Overhaul MET turbocharger
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 8
MET Turbocharger Line-up & Basic Construction
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 9
MET Turbocharger Line-up & Basic Construction
Compressor Impeller
Rotor Shaft
& Turbine Blade
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 10
Kind of Maintenance
Kind of Work scope
Maintenance
Initial Check of ・Remove compressor side
Bearings parts(Impeller, support ,etc.)
(Compressor side) ・Check of thrust bearings
condition.
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 11
MET Turbocharger – Maintenance Guideline
Sample, relevant for MET71, -66 and -60 types
5 years 10 years 15 years
10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 (Hrs)
Working Items
Initial Check of Bearings 【Approx. 8,000 Hrs after vessel in service】
(Compressor side)
Turbine Inspection, and
【Every 12,000 – 15,000 Hrs】
Cleaning
Full Overhaul 【Every 20,000 – 30,000 Hrs】
Necessary Parts
Overhaul Kit “A”
Overhaul Kit “B”
Overhaul Kit “C1+C2”
Recommended Parts
Nozzle Ring
Replacement of so-called “Hot Parts”
Gas outlet guide shall be considered after 10 years of
service due to aging wear
Turbine Blades
Initial Check of Bearings (Compressor side) is recommended to check no damage resulting from
foreign particles in oil pipes during new-building assembling work has happened.
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. Please refer to TZ-E002-2932-R12 12
Stock of Overhaul Kit
Recommendation for spare parts as onboard ship’s stock
Initial check of
To be stocked as spare
Kit “A”
(consumable parts)
bearings parts on-board as kit
(Compressor side)
Turbine Inspection,
Kit “B”
(consumable parts)
and Cleaning
Larger
parts(Blade/
Nozzle) Consumable
22% parts (O-
Yes ring/Packing)
37%
No 48% C1 covers
52% Small parts consumable parts
(Bearing,
Labyrinth, etc)
41%
C2 covers
these parts
Questionnaires result to repair dockyard @ June 2017
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 14