02 Contents

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Doc.

No:SPI/QSP – A
QUALITY SYSTEM PROCEDURE Issue: C
Rev. No: 00
Date: 01.12.2018
CONTENTS Page 1 of 4

Sl.No. Process cross Reference

1 TOP MANAGEMENT (MRM & BUSINESS PLAN)


Quality Management System ( Internal & External Issue, Document Management ,
2 Risk Analysis )

3 Contract Review (Marketing)


4 Process Design
5 Purchase and Supplier Management
Production - (Pressing and Secondary Operations)
6

7 Maintenance Process
Quality Assurance (Inspection ,Testing, Measurement Control ,NC Product Handling,
8 CAPA )

Customer Feedback Process with Customer Compliant


9
Stores & Dispatch
10
Human Resources
11 (Training, Employee Motivation)

Internal Audit Process


12
Continual Improvement
13

SRI PANDIYAN INDUSTRIES


Doc. No:SPI/QSP – A
QUALITY SYSTEM PROCEDURE Issue: C
Rev. No: 00
Date: 01.12.2018
CONTENTS Page 2 of 4

No of
Section Issue / Revision Title Pages

SRI PANDIYAN INDUSTRIES


Doc. No:SPI/QSP – A
QUALITY SYSTEM PROCEDURE Issue: C
Rev. No: 00
Date: 01.12.2018
CONTENTS Page 3 of 4

QSP-01 C/Rev 00 / 01.12.2018 Control of Documents 06

QSP-02 C/Rev 00 / 01.12.2018 Control of Records 04

QSP-03 C/Rev 00 / 01.12.2018 Business Planning & Management Review 03

QSP-04 C/Rev 00 / 01.12.2018 Human Resource Management & Training 04

QSP-05 C/Rev 00 / 01.12.2018 Internal Audit 05

QSP-06 C/Rev 00 / 01.12.2018 Control of Non Conforming Products 03

QSP-07 C/Rev 00 / 01.12.2018 Corrective and Preventive Actions 03

QSP-08 C/Rev 00 / 01.12.2018 Advanced Product Quality Planning (APQP) 13

QSP-09 C/Rev 00 / 01.12.2018 Production Part Approval Process(PPAP) 06

QSP-10 C/Rev 00 / 01.12.2018 Incoming inspection 03

QSP-11 C/Rev 00 / 01.12.2018 Contract Review & specification Review Procedure 03

QSP-12 C/Rev 00 / 01.12.2018 Contingency Plan Procedure 04

QSP-13 C/Rev 00 / 01.12.2018 Stores Procedure 03

QSP-14 C/Rev 00 / 01.12.2018 Failure Mode Effective Analysis (FMEA ) 10

QSP-15 C/Rev 00 / 01.12.2018 Customer Communication and Satisfaction 02

QSP-16 C/Rev 00 / 01.12.2018 Equipment Maintenance And Calibration 03

QSP-17 C/Rev 00 / 01.12.2018 Material Handling , Preservation And Storage 02

QSP-18 C/Rev 00 / 01.12.2018 Final Inspection ,Packing & Dispatch 02

QSP-19 C/Rev 00 / 01.12.2018 Continual Improvement 02

QSP-20 C/Rev 00 / 01.12.2018 Quality Assurance 02

QSP-21 C/Rev 00 / 01.12.2018 Customer Return Analysis


03
QSP-22 C/Rev 00 / 01.12.2018 Measurement system Analysis 04

QSP-23 C/Rev 00 / 01.12.2018 Rework 03

QSP-24 C/Rev 00 / 01.12.2018 Customer related process / Product Realization 03

QSP-25 C/Rev 00 / 01.12.2018 Purchase Process 06

02
QSP-26 C/Rev 00 / 01.12.2018 Control of customer supplied Materials
03
QSP-27 C/Rev 00 / 01.12.2018 Identification & Traceability

QSP-28 C/Rev 00 / 01.12.2018 Machine Maintenance & Tooling Management 03

QSP-29 C/Rev 00 / 01.12.2018 Engineering Change Management 03

QSP-30 C/Rev 00 / 01.12.2018 Production 02

QSP-31 C/Rev 00 / 01.12.2018 4M change control 09

SRI PANDIYAN INDUSTRIES


Doc. No:SPI/QSP – A
QUALITY SYSTEM PROCEDURE Issue: C
Rev. No: 00
Date: 01.12.2018
CONTENTS Page 4 of 4

Customer Specific Requirements Cross reference:

Procedure Reference Description SQAM Reference

QSP-08 Advanced Product Quality Planning (APQP)

QSP-24 Customer Related Process

QSP-29 Engineering change Management

QSP-29 Engineering change Management

QSP-27 Identification & Traceability

Final Inspection ,Packing & Shipping


QSP-18 Procedure

QSP-06 Control of Nonconforming Products

QSP-05 Internal Audit

QSP-01 & 02 Control of Documents & Records

QSP-25 Purchasing

SRI PANDIYAN INDUSTRIES