PT.

HAKAASTON
Departmen Produksi 1
LAPORAN MINGGUAN PRODUKSI BULAN-XI 2023
Periode : 26 Oktober - 25 November 2023
Unit Produksi Aceh

` Ongoing Project
Kontrak/ PO sd Bulan Lalu 2023 Pekan-1 Pekan-2 Pekan-3 Pekan-4 Pekan-5 Pekan-6 Bulan ini Tahun ini Total sd Saat Ini
Jenis Produksi Sat Harga Sat (Rp) Carry Over 2020
Volume (Rp) Volume (Rp) Volume (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) Vol (Rp) %

MOB DEMOB LS 4.000.000.000 1 4.000.000.000 0,50 2.000.000.000 - - - - - - - - - - - - - - 0,50 2.000.000.000 50,00%


PERSIAPAN LAHAN LS 1.000.000.000 1 1.000.000.000 1,00 1.000.000.000 - - - - - - - - - - - - - - 1,00 1.000.000.000 100,00%
PRIMECOAT KG 13.500 423.747,61 5.720.592.735 260.371,27 3.515.012.145 - - - - - - - - - - - - - - - - - - 260.371,27 3.515.012.145 61,44%
TACK COAT KG 14.900 172.100,29 2.564.294.321 27.167,95 404.802.455 - - - - - - - - - - - - - - - - - - 27.167,95 404.802.455 15,79%
HOTMIX AC BASE TON 1.327.980 42.374,76 56.272.833.785 47.068,66 62.506.239.107 - - - - - - - - - - - - - - - - - - 47.068,66 62.506.239.107 111,08%
HOTMIX AC BC TON 1.350.000 6.180,73 8.343.985.500 2.062,51 2.784.388.500 - - - - - - - - - - - - - - - - - - 2.062,51 2.784.388.500 33,37%
HOTMIX AC WC TON 1.405.042 16.327,37 22.940.639.457 13.343,03 18.747.516.623 - - - - - - - - - - - - - - - - - - 13.343,03 18.747.516.623 81,72%
Sub Total hotmix dan Pendapatan 64.883 100.842.345.797 62.474 90.957.958.830 - - - - - - - - - - - - - - - - - - 62.474,2 90.957.958.830
Kontrak Baru ADD 01 - - - - - -
MOB DEMOB LS 2.000.000.000 1,00 2.000.000.000 - - - - - - - - - - - - - - - - - - 0,00%
PRIMECOAT KG 13.500 2.382,52 32.164.020 2.382,52 32.164.020 - - - - - - - - - - - - - - - - - - 2.382,52 32.164.020 100,00%
TACK COAT KG 14.900 1.110,23 16.542.427 1.110,23 16.542.427 - - - - - - - - - - - - - - - - - - 1.110,23 16.542.427 100,00%
HOTMIX AC BASE TON 1.573.661 461,59 726.386.181 461,59 726.386.181 - - - - - - - - - - - - - - - - - - 461,59 726.386.181 100,00%
HOTMIX AC BC TON 1.652.717 - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0!
HOTMIX AC WC TON 1.675.898 420,41 704.564.278 420,41 704.564.278 - - - - - - - - - - - - - - - - - - 420,41 704.564.278 100,00%
PRIMECOAT KG 13.500 100.853,49 1.361.522.115 22.705,87 306.529.239 25.457,01 271.618.785,00 - - - - - - 1.000,00 13.500.000 - - 6.124,00 82.674.000 7.124,00 96.174.000,00 32.581,01 439.843.635,00 55.286,88 746.372.874 54,82%
TACK COAT KG 14.900 115.773,49 1.725.025.001 4.369,09 65.099.396 2.877,80 42.879.239,31 - - - - - - - - 2.989,00 44.536.100 - - 2.989,00 44.536.100,00 5.866,80 87.415.339,31 10.235,89 152.514.735 8,84%
HOTMIX AC BASE TON 1.622.272 27.331,63 44.339.338.063 5.320,09 8.630.633.044 5.814,60 7.439.901.619,20 - - - - - - 230,51 373.949.919 - - - - 230,51 373.949.918,72 6.045,11 9.806.812.689,92 11.365,20 18.437.445.734 41,58%
HOTMIX AC BC TON 1.700.301 - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0!
HOTMIX AC WC TON 1.722.929 5.224,21 9.000.942.911 585,13 1.008.137.446 1.498,35 2.581.550.667,15 - - - - - - - - 1.048,65 1.806.749.496 - - 1.048,65 1.806.749.495,85 2.547,00 4.388.300.163,00 3.132,13 5.396.437.609 59,95%
Sub Total hotmix dan Pendapatan 33.437,8 54.771.231.433,6 6.787,2 ############### 7.313,0 10.335.950.310,7 - - - - - - 230,51 373.949.919 1.048,65 1.806.749.496 - - 1.279,2 2.321.409.514,6 8.592,1 14.722.371.827,2 15.379,3 26.212.427.858,4
Readymix Fs 45 M3 1.288.000 50.544,10 65.100.800.800 - - - - - - - - - - - - - - - - - - - - - - 0,00%
Readymix Class B1 M3 1.030.000 5.000,00 5.150.000.000 23,00 23.690.000 - - - - - - - - - - - - - - - - - - 23,00 23.690.000 0,46%
Readymix Class B2 M3 1.081.250 6.933,31 7.496.641.438 2.912,50 3.149.140.625 - - - - - - - - - - - - - - - - - - 2.912,50 3.149.140.625 42,01%
Readymix Class C M3 943.850 18.500,00 17.461.225.000 620,01 585.196.439 - - - - - - - - - - - - - - - - - - 620,01 585.196.439 3,35%
Readymix Class D M3 821.850 - - - - - - - - - - - - - - - - - - - - - - - - #DIV/0!
Readymix Class E M3 765.800 17.300,00 13.248.340.000 1.556,06 1.191.630.748 - - - - - - - - - - - - - - - - - - 1.556,06 1.191.630.748 8,99%
Sub Total hotmix dan Pendapatan 98.277 108.457.007.238 5.112 4.949.657.812 - - - - - - - - - - - - - - - - - - 5.111,6 4.949.657.812
TACK COAT KG 14.900 554,14 8.256.686 1.134,14 16.898.686 - - - - - - - - - - - - - - - - - - 1.134,14 16.898.686 204,67%
HOTMIX AC BC TON 1.525.000 37,26 56.821.500 37,26 56.821.500 - - - - - - - - - - - - - - - - - - 37,26 56.821.500 100,00%
HOTMIX AC WC TON 1.595.000 147,02 234.496.900 334,42 533.399.900 - - - - - - - - - - - - - - - - - - 334,42 533.399.900 227,47%
Sub Total hotmix dan Pendapatan 184 291.318.400 372 607.120.086 - - - - - - - - - - - - - - - - - - 371,7 607.120.086
TACK COAT KG 12.500 1.320,00 16.500.000 1.320,00 16.500.000 - - - - - - - - - - - - - - - - - - 1.320,00 16.500.000 100,00%
HOTMIX AC-BC LOCCO TON 1.150.000 120,53 138.609.500 120,53 138.609.500 - - - - - - - - - - - - - - - - - - 120,53 138.609.500 100,00%
HOTMIX AC WC TON 1.400.000 233,73 327.222.000 233,73 327.222.000 - - - - - - - - - - - - - - - - - - 233,73 327.222.000 100,00%
Sub Total hotmix dan Pendapatan 234 482.331.500 121 482.331.500 - - - - - - - - - - - - - - - - - - 233,7 482.331.500
210.073.002.935 96.997.068.228 - - - - - - - 14.722.371.827,23 96.997.068.227,55

Aceh Besar, 25 November 2023


Disetujui Oleh : Dibuat Oleh :

Taufikurrachman Saleh Irfandi


Plant Manager Teknik