Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MET Turbo Charger

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

TZ-E002-5886

After service of MET turbocharger

2018
Turbocharger Service Section,
Turbocharger Division

© 2017 MITSUBISHI HEAVY INDUSTRIES MARIE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved.
Overhaul MET turbocharger

© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 8
MET Turbocharger Line-up & Basic Construction

10 Sizes of Axial Turbine Turbochargers and 5 Sizes of Radial Turbine Turbocharger

© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 9
MET Turbocharger Line-up & Basic Construction

Integrated Head Tank Complete Non-cooling Gas Casing

Inside Bearing Arrangement Gas Inlet Casing


(Double)

Compressor Impeller
Rotor Shaft
& Turbine Blade

Seal Air Passage

© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 10
Kind of Maintenance
Kind of Work scope
Maintenance
Initial Check of ・Remove compressor side
Bearings parts(Impeller, support ,etc.)
(Compressor side) ・Check of thrust bearings
condition.

Turbine Inspection, ・Remove turbine side


and Cleaning parts.(gas inlet casing/nozzle
ring)

Full Overhaul ・Pulling out of rotor shaft is


required.
・Bearings are also removed &
inspected.

© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 11
MET Turbocharger – Maintenance Guideline
Sample, relevant for MET71, -66 and -60 types
5 years 10 years 15 years
10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 (Hrs)

Working Items
Initial Check of Bearings 【Approx. 8,000 Hrs after vessel in service】
(Compressor side)
Turbine Inspection, and
【Every 12,000 – 15,000 Hrs】
Cleaning
Full Overhaul 【Every 20,000 – 30,000 Hrs】

Necessary Parts
Overhaul Kit “A”
Overhaul Kit “B”
Overhaul Kit “C1+C2”

Recommended Parts
Nozzle Ring
Replacement of so-called “Hot Parts”
Gas outlet guide shall be considered after 10 years of
service due to aging wear
Turbine Blades

Required Working Time for one T/C : Engineers x Hrs


Initial Check of Bearings (Compressor side) : 2 x 5Hrs
Turbine Inspection, and Cleaning : 2 x 3Hrs
Full Overhaul : 2 x 10Hrs

Initial Check of Bearings (Compressor side) is recommended to check no damage resulting from
foreign particles in oil pipes during new-building assembling work has happened.

© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. Please refer to TZ-E002-2932-R12 12
Stock of Overhaul Kit
Recommendation for spare parts as onboard ship’s stock

Overhaul Kit Relevant service job Photo

Initial check of
To be stocked as spare
Kit “A”
(consumable parts)
bearings parts on-board as kit
(Compressor side)

Turbine Inspection,
Kit “B”
(consumable parts)
and Cleaning

Only necessary to order


the actual consumed
Kit “C1 + C2” parts after service jobs
(C1:consumable parts
Full Overhaul
C2:condition basis parts)

Ø No urgent arrangement for required spare parts


Advantages Ø No urgent arrangement in case of trouble
Ø No worry about lead time
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. Please refer to TZ-E002-5628 13
Stock of Overhaul Kit
【Questionnaires Result to Dockyard(Repair)】

• Experiences of urgent arrangement of necessary parts : About 40%


• Consumable parts such as O-rings : 40%

Experiences of urgent What kind of parts were needed?


arrangement
(Hearing to dockyards) Others
0%

Larger
parts(Blade/
Nozzle) Consumable
22% parts (O-

Yes ring/Packing)
37%
No 48% C1 covers
52% Small parts consumable parts
(Bearing,
Labyrinth, etc)
41%
C2 covers
these parts
Questionnaires result to repair dockyard @ June 2017
© 2017 MITSUBISHI HEAVY INDUSTRIES MARINE MACHINERY & EQUIPMENT CO., LTD. All Rights Reserved. 14

You might also like