Dear Madam:
This certificate does not create any right nor can it be used as an authorization
to implement or commence with the operation of the project. This Office shall
be monitoring the project periodically to ensure strict compliance with the
stipulations cited in the attached ECC.
%referenceno%
SUBJECT to the conditions and restrictions set out herein labeled as Annexes
A and B:
PROJECT DESCRIPTION
This Certificate shall cover the ARUSO CO. LTD. Gasoline Refilling
Station with an area of Seven Hundred Fifty (750) square meters to
be located in Block 4, Lot 4093-A, National Highway, Purok Puso,
Brgy. Somosa, Tabogon, Cebu, Region R07 with geographic
coordinates of 10°58'15.8"N and 124°00'16.9"E.
PROJECT COMPONENTS
I, Maria Kelly A. Nolasco, Owner of ARUSO CO. LTD. with office address
located in Block 4, Lot 4093-A, National Highway Purok Puso, Brgy. Somosa,
Tabogon, Cebu, Region VII (Central Visayas), 6009 takes full responsibility in
complying with all conditions in this Environmental Compliance Certificate
(ECC).
TIN No.
Notary Public
Doc. No.
Page No.
Book No.
Series of
I. ENVIRONMENTAL MANAGEMENT
1. This ECC supersedes the Certificate of Non-Coverage (CNC) for the 16-kL
total storage capacity gasoline refilling station project docketed as CNC-
OL-R07-2023-06-02025 located within the same site issued on June 30,
2023 by the EMB Central Office;
5. The Proponent shall install and maintain air pollution control devices to
minimize dust and gas emissions from different sources. Likewise, the
Proponent shall ensure that emissions comply with the DENR standards
and all the provisions of RA 8749, the Philippine Clean Air Act of 1999,
and its Implementing Rules and Regulations at all times;
14. The Proponent shall allow entry of EMB7 field personnel into the project
site at all times to conduct monitoring and to validate the project’s
compliance to the ECC conditions stipulated therein;
19. The proponent shall ensure that the proof of authority over the project
area and tenurial are valid prior to implementation of the project. Any
complaint, conflict, and issue arising from the ownership or right over
the area/s covered shall be resolved by the proponent with the
appropriate concerned Government Agency/Entity (e.g., DENR7, affected
LGUs, Registry of Deeds, Judicial Courts, etc.);
III. RESTRICTIONS
19. This certificate should not be construed as a permit or any form of proof
of authority/ownership;
22. The Proponent shall not commercialize nor illicitly dispose outside the
project site of any quarried material resulting from clearing and
development of the project. Otherwise, a separate ECC will have to be
applied for quarry activities;
23. No other activities shall be undertaken other than what was stipulated in
the updated IEEC document. Any expansion or modification of the
Project beyond the project description or any change in the activity shall
be subject to a new EIA requirement; and
For the assistance and guidance of the Proponent and Government agencies
concerned in the management of the Project and for better coordination in
mitigation of the impacts of the Project on its surrounding areas and the
environment, the following recommendations are forwarded to the parties and
authorities concerned for appropriate action.
6. The proponent shall comply with the Labor Code of the Philippines
DOE
7. The proponent shall comply with pertinent policies relative to energy
exploration, development, utilization distribution, and conservation
BFP – Bureau of Fire Protection
8. The proponent shall comply with the fire safety protection requirements of
the Fire Code of the Philippines