Compound Wall 3
Compound Wall 3
Compound Wall 3
2
Earth work Excavation for CRS:-
CUM 1 144.24 0.6 2.45
CUM 1 52.63 0.6 1.96
TOTAL QTY CUM
8 FOOTING
HWALL CUM 41 1 1 0.3
HWALL CUM 4 1.5 1 0.3
CWALL CUM 14 1 1 0.3
CWALL CUM 1 1.5 1 0.3
TOTAL QTY CUM
9 COLUMN
HWALL CUM 45 0.3 0.23 7.67
CWALL CUM 16 0.3 0.23 7.843
TOTAL QTY CUM
10 PLINTH BEAM
HWALL CUM 1 133.89 0.23 0.3
CWALL CUM 1 48.72 0.23 0.3
TOTAL QTY CUM
11 BEAM
HWALL CUM 1 144.24 0.23 0.3
CWALL CUM 1 52.63 0.23 0.3
TOTAL QTY CUM
16 Centring Work
A BED CONCRETE
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
CWALL SQM 14 5.2 0.3
CWALL SQM 1 5.6 0.3
TOTAL QTY SQM
B FOOTING MAT
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
CWALL SQM 14 5.2 0.3
CWALL SQM 1 5.6 0.3
TOTAL QTY SQM
FT mat
HWALL SQM 41 4 0.3
HWALL SQM 4 5 0.3
CWALL SQM 14 4 0.3
CWALL SQM 1 5 0.3
TOTAL QTY SQM
COLUMNS
HWALL SQM 41 4 0.3
HWALL SQM 4 5 0.3
CWALL SQM 14 4 0.3
CWALL SQM 1 5 0.3
TOTAL QTY SQM
D Plinth Beams
HWALL SQM 1 133.89 1.06
CWALL SQM 1 48.72 1.06
TOTAL QTY SQM
E Floor Beams
HWALL SQM 1 144.24 1.06
CWALL SQM 1 52.63 1.06
TOTAL QTY SQM
TOTAL QTY
TONS
Quantity Remarks
83.15
11.23
28.39
2.81
125.58
212.0328
61.89288
273.93
125.58
6.93
0.94
2.37
0.23
12.30
1.80
4.20
0.45
14.35
5.29
76.73
6.93
0.94
2.37
0.23
10.47
8.65
3.16
11.81
13.39
4.87
18.26
12.3
1.8
4.2
0.45
18.75
23.81535
8.658672
32.47
9.23841
3.36168
12.60
9.95256
3.63147
13.58
212.0328
61.89288
273.93
59.433771
19.721856
79.16
278.3832
92.6288
371.01
278.3832
92.6288
371.01
63.96
6.72
21.84
1.68
94.20
63.96
6.72
21.84
1.68
94.20
49.2
6
16.8
1.5
73.50
49.2
6
16.8
1.5
73.50
365.859
133.01728
498.88
141.9234
51.6432
193.57
152.8944
55.7878
208.68
1236.53
10
COMPOUND WALL
TOTAL
TOTAL - A
1 Add GST @ 18 %
GRAND TOTAL (A+B)
Amount
37674
82177.704
15345.6856
57557.5
100435.5
0
64967.1
162187.5
300384.7035
108990.7785
122256.27
1780516.92
633245.016
222607.2
64927.1
741915.048
950000
5445188.03
168800.83
5613988.85
1010517.99
6624506.85