Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Assignment No 5

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

ASSIGNMENT NO 5

1.Define software quality.


2.Name four software quality assurance activities.
3.Explain four basic principles of software project scheduling.
4. Explain GANTT chart and its application for project tracking with
an example.
5.Compare CMMI and ISO for software w.r.to
i)scope
ii)Approach
Iii) Implementation.
6.Differentiate between Software Quality Management and Software
Quality Assurance (any two points).
7.Draw time chart for Libraray management system System (5
days a week). Consider broad phases of SDLC.
8.Describe CMMI. Give significance of each level.
9.Identify and enlist requirement for given modules of employee
management software
10. ExpCritical Path Method (CPM),Program Evaluation Review Technique (PERT)
11.Describe in detail eight principles of good planning.
12.What is philosophy of six sigma? Explain Six sigma strategies.

You might also like