Clear Cover-2": Footing Section
Clear Cover-2": Footing Section
Clear Cover-2": Footing Section
GB-01 GB-01
COLUMN SCHEDULE
FLOOR LEVEL
(10X15)
(10X15)
GB-02
GB-02
GB-02
GB.
R1 C1
GL.
Notes for Footings: Column Bar Lapping
R2
1. f 'c = 2,800 Psi.
2. fy = 60,000 Psi.
3. Mix ratio = 1:1.5:3
4. S.Sand (FM=2.5) : L.Sand (FM=1.5) =2:1 C2
5. 20mm down graded 1st Class Bricks
(Best Quality)chips used as CA.
10mm Ø @ 6. Clear cover =3''
(10X12)
(10X15)
(10X12 2. fy = 60,000 psi.
GB-02
GB-02
GB-02
GB-02
3. Mix ratio = 1:1.5:3
3"
3"
F1
42"
1
4. S.Sand (FM=2.5) : L.Sand (FM=1.5) =2:1
F2 5. 20mm down graded 1st Class Bricks Column Tie Single Tie
3"BFS
(Best Quality) chips used as CA.
FOOTING SECTION F3 6. Clear cover - Below GB=3"
- Above GB=1.5"
N S
GR.BEAM LAY-OUT PLAN.
W
10mmØ@ 6"c/c 10mmØ@ 8"c/c 10mmØ@ 6"c/c 2" 10mmØ@ 6"c/c 10mmØ@ 8"c/c 10mmØ@ 6"c/c 2"
15"
15"