0 08-08-2017 SUBMISSION FOR APPROVAL VIVEK SAJI


R.No DATE REVISION CHD APPD
1
2

A A

A/C75
Ø42
ISOMETRIC VIEW
47
A/F65
120

TEST REQUIREMENTS

B 1. DIMENSIONAL REPORT B
2. INTERFACE CHECK THROUGH QC/SBC PRIOR
TO BULK PRODUCTION
3. SURFACE FINISH : 3.2 MICRONS
a 4. HYDROSTATIC TEST : PROOF PRESSURE TEST AT 1.5 TIMES AND LEAK
1.6 TEST AT 1.25 TIMES OF THE WORKING PRESSURE
5. LPT
6. TRACEABILITY MARKING : AIPL & BOM ID.
Ø42
Ø32

12 Ø55
120

C C

A
R0 30
.5 °

1x45°
M60X2

A/C75
Ø64
Ø44

1x45°
D D
36 0
20 A
+1.0 A/F65 1 SHEET NO. 1 1
61

SCALE

75
1 2 3 4 5 6