Construction of

CONTRACTOR DAILY REPORT DATE Friady,February 9, 2024

PROJECT : Construction of Contract Number

Weather Report Sunny Temperature Min°C 24 Max°C 32

Main contractor Report N° 1

Contractor Mainpower Contractor's Equipments

Indirect Direct

Description Qty Description Qty Equipement Qty


PROJECT MANAGER 1 GENRAL FOREMAN 1 BOB CAT 2
PROJECT PLANNER 1 CIVIL SUPERVISOR 1 FORK LIFT 1
SITE CONSTRUCTION MANAGER 1 CIVIL FOREMAN 1 MOBILE CRANE 1
RHSE 1 CARPENTER 1 EXCAVATOR 1
QHSE 1 MASON 5 AIR COMPRESOR 1
ARCHITECT 1 STEEL FIXER 4 CONCRETE VIBRATOR 2
QUANTITY SURVEYOR 1 HELPER 2 GRADER 1
MEP MANAGER 1 ENGINE DRIVER 1 CONCRETE MIXER 1
SORE KEEPER 1 Electrician 1 CONCRETE PUMP 1
COST CONTROLER 1 BAR BENDING MACHINE 1
CUTTING MACHINE 1
JAJCK HAMMER 1
GRINDING WHEEL 1

Subtotal 10 Subtotal 17 Subtotal 15


Subcontractor Mainpower Subcontractor's Equipments
Indirect Direct
Description Qty Description Qty Equipement Qty
HVAC 2 HVAC 6
ELECTRICAL 1 ELECTRICAL 6
FIRE FITTING 1 FIRE FITTING 3

Subtotal 4 Subtotal 15 Subtotal 0

Total Indirect 14 Total Direct 32 Total Equipement 15

HSE SUMMARY

N° Description Qty/Day Qty To Date Remarks


1 Safe man days
2 Safe man hours
3 HSE induction cundected
4 Toolbox Talks
5 Iternal training
6 External training
7 work permit issued
8 Work permit approuved
9 Incident
10 Accident
11 Days lost with work stoppage
12 Severity index
13 frequency index

Quality Summary

N° Description Qty/Day Qty To Date Remarks


1 internal inspection
2 External inspection
3 Product inspection
4 Internal non-compliance
5 External non-compliance
6 Internal product non-compliance
7 External product non-compliance
8 Client claim
Follow up of Constat, Request For Information & Material Approval Request

Constat Qty Request For Information Qty Material Approval Request Qty

Constat sent RFI sent MAR sent

Constat sent To Date RFI sent To Date MAR sent To Date

Constat in progress To Date RFI in progress TO Date Mar in progress To Date

Closed constat To Date Closed RFI To Date Closed MAR To Date


Blocking points

POINTS Qty 3

Point Description Claimed By

1
2
3
Blocking points Claimed To Date Qty

DETAILS OF DAILY WORK ACTIVITIES

N° Zone/location Description of activities BOQ items Unit BOQ Qty Today Qty Qty To Date

DETAILS OF DAILY WORK ACTIVITIES ASSIGNMENT RESSOURCES

MANPOWER MATERIAL
N° Zone/location RESPONSIBLE of Area Description of activities
Qualification Qty Hour/Day Total,H/Day Type Qty Total,H/Day

Mason 2 8 16 Bobcat BC,20 1 8

Total 16 Total 8
PHOTOS

Description : Description :

Description : Description :

Description : Description :

Description : Description :

Description : Description :

Description : Description :

PREPARED BY

NAME DATE VISA

Description :