Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Saa' - 101

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LAND KEY :

PROPOSED PLOT
LIMIT

PLOT LIMIT PLOT LIMIT BOUNDARY WALL EXISTING


BOUNDARY WALL
PROPOSED
GUARD ROOM

F2

C2
EXISTING BOUNDARY WALL
PLOT
LIMIT

3500
PLOT
LIMIT

F1
EXISTING EXISTING

C1
BOUNDARY WALL BOUNDARY WALL
PLOT
LIMIT

6170
GENERAL NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT SITE LAYOUT AND
LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.

F1

C1
2. DRAWINGS SHALL NOT BE SCALED. ANY DISCREPANCIES
BETWEEN THE DRAWINGS & WRITTEN DIMENSIONS,
THE WRITTEN DIMENSIONS SHALL GOVERN.

6170
ARCHITECT : ABEIR ELEZABI 050-3384030

STRUCTURAL ENGINEER : MOHAMED MAGDELDIN 055-5500645

F1

C1
00 ISSUED FOR APPROVAL 30/03/2020

6170
REV. NO. DESCRIPTION Date
EMPLOYER:

PRECAST PANEL & FOOTING


CONNECTION BETWEEN

BY THE SPECIALIST
F1

C1

3700
SEE GUARD ROOM DETAILS
AL AIN CITY MUNICIPALITY

DWG. S-003

5600
EXISTING BOUNDARY WALL

OWNER:

500 1250
F1

C3
DEPARTMENT OF
MUNICIPALITIES AND

4000
TRANSPORT
AL AIN CITY MUNICIPALITY

500
F2

C4

3585
CONSULTANT :

F1

C1

6170
TECHNICAL ENGINEERING & SCIENTIFIC STUDIES Co. (Ltd)
AL AIN -TEL : 7629920 - P.O.BOX : 16420 - FAX : 7629906
ABU DHABI -TEL : 6313513 - FAX: 6313342

F1

C1
TESSCO

6170
PROJECT NAME :

REHABILITATION OF BOUNDARY

F1

C1
WALLS OF GRAVES IN AL AIN

6170
ZONE :

SA'A

F1

C1
SECTOR NO : PLOT NO :

01 77-01-801-101

6170
PROJECT DESCRIPTION :

F1

C1

4820
REHABILITATION OF BOUNDARY
EXISTING BOUNDARY WALL
WALLS OF GRAVES IN AL AIN

F2

C2
PLOT LIMIT PLOT LIMIT

DRAWING TITLE :

Structural General Notes PROPOSED BOUNDARY WALL LAYOUT


- All dimensions in millimeters.
(All Footings are centered with columns UNO.)
- No of floors = ONE FLOOR .
DRAWING NO : REVISION NO:
- Proposed Design Bearing capacity = 200 kN\m2
S-001 00
to be verified with the final soil investigation report that
must be done before execution start by the contractor.
SUBMISSION DATE : SCALE :
- Foundation level is @ 1.00m below ZERO level,
30/03/2020 1:200
(as per required excavation depth h below
be ellow
ow EGL.),
EGL
G .),
oill investigation
to be verified with the final soil invve
in
inveessttig
iga
attio
ion report
rre
ep
poort that
must be done before execution tion
on
o n sstart
tarrtt b
ta byy th
tthe
he co
ccontractor.
on
nttra
ra PROJECT ID : PLAN ID :

B2SE-2019-07701 B2SE-2019-07701
- The Ground Water table is not not given
no give en yet,
yye
ett,,
oil investigation
oi
to be verified with the final soil invve
in esttiig
est ga
attioion report
rre
epo
epo
port
r that
OFFICE USE ONLY :
must be done before execution tionn sstart
tta
art
rt bby y th
tthe
he ccoontra
on
contractor.

- The foundation ground shall be proof rolled with


vibratory compactor to confirm that any loose materials
are compacted to not less than 95% of max. dry density.

A - All Pre-cast & Galvanized Steel Boundary Wall with


(Guard Rooms) drawings,
are indicative to tendering purpose only, so,
THE CONTRACTOR HAS TO CLOSE ANY GAP BETWEEN PRECAST PANEL BOTTOM AND GROUND LEVEL shop drawings and structural calculation
B WITH SOLID BLOCK TO BE FINISHED WITH BITUMINOUS MATERIAL AS PER SPECIFICATION
should be submitted by specialist sub-contractor to the
authorities approval before execution start at site.

You might also like