SIPSTypical Details-Version 1
DETAIL LIST AND DESCRIPTION
DETAIL LIST
DRAWING NUMBER DETAIL NUMBER DETAIL DESCRIPTION REVISION
DISCLAIMER
THE DETAILS PORTRAYED IN THIS MANUAL ARE FOR DESIGNERS REFERENCE AND GUIDANCE ONLY. THESE ARE SIPS INDUSTRIES PRODUCT TYPICAL
DETAILS. THE DETAILS INCLUDED ARE NOT DEFINITIVE AND WILL LACK THE WATERPROOFING, FINISHING AND OFTEN THE SPECIFIC ENGINEERING OF A
PARTICULAR PROJECT. CARE MUST BE TAKEN WHEN REPLICATING THESE DETAILS TO ENSURE THE SPECIFIC PROJECT DETAILS ARE ENTIRELY
CORRECT. DETAILS ARE FOR REFERENCE, CLARITY OF INFORMATION AND ARE NOT CONCLUSIVE, SHOULD YOU NEED MORE CLARITY OF DETAILING OR
WISH TO SEE ADDITIONAL DETAILING, PLEASE CONTACT SIPS INDUSTRIES TECHNICAL TEAM. SIPS INDUSTRIES DO NOT ACCEPT ANY LIABILITY FOR
PROJECT DETAILING.
SIPS INDUSTRIES HAVE WORKED ON MANY VARIOUS PROJECTS AND THE DETAILS HEREWITH ARE
MERELY TYPICAL CONSTRUCTION DETAILS, FOR ADDITIONAL DETAILS OR MORE COMPLEX
DETAILS, THERE IS A GOOD POSSIBILITY THAT SIPS INDUSTRIES HAVE DETAILS THAT MAY ASSIST,
PLEASE CONTACT SIPS INDUSTRIES TECHNICAL DEPARTMENT FOR SUCH INFORMATION
SIPS INDUSTRIES WILL UPDATE SPECIFICATIONS AND DETAILS ON A REGULAR BASIS AS REQUIRED
BY INDUSTRY STANDARDS OR PRODUCT AMENDMENTS REQUIRE, IT IS ADVISED YOU CHECK OUR
WESITE DOWNLOAD SECTION [WWW.SIPSINDUSTRIES.COM.AU] TO ENURE YOU HAVE THE
CURRENT FILES.
-plate + 12mm- X
90
°
BREATHER MEMBRANE
BATTENED CAVITY
CLADDING FINISH
FOAM GLUE LINE - CONTINUOUS
115 115
SIPS SIPS
102 X
145 115
SIPS SIPS
132 X
CHECK ENGINEERING
FOR FIXING SPEC
165 115
SIPS SIPS
152 X
BOTTOM BATTEN
VERTICAL HOLES DRILLED
AT 600 C/C, WRAPPED WITH
INSECT CONTROL MESH
100 AND TAPED
BATTEN/CAVITY
PLASTERBOARD
SELECTED CLADDING
CLOSING BATTEN
100
BATTEN/CAVITY
PLASTERBOARD
SELECTED CLADDING
CLOSING BATTEN - H3
BATTEN/CAVITY
SELECTED CLADDING
CLOSING BATTEN - H3
SIPS INDUSTRIES
EXTENAL WALL PANEL
Set Sole Plates 12mm
in from floor edge
132
Perimeter Beam
Dashed indicates
Alternative Joist
Direction / Span
BATTEN/CAVITY
PLASTERBOARD
Dashed indicates
Alternative Joist
Direction / Span
End Timber
DPC
BATTEN/CAVITY
PLASTERBOARD
SELECTED CLADDING
FLOORING
CLOSING BATTEN
SIPS INDUSTRIES FLOOR PANEL
SIPS INDUSTRIES
INTERNAL WALL PANEL WATER RESISTANT
WALL LINING
PLASTERBOARD
WATER PROOFING AND
TILING BY OTHERS
FLOORING
WATER RESISTANT
SECURA FLOORING
OR SIMILAR
SIPS INDUSTRIES
INTERNAL WALL PANEL WATER RESISTANT
WALL LINING
PLASTERBOARD
WATER PROOFING AND
TILING BY OTHERS
FLOORING
WATER RESISTANT
SECURA FLOORING
OR SIMILAR
Double Stud
2/ 35mm MGP10 Electrical Conduit
Internal Plasterboard/Lining
70
PRE-ASSEMBLED WALL
Continuous Glue Line
Nails are Scew Fixed
50mm Ringshank Nails @150mm centers
Steel Column to
Engineers Spec Timber to Suit
Steel Column to
Engineers Spec
35mm MGP10
Breathable Membrane
Cladding Material
Vertical Battens
PLAN
IF EXTERNAL WALL
BREATHABLE MEMBRANE
SIPS INDUSTRIES VAPOUR BARRIER
EXTENAL WALL PANEL
BATTEN/CAVITY
PLASTERBOARD
SELECTED CLADDING
Dashed indicates (if applicable)
Alternative Joist
Direction / Span
IF EXTERNAL WALL
PROCTOR WALL WRAP
BREATHABLE MEMBRANE
SIPS INDUSTRIES VAPOUR BARRIER
EXTENAL WALL PANEL
BATTEN/CAVITY
OSB Facing
SIPS Panel supplied by
SIPS
LAMINATED
LVL BEAMS
300
265
33
NAIL LAMINATION
m
0m
20 SECTION SIZE 'B' NAIL DIA NAIL LENGTH
35mm 3.06mm 75mm
B 45mm 3.3mm 90mm
63mm 3.3mm 100mm
10mm PLASTERBOARD
BREATHER MEMBRANE
145mm SIPS INDUSTRIES PANEL EXTERNAL CLADDING MATERIAL
AIR-TIGHT TAPE
120x35 MGP10 35mm EXERNAL BATTENS
* SIPS INDUSTRIES PANELS WILL ACCEPT ALMOST ANY WINDOW AND MAY NEED
PROJECT SPECIFIC DETAILING BY THE DESIGNER - WIINDOWS SHOWN ARE INDICITIVE ONLY
30
10mm PLASTERBOARD
BREATHER MEMBRANE
145mm SIPS INDUSTRIES PANEL EXTERNAL CLADDING MATERIAL
AIR-TIGHT TAPE
120x35 MGP10 35mm EXERNAL BATTENS
INTERNAL SILL
5°
HORIZONTAL BATTEN
145
SIPS PANEL
* SIPS INDUSTRIES PANELS WILL ACCEPT ALMOST ANY WINDOW AND MAY NEED
PROJECT SPECIFIC DETAILING BY THE DESIGNER - WIINDOWS SHOWN ARE INDICITIVE ONLY
DOUBLE OR TRIPLE
TIMBER ENDS
.
.
TOP PLATE
BOX BEAM BASE PLATE SIPS SPLINE
TOP PLATE
.
CRIPPLE STUDS
. SINGLE OR DOUBLE
AS SPEC BY ENGINEER
.
WINDOW INFILL PANELS
BASE PLATE
SIPS SPLINE
.
BASE PLATE
TOP PLATE
BASE PLATE
BASE PLATE
35
105
Varies
35
Continuous Bottom Plate
70 70
BB
Verticle Stud
Nailing at 150 c/c
70
TIMBER STUD
TIE DOWN STUD ENCLOSED WITHIN
PANEL
SOLE PLATE
150 150
30x1.0 GALVANISED TIE DOWN STRAP
FIXED VIA 6/2.8Ømm GALV NAILS TO
BOTH SIDES, ONE STRAP PER STUD
TIMBER STUD
O
SB
SIPS INDUSTRIES WALL PANEL
NAILING @ 60mm C/C
600
SOLE PLATE
HB FULLER FIRESOUND
SEALANT TOP OF WALL
JOINTING COMPOUND
CSR Gyprock Basecoat 45 or equivalent approved.
Nominal 50mm wide perforated tape along joints
on the outer layer of plasterboard
HB FULLER FIRESOUND
BOUNDARY
SEALANT
20
PROCTOR ROOFSHEILD
BREATHER MEMBRANE
VAPOUR BARRIER
DRESSED INTO GUTTER
20
338
BOUNDARY
HB FULLER FIRESOUND
SEALANT
25mm PLASTERBOARD SCREWS TOP OF WALL
Fixings are to be spaced at nominal 300mm centers
into the perimeter studs and 200mm into the vertical
butt joints, maintaining nominal 12-15mm spacing SIPS INDUSTRIES PANEL WALL
from the board edge. The spacing in the field of the BUILD TO MANUFACTURERS
sheets is to be 300mm. SPECIFICATIONS
41mm PLASTERBOARD SCREWS
Fixings are to be spaced at nominal 300mm centers
into the perimeter studs and 200mm into the vertical
butt joints, maintaining nominal 12-15mm spacing
from the board edge. The spacing in the field of the
sheets is to be 300mm.
40 or 50mm BUILDING GAP
50mm FIBREWOOL
ROXUL STONEWOOL or equivalent approved FIBRE WOOL INSULATION
insulation between SIPS wall with a density of MIN DENSITY 14kg/m³
14kg/m³ or greater for acoustic purposes
JOINTING COMPOUND
CSR Gyprock BAsecoat 45 or equivalent approved.
Nominal 50mm wide perforated tag along joints
on the outer layer of plasterboard
SEALANT
HB FULLER FireSound Acryllic Sealant to be applied
to the perimeter plasterboard interface as detailed on
ALL layers of Fyrcheck boards.
HB FULLER FIRESOUND
SEALANT
ACOUSTIC
THIS WALL SYSTEMS HAS BEEN TESTED IN ACCORDANCE WITH AS1191 -
REPORT REF ALA-12-089-2, RESULTING IN AN ACOUSTING RATING OF: Rw64(-2-7)
414
BOUNDARY
HB FULLER FIRESOUND
SEALANT
25mm PLASTERBOARD SCREWS TOP OF WALL
Fixings are to be spaced at nominal 300mm centers
into the perimeter studs and 200mm into the vertical
butt joints, maintaining nominal 12-15mm spacing SIPS INDUSTRIES PANEL WALL
from the board edge. The spacing in the field of the BUILD TO MANUFACTURERS
sheets is to be 300mm. SPECIFICATIONS
41mm PLASTERBOARD SCREWS
Fixings are to be spaced at nominal 300mm centers
into the perimeter studs and 200mm into the vertical
butt joints, maintaining nominal 12-15mm spacing
from the board edge. The spacing in the field of the
sheets is to be 300mm.
TOP HATS
40 or 50mm BUILDING GAP
Installed between the plasterboard layers as detailed. FIBRE WOOL INSULATION
Fixed at 600mm centers vertically. MIN DENSITY 14kg/m³
50mm FIBREWOOL
ROXUL STONEWOOL or equivalent approved
insulation between SIPS wall with a density of
14kg/m³ or greater for acoustic purposes
25mm FIBREWOOL
ROXUL STONEWOOL or equivalent approved
insulation between top hats with a density of
14kg/m³ or greater for its fire retartant properties
JOINTING COMPOUND
CSR Gyprock BAsecoat 45 or equivalent approved.
Nominal 50mm wide perforated tag along joints
on the outer layer of plasterboard
16mm CSR FYRCHECK
SEALANT PLASTERBOARD
HB FULLER FireSound Acryllic Sealant to be applied
to the perimeter plasterboard interface as detailed on
ALL layers of Fyrcheck boards.
13mm CSR FRYCHECK
PLASTERBOARD
HB FULLER FIRESOUND
SEALANT
UT
C
Primary Tape
OR Profiled Sill
. .
Cut Horizontally Secondary Sill Tape
to fit secondary tape
1.CUT MEMBRANE AS SHOWN 2.DRESS MEMBRANE INTO REVEAL 4.INSTALL WINDOW WITH SILL
3.APPLY SECONDARY SILL TAPE 5.IF NO SILL, APPLY PRIMARY TAPE
Dress Membrane
Over Flashing
TOP TAPE
Vertical Tape
Over SIll Tape DPC Lapped Under
Membrane by 150mm
6.APPLY VERTICAL SEALANT TAPES 7.APPLY TOP SEALANT TAPE 9.FOLD MEMBRANE DOWN
8.DRESS DPC BEHIND MAMBRANE
FIND THE OPENING CAREFULLY AND FIT SECONDARY WINDOW SILL APPLY PRIMARY TAPES, BEGINNING
CUT AN INVERTED 'Y' INTO THE MEMBRANE TAPE OR SIMILAR TRAY AT THE SILL OF THE WINDOW, THEN
VERTICALLY, AND FINALLY APPLYING
THE HEAD DETAIL AS ABOVE.
SELECTED GUTTER
AND FASCIA BOARD/PROFILE
SELECTED GUTTER
AND FASCIA BOARD/PROFILE
SIPS INDUSTRIES ROOF PANEL
GENERALLY 175mm THICK R4.4
SEE TECHNICAL SPECIFICATIONS
FOR SPANS AND OTHER INFORMATION
SELECTED SOFFIT LINING DORECT
TO PANEL OR TRADITIONAL ALTERNATIVE
SHOWN DASHED
SELECTED
SOFFIT
LINING SIPS INDUSTRIES ROOF PANEL
GENERALLY 175mm THICK R4.4
SEE TECHNICAL SPECIFICATIONS
FOR SPANS AND OTHER INFORMATION
SELECTED GUTTER
SELECTED GUTTER
AND FASCIA BOARD/PROFILE
TIMBER RAFTER WITH BIRDSMOUTH OVER
WALL PLATE, OR OVER PANEL END
SELECTED SOFFIT LINING DORECT
TO PANEL OR TRADITIONAL ALTERNATIVE
SHOWN DASHED
SELECTED GUTTER
PROVIDE PROFILED FLASHING BEHIND
GUTTER OVER EXTERNAL WALL AND
BREATEHR MEMBRANE
SELECTED
SOFFIT
LINING SIPS INDUSTRIES ROOF PANEL
GENERALLY 175mm THICK R4.4
SEE TECHNICAL SPECIFICATIONS
FOR SPANS AND OTHER INFORMATION
SELECTED GUTTER
AND FASCIA BOARD/PROFILE
Breather Membrane
Breather Membrane
PROFILED COLORBOND
METAL FLASHING