EQUIPMENT SUMMARY
Maikel Tosti
Firmato digitalmente da Maikel Tosti Firmato digitalmente da Umberto Corsi
ND: cn=Maikel Tosti, o, ou,
email=tosti.m@pegitaly.it, c=IT Roberta Lanteri ND: cn=Roberta Lanteri, o, ou,
email=lanteri.r@pegitaly.it, c=IT Umberto Corsi ND: cn=Umberto Corsi, o, ou,
email=corsi.u@pegitaly.it, c=IT
Mod. ST0002_0/xls
Data: 2018.03.05 14:11:55 +01'00' Data: 2018.03.05 14:12:14 +01'00' Data: 2018.03.05 14:12:39 +01'00'
This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THI-QAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet
PE14017AR 00 EL-1100 - 00 2/6
01-E-001 A/B Oil / Oil Heat Exchanger BEU 3,3 550 120 12,5 CS 120 16 CS Shell & Tube Heat Exchanger
ASTM ASTM
01-E-002 Water / Water Heat Exchanger PHE 1,5 40 80 11 100 11 Plate Heat Exchanger
B575 B575
This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THI-QAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet
PE14017AR 00 EL-1100 - 00 3/6
Design Design
Flow
Rev. Item Service Temp. Press. Material Description
[°C] [bar g] [m3/h]
Package including:
- No.1 03-F-001 Automatic Self-Cleaning Prefilter; filtration degree=50 µ.
03-PK-001 Water Treatment System - - - - - No.2 03-F-002 A/S Pre-filter; 1 operating / 1 istand by. filtration degree=25 µ.
- No.1 03-F-003 Filter Coalescer; Oil content: 1000 ppm inlet, 30 ppm outlet; filtration
degree=15 µ.
Package including:
- No.2 dosing pumps (1 oper., 1 stand-by); No.heads: 2 (for each pump); Head-1: flow
Demulsifier rate 20 l/h, discharge pressure 10 bar g; Material: S.S.;Head-2 : flow rate 20 l/h, discharge
04-PK-001 - - - -
Injection Package pressure 6.5 bar g; Material: S.S.
- No.1 storage vessel: capacity 2 m3, material S.S.
- No.1 calibration pot
Package including:
- No.2 dosing pumps (1 oper., 1 stand-by); No.heads: 3 (for each pump); Head-1: flow
rate 20 l/h, discharge pressure 13.5 bar g; Material: S.S.;Head-2 : flow rate 20 l/h,
Corrosion Inhibitor
04-PK-002 - - - - discharge pressure 6.5 bar g; Material: S.S.;Head-3 : flow rate 10 l/h, discharge pressure
Injection Package
5.5 bar g; Material: S.S..
- No.1 storage vessel: capacity 2.5 m3, material S.S.
- No.1 calibration pot
Package including:
- No.2 dosing pumps (1 oper., 1 stand-by); No.heads: 4 (for each pump); Head-1: flow
rate 20 l/h, discharge pressure 13.5 bar g; Material: S.S.;Head-2 : flow rate 20 l/h,
Scale Inhibitor discharge pressure 6.5 bar g; Material: S.S.;Head-3 : flow rate 10 l/h, discharge pressure
04-PK-003 - - - -
Injection Package 5.5 bar g; Material: S.S.; Head-4 : flow rate 2 l/h, discharge pressure 7.5 bar g; Material:
S.S.
- No.1 storage vessel: capacity 2.5 m3, material S.S.
- No.1 calibration pot
This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THI-QAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet
PE14017AR 00 EL-1100 - 00 4/6
Centr. Electr.
01-P-001 A/S Charge Pumps 1/1 455 897 90 6,6 - API Class S-6 API Class S-6 130
Horiz. Motor
Centr. Electr.
01-P-002 A/S Fresh Water Pumps 1/1 20 1000 100 7,5 - API Class S-6 API Class S-6 15
Horiz. Motor
Centr. Electr.
01-P-003 A/S Recycle Water Pumps 1/1 21 960 120 5,5 - API Class D-1 API Class D-1 10
Horiz. Motor
This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THI-QAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet
PE14017AR 00 EL-1100 - 00 5/6
Centr. Electr.
03-P-001 A/S Effluent Water Pumps 1/1 349 1000 100 48 - API Class D-1 API Class D-1 745
Horiz. Motor
Centr. Electr.
03-P-002 A/S Sump Pumps 1/1 2 850 100 6,5 - API Class S-6 API Class S-6 20
Horiz. Motor
This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THI-QAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet
PE14017AR 00 EL-1100 - 00 6/6
02-V-001 Closed Drain Drum Horiz. 7200 2600 120 3,5 CS 3.0 N
03-V-001 Accumulated Water Tank Vert. 4000 1800 120 9,0 CS 6,0 N