(8CL) FP 1
(8CL) FP 1
(8CL) FP 1
1100
A
3150
RISER
7000
DOWN
FHC
FHC
9500
3850
FE FE FE FE
B 2500
2500
C
1100
1 2 3 4 5 6 7 8 9 10 11
600 45000 600
A 3000
3150
RISER
UP FHC FHC
9500
3850
8000
FE FE FE FE
B
2500
WP2
WP1
C
1100
REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH PARTIAL GROUND FLOOR (SHOWING LOCATION OF
PROPOSED PROJECTS CISTERN, PARTIAL ROOF PLAN, ELEVATION OF
MANUEL D. TORRES PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD 50
STANDARD TWO-STOREY OVERHEAD WATER TANK, ISOMETRIC DIAGRAM OF
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING WATER PUMPING SYSTEM, SCHEMATIC DIAGRAM FP-1
POSITION: MECHANICAL ENGINEER
OF WATER LEVEL CONTROL, LEGEND, SCHEDULE 57
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 8 - CLASSROOMS )
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17) OF EQUIPMENT