Batugade: Cross Section (Section A-A) 1:70
Batugade: Cross Section (Section A-A) 1:70
Batugade: Cross Section (Section A-A) 1:70
A A
B B
C C
Zincalumn Roof 0.35mm Gording
C Purlin 75x150mm U Gutter Horizontal
Truss 6/12cm
D D
1.50 1.50
E O Gutter Vertical E
Column IWF
125x250mm
F 4.85 F
5.00
3-PN1MPa Brass
ball valve (R1)
40x40cm
Emergency cut-off valve
0.15
GB/T3289.10 R1 Tee
Foundation
10
0.50 0.50
45
100
Grill
Anchor 6 Ø32 Anchor 6 Ø32
25x25cm
Cut-off valve
Scene welding mounting bracket
The connection tube of the bottom
of emegency cut-off valve
1.50 1.50
Communication
Power wire and line pipe
H H
Oil and gas
Fuel signal wire pipe
recovery pipe
Stone fondation Stone fondation
Beam 20/40 Beam 20/40
Empty stone
Lean Concrete 5cm 2.00 2.10 2.10
Empty stone
Lean Concrete 5cm
Column 50/50 Column 50/50
0.30 0.30
0.05 0.05
0.70 Concrete slab 10cm Concrete slab 10cm 0.70
0.90 0.90
Foot plate 1.20/0.50 Foot plate 1.20/0.50
0.45 0.45
1 2
J J
K K
PREPARED BY: PROJECT OWNER PROJECT TITLE DRAWING TITLE SCALE NOTE
AUTORIDADE NASIONAL DO PETROLEO (ANP)
NEW CONSTRUCTION OF ETO FUEL CHECKED BY: APPROVED BY:
FILLING STATION CROSS SECTION (SECTION A-A) 1:70
PROJECT LOCATION DRAWING BY CHECKED BY DRAWING NO.
L L
1 2 3 6 7 8 9 10 11 12 13 14 15 16