharp and pointy resulting hand injuries Only trained and certified rigger shall be assigned for the rigging
6.4 Connect accessories for the The unfamiliarity of the process. Significant cost due to Assign trained and experienced with technical knowledge
jumper. Unqualified personnel. damages personnel for the task.
Exposure to sharp and pointy Cuts/pinch/crash points All personnel must be equipped with appropriate PPEs such as (list
materials. resulting hand injuries all applicable PPEs).
6.5 Press the connecting accessories Unqualified personnel. property damage and/or Only trained and experienced with technical knowledge personnel
using the hydraulic press. Ergonomics (awkward posture). injuries to the worker shall be assigned for the task.
Illness due to bad Maintain natural body posture as much as possible in performing
ergonomics the task.