HIRA of Plaster Work.
HIRA of Plaster Work.
HIRA of Plaster Work.
Resultant Risk
Sr. No. Sub activity Hazards Risk Severity Probability Control Measures Required Additional control measure. Severity Probability Resultant risk Risk Level
risk Level
1.Unauthorized operator.
1.Transportation to be done by authorized
operator,
2.Damage 1.Major & Minor
Sand, cement 2.Proper access to be provided for
1 equipment. 3.workers hit injury. 4 2 8 M 4 1 4 L
delivery at site Vehicle.
by machine. 2.causality
3.Training and TBT given
4.Im proper access
.
1.Fall of material. 1.Major ,Minor 1.Job specific training given.
2.Fall of person during injury, 1.Third party inspection shall be done of 2.TBT given.
pulling of bucket. 3.Failure crane. 3.Close supervision.
of machine. 2.casuality, 2.Physical fitness of machine shall be 4.Crane checklist to
Material shifting 4. Dust hazard. 3.skin diseases. checked prior to use. be followed.
2 4.Respiratory 4 3 12 H 5.Nose 4 1 4 L
by crane. 3.Over load prohibited.
disease. 4.Job specific mask shall be used.
PPEs used. 6.Dust
5.Proper edge protection provided. control mesaure shall be
followed.
1.Flying object. 1. Eye injury. 1.Proper working platform provided. 1.TBT and training given.
2.Improper tools. 2.Cut injury. 2.Full body harness,Safety helmet,safety 2. Safe
3.Damage tools. 3.Major/Minor shoes shall be used. working platform provided.
4.Fall from injury. 3.Over head protection provided.
Chicken mess height. 3.Close supervision required.
3 fixing and bull 5.Fall of material 4.Casualty 4 3 12 H 4. Height work permit shall be used. 4 1 4 L
marking. 5.scafolding platform shall be inspected
before use.
6.Right tools shall be used.
7.Tools shall be checked
before used.
1.Fall of object. 2.Improper 1.Major/Minor Injury 1.Secure working platforms. 1.Job specific training given.
base. 3.Untrained worker. 2.casualty. 2.No opening. 2.TBT given.
4.Improper communication. 3. No loose materials on the 3.Close supervision.
height. 4.Scaffold material to be check
4.Throwing of materials is strictly before use.
Scaffold and prohibited. 4.Scaffold rect by trained
4 4 3 12 H 4 1 4 L
working platform. 5.Only trained and experienced scaffolder.
scaffolder to be engage for erection work. 6. Cautionary signage
shall be displayed.
7.Barricading under the work
area