Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

All in One

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Date: March 13; 2024

To: CARE ETHIOPIA


Addis Ababa
Subject: Application for Vacant Position
Dear/Sir
I would like to apply for the vacant Position in your organization announced for the position of Infrastructure
Development Supervisor.
Recently I am on the position of Project Manager in the Division of Irrigation and Energy for Construction
Supervision and Contract Administration of Yadot Large Scale Irrigation Project (Bale), Mojo Medium
Scale Irrigation Project (Girawa), Sadiqa Medium Scale Irrigation Project (Wollega) & Kellecha Small Scale
Irrigation Project (Gelemso).
So, I am one of the competent for the post that match with my profession & experience and I attached my CV
and credential documents with this application letter.

With Regards.

Feysel Ahmed
Tel. +251911825237/0965678930
Email: feyselahmed1216@gmail.com
Experience Summary
S/N Position held Employer Duration
Project Manager for construction Supervision & Contract October 30/2020 - up to now
1 Administration (Yadot, Mojo, Sadika & kelecha) Irrigation projects. ECO
Design Engineer (10 Small Scale Irrigation Project) & Infrastructures.
2 ECO May 10/2019 – Octo. 29/2020
Earth and/or Lined Canal Supervisor Arjo Didessa Sugar Development
RMC Construction Project Chainage 0+000 to 32+235 km (LOT 1 & 2).
3 ECO Mar 09/2018 – May 09/2019

4 Senior Design Engineer ECO Oct.30/2015-March 08/ 2018


FAYA ROAD
5 Project Manager & Material Engineer CONSTRUCTION ENTERP. Mar. 30/2012- Oct.20/2015

6 Senior Contract Engineer OWWDSE Aug.07/2011-Feb.30/2012


7 Division Manager, Research and Planning of RBDSW OWWDSE Mar.11/2010-Aug.06/2011
8 Construction Supervisor; Assistant Resident Engineer; TIBILA OWWDSE Aug.17/2008-Mar.10/2010
Febr. 2004 - Feb, 2008
9 Community Facilitator CARE-ETHIOPIA
10 Water Management & Project Engineer OIDA/Southern Branch July.01/2000-Febr,10/20004

11 Irrigation Expert Bale Agricultural Bureau Nov. 01/1998-June 30/2000

N.B: ECO= Engineering Corporation of Oromia


RBDSW= Road-Building Design & Supervision Works (RBDSW)
OWWDSE= Oromia Water Works Design and Supervision Enterprise
OIDA/SB= Oromia Irrigation Development Authority/ Southern Branch
TIBILA (Fentale-II) Integrated Irrigation Development Project
CURRICULUM VITAE
1. PERSONAL INFORMATION
• Name- Feysel Ahmed Hassen
• Sex- Male
• Date of birth- September 1981G.C.
• Place of birth- East Hararghe(Bisidimo)
• Nationality-Ethiopian
• Current Address- Finfinne/Addis Ababa
• Tel: 0911825237/0965678930
2. Educational Back Ground
• Civil Engineering Stream in Hydraulic Engineering (B.sc.), Arba Minch University
• Agricultural Engineering (Diploma), Awassa college of Agriculture
3. Language Skills
• Language Speaking Writing Listening
Afaan Oromo Excellent Excellent Excellent
Amharic Excellent Excellent Excellent
English Very good Very good Very good
4. Professional Experiences
• Project Manager; Construction Supervision & Contract Administration.
• Senior Design Engineer of Arjo Didesa Large Scale Irrigation Project Since October, 2015
of Oromia Water Works Design and Supervision Enterprise.
• Material Engineer of Faya Construction Enterprise for the Road Construction
from March.01/2012 to Apr. 30/2015.
• Senior Contract Engineer for Road Design & Supervision Projects in Oromia Water
Works Design & Supervision Enterprise, August 07/2011 to Feb.30/2012.
1. Prepare/Organize Bill of Quantities and Engineering Cost Estimation.
2. Prepare and Compile Tender Document’s.
3. Monitor and Review Quantity of all activities.
4. Administration of All Roads Projects Contract.
• Division Manager, Research and Planning Division of Road and Building Work in Oromia
Water Works Design & Supervision Enterprise, March 11/2010 to August 06/2011.
Main Activities and Responsibility:
1. Coordinates and supervises all the research and Planning activities of road
and building.
2. Prepare norms for study, design, construction supervision, surveying and
the like works in building and road works.
3. Prepare and/or coordinates the preparation of technical and financial
proposals for design projects and ensures its timely submission to the
clients.
4. Clarifies the project scope and definitions of projects.
5. Prepare code of practice for foundation, soils, materials and structures.
6. Develops and adopts different software & modeling tools for building and
road study and design.
7. Frequently Undertakes training need assessment of Road and Building to fill
the gap for new technologies.
8. Facilitates agreement signing with the client and collects advance as per
the agreement.
• Construction Supervision Team Leader of Fentale-II(Tibila) Irrigation Based Integrated
Development Project in Oromia Water Works Design & Supervision Enterprise,
August 17/2008 to March 10/2010.
The project was planned to irrigate 8000ha and financial cost is 180,000,000ETB.
Main Activities and Responsibility:
1. Supervision of construction for their compliance with design standard,
Specifications and contract document.
2. Adjust designs to accommodate changes made after the first design to meet
realistic site conditions.
3. Instructing the contractor on the scheduling and methodology of day to day
construction activities, in line with contract specification.
4. Checking and approving the contractor’s Take off Sheet & Payment Certificate.

• Water management Expert and construction Engineer in oromia irrigation development


authority (OIDA) southern branch office, BALE, July01/2000 to Feb.10/2004
Main Activities and Responsibility:
1. Scheduling the irrigation water for the community in Block.
2. Awareness creation on use of irrigation and watershed management.
3. Supervise the overall progress of irrigation schemes and close follow-up on
operation and maintenance of the schemes.
4. Mobilization of the users on maintenance of the schemes.
5. Carry over the construction activities on the site according to the design and
specification.
• Irrigation expert, Goro Woreda Agricultural Office, BALE, Nov.01/1998 to June30/2000.
Main Activities and Responsibility:
1. Awareness creation of irrigation, management and extension for the users.
2. Give informal education of irrigation extension for the beneficiaries.
3. Schedule crop water requirement for all types of crops in the command area.
4. Follow up maintenance and operation of the schemes.
5. In service Training
• Construction Management
• Dispute Claim Management
• TOT on community participation technique and participatory action planning.
• TOT on water harvesting technology.
• Training on project and Monitoring Evaluation.
6. Other Skills
• Basic Computer Skills (All Microsoft Office)
• Civil 3D Software
• Arc-Gis Software
• Soft Wares: Water CAD, AutoCAD.
7. Additional
• Professional License and Driving License.
• Final year project-Design of Abyi Adi Town (Tigray) Water Supply.
8. Referenc
• Abubeker Mohammed (M.Sc.)
Deputy General Manager of Road and Building
Tel.No. 0911960432
• HassenNur Mohammed
Deputy General Manager of Irrigation and Energy
Tel.No. 0911455603

Certification: I certify that to the best of my knowledge the above information is true.
Signature: ____________ Date: __13/03/2024___

You might also like