MATERIAL LIST
PART No. COMPONENT DESCRIPTION N.S. (IN) SCHED RATING END PREP. QTY DET-UNIQUE/CLIENT CODE
D
NP
/2"
5 1.1 PIPE
EL +27424 SEE ISO 1 PIPE, CS ASTM A106 GR B SCH=S-80 , 1.1/2 S-80 PE 3.5 M PIP-541SAF0004
PREEM DRG: M281307&MTC:006
01.50
WOOD DRG: 2300-52-AAA-CW-280-281307-03
2 PIPE, CS ASTM A106 GR B SCH=S-160, 3/4 S-160 PE 0.1 M PIP-541SAF0005
LINE NO: 1.5"-CW-A31-1B-281307/10-WET
E 2025700 00.75
A N 6260212 FITTINGS A
33 EL +27424 3 TEE, CS ASTM A105N SCH=NREQD, 01.50 1.1/2X NREQD 3000 SWE 1 ETEE-551HAB0005
1.1/2
4 REDUCING TEE, CS ASTM A105N SCH=NREQD 1.1/2X3/4 NREQD 3000 SWE 1 RTEE-551FAB0001
SCH=NREQD, 01.50 x 00.75
5 90 DEG ELBOW, CS ASTM A105N SCH=NREQD, 1.1/2 3000 SWE 2 90E-551HAB0003
628
1
01.50
6 FIGURE 8, CS ASTM A516 GR 60 SCH=NREQD, 1.1/2 150 RFTBE 1 F8F-561FBP0011
01.50
7 PLUG, CS ASTM A105N SCH=NREQD, 00.75 3/4 NREQD MTE 1 EHP-551HAB0031
CONN TO FLANGES
C2881_LUBE OIL SKID/O29605/28PTP215 12 8 SOCKET WELD FLANGE, CS ASTM A105N 1.1/2 150 RFFE/SWE 4 FLG-561NAB0030
1.5 in RFFE 150 F8 G9 B10 STEM EAST SCH=NREQD SCH=S-80 , 01.50
E 2024639 GASKETS
N 6260179 74
9 NON METALLIC GASKET, ARAMID FIBER WITH 1.1/2 150 4 GAS-576GBA0006
B EL +26400 B
NBR BINDER FILLER SCH=NREQD, 01.50
6
TAIL S BOLTS
1
10 STUDBOLTS, ASTM A193 GR B7 / ASTM A194 1/2 8 STU-572SAG0003
163
1 Open Position
F8 G9 B11 GR 2H - 75.0 MM LENGTH
11 STUDBOLTS, ASTM A193 GR B7 / ASTM A194 1/2 4 STU-572SAG0003
F8 G9 GR 2H - 85.0 MM LENGTH
7 VALVES / IN-LINE ITEMS
CONN TO
12 GATE VALVE, CS ASTM A105N SCH=NREQD 1.1/2 800 SWE 1 GAT-512GAQ0034
C2881_LUBE OIL SKID/O29615/28PTP228 10
1
58 SCH=NREQD, 01.50
1.5 in RFFE 150
E 2024639 13 GATE VALVE, CS ASTM A105N SCH=NREQD 3/4 800 SWE/FTE 1 GATST-512GAQ0036
SCH=NREQD, 00.75
147
N 6260179
EL +25650
C 1.5"-CW-A31-1B-281307/10-WET 1.1 C
/2"
N PD 84
1 3
1.1/2X1.1/2"NPD
F8 G9 B10 EL +26400
750
21
7
4
1.1/2X3/4"NPD 1
D TRACE: D
2
0
109
TRACE:
10
13
5
STEM EAST
37
E E
NOTES:
F 1. FOR PIPE SUPPORT STANDARD REFER TO WOOD DOC.NO.: 2300-8230-SP-000-0023. F
ALL MATERIAL REQUIRED TO FABRICATE PIPE SUPPORTS SHALL BE SUPPLIED BY THE MECHANICAL CONTRACTOR EXCEPT FOR PIPE TRUNNIONS AND WHERE NOTED.
2. ALL FLANGE BOLT HOLES SHALL STRADDLE CENTRE LINES UNLESS INDICATED OTHERWISE.
3. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE TO FACE OF FLANGE OR CENTRE LINE OF PIPE. DIMENSIONS ARE IN MILLIMETRES.
4. FIELD WELDS (FW) AND FIELD FIT WELDS (FFW) HAVE BEEN SHOWN ON THE ISOMETRIC TO GIVE GUIDANCE TO THE CONTRACTOR
THE CONTRACTOR SHOULD CONFIRM THE POSITION OF FFWs DURING CONSTRUCTION TO SUIT SPOOLING AND ERECTION
AN ADDITIONAL PIPE LENGTH OF 150mm HAS BEEN INCLUDED IN THE BILL OF MATERIALS WHERE FFWs ARE SPECIFIED. S1 24/11/22 ISSUED FOR CONSTRUCTION s.arumugam3 v.subramanian kannan.palaniyandi sriramana.palla2
- s.abhayankaran