Log201 2024 01 Asmt
Log201 2024 01 Asmt
Log201 2024 01 Asmt
Semester 1 2024
Module name LOGISTICS MANAGEMENT 201
Module Code LOG201
Due date 22 April 2024
Total Marks 75
COVER PAGE
Please include the following information on the first page of the assignment:
Name, Surname, Student Number and Module Code.
BODY
1. The assignment answers must be typed in MS Word format and saved as a
PDF document (File > Save As > Save as Type: PDF).
2. Save your file (MS Word or PDF) with the following naming convention:
[STUDENTNUMBER] [MODULECODE] [SURNAME].pdf
E.g. 21111234 BCU101 Surname.pdf
LIST OF REFERENCES
Refer to the STADIO Referencing guide HERE for guidance.
• The process detailed above is the same on a personal computer and mobile
device. You will, however, need to ensure that you have saved your completed
assignment on the mobile device and have downloaded the Canvas Student
Application before attempting to submit.
• You do not require a Canvas class ID and enrolment key to access your registered
module class, as you have been allocated to the class based on your registration.
If you do not see your module class appear, please contact the office for
assistance.
• If you experience any difficulties during the submission process – after reading
through the guide and attempting the prescribed steps – please do not hesitate to
contact the office for assistance.
Case Study
AMPS Electric Vehicle (EV) manufacturer is a leading multinational manufacturer with a
facility in Roslyn, Pretoria. Recently AMPS EV found itself facing numerous challenges
in its supply chain and logistics operations. In addition, the company realises that to keep
up with the rapidly growing demand for electrified cars in South Africa due to the ever-
increasing diesel and petrol price, it must ramp up production and reduce manufacturing
costs. AMPS EV uses international raw material suppliers and imports raw materials
through Durban harbour. They also try to take advantage of favourable trade agreements
and economies of scale.
AMPS EV recognises that over the last year their procurement costs have increased
dramatically, which affects the whole operation. The company aims to reduce
procurement costs without compromising product quality or supplier relationships. They
are also considering using e-procurement tools.
Currently AMPS EV are using a materials requirement planning (MRP) system to ensure
that production operations run smoothly and that customer demands are met. They are
considering enhancing the manufacturing processes for efficiency and quality
assurance.
1.1 Define an alternative method of forecasting that AMPS EV can use to reduce
imprecise forecasting. (2)
1.2 Describe at least five forecasting techniques that can be used based on your
answer to 1.1. (10)
4.1 Discuss the standards AMPS EV must comply with to improve information
quality between the partners. (12)
4.2 Does AMPS EV use a centralised of decentralised information system? Justify
your answer. (2)
Question 6 (3 marks)
Name the performance measurement that measures the critical success factor of
competitiveness of AMPS EV and provide two examples.