Drain Sec-D Baramulla - Standard
Drain Sec-D Baramulla - Standard
Drain Sec-D Baramulla - Standard
REV
Prow
DATE
FRL At
FRL At
Design
OGL At
Median
Shyness
Centerline
Carriageway
Service Road
Existing Road
Paved Shoulder
Proposed Structure
LEGEND :- Profile
DESCRIPTION
LEFT DRAIN IL(m)
DESIGN CHAINAGE
LEFT SR INNER EDGE LVL
HORIZONTAL ALIGNMENT
RIGHT SR INNER EDGE LVL
DESIGNED
LENGT
-1.5
CO-OR
DESIG
TRANS
rain
45+
SUPER
D
44990 1596.632 1596.465 1596.597 1596.597 1595.140 1595.612
HIP
um m E
HORIZ
H (m)
IN
ITION
CURV
DINAT
N SPE
p a th c ad-5.5 .5m
45000 1596.516 1596.432 1596.573 1596.573 1595.160 1595.582
t
E
DRAWN
o - 2 CH L
G=-0.300%
L=60.000m
o R r T
LEVAT
e e A
CURV
ld M
ONTA
F rvic
RADIU
Lst=71.469m
E LEN
Se d Shou -7.0m
e y
ION (e
NORT
L CUR
E NUM
TRAILIN
PH)
S (m)
LEADIN
Pav iagewa m
a r r 0 . 5
EASTIN
-
Lvl.=1595.522m
m
GTH (m
C s
BER
HING
nes 610
G (m)
VE DE
(Y)
Shydian-0.
Me
CHECKED APPROVED
45040 1596.080 1596.786 1596.476 1596.476 1595.240 1595.482
TAILS
G=0.200%
L=140.000m
45050 1595.970 1596.586 1596.451 1596.451 1595.260 1595.462
80
N.R
37893
Client:
0.000
HIP CH
44880
R=-3000.0m
Lc=35.621m
0.000
G=-0.200%
L=70.000m
1
35.621
-3000.0
100
2.966
00
: 45+
45+
45080 -999.000 1596.276 1596.379 1596.378 1595.320 1595.402
049.28
0
L
45100 -999.000 1596.450 1596.400 1596.330 1595.360 1595.351 Ch.=45100.000m
G
SRINAGAR
LENGT
CO-OR
TRANS
Lvl.=1595.360m
L
G
D
SUPER
DESIGN
HIP
Lst=64.219m
Lvl.=1595.320m Lvl.=1595.550m
L
L
HORIZO
ITION
G
G
CURVE
INATE
Lvl.=1595.294m Lvl.=1595.850m
CURVE
L
G
N
NTAL C
RADIUS
Lvl.=1595.980m
(KMPH
(m)
TRAILIN
)
ION (e%
NORTH
LEADIN
H (m)
URVE D
G (m)
G (m)
ING (Y)
ETAILS
R=-250.0m
HIP CH
Authority's Engineer:
Lc=67.639m
378933
:
0.000
G=-0.200%
L=100.000m
45+200
2
.0
67.639
G=0.200%
L=90.000m
-250.00
5.154
90
0
Website: www.bloomcos.com
E-Mail: info@bloom-india.com
45+165
L
L
G
G
45230 1597.785 1596.911 1597.079 1596.898 1596.110 1595.925 Ch.=45230.000m Ch.=45230.000m
Lvl.=1595.925m Lvl.=1596.110m
L
L
G
G
Lst=49.919m
45240 1596.445 1596.831 1597.099 1596.912 1596.130 1595.945 Ch.=45240.000m Ch.=45240.000m
Lvl.=1595.945m Lvl.=1596.130m
L
G
Contractor :
IL=1594.400
L
45250 1597.177 1596.825 1597.175 1596.904 1596.205 1595.925 Ch.=45250.000m
G
Lvl.=1596.205m
L
HIP
G
45260 1598.541 1596.682 1597.253 1596.875 1596.285 1595.905 Ch.=45260.000m Ch.=45260.000m
LENGTH (m)
TRANSITION
Lvl.=1595.905m Lvl.=1596.285m
L
CO-ORDINATE
G
45270 1598.965 1596.388 1597.283 1596.824 1596.315 1595.824 Ch.=45270.000m
Lvl.=1596.315m
L
G
RADIUS (m)
L
R
G
45+300
CURVE LENGTH (m)
G=-0.810%
L=40.000m
Lvl.=1596.190m
L
G
HORIZONTAL CURVE DETAILS
EASTING (X)
LEADING (m)
TRAILING (m)
NORTHING (Y)
G
G
45310 1596.981 1596.837 1596.792 1596.441 1595.824 1595.473 Ch.=45310.000m Ch.=45310.000m
Lvl.=1595.473m Lvl.=1595.824m
Ls=35.000m L Ls=35.000m
L
45320 1595.769 1596.182 1596.568 1596.332 1595.599 1595.363
G
1595.023
3
80
4.1
Ch.=45330.000m
1.373
35.000
-700.000
Lvl.=1595.374m
448573.876
3789296.500
L
45340 1596.232 1596.059 1596.166 1596.113 1595.194 1595.143
G
HIP CH: 45+284.553
G=-1.100%
L=60.000m
Proof Consultant :
Lvl.=1595.014m
L
45360 1596.517 1595.624 1595.861 1595.895 1594.889 1594.923
L
G
45+400
45390 1594.792 1596.275 1595.575 1595.595 1594.604 1594.613
G=-0.800%
L=70.000m
45420 1595.819 1594.986 1595.341 1595.341 1594.364 1594.353
Safety Consultant :
45440 1595.684 1594.701 1595.184 1595.184 1594.204 1594.193 Ch.=45440.000m
Lvl.=1594.204m
45450 1595.093 1594.614 1595.106 1595.106 1594.129 1594.113
uainfratechlegato@gmail.com
45460 1594.015 1594.538 1595.028 1595.028 1594.054 1594.033
Lst=253.252m
G=-0.750%
L=40.000m
45480 1593.971 1594.596 1594.872 1594.872 1593.904 1593.873 Ch.=45480.000m
G=-0.800%
L=140.000m
Lvl.=1593.904m
45+500
45490 1593.863 1595.145 1594.794 1594.794 1593.824 1593.793
PROJECT :
HORIZONTAL
HIP
LENGTH (m)
CO-ORDINATE
G=-0.800%
L=50.000m
TRANSITION
LENGTH (m)
RADIUS (m)
CURVE LENGTH
SUPERELEVATIO
ER
RADIUS (m)
(m)
Lvl.=1593.504m
CURVE NUMBER
SUPERELEVATION
N (e%)
D (KMPH)
Lvl.=1593.393m
LEADING (m)
NORTHING (Y)
TRAILING (m)
(e%)
PH)
DETAILS
LEADING (m)
TRAILING (m)
NORTHING (Y)
Lvl.=1593.174m
HIP CH: 45+5
30.143
80
N.R
0.000
0.000
-2500.000
3789184.479
Lvl.=1593.173m
80
N.R
69.316
0.000
0.000
4000.000
88.564
3789110.129
45+600
HIP CH: 45+783.912
L=110.000m
L=110.000m
Lvl.=1592.953m
L
L
G
G
Lvl.=1593.243m
G=-0.200%
L=50.000m
45+800
45790 1592.883 1593.643 1594.048 1594.039 1593.071 1593.063
RADIUS (m)
R=4000.0m
CURVE NUMBER
Lc=69.316m
KM 44+960 TO KM 46+000
EASTING (X)
LEADING (m)
TRAILING (m)
HORIZONTAL CURVE DETAILS
80
DATE :
448012.094
3789071.564
Aman Gupta
Lst=51.332m
HIP CH: 45+889.708
Aman Gupta
DRAWN
Manish Kumar
Manish Kumar
SB/HW/PP/DR/1D/01
.840
Gaurav Rawat
Gaurav Rawat
G=-0.200%
L=100.000m
Ls=58.000m
G=-0.200%
L=110.000m
TRAN
REVISION:
DESIG
SUPE
L
R
RD
HIP
SITION
N SPE
CURV
46+000
RELEV
INATE
Lvl.=1592.571m
ONTA
APPROVED
INE
ED (K
E LEN
RADIU
ATION
Lvl.=1592.543m
NORT
GTH
E NUM
L CUR
MPH)
S (m)
LEADIN
H
(e%)
EASTIN
G(
BER
(m)
ING
VE D
ING (m
Ls=58.00
NO.
REV
Prow
DATE
FRL At
FRL At
Design
OGL At
Median
Shyness
Centerline
Carriageway
Service Road
Existing Road
Paved Shoulder
Proposed Structure
LEGEND :- Profile
DESCRIPTION
LEFT DRAIN IL(m)
DESIGN CHAINAGE
LEFT SR INNER EDGE LVL
378
HORIZONTAL ALIGNMENT
RIGHT SR INNER EDGE LVL
90
58.
000
Lvl.=1592.571m
580
000
46000 1592.325 1593.823 1593.612 1593.612 1592.538 1592.543 Ch.=46000.000m
Lvl.=1592.543m
46010 1592.340 1593.801 1593.579 1593.579 1592.505 1592.503
LENGT
CO-OR
TRANS
SUPER
DESIGN
DESIGNED
HIP
46020 1592.336 1593.937 1593.546 1593.546 1592.472 1592.463
46+000
H (m)
HORIZO
Ls=58.000m
ITION
CURVE
DINATE
46030 1592.225 1594.060 1593.513 1593.513 1592.439 1592.423
SPEED
ELEVAT
MATCH LINE
CURVE
DRAWN
(K
NTAL C
RADIUS
L
46040 1592.388 -999.000 1593.480 1593.480 1592.406 1592.383 LENGT
(m)
TRAILIN
NORTH
ION (e%
MPH)
LEADIN
)
NUMBE
H (m)
G=-0.400%
L=80.000m
G (m)
G (m)
G (X)
G=-0.330%
L=130.000m
46070 1591.823 1594.202 1593.381 1593.381 1592.307 1592.263
CHECKED APPROVED
R=1200.0m
Lc=42.452m
46080 1592.002 1594.262 1593.348 1593.348 1592.274 1592.223 Ch.=46080.000m
80
Lvl.=1592.223m
N.R
HIP CH
378902
0.000
0.000
447843
Client:
42.452
1200.00
8.563
.508
0
: 46+
46+100
46110 1592.145 1594.674 1593.250 1593.250 1592.175 1592.163
Lst=27.785m
.149
G=-0.200%
L=70.000m
46130 1592.298 1593.755 1593.192 1593.192 1592.122 1592.123
SRINAGAR
L=30.000m L
L
G=-0.200% G
G
R=-2000.0m
Lc=61.046m
46160 1592.449 1593.682 1593.147 1593.147 1592.029 1592.029 Ch.=46160.000m
Lvl.=1592.029m
46170 1592.033 1593.545 1593.143 1593.143 1592.009 1592.009
G=-0.200%
G=-0.200%
L=40.000m
L=40.000m
46200 1592.400 1593.742 1593.144 1593.144 1591.949 1591.949 Ch.=46200.000m
Lvl.=1591.949m
L
L
G
G
46+200
46210 1591.891 1593.256 1593.145 1593.145 1592.177 1592.177 Ch.=46210.000m
Authority's Engineer:
Lvl.=1592.177m 210
46220 1591.785 1593.650 1593.145 1593.145 1592.157 1592.157
CH. 46+
IL=1591.345
Website: www.bloomcos.com
ENDS ALTL
E-Mail: info@bloom-india.com
46230 1591.635 1593.809 1593.146 1593.146 1592.137 1592.137
RE WA 10
Lst=127.789m
46260 1591.846 1592.966 1593.148 1593.148 1592.077 1592.077
Contractor :
46280 1591.850 1593.590 1593.149 1593.149 1592.037 1592.037
LENGTH (m)
TRANSITION
CO-ORDINATE
46+300
CURVE NUMBER
(e%)
NORTHING (Y)
DETAILS
L=230.000m
L=230.000m
46340 1591.981 1592.730 1593.049 1593.049 1591.917 1591.917
80
0.000
45.103
2000.000
447585.953
Proof Consultant :
46390 1592.008 1592.402 1592.831 1592.831 1591.817 1591.817
LENGTH
CO-ORD
TRANSIT
DESIGN
HIP
46+400
CURVE
INATE
LEVATIO
N
NTAL C
RADIUS
Lst=118.405m
LENGTH
(m)
TRAILIN
NORTH
LEADIN
(KMPH)
N (e%)
(m)
G (m)
G (m)
ING (Y)
Lvl.=1591.717m
ETAILS
L
L
46450 1592.772 1592.775 1592.945 1592.945 1591.842 1591.842
G
G
46460 1591.847 1592.747 1592.934 1592.934 1591.967 1591.967 Ch.=46460.000m
Lvl.=1591.967m
80
N.R
HIP CH:
Safety Consultant :
0.000
447764.6
61.046
-2000.00
549
03
IL=1590.825
9910339343,9971210616
UA Infratech Legato & Co
46490 1592.033 1592.961 1592.814 1592.814 1591.842 1591.842
uainfratechlegato@gmail.com
683
G=-0.415%
G=-0.415%
L=50.000m
L=50.000m
46500 1591.542 1592.566 1592.769 1592.769 1591.801 1591.801
Ls=75.000m
46520 1591.791 1592.169 1592.711 1592.711 1591.740 1591.740
HIP
PROJECT :
CO-ORDINATE
SUPERELEVATION (e%)
HIP
HORIZONTAL CURVE DETAILS
EASTING (X)
LEADING (m)
TRAILING (m)
NORTHING (Y)
LENGTH (m)
CO-ORDINATE
80
R=-300.0m
5.0
Lc=90.320m
SUPERELEVATION (e%)
75.000
-300.000
G=-0.200%
G=-0.200%
AILS
L=160.000m
L=160.000m
EASTING (X)
447328.488
LEADING (m)
TRAILING (m)
NORTHING (Y)
3788946.677
80
5.0
32.292
0.000
0.000
-250.000
3788787.440
L=70.000m
L=70.000m
y
46720 1591.172 1591.981 1592.235 1592.235 1591.215 1591.214
n ewa d-5.5min-1.5
e y - m
46h+
FLYOVER LENGTH 1.704 KM) OF TOTAL LENGTH 22.736 KMs TO NH
Med 7 ss-
46730 1591.235 1591.921 1592.189 1592.189 1591.170 1591.169 Ch.=46740.000m
44.958 TO KM 48.500 (DELINA FYOVER INCLUDING CONSTRUCTION OF
ian0- 00.5m7.0m
Lvl.=1591.125m
1.0m
46740 1591.026 1591.936 1592.142 1592.142 1591.125 1591.125 Ch.=46740.000m
Lvl.=1591.124m
46750 1591.184 1591.893 1592.096 1592.096 1591.078 1591.075
SCALE:
G=-0.470%
L=70.000m
G=-0.410%
L=30.000m
KM 46+000 TO KM 47+000
CO-O
CURV
LENG
CURV
T
RDIN
R=-250.0m
SUPE
RADIU
E NU
ATE
N
(m
DESIG
CURV
E LEN
Lc=32.292m L
)
E
GTH
N SP
MBER
EAS
DETA
NORT
EED
IL
VATIO
LEAD
S
TRAIL
TING
(K
DRG. NO.
Aman Gupta
HING
P
N (e%
)
ING (m
(Y)
DESIGNED
H)
)
ING (m
)
46+
G=-0.200%
G=-0.200%
L=110.000m
L=110.000m
Lc=67.945m
13
: 46+
4470
250.0
9
8874
5
82.73
0.000
02.09
5.0
0.000
8.17
5
MAR 2024
80
3
DRAWN
Manish Kumar
Manish Kumar
Ch.=46950.000m
L
G
G
Lvl.=1590.992m
Ls=30.000m
IL=1589.198
G=0.200%
L=50.000m
Lvl.=1590.775m
REVISION:
TRANSITION
LENGTH (m)
CO-ORDINATE
G
G
Lvl.=1591.052m
R0
CURVE NUMBER
APPROVED
Ch.=47020.000m
CURVE LENGTH (m)
EASTING (X)
TRAILING (m)
NORTHING (Y)
G=-0.5
L=50.0
NO.
REV
Prow
DATE
FRL At
FRL At
Design
OGL At
Median
Shyness
Centerline
Carriageway
Service Road
Existing Road
Paved Shoulder
Proposed Structure
LEGEND :- Profile
DESCRIPTION
LEFT DRAIN IL(m)
DESIGN CHAINAGE
LEFT SR INNER EDGE LVL
HORIZONTAL ALIGNMENT
RIGHT SR INNER EDGE LVL
G=0.200%
L=50.000m
47000 1591.399 1593.933 1591.753 1591.753 1590.755 1591.052 Ch.=47010.000m
G=0.200%
L=40.000m
Lvl.=1590.775m
47010 1591.452 1592.009 1591.753 1591.753 1590.775 1591.072 Ch.=47010.000m
Lvl.=1591.072m
L
L
G
G
47020 1591.516 1591.875 1591.738 1591.738 1590.755 1591.052 Ch.=47020.000m
DESIGNED
Lvl.=1591.052m
MATCH LINE
47030 1591.534 1591.369 1591.709 1591.709 1590.701 1590.992 Ch.=47020.000m
Lvl.=1590.755m
47+000
HIP
DRAWN
47040 1591.566 1591.490 1591.664 1591.664 1590.647 1590.932
LENGTH (m)
TRANSITION
CO-ORDINATE
47050 1591.339 1592.208 1591.604 1591.604 1590.593 1590.872
G=-0.540%
L=50.000m
RADIUS (m)
G=-0.600%
L=70.000m
CURVE LENGTH (m)
R=265.0m
47070 1591.049 1591.713 1591.464 1591.464 1590.485 1590.752 Ch.=47070.000m
SUPERELEVATION (e%)
Lc=163.663m
Lvl.=1590.485m
EASTING (X)
HORIZONTAL CURVE DETAILS
CHECKED APPROVED
LEADING (m)
TRAILING (m)
NORTHING (Y)
HIP
Client:
47100 1590.845 1591.428 1591.254 1591.254 1590.275 1590.557
LENGTH (m)
TRANSITION
100
14
80
5.0
CO-ORDINATE
47110 1591.106 1591.265 1591.184 1591.184 1590.205 1590.482
30.000
30.000
G=-0.700%
L=60.000m
163.663
47+
265.000
446944.437
3788671.016
CURVE NUMBER
47130 1590.663 1592.054 1591.051 1591.051 1590.065 1590.332 Ch.=47130.000m CURVE LENGTH (m)
G=-0.750%
L=60.000m
DESIGN SPEED (KMPH)
SUPERELEVATION (e%)
Lvl.=1590.065m
SRINAGAR
L
EASTING (X)
LEADING (m)
TRAILING (m)
47140 1590.640 1590.822 1591.003 1591.003 1590.002 1590.257
G
HORIZONTAL CURVE DETAILS
NORTHING (Y)
Lvl.=1589.939m
47150 1590.613 1591.261 1590.968 1590.968 1589.939 1590.182 Ch.=47150.000m
L
47160 1590.549 1592.323 1590.947 1590.947 1589.919 1590.082 Ch.=47150.000m
G
Ls=30.000m
40
5.0
47170 1590.603 1591.058 1590.940 1590.940 1589.899 1589.982 Ch.=47170.000m
15
0.000
0.000
Lvl.=1589.982m
26.620
68.000
0
446795.971
3788693.839
L
47180 1590.543 1590.852 1590.940 1590.940 1589.879 1589.962
20
7+
HIP CH: 47+204.947
4
SI
LE
SU
GN
PE
SP
RE
TH
CO
AN
G=-0.200%
L=50.000m
SI
EE
LE
-O
(m
VA
RD
TIO
R=68.0m
(K
Authority's Engineer:
N
IN
HI
L
TIO
Lc=26.620m
P
MP
T
(
E
H)
CU
Lvl.=1589.882m
L
RA
G
L
LE
R
ILI
RV
%)
E
AD
NO
Website: www.bloomcos.com
NG
Lvl.=1589.832m
E-Mail: info@bloom-india.com
RI
LE
(
IN
RA
RT
CU
G
EA
DI
m)
ZO
HI
NG
(m
US
E
NT
L=160.000m
)
TH
NG
IN
AL
(m
(Y
NU
)
(m
(X
40
CU
)
MB
30
RV
ER
5.0
E
7+
DE
37
0
0.0
4
88
TA
70
ILS
67
6.5
76
17
G=-0.200%
L=80.000m
HI
.53
Contractor :
.84
4
P
-68
5
.00
0
16
47
DE
SU
2
TR
Lst=107.785m
SIG
NG
PE
CO
7.8
Ch.=47310.000m Ch.=47310.000m
AN
TH
NS
S
RE
2
Lvl.=1589.672m Lvl.=1589.619m
L
L
-OR
G
G
PE
(m
LE
)
ITIO
ED
VA
HIP
Lvl.=1589.956m Lvl.=1590.021m
L
CU
G
AT
TIO
E
HO
(KM
L
RV
G
TR
L
N(
Lvl.=1590.091m
PH
L
RIZ
G
EL
AIL
CU
RA
EA
e%
NO
R
RT
DIN
EA
VE
Lvl.=1589.856m Lvl.=1590.136m
L
TA
GT
G
S(
ST
(m
H
G(
)
HIN
L
NU
LC
G
m)
m)
Lvl.=1590.161m
ING
(m
UR
MB
(Y)
(X)
VE
ER
L
G
DE
47+400
50
TA
Lvl.=1589.441m
ILS
378
0.0
00
00
875
634
3.0
R=-120.0m
HIP
63.
Lc=63.162m
Proof Consultant :
47390 1589.848 1590.152 1590.426 1590.426 1589.697 1589.401
-12
IL=1588.235
62
G=-1.160%
L=60.000m
.88
CH
162
0
0.0
17
00
: 4
L
Lvl.=1589.465m
G=-0.200%
L=70.000m
0
L
G
Ls=40.000
Foo
HOR
m
Lvl.=1589.271m
Servticpath cum
IZO
G=-0.200%
L=70.000m
L
47460 1590.258 1590.258 1589.365 1589.151
G
CO-O
L
Carria e Road-5Drain-1.5m
.
R
TRAN
HIP
NTAL
S
CURV
LENG
CURV
D
U
RDIN
s
A
Lvl.=1589.031m
S
SITIO
E
T
RADIU
Safety Consultant :
E NU
Media s-0.5m m
N
n
TH (m
IG
CURV
E LEN
4-71.+
Lvl.=1589.325m
L
RELE
S (m)
0m5
G
E N
GTH
N SP
DE
MBER
00
9910339343,9971210616
UA Infratech Legato & Co
(m)
EED
VATIO
LEAD
ORTH
uainfratechlegato@gmail.com
TAILS
TRAIL
Ls=40.000
47500 1589.832 1589.883 1589.892 1589.892 1589.083 1588.866 Ch.=47500.000m
m
(KM
Lvl.=1588.866m
ING (X
)
P
N (e%
H
ING (m
)
)
)
Lvl.=1588.962m
HIP C
L
47520 1590.232 1589.867 1589.707 1589.707 1588.802 1588.676
G
H: 4
18
-120.0
3788
Lvl.=1588.642m
7+46
00
48
9.120
PROJECT :
47540 1589.505 1589.334 1589.521 1589.521 1588.547 1588.486
40.00
731.6
40.00
0
.378
5.0
4.555
50
59
G=-0.950%
L=70.000m
Lst=51.576m
47550 1588.863 1589.173 1589.428 1589.428 1588.452 1588.391
G=-0.950%
L=40.000m
Lvl.=1588.262m
47570 1589.288 1589.158 1589.229 1589.229 1588.262 1588.201 Ch.=47570.000m
HOR
Lvl.=1588.201m
47+
47580 1588.495 1590.321 1589.122 1589.122 1588.146 1588.088
IZON
600
CO-O
TA
CUR
CUR
HIP
TRAN
L
S
LENG
U
RAD
E
A
VE N
TH
P
VE L
CUR
SITIO
S
E
(m )
G
UMB
IGN
EREL
IUS (m
VE D
E N
ER
EVAT
SPEE
TH (m
ORT
ETAIL
IN
LEAD
S
G=-1.130%
L=80.000m
ING
HING
G (X
D (KM
)
ING
PH)
(m )
HIP C
4463
7+6
3788
Lvl.=1587.297m
209.7
6
.000
1
46
.5
0.000
1
4
0.000
N.R
80
99
G=-1.170%
L=40.000m
Lvl.=1586.829m
IZO
Ch.=47690.000m
CO
T
T
-
C
Lvl.=1586.870m
R
L
O
U
CUR
E
R
HIP
RAD
U
RDIN
VE N
NSIT
VE L
R
IU
GTH
V
SUP
S
ATE
G=-1.520%
DES
L=40.000m
ION
UMB
ENG
D
(m)
E
IG
(m)
ERE
G=-1.550%
L=50.000m
R
N
TH
LE
ETA
L
S
Lvl.=1586.221m
NOR
SPE
m)
ILS
ED
ING
Lvl.=1586.095m
RAIL
THIN
ION
ING
(X)
ING
G (Y
(e%
)
(m
)
)
(m
PH)
)
CH:
47+8
0 0
-200
20
47+
378
47.0
2
851
0.00
2 3
0
82
852
G=-1.800%
G=-1.780%
L=60.000m
L=80.000m
.364
0.00
0
.041
N
0 0
2.90
.
0
2
1:200
Ch.=47800.000m
KM 14.200 TO KM 24.400, FROM KM 35.300 TO KM 44.294 & FROM KM HORIZONTAL : 1:2000
Lvl.=1584.797m
47820 1586.506 1584.602 1585.679 1585.679 1584.707 1584.657
TITLE:
L
G
Lvl.=1584.399m
47840 1584.631 1585.156 1585.420 1585.420 1584.399 1584.377 Ch.=47840.000m
KM 47+000 TO KM 48+000
Lvl.=1584.377m
47850 1584.490 1587.758 1585.312 1585.312 1584.295 1584.276 FLYO CH.47+
PLAN & PROFILE
9
47860 1584.168 1585.147 1585.210 1585.210 1584.191 1584.175
47+9
00 VER E
R=-2000.0m
NDS A14
Lc=47.082m
T
47870 1584.028 1584.059 1585.108 1585.108 1584.087 1584.074
STA
RE WRTS AT C
47880 1583.991 1583.945 1585.005 1585.005 1583.983 1583.973
ALL H. 47
DATE :
+91
4
H
Aman Gupta
Aman Gupta
ORIZ
L=100.000m
L=100.000m
CO-O
ONTA
LENG
S
CURV
E
T
RDIN
IT
DE
H
A
L CU
ION
IG
E LEN
NUM
(m)
RVE
(m
RELE
GTH
BER
N SP
Lvl.=1583.359m
MATC
NOR
MAR 2024
DETA
EAST
H
47940 1585.028 1584.642 1584.397 1584.397 1583.359 1583.367 Ch.=47940.000m
(m)
EED
VATIO
LEAD
TH
DRAWN
Manish Kumar
Manish Kumar
LINE
ILS
Lvl.=1583.367m
TRAIL
IN
IN
G
N (e
ING (X
Lst=123.588m
(KMP
% )
ING (m
(Y)
)
H)
(m )
48+0
H
00
47970 1583.756 1585.646 1584.190 1584.190 1583.158 1583.157
CO-O
G=-0.670%
G=-0.700%
L=40.000m
L=40.000m
: 48
CU
21
CUR
1200
R
HIP
TRAN
4460
3788
+0
.0
V
SB/HW/PP/DR/1D/03
LENG
Ch.=47980.000m
36.05
SIT
9
00
VE N
Lvl.=1583.087m
SUP
IO
E LE
82.94
TH (
DES
Gaurav Rawat
E
Gaurav Rawat
0.000
435.4
16.52
CHECKED
ATE
5
N
0.000
3
N.R
IUS (
80
Ch.=47980.000m
m)
31
UMB
N
NGT
Lvl.=1583.091m
m)
ER
ELEV
SPE
NOR
H (m
)
LEAD
ATIO
ED (
TRAIL
TING
G=-0.430%
L=40.000m
IN
ING
(X)
G=-0.490%
L=50.000m
KMP
N (e%
G (Y
H
(m)
Lvl.=1582.915m
(m)
R=1200.0m
R0
Lc=36.059m
Lvl.=1582.846m
48040 1583.957 1583.164 1583.836 1583.836 1582.766 1582.759
4460
41.9
3788
38
30.9
2
405.0
G=-0.780
L=50.000
NO.
REV
Prow
DATE
FRL At
FRL At
Design
OGL At
Median
Shyness
Centerline
Carriageway
Service Road
Existing Road
Paved Shoulder
Proposed Structure
LEGEND :- Profile
DESCRIPTION
LEFT DRAIN IL(m)
DESIGN CHAINAGE
LEFT SR INNER EDGE LVL
HORIZONTAL ALIGNMENT
RIGHT SR INNER EDGE LVL
80
G=-0.430%
L=40.000m
21
N.R
0.000
0.000
36.059
G=-0.490%
L=50.000m
DESIGNED
1200.000
48020 1582.915
1584.828 1583.125 1583.983 1583.983 1582.895 1582.915 Ch.=48020.000m
446082.945
3788435.431
Lvl.=1582.915m
R=1200.0m
Lc=36.059m
48030 1582.837
1587.033 1583.143 1583.915 1583.915 1582.846 1582.837 Ch.=48030.000m
DRAWN
48040 1582.759
1583.957 1583.164 1583.836 1583.836 1582.766 1582.759
L
48050 1582.681
1582.846 1583.159 1583.758 1583.758 1582.686 1582.681
G=-0.780%
L=50.000m
48060 1582.603
1582.783 1583.033 1583.679 1583.679 1582.606 1582.603
HIP
48070 1582.525
1582.749 1582.905 1583.600 1583.600 1582.526 1582.525 Ch.=48070.000m
TRANSITION
LENGTH (m)
G=-0.800%
L=60.000m
CO-ORDINATE
Lvl.=1582.525m
CHECKED APPROVED
48080 1582.455
1582.718 1582.786 1583.528 1583.528 1582.446 1582.455
RADIUS (m)
R=-2000.0m
Ch.=48090.000m
Lc=41.938m
48090 1582.385
1582.674 1582.754 1583.471 1583.471 1582.366 1582.385
CURVE NUMBER
Lvl.=1582.366m
L
CURVE LENGTH (m)
Client:
G
SUPERELEVATION (e%)
48100 1582.315
1582.560 1582.759 1583.429 1583.429 1582.305 1582.315 Ch.=48100.000m
G=-0.700%
L=40.000m
48+100
HORIZONTAL CURVE DETAILS
Lvl.=1582.305m
EASTING (X)
LEADING (m)
TRAILING (m)
NORTHING (Y)
48110 1582.245
1582.335 1582.805 1583.403 1583.403 1582.285 1582.245 Ch.=48110.000m
Lvl.=1582.245m
48120 1582.225
1582.298 1583.472 1583.393 1583.393 1582.265 1582.225
48130 1582.205
1582.290 1584.108 1583.397 1583.397 1582.245 1582.205
22
SRINAGAR
80
N.R
0.000
0.000
41.938
48140 1582.185
1582.270 1582.643 1583.411 1583.411 1582.225 1582.185
-2000.000
G=-0.200%
L=60.000m
446030.923
3788405.084
Lvl.=1582.185m
48160 1582.145
1582.560 1583.206 1583.438 1583.438 1582.185 1582.145 Ch.=48160.000m
Lvl.=1582.145m
L
L
G
G
48170 1582.463
1582.388 1582.927 1583.451 1583.451 1582.463 1582.463 Ch.=48170.000m
Lvl.=1582.463m Footpath cum Drain-1.
5m
48180 1582.483
1582.095 1582.454 1583.464 1583.464 1582.483 1582.483 Service Ro ad -5. 5m
48190 1582.503
1581.937 1582.286 1583.478 1583.478 1582.503 1582.503 Carriageway-7.0m
G=0.200%
G=0.200%
L=30.000m
L=30.000m
IL=1580.695
IL=1580.695
48200 1582.524
1581.824 1582.232 1583.491 1583.491 1582.523 1582.524 Ch.=48200.000m Shyness-0.5m
Lvl.=1582.523m Median-1.0m
48210 1582.513
1581.712 1582.179 1583.497 1583.497 1582.538 1582.513 Ch.=48200.000m
Authority's Engineer:
Lvl.=1582.524m
48+200
48220 1582.503
1581.673 1582.147 1583.448 1583.448 1582.552 1582.503
ENDS AT CH. 48+214
RE WALL
Website: www.bloomcos.com
48230 1582.493
1581.627 1582.190 1583.333 1583.333 1582.566 1582.493
E-Mail: info@bloom-india.com
1105, B&C, Welldone Tech Park, Sect.
48 Sohna Road Gurugram H.R.-122018
48240 1582.482
1581.582 1582.233 1583.160 1583.160 1582.581 1582.482
1581.581 1582.240
48250 1582.472
1582.987 1582.987 1582.595 1582.472
48260 1582.462
1582.856 1582.856 1582.609 1582.462
48270 1582.452
1582.770 1582.770 1582.624 1582.452
Contractor :
48280 1582.441
1582.729 1582.729 1582.638 1582.441
48290 1582.431
1582.725 1582.725 1582.652 1582.431
48300 1582.421
1582.723 1582.723 1582.667 1582.421
48+300
48310 1582.411
1582.721 1582.721 1582.681 1582.411
48330 1582.390
1582.718 1582.718 1582.710 1582.390
Lst=471.239m
48350 1582.370
1582.714 1582.714 1582.738 1582.370
48360 1582.359
1582.713 1582.713 1582.753 1582.359
48370 1582.349
1582.711 1582.711 1582.767 1582.349
48380 1582.339
1582.709 1582.709 1582.781 1582.339
Proof Consultant :
48390 1582.329
1582.708 1582.708 1582.796 1582.329
G=0.143%
G=-0.103%
L=368.954m
L=368.954m
48400 1582.318
1582.706 1582.706 1582.810 1582.318
48430 1582.288
1582.701 1582.701 1582.853 1582.288
Earthen Shoulder-1.5m
Paved Shoulder-2.5m
48440 1582.277
1582.699 1582.699 1582.867 1582.277
IL=1580.959
Carriageway-7.0m
48450 1582.267
1582.697 1582.697 1582.882 1582.267 Shyness-0.5m
Median-0.6m
48460 1582.257
1582.696 1582.696 1582.896 1582.257
48470 1582.247
1582.694 1582.694 1582.910 1582.247
Safety Consultant :
48480 1582.236
1582.692 1582.692 1582.925 1582.236
uainfratechlegato@gmail.com
48500 1582.216
1582.689 1582.689 1582.953 1582.216
48520 1582.195
1582.685 1582.685 1582.982 1582.195
48530 1582.185
1582.684 1582.684 1582.996 1582.185
PROJECT :
48540 1582.175
1582.682 1582.682 1583.011 1582.175
N
48550 1582.164
1582.680 1582.680 1583.025 1582.164
48560 1582.154
1582.679 1582.679 1583.039 1582.154 Ch.=48568.954m
Lvl.=1583.052m
48569 1582.145
1582.677 1582.677 1583.052 1582.145 Ch.=48568.954m
Lvl.=1582.145m
KM 48+000 TO KM 48+569
DATE : PLAN & PROFILE
DRG. NO.
Aman Gupta
Aman Gupta
DESIGNED
MAR 2024
DRAWN
Manish Kumar
Manish Kumar
SB/HW/PP/DR/1D/04
Gaurav Rawat
Gaurav Rawat
CHECKED
BARAMULLA
REVISION:
R0
APPROVED