Appendix D - RII
Appendix D - RII
Appendix D - RII
Revision: 00
This area concerns maintenance work which, if improperly accomplished, could endanger the safe operation of the aircraft. RII items appear in all
elements of the Air Peace Ltd continuous airworthiness maintenance programme. They receive the same consideration regardless of whether or
not they are related to scheduled or unscheduled tasks.
The following are the designated items of maintenance and alterations which must be inspected by the RII Inspector whenever the type of
maintenance identified below is accomplished on the aircraft. Additionally, whenever any of these systems or Components are disturbed to gain
access to other components, their reinstallation must be an RII. The RII will require checking by a second person before release for flight. The
second person cannot be the one who performed the work. Any item may be designated as an RII if it is deemed necessary by the Quality
Manager.
RII ITEMS DESCRIPTION
27-11-00-220-001-A00 Inspect (Detailed Inspection) Aileron Primary Mechanical Control from Control Wheel to Aileron PCAs, Checking
27-21-01-220-001-A00 Cables, Pulleys, NRUs,
Inspect (Detailed Quadrants,
Inspection) RudderDisconnect System andControl
Primary Mechanical Mechanical LinksCables, Pulleys and Quadrants
Checking
Inspect
27-21-02-220-001-A00 from (Detailed
Control WheelInspection) Rudder
to Aileron PCAs,Main Control
Checking Feedback
Cables, Path, PCU Linkage and Mounting Points, Rudder
Pulleys,
Checking Cables, Pulleys and Quadrants
Actuator Attachments, Hinges, and Connecting Rods
NRUs, Quadrants,
27-31-01-220-001-A00 Inspect Disconnect
(Detailed Inspection) System
Elevator andCables
Control Mechanical Links
Revision: 00
Revision: 00
28-11-00-720-001-A00 Functionally Check critical bonding integrity of selected conduits inside the wing tank, Fuel Pump and FQIS connectors
at tank wall by conductivity measurements
28-21-01-220-001-A00 Inspect Electric Fuel Pump Connector
28-23-03-220-001-A00 Inspect Pilot Valve harness inside the conduit
28-23-04-220-001-A00 Inspect Vent Valve harness inside the conduit
28-41-01-720-001-A01 Functional Check of the Safe Life Features of the Fuel
28-41-03-220-001-A00 Inspect FQIS harness for clamp and wire jacket integrity
32-34-03-720-001-A00 Functionally Check Condition and Tension of Free-Fall Control
Cables