RA Fatigue
RA Fatigue
RA Fatigue
Name of project
or activity:
Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot & Vault Excavation NEOM code:
Component or
aspect of work:
Fatigue Sheet no. 1 of 5
Health & safety severity: Likelihood: Assessed Severity Name & signature Date
risk: 1 2 3 4 5
1 = Very Low – no injury, 2-man days LTI R = Rare – unlikely to occur Farooq Aziz
UL = Unlikely – unlikely but possible R N N A A A Prep’d: 28/2/24
2 =Low – minor ‘first aid’ injury, 2-4 days LTI
3 =–Medium several causalities that might require hospitalization with long term effect M = Possible – possible at some time UL N A A AR AR Mushtaq Ansari
H =Likely – likely to occur several times Rev’d: 28/2/24
5 to 15 man-days (LTI) P A A AR AR UA
Likelihood
AC = Frequent – likely to occur many times
4 =High – •Would cause serious causalities result in long term physical impairment of personnel L A AR AR UA UA
•Incident resulting in complete stop of work for more than 2 weeks
5 =Very High – • Would cause serious causalities result in serious Injuries or loss of lives.
AC A AR UA UA UA
Incident resulting in complete shutdown of operations
NEOM-NLFPRC-003 FRM 001 – Acceptability of assessed risks: UA = Unacceptable (action essential) AR = Action required (if reasonably practicable) A = Acceptable (manage risk) N = Negligible
NEOM-NLF-FRM-002.01 NEOM Risk Assessment Form
Name of project
or activity:
Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot & Vault Excavation NEOM code:
Component or
aspect of work:
Fatigue Sheet no. 2 of 5
Likelihood
AC = Frequent – likely to occur many times
4 =High – •Would cause serious causalities result in long term physical impairment of personnel L A AR AR UA UA
•Incident resulting in complete stop of work for more than 2 weeks
5 =Very High – • Would cause serious causalities result in serious Injuries or loss of lives.
AC A AR UA UA UA
Incident resulting in complete shutdown of operations
NEOM-NLFPRC-003 FRM 001 – Acceptability of assessed risks: UA = Unacceptable (action essential) AR = Action required (if reasonably practicable) A = Acceptable (manage risk) N = Negligible
NEOM-NLF-FRM-002.01 NEOM Risk Assessment Form
Name of project
or activity:
Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot & Vault Excavation NEOM code:
Component or
aspect of work:
Fatigue Sheet no. 3 of 5
Health & safety severity: Likelihood: Assessed Severity Name & signature Date
risk: 1 2 3 4 5
1 = Very Low – no injury, 2-man days LTI R = Rare – unlikely to occur Farooq Aziz
UL = Unlikely – unlikely but possible R N N A A A Prep’d: 28/2/24
2 =Low – minor ‘first aid’ injury, 2-4 days LTI
3 =–Medium several causalities that might require hospitalization with long term effect M = Possible – possible at some time UL N A A AR AR Mushtaq Ansari
H =Likely – likely to occur several times Rev’d: 28/2/24
5 to 15 man-days (LTI) P A A AR AR UA
Likelihood
AC = Frequent – likely to occur many times
4 =High – •Would cause serious causalities result in long term physical impairment of personnel L A AR AR UA UA
•Incident resulting in complete stop of work for more than 2 weeks
5 =Very High – • Would cause serious causalities result in serious Injuries or loss of lives.
AC A AR UA UA UA
Incident resulting in complete shutdown of operations
NEOM-NLFPRC-003 FRM 001 – Acceptability of assessed risks: UA = Unacceptable (action essential) AR = Action required (if reasonably practicable) A = Acceptable (manage risk) N = Negligible
NEOM-NLF-FRM-002.01 NEOM Risk Assessment Form
Name of project
or activity:
Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot & Vault Excavation NEOM code:
Component or
aspect of work:
Fatigue Sheet no. 4 of 5
Health & safety severity: Likelihood: Assessed Severity Name & signature Date
risk: 1 2 3 4 5
1 = Very Low – no injury, 2-man days LTI R = Rare – unlikely to occur Farooq Aziz
UL = Unlikely – unlikely but possible R N N A A A Prep’d: 28/2/24
2 =Low – minor ‘first aid’ injury, 2-4 days LTI
3 =–Medium several causalities that might require hospitalization with long term effect M = Possible – possible at some time UL N A A AR AR Mushtaq Ansari
H =Likely – likely to occur several times Rev’d: 28/2/24
5 to 15 man-days (LTI) P A A AR AR UA
Likelihood
AC = Frequent – likely to occur many times
4 =High – •Would cause serious causalities result in long term physical impairment of personnel L A AR AR UA UA
•Incident resulting in complete stop of work for more than 2 weeks
5 =Very High – • Would cause serious causalities result in serious Injuries or loss of lives.
AC A AR UA UA UA
Incident resulting in complete shutdown of operations
NEOM-NLFPRC-003 FRM 001 – Acceptability of assessed risks: UA = Unacceptable (action essential) AR = Action required (if reasonably practicable) A = Acceptable (manage risk) N = Negligible
NEOM-NLF-FRM-002.01 NEOM Risk Assessment Form
Name of project
or activity:
Limak & Al-Ayuni Joint Venture – Neom Trojena Time Travel Tunnel, Depot & Vault Excavation NEOM code:
Component or
aspect of work:
Fatigue Sheet no. 5 of 5
Health & safety severity: Likelihood: Assessed Severity Name & signature Date
risk: 1 2 3 4 5
1 = Very Low – no injury, 2-man days LTI R = Rare – unlikely to occur Farooq Aziz
UL = Unlikely – unlikely but possible R N N A A A Prep’d: 28/2/24
2 =Low – minor ‘first aid’ injury, 2-4 days LTI
3 =–Medium several causalities that might require hospitalization with long term effect M = Possible – possible at some time UL N A A AR AR Mushtaq Ansari
H =Likely – likely to occur several times Rev’d: 28/2/24
5 to 15 man-days (LTI) P A A AR AR UA
Likelihood
AC = Frequent – likely to occur many times
4 =High – •Would cause serious causalities result in long term physical impairment of personnel L A AR AR UA UA
•Incident resulting in complete stop of work for more than 2 weeks
5 =Very High – • Would cause serious causalities result in serious Injuries or loss of lives.
AC A AR UA UA UA
Incident resulting in complete shutdown of operations
NEOM-NLFPRC-003 FRM 001 – Acceptability of assessed risks: UA = Unacceptable (action essential) AR = Action required (if reasonably practicable) A = Acceptable (manage risk) N = Negligible