Abstract
There has been and will always be failures in construction business, like any other business.
Engineers and Consultants are paying serious attention to prevent and learn from them.
There is nothing stationery against the nature forces. It is quite often in the façade industry,
either designers pay less or no attention to the building movements or underestimate its
interactions. In the building envelope, the impact will be so severe with devastating damages to
the building and its services; resulting expensive rectifications and disruptive occupancy of the
building.
Mistakes are being made during the design, fabrication and installation stages. However most of
them are still caused by, misinterpreting the basic physics rules and the main principles. Every
failure tells us something, only if we listen to it correctly. We must not only criticize, punish or just
fix it, but learn from them. We need to empathize to see which mistakes are repeated, which main
principal is not understood by the designers and installers.
Basic design principles of joints and allowances for adequate movements start from these typical
facade details. Simple verifications and design process may avoid disruptive impact on post
completions.
Not only avoiding failures, but also using the information, researching and collecting data, will
help us improve the Facade sector.
On this note two cooperating Facade Consultant Companies, each working in different regions
and experienced in dealing with problematic issues, came together to share the experiences by
presenting a detailed work, on reasons, facts, statistics, solutions, suggestions and future
preventions on Facade Failures.
Keywords
1. Introduction
Buildings as homes, offices, hotels or hospitals, are man-made structures intended for human use.
These are shelters and physical divisions of the human habitat which supply comfort and safety.
Many of the definitions of Building say “a structure with a roof and wall for people use”. Wall is
something mentioned primarily and we believe it refers to the outer walls.
Outer walls of the building, together with the windows, glazings and claddings, are either a
border or a filter between the indoor and outdoor conditions. These are the elements that
provide most of the comfort conditions we need.
The severity of the problem, with the building envelope, may vary from a minor performance loss
to a devastating collapse, but in either case our comfort or more critically our safety will be under
threat. Therefore this means, the purpose and functionality of this element of the building is not
succeeded.
There are and have been many problems occurred with the windows, curtain walls and claddings
(envelope) of the buildings. And mainly we have learned from them a lot. But the technology has
developed very fast. The Investments are getting larger every decade, also the size of the
buildings and complexity. Unfortunately the speed of learning from past mistakes is not enough
to keep up following.
It is not possible to overview all mistakes and not necessary to examine the ones that are not
repeating. In this study, we will consider some of these failures and mistakes through our 50 years
old experience and daily facts from some cases.
https://www.cephedanisman.com/yazi04.htm 1/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
Many of these failures due to miscalculations or poor engineering are studied before.
Furthermore there are more complex problems such as ‘nickel-sulfide inclusion’, which causes
serious concerns on glass applications. Here we will mainly focus on the mistakes or misses that
were made during the designs, shop drawing preparation or design development and
implementation stages including workmanship issues and construction failures. That we believe,
these could have been easily prevented with right approach and checks in place. And we will try
to find what reality lies behind these mistakes, we will try to go to the roots and find if there is a
common solution.
2. Methodology
The authors of this paper are from Turkey and India, consultants of projects mainly in Turkey,
Singapore, Malaysia, Russia, India, North Africa and middle east countries. There are of course
some similarities and differences of the failures. We are going to show some case studies, and
some other examples. These are some mistakes that we observed in different projects. We have
used examples from different projects in each single case study. So we can tell that these are
common mistakes or common problems.
Failures must be sorted in types. Miscalculation and poor engineering problems, materials and
supply chain problems, design problems and workmanship problems are the most important
ones. We will focus on the last two.
In fact the first case study is not only one case, this is one common problem from three different
actual projects of FMT Façade Consultants. The same mistake has been done by the designers
during the shopdrawing phase and also by the technicians during the installation.
The first project is in Istanbul, erected recently (year 2014). Below drawing was submitted by the
façade contractor as the shopdrawing. The Façade of this part of this building has been designed
as “window wall”, glazed facades are located between slabs and the slab edges are covered with
metal sheet cladding. Therefore in each floor there is a bottom end of the glazed façade. Because
of the heights of the floors and since in Turkey there is not any developed window wall systems
such as in the U.S., usually the façade specialist are using Stick Curtain wall system elements.
This is a Stick Curtain wall system, used as window wall, and the façade contractor submitted this
drawing for the bottom connections. Façade Consultant was involved in the project after
installation started, to inspect the problems in this project.
As it can be seen, there is an insulation membrane shown with red. And the technicians in the
jobsite applied the membranes exactly as they are in the drawings.
https://www.cephedanisman.com/yazi04.htm 2/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
As shown in the above picture, technicians kept respecting the shopdrawings. And as it can be
seen in the picture, the water insulation is in front of the system elements.
And also water drainage pipes were not used. The result is shown in the pictures below.
https://www.cephedanisman.com/yazi04.htm 3/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
These leakages were experienced after the main contractor was warned with the report including
figure 3 above. Finally the façade specialist, used drainage fittings (pipes) and sealed the bottom
line of the system in order to direct the water out.
This case shows us that neither the white collar people preparing these drawings nor the blue
collars, have any idea about the façade system, how the water moves, how the pressure
difference helps water infiltration and what condensation is.
https://www.cephedanisman.com/yazi04.htm 4/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
These are all basic principles that can only be learned through the scientific approach. And must
be taught to all façade teams including the installation technicians.
But this case is from another city, another Country and by another Façade specialist. The Russian
contractors did the same mistake in their shopdrawings.
Fortunately, Façade consultant was involved during the design development stage so the
contractor was warned and they corrected these details for allowing the water drains outside.
In these two examples the problem was caused by the shopdrawing designer, but below example
shows us even though the drawing was correct, the installation crew made the same mistake;
As we have mentioned, there is nothing stationery against the nature forces. It is quite often in
the facade designs industry, either designers pay no attention to the building movements or
underestimate its interactions.
The impact will be so severe in the building envelope with devastating damages to the building
and its services. There will be expensive rectifications and disruptive occupancy of the building as
https://www.cephedanisman.com/yazi04.htm 5/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
a consequence. Some facts of similar instances from a building investigation have been presented
here.
Following; showing pattern of failure modes of Unitized Curtain Wall systems and causes
Pictures illustrate the impact and post instance scenario of façade glazing panels behaviors.
Excessive joints movements are evident in these pictures of external and internal façades
https://www.cephedanisman.com/yazi04.htm 6/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
Figure 11, External view of joints failures
Basic design principles of joints and allowances for adequate movements start from these typical
facade details.
Simple verifications and design process may avoid disruptive impact on post completions.
Below there are some pictures from a very common mistake about the thermal movement
ignorance. Either the designers or the installation crew, underestimated the thermal expansions.
https://www.cephedanisman.com/yazi04.htm 7/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
It is clearly seen that, in these four different jobsites, the façade specialist installation crew have
no idea about the thermal expansions and thermal expansion joints.
Therefore these cases are showing us the importance of the scientific facts and how easily these
facts are underestimated due to the lack of knowledge and education.
Failures are threats to human life and safety, moreover failures cause loss of time, money,
prestige and most importantly precious human life.
What we have seen in these case studies could have been prevented easily if the designers or
implementing team had specific skills and experiences. On the other hand it is very obvious that,
overall skills and manpower of some building envelope industry and supply chain are trained and
already upgrading their skills as well as the adequate checks and supervisions are completed.
For example, the system designs of well known system house companies are tested and verified
or IGU’s that are obtained from producers are under well QAQC procedures. But when it comes
to the construction phase and the time is one of the most important issues, then the controls and
verifications are getting weaker.
System houses design the systems and their components very well and describe it in their
manuals sufficiently, but when it comes to connect them with other structures, mount to the
building structures, both the design developers of the construction, the crew preparing the
shopdrawings, and the foremen plus workers skip some crucial basics of physics and general
rules.
It seems that those technical teams do not have enough education about the basic physics rules.
Of course we are speaking about our regions but let us not forget that these are the fastest
growing regions and the demand of buildings is still increasing.
It is very clear that the project detail designers and the installation crews must be educated about
the building physics, they need to know why there is a thermal expansion gap or what is water
drainage.
The façade specialist companies must give importance to their inspections as well as their
internal educations. I have seen some internal random inspections of façade specialist companies
but only in few cases. Usually there is no double check with the stage of design development –
shopdrawings and installation. On the contrary it is observed that the controls during the factory
https://www.cephedanisman.com/yazi04.htm 8/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
productions are sufficient enough. Therefore the façade specialist must give the same importance
to the jobsites as well as their factories.
Another safe way of controlling the jobsite phase must be done by the developers or main
contractor by using the façade consultants.
Matrix illustrates the relationship between the designer’s skills and possible outcome of the
designs.
Either during the designing stage or the site works, the power of nature and materials must not
be underestimated, on the contrary these must be calculated very carefully. Even though the
correct application is shown in the drawings, the installer can underestimate and continue with
his own way. This implicates that the education of both the designers and the installers, has a very
high importance and necessity.
References
Tasarım ve Ana Sayfa I Sertifikalar I Sosyal Sorumluluk I KVKK, Yasal ve Etik Beyan I İnsan Kaynakları I İletişim
Geliştirme
serdarcamlica.com® FMT MÜHENDİSLİK, MÜŞAVİRLİK HİZMETLERİ ve DIŞ TİC. A.Ş. I info@cephedanisman.com I +90 (212) 709 2893 I +90 (212) 236 6828
FMT, Bristol
UWE
Üniversitesi
Cephe
Teknolojileri
Kurumu
CWCT ve
Uluslararası
Cephe
Mühendisleri
https://www.cephedanisman.com/yazi04.htm 9/10
8/6/2021 FMT - Façade Failures Due To Project Design Development And Workmanship
Odası SFE
üyesidir
https://www.cephedanisman.com/yazi04.htm 10/10