Preparatory Survey For The Assam Health System Strengthening Project in India
Preparatory Survey For The Assam Health System Strengthening Project in India
Preparatory Survey For The Assam Health System Strengthening Project in India
Final Report
(Advanced Version)
March 2022
Exchange Rate
USD 1=JPY 115.262
INR 1 = JPY 1.53857
(JICA Rate in February 2022)
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Location Map
i
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
ii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
FY Fiscal Year
G Ground Floor
GEM Government e-Marketplace
GGE General Government Expenditure
GHE Government Health Expenditure
GMCH Guwahati Medical College and Hospital
GNM General Nurse Midwife(ry)
GOA Government of Assam
GOI Government of India
GP General Physician
GSDP Gross State Domestic Product
HEAJ Healthcare Engineering Association of Japan
HEPA High Efficiency Particulate Air
HFO High frequency oscillation
HFWD Health and Family Welfare Department
HIV Human Immunodeficiency Virus
HMIS Hospital Management Information System
ICB International Competitive Bidding
ICT Information and Communication Technology
ICU Intensive Care Unit
IDS Individual Dialysis System
IMR Infant Mortality Rate
INR Indian
IPD Inpatient Department
IPHS Indian Public Health Standards
IPL Intense Pulsed Light
IT Information Technology
IVR Interventional Radiology
JICA Guidelines JICA Guidelines for Environmental and Social Considerations
JMCH Jorhat Medical College and Hospital
JPY Japanese Yen
KPI Key Performance Indicator
LCB Local Competitive Bidding
LMICs Lower Middle-income Countries
MBBS Bachelor of Medicine and Bachelor of Surgery
MC Medical College
MCH Medical College Hospital
MCI Medical Council of India
MEP Mechanical, Electrical and Plumbing
MH Model Hospital
MHFW Ministry of Health and Family Welfare
MHRB Medical & Health Recruitment Board
MIS Management Information System
MM Man-Months
MMR Maternal Mortality Ratio
MRD Medical Records Department
MRI Magnetic Resonance Imaging
NABH National Accreditation Board for Hospitals and Health Care Providers
NBC National Building Code
NCB National Competitive Bidding
NCDs Non-communicable Diseases
NER North Eastern Region
NGO Non-governmental Organization
NHM National Health Mission
NHP National Health Policy
NIC National Informatics Centre
NICU Neonatal Intensive Care Unit
NMC National Medical Commission
NSO National Statistics Office
iii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
iv
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Final Report
(Advanced Version)
Table of Contents
Location Map
Abbreviations and Acronyms
v
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
vi
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Annexes
Annex I Methodology of the Subcontracted Survey
Annex II Important Modules in the National Health Mission
Annex III NHM - MIS PLAN 2021-22
Annex IV Hospital Management Information System (HMIS) Vendors Sample List
Annex V National Health Digital Mission
Annex VI Visit to Tripura National Information Centre (NIC) and Study of e-Hospital
Annex VII List of Interviewees for ICT Survey Visit
Annex VIII Record of Public Consultation
vii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
List of Figuress
Figure 1-1 Background and Significance of the Project ............................................................................. 1-2
Figure 2-1 Organisation of Health and Family Welfare Department.......................................................... 2-4
Figure 2-2 Change in Top 15 Causes of DALYs in Assam State, 1990-2016 ............................................ 2-5
Figure 2-3 Contribution of Top 10 Risks to DALYs in Assam State, 1990-2016....................................... 2-6
Figure 2-4 COVID-19 Infected Cases in Assam State from 19 June to 12 September 2021 ..................... 2-8
Figure 2-5 Referral System in Assam State ................................................................................................ 2-9
Figure 2-6 Number of Private Hospitals per 100,000 Population .............................................................. 2-9
Figure 2-7 Level of Household Income of the Respondents .................................................................... 2-12
Figure 2-8 Proportion of Respondents who Came to the Nearest Facility ............................................... 2-13
Figure 2-9 Satisfaction with Hospital Facility .......................................................................................... 2-13
Figure 2-10 Comfortableness with the Hospital Staff ................................................................................ 2-13
Figure 2-11 Satisfaction with Doctor’s Behaviour ..................................................................................... 2-14
Figure 2-12 “Do you recommend this hospital to your friends/ family members?”................................... 2-14
Figure 2-13 “Will you go to private facility if it is affordable?” ................................................................ 2-14
Figure 2-14 Medical Education System in India ........................................................................................ 2-17
Figure 2-15 Number of Doctors per 100,000 Population by States............................................................ 2-18
Figure 2-16 Density of Registered Medical Doctors .................................................................................. 2-18
Figure 2-17 Density of Nursing and Midwifery Personnel ........................................................................ 2-18
Figure 2-18 Satisfaction with Working Environment (MCH) .................................................................... 2-21
Figure 2-19 Determinants of Satisfaction of Working Environment (Multiple Answers) (MCH) ............. 2-21
Figure 2-20 Factors to Choose the Workplace (Multiple Answers) (MCH) ............................................... 2-22
Figure 2-21 Satisfaction with Learning Environment (MCH).................................................................... 2-22
Figure 2-22 Determinants of Satisfaction of Learning Environment (Multiple Answers) (MCH)............. 2-23
Figure 2-23 Preference of Working in Rural Areas (MCH) ....................................................................... 2-23
Figure 2-24 Trends of Out-of-pocket Expenditure and Domestic General Expenditure, India .................. 2-24
Figure 2-25 Out-of-pocket Expenditure by Healthcare Functions, FY 2016-2017 .................................... 2-25
Figure 2-26 Out-of-pocket Expenditure by Healthcare Providers, India, FY 2016-2017 .......................... 2-25
Figure 2-27 Total Health Expenditure as a Share of GSDP for Selected States, FY 2016-17 .................... 2-26
Figure 2-28 Government Health Expenditure as a Share of GSDP for Selected States, FY 2016-17 ........ 2-26
Figure 2-29 Government Health Expenditure as a Share of General Government Expenditure for
Selected States, FY 2016-17 ................................................................................................... 2-26
Figure 2-30 Out-of-pocket Expenditure as a Share of Total Health Expenditure for Selected States,
FY 2016-17 ............................................................................................................................. 2-27
Figure 2-31 Out-of-pocket Expenditure per Capita for Selected States, FY 2016-17 ................................ 2-27
Figure 2-32 Growth Rate of GSDP and State’s Contribution toward GDP ................................................ 2-28
Figure 2-33 Trend of Revenue and Expenditure of the Government of Assam.......................................... 2-29
Figure 2-34 Composition of Government Revenue in Assam .................................................................... 2-30
Figure 2-35 Composition of the State’s Own Tax Revenue in Assam ........................................................ 2-30
Figure 2-36 Major Fiscal Indicators of the Government of Assam ............................................................ 2-31
viii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Figure 2-37 Composition of Outstanding Debt of the Government of Assam ........................................... 2-31
Figure 2-38 Composition of Government Expenditure in Assam .............................................................. 2-32
Figure 3-1 Population Pyramid in Assam ................................................................................................... 3-1
Figure 3-2 Projected Urban Population to Total Population ....................................................................... 3-2
Figure 3-3 Per Capita Net State Domestic Product .................................................................................... 3-2
Figure 3-4 Net State Value Added by Economic Activity .......................................................................... 3-3
Figure 3-5 Monthly Precipitation, Mean Maximum and Minimum Daily Temperature (Dispur) .............. 3-3
Figure 3-6 Trend in District Level Rainfall (left) Rainy Season and June-September (right) .................... 3-4
Figure 3-7 Average Frequency of Rainy Days (left) and June-September (right) ...................................... 3-4
Figure 3-8 Agro-Climate Division of Assam State..................................................................................... 3-5
Figure 3-9 Geological Base Map of Assam with Different Geological Formations ................................... 3-6
Figure 3-10 Major River System .................................................................................................................. 3-7
Figure 3-11 Wildlife Protected Areas in Assam ........................................................................................... 3-8
Figure 3-12 Tectonic Map of North Eastern Region .................................................................................... 3-9
Figure 3-13 Flood Hazard Map of Assam .................................................................................................. 3-10
Figure 5-1 Collaboration between Target Hospitals ................................................................................... 5-3
Figure 6-1 Site Map (SMCH) ..................................................................................................................... 6-7
Figure 6-2 Site Map (TMCH)..................................................................................................................... 6-8
Figure 6-3 Site Map (JMCH) ................................................................................................................... 6-10
Figure 6-4 Site Map (FAAMCH) ..............................................................................................................6-11
Figure 6-5 Site Map (DMCH) .................................................................................................................. 6-12
Figure 6-6 Site Map (LMCH)................................................................................................................... 6-13
Figure 6-7 Location of the Site ................................................................................................................. 6-16
Figure 6-8 Site Plan .................................................................................................................................. 6-17
Figure 8-1 Recommended Norms for Hospital Nursing Service ................................................................ 8-2
Figure 10-1 Flow of Environmental Clearance Procedures........................................................................ 10-8
Figure 10-2 Institutional Arrangement for Environmental Management during Construction ................ 10-25
Figure 10-3 Institutional Arrangement for Environmental Management during Construction ................ 10-26
Figure 11-1 Budgetary Flow in Health in Assam ........................................................................................11-2
Figure 11-2 Budget Allocation Process .......................................................................................................11-4
Figure 11-3 Composition of Budget on Health by Budget Entity in Assam ...............................................11-5
Figure 12-1 Draft of Organisation Chart of the Project .............................................................................. 12-1
Figure 12-2 Project Implementation Schedule (Construction) ................................................................... 12-4
Figure 12-3 Project Implementation Schedule (Medical Equipment, Furniture, and ICT) ........................ 12-5
Figure 12-4 Project Implementation Schedule (Soft Component) ............................................................. 12-6
ix
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
List of Tables
Table 2-1 Priorities of the National Health Policy 2017 ........................................................................... 2-1
Table 2-2 Targets of the National Health Plan 2017 and Key Performance Indicators of Assam
2019-20 ..................................................................................................................................... 2-2
Table 2-3 Progress in Health Sector Priority Actions in Assam................................................................ 2-2
Table 2-4 Priorities of Health and Family Welfare Department of Assam under 2021/22 Budget ........ 2-3
Table 2-5 Roles of Federal, State, and District Health Authorities ........................................................... 2-3
Table 2-6 Major Demographic and Health Indicators of Assam and India ............................................... 2-5
Table 2-7 Infant and Maternal Deaths in Districts in Assam (2016) ......................................................... 2-7
Table 2-8 Health Facilities in Districts in Assam (2019) ........................................................................ 2-10
Table 2-9 Chief Minister’s Free Diagnostic Services Programme ...........................................................2-11
Table 2-10 Assam Cancer Centre...............................................................................................................2-11
Table 2-11 General Characteristics of Respondent for the Patient Satisfactory Survey ........................... 2-12
Table 2-12 Major Professional Categories and 53 Professions by the Allied and Healthcare
Professions Bill, 2018 ............................................................................................................. 2-16
Table 2-13 Levels of Nursing Education in India ..................................................................................... 2-17
Table 2-14 Estimated Vacancy Rate in Secondary and Primary Health Institute in Assam (2020) .......... 2-19
Table 2-15 Vacancy Rate of Health Personnel in Medical College Hospitals in Assam (2021) ............... 2-20
Table 2-16 General Characteristics of Respondent for the Staff Satisfactory Survey............................... 2-20
Table 2-17 Health Financing Indicators of India, 2018 ............................................................................ 2-24
Table 2-18 Summary of HIS Implementation Status of the Target Medical College Hospitals................ 2-34
Table 2-19 Brief Comparative State of e-Hospital and other Software .................................................... 2-35
Table 2-20 Summary of HMIS and HIS in Assam.................................................................................... 2-36
Table 2-21 Summary of the Candidate Medical College Hospitals (1) .................................................... 2-37
Table 2-22 Summary of the Candidate Medical College Hospitals (2) .................................................... 2-38
Table 3-1 Groundwater Quality Problems ................................................................................................ 3-7
Table 3-2 Current Specifications and Conditions of Seven MCH .......................................................... 3-10
Table 3-3 Gauhati Medical College and Hospital (GMCH) ....................................................................3-11
Table 3-4 Assam Medical College and Hospital (AMCH) ..................................................................... 3-12
Table 3-5 Silchar Medical College and Hospital (SMCH) ..................................................................... 3-12
Table 3-6 Jorhat Medical College and Hospital (JMCH)........................................................................ 3-13
Table 3-7 Tezpur Medical College and Hospital (TMCH) ..................................................................... 3-14
Table 3-8 Fakhruddin Ali Ahmed Medical College and Hospital (FAAMCH)....................................... 3-14
Table 3-9 Diphu Medical College and Hospital (DMCH) ...................................................................... 3-15
Table 3-10 Sampled District Hospitals ..................................................................................................... 3-15
Table 3-11 Swahid Mukunda Kakati (SMK) Civil Hospital, Nalbari ....................................................... 3-16
Table 3-12 Udalguri Civil Hospital, Udalguri........................................................................................... 3-16
Table 3-13 S.K Roy Civil Hospital, Hailakandi........................................................................................ 3-16
Table 3-14 Sivasagar Civil Hospital, Sivasagar ........................................................................................ 3-16
Table 3-15 Goalpara Civil Hospital, Goalpara.......................................................................................... 3-17
x
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
xi
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
xii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 14-4 Long-term Projection of Income per Capita in Assam ........................................................... 14-6
Table 14-5 Comparison of Hospital Service Rates ................................................................................... 14-7
Table 14-6 Transportation and Accommodation Costs for Inpatients’ Families ....................................... 14-7
Table 14-7 (This Part Intentionally Left Blank)........................................................................................ 14-8
Table 14-8 (This Part Intentionally Left Blank)........................................................................................ 14-9
Table 14-9 (This Part Intentionally Left Blank)........................................................................................ 14-9
xiii
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The Government of Assam (GOA) has made efforts to strengthen the primary healthcare system with the
aim of achieving Universal Health Coverage (UHC) through the implementation of the National Health
Mission (NHM). However, strengthening the entire medical system in terms of fostering medical personnel
by medical college hospitals, preventing the outflow of human resources, strengthening the systems and
operations of secondary and tertiary medical institutions, renewing aging facilities and equipment, and
strengthening cooperation between medical institutions are remaining to be major issues. In addition, the
spread of COVID-19 has caused further burden on the medical institutions in the state. The project aims to
improve access and quality of service for rural residents in Assam State by improving and strengthening
the medical and educational institutions, focusing on core medical centres of secondary and tertiary medical
institutions.
Also, GOA formulates a policy on reducing the out-of-pocket expenditure (OOPE) for the use of healthcare
services. These include free medicines, free cardiac surgery for children, compensation for the poor, and a
reduction in the number of visits to private institutions by improving the quality of public medical facilities.
The utilisation rate of public medical institutions is 50.6%, which is higher than the national average of
32.5%, especially in the rural areas [NSO, 2020]. There is a large disparity in service provision and health
situations in Assam, and in the tea plantation area, where 20% of the population lives, as doctors are not
stationed in half of the healthcare facilities [The Enterprise of Healthcare, 2019]. In addition, the three
districts along the Brahmaputra River, where 10% of the population lives, are in the bottom 20 health
rankings of the Aspiration District Program [NITI Aayog, 2018].
The population has increased by 14% from 2011 to 2019, but expansion of the system of healthcare service
provision has not caught up, and the number of doctors per 100,000 population is 40.3, which is far below
the national average (79.7) [WHO, 2016]. To keep the high-quality human resources in the public medical
institutions, it is important to improve the working conditions and environment that enables a continuous
study of knowledge and skills, but existing facilities and equipment of public hospitals are aging and not
attractive environments for healthcare professionals.
In addition, the spread of COVID-19 infection has caused further burden on medical institutions, and there
is a strong demand for system strengthening from the perspective of infectious disease control. For these
1-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
reasons, this project is important in the health sector of India and Assam and will greatly contribute to the
realisation of UHC.
In this circumstance, "the Assam Health System Strengthening Project" has been formulated, which aims
to improve the abovementioned situations, strengthen the functions of medical institutions focused on
tertiary hospitals which are core medical centres, remedy the medical burdens, and create an environment
where residents in Assam State can access equally to necessary medical services.
The background and significance of this project are shown in Figure 1-1.
Background
Significance
It is an important project in the health sector of India and Assam as the project aims to improve
access to public medical services and quality medical services for rural residents, through the
improvement of secondary and tertiary medical institutions, which are core medical centres.
The healthcare issues facing Assam State are essential but improving only the hardware cannot solve those
issues in a short period. It is also difficult to start interventions in all areas of the state at once to solve those
issues. Therefore, this project focuses on the "establishment of model project that enables the Indian side
to develop horizontally through self-efforts (see following box).
Developing an environment that can ensure qualified medical personnel (Regarding the
quantitative expansion, the construction of medical colleges is in progress; therefore, the project
will develop an environment where high-quality clinical education can be provided in medical
college hospitals).
Strengthening cooperation between secondary and tertiary level medical institutions
(establishment of referral systems, system of dispatch the doctors, provision of technical guidance
and training, etc.)
1-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
1) Improvement of existing tertiary medical institutions (medical college hospitals) and provision of
related equipment.
2) Improvement of existing secondary medical institutions and provision of related equipment.
(2) Strengthening the capabilities of medical professionals.
(3) Strengthening the organisational and management capabilities for provision of the medical services.
(4) Consulting service including design development, tender assistance, supervision for construction
and equipment work, and capacity development.
Survey Area
1-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
NHP 2017 is based on the principles of universality, affordability, equity, patient-centred, and quality care,
inclusive partnership, pluralism, decentralisation, as well as dynamism based on the World Health
Organization (WHO) “Heath in All Policies”. The priorities of NHP 2017 are summarised in Table 2-1.
Table 2-2 presents the targets of NHP 2017 and key performance indicators (KPIs) of Assam for 2019-20.
2-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Progress of the flagship and priority actions from 2017 to 2021 are summarised in Table 2-3. The
Government of Assam has been making great effort to increase production of medical doctors by
establishing medical colleges and hospitals.
2-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The implementation structure, the position within GOA (delegation of authority to the project), the
relationship with each department, the personnel composition, and understanding the demarcation /
responsibility, budget scale / execution status, etc., of the implementation agency of the GOA, Health and
Family Welfare Department (HFWD) (Figure 2-1) will be clarified. Also, the consensus with the HFWD
regarding the implementation system of this project will be built.
It is assumed that the Directorate of Health Services (in charge of medical institutions), the Directorate of
Medical Education (in charge of medical colleges), and the National Health Mission (maternal and child
health, infectious diseases, NCDs countermeasures) will be involved in the implementation of the project.
2-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
On the other hand, rationalisation of the decision-making process is important when implementing the
project. Therefore, in this survey, the process of decision-making, authority, demarcation, and responsibility
within the HFWD and GOA related to design, design change, procurement, construction, etc., will be
scrutinised. In addition, information from other projects underway will be collected and the actual situation
and issues will be confirmed.
A Project Management Unit (PMU) will be set up within the HFWD as an executing agency in
implementing the project. In addition, a governing body & executive committee should be established from
the perspective of state-wide management. Based on these, consensus building will be achieved for
improving the efficiency of decision-making process during project implementation.
Minister
Principal Secretary
Directorate of
Directorate of Health Directorate of Food and Assam State
National Assam State
Drug Directorate of Blood
Health Services Medical Health AIDS Control
Administ- AYUSH Transfusion
Services [Family Education Mission Society
Welfare] ration Counsel
Source: [Health and Welfare Department, Assam, 2021] [Gov of India, 2021]
Figure 2-1 Organisation of Health and Family Welfare Department
1
Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura
2-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
2020], institutional delivery in 2019-2020 was 91% and it could contribute to improve maternal and
neonatal mortality.
Table 2-6 Major Demographic and Health Indicators of Assam and India
Indicators Assam India Year
Population 31,205,576 1,210,193,422 2011
Under 14 32.8% 28.6% 2011
65 and over 4.2% 5.3% 2011
Population growth from 2001 17.07% 1.64% 2011
Sex ratio (female to 1,000 male) 958 940 2011
Life expectancy (years at birth) 66.2 69.0 2017-18
Literacy Male 77.85% 82.14% 2011
Female 66.27% 65.46% 2011
Per capita GSDP at constant prices (INR) 65,138 100,268 2011-12
Population living below national poverty line 32.0% 21.9% 2019
Maternal mortality ratio (per 100,000 livebirths) 215 113 2017-18
Neonatal mortality (per 1,000 livebirths) 32.8 29.5 2015-16
Infant mortality (per 1,000 livebirths) 47.6 40.7 2015-16
Under-five mortality (per 1,000 livebirths) 56.5 49.7 2015-16
Institutional delivery 70.6% 78.9% 2015-16
ANC by a skilled provider* 82.5% 79.3% 2015-16
Four or more ANC visits 46.4% 51.2% 2015-16
Note: *doctor, auxiliary nurse midwife, nurse, midwife, and lady health visitor
Source: [Census Organization of India, 2011], [NSO, 2019], [IIPS, 2017], [NITI Aayog, 2019]
As shown in Figure 2-2, the burden of non-communicable diseases has increased from 1990 to 2016.
However, diarrhoea and infectious diseases, as well as nutrition condition such as anaemia, still account for
certain proportions among major causes of Disability-adjusted Life Year (DALYs). Regarding coronavirus
disease 2019 (COVID-19), accumulated cases were at 219,272 and deaths were at 1,112, as of April 13,
2021. All seven medical college hospitals, a military hospital, and 15 government hospitals are designated
as “COVID-19 hospitals” [Gov of Assam, 2021].
100%
COPD
90% NCDs
Stroke
80% NCDs
Ischaemic heart disease
70% Hepatitis
Diabetes
60%
Diarrhoeal diseases
50% Lower respiratory infections
Tuberculosis
40%
Preterm birth complications
30%
Other neonatal disorders
20% Neonatal encephalopathy
Iron-deficiency anaemia
10%
Self-harm
0% Road injuries
1990 2016
Sense organ diseases
year
2-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
As presented in Figure 2-3, nutrition condition and environmental health were major risk factors of DALYs
both in 1990 and 2016; however, unhealthy lifestyles increased in 2016.
100%
90%
Malnutrition (maternal and child)
80%
WASH
% in total DALYs Risk
70%
Air pollution
60%
Tobacco use
50%
Dietary risks
40%
High blood pressure
30%
High fasting plasma glucose
20%
Alcohol & drug use
10%
Occupational risks
0%
1990 2016 High body-mass index
Year
Table 2-7 presents the comparison of estimated infant and maternal death per 100,000 population among
the districts. There are six aspirational districts in the health sector selected based on maternal and child
health status. Also, the health status of tea garden areas has been a concern and therefore, GOA has been
making interventions to enhance health services in tea gardens [GOA and NHM Assam, 2016].
In comparison of the numbers of death per 100,000 population, the state centre, Kamrup Metro, showed
the highest both in infant and maternal death. Also, in some districts in Lower Assam including Goalpara,
and Kokrajhar, as well as Barak Valley including Cachar, Hailakandi, and Karimganjm, the number of
infant deaths per population was higher within the state. Regarding maternal death, Chacar and Dibrugarh
were also higher.
2-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Figure 2-4 presents the number of COVID-19 infected people from 19 June to 12 September 2021. As of
13 September 2021, the cumulative number of confirmed cases were 580,657 and deaths were 5,502. From
March to May 2021, the confirmed cases had increased, but getting better until September 2021.
2-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Overview
Figure 2-5 summarises the referral system in Assam State. Health service provision system could not cover
the increasing population at 14% from 2011 to 2019 [The Enterprise of Healthcare, 2019]. Primary level
health facilities cover more population than the national standards. The coverage population of a primary
level health facility varies among districts. For example, Dima Hasao and Majuli districts seem to have
enough number of primary health facilities, while community health centres in Cachar, Kamrup
Metropolitan, Kokrajhar, South Salmara, and Sivasagar cover more than twice of the standard population
(120,000)2.
Patient referral should be carried out in accordance with the referral guidelines. The patients should access
the nearest primary facilities, and they could be referred based on the decision of a health personnel.
However, it is not strictly regulated. Then, patient could access the health facility at any level without any
penalty or additional payment.
2 Population per health facility was calculated by number of health facilities provided by JICA and population in Census 2011.
2-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
NHM
Mini Hub Laboratory (42)
80,000 for remote areas First Referral Unit (FRU)/ Model Hospitals (MH)
(199): 4 medical officers, 21 Paramedical staff**
30,000 for general/ Charitable hospitals (5)
20,000 for remote areas Primary Health Centre (PHC)/BPHC*/MPHC*/RPCH*/ Tea garden hospitals (150)
State Dispensary (SD) (1,002):
Rural areas: 1 medical officer, 14 paramedical staff
5,000 for general/ Private
3,000 for Sub Centre (SC) (4,713): Poly Clinics (244)
remote areas Auxiliary nurse midwife (ANM) 1 / Female or Male health worker 1 Diagnostic Centres (355)
*BPHC=Block PHC, MPHC=Mini PHC, RPHC=River-line PHC **Paramedical staff includes nurses.
Source: [Census Organization of India, 2011] [MHFW, 2012] [Gwmsath Mushahary & Manjil Basumatary, June 2020]
[Directorate of Economic and Statistics, 2017] [Assam Cancer Care Foundation, 2021]
Figure 2-5 Referral System in Assam State
As presented in Table 2-8, eight medical college hospitals are serving tertiary medical services and seven
more hospitals are under development. In India, the number of medical colleges for 100,000 population is
0.03 on average and those are similar in the divisions in Assam. And Hojai, Karbi Along, and Dibrugarh
have no secondary level hospitals (Table 2-8).
According to the HFWD of GOA [HFWD, Assam, 2018], because the number of private hospitals is also
limited, many people seek tertiary care in another state. It causes high out-of-pocket expenditure (OOPE),
especially for hospitalisation. As shown in Figure 2-6, the number of private hospitals per 100,000
population in Assam (1.4) is less than half of the national average (3.2).
14.00
12.00
10.00
8.00
6.00
4.00
India
2.00
0.00
2-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Hospital beds per 1,000 population was 0.89 on average in Assam. Districts in Upper Assam tend to have
higher beds to population ratio, while Duburi, Nagaon, and Karimganj have less than half of the state
average.
Majuli 0 1 2 7 34
Golaghat 1 1 9 39 143 1.07
Sivasagar 1 1 2 27 150 0.51
Charaideo 0 1 2 19 70
Cachar 1 0.028 1 0 7 31 270 1.04
Valley
Barak
2-10
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Charitable hospitals
- Providing maternal and child health services, including immunisation, antenatal care, basic testing, delivery,
outpatient services for below poverty line (BPL) families
- Five hospitals in 2016/17; Assam State Government subsidies INR 1,500,000 per year
Tea garden hospitals (since 2007)
- 2007: 50 → 2020: 150 hospitals
- MoU between NHM and hospital operator: subsidisation - INR 750,000 per year
- Subsidisation (INR 750,000/year) for MCH services, emergency care, referral to public facilities,
communicable diseases and NCDs care, facility improvement, etc., as well as salary of doctors and
paramedical staff
- Essential drugs and an ambulance are provided.
Source: [HFWD Assam, 2021]
In partnership with Tata Trusts, GOA established Assam Cancer Foundation to provide cancer prevention
and care services from primary to tertiary levels, as well as strengthen research capacity (Table 2-10).
2-11
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 2-11 General Characteristics of Respondent for the Patient Satisfactory Survey
U5 6-9 10's 20's 30's 40's 50's 60's 70's 80's+ No answer Total
Medical College Hospitals (MCH)
IPD Female 2 1 9 30 22 28 16 11 3 1 123
Male 3 7 12 30 42 38 36 23 9 2 202
No answer 12 12
OPD Female 2 4 6 28 22 22 23 15 3 125
Male 5 10 12 60 31 26 25 10 5 7 191
No answer 10 10
Civil/District Hospitals (CDH)
IPD Female 3 5 9 36 10 5 1 3 1 73
Male 3 1 3 10 7 5 6 4 1 1 41
No answer 1 1
OPD Female 1 2 3 12 8 8 3 1 38
Male 1 7 19 16 9 4 1 1 1 59
Note: IPD= inpatient department, OPD= outpatient department
Source: JICA Survey Team
As shown in Figure 2-7, the household income of the respondents in civil/district hospitals (CDH) was
lower than that in the medical college hospitals. In CDH, 75% were free of charge and 38% in MCH. Most
of the payments were made for testing. Although 33% applied Atal Amrit Yojana (health insurance for the
poor) and 40% used other financial support scheme, most of the respondents did not have a health card3 to
obtain financial assistance from the government with simpler process because they did not know.
IPD
MCH
OPD
IPD
CDH
OPD
As shown in Figure 2-8, most of the respondents in CDH accessed the nearest hospitals and 93% came
directly without referral from the primary level facilities. In MCH, 25% were referred from the secondary
level hospitals. According to local experts, even if patients go to the nearest CDH, as necessary equipment
or specialised doctors are not available, they are referred to MCH. Therefore, people prefer to go directly
to MCH.
3 Although they do not have a health card, they can obtain financial assistance by applying at the counter in every hospital visit.
2-12
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
IPD
MCH OPD
IPD
CDH
OPD
No Yes
Satisfaction with hospital facilities was lower in CDH. Among the three rooms, satisfaction in a waiting
room was lower than in the other rooms (Figure 2-9).
Examination room
MCH
Consultation room
Waiting room
Examination room
CDH
Consultation room
Waiting room
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
In MCH, the proportion of respondents who did not feel comfortable with the receptionist and nurses was
higher, while in CDH, nearly half felt comfortable with the nurses (Figure 2-10).
Nurses
MCH
Doctors
Receptionist
Nurses
CDH
Doctors
Receptionist
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
2-13
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Regarding doctor’s behaviour in MCH, although some rated excellent, the proportion of good was lower
than in CDH (Figure 2-11). In CHD, a few did not receive any explanation or answer to the question.
Diagnosis
Doctor's explanation
Diagnosis
Doctor's explanation
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Although most of the respondents will recommend the hospital to friends or family members (Figure 2-12),
more than half of them would go to private facilities if they were affordable (Figure 2-13). According to
the interviews with some experts in community health in Assam, people tend to think that free and cheap
services are not good in quality.
IPD IPD
MCH
MCH
OPD OPD
IPD IPD
CDH
CDH
OPD OPD
0% 20% 40% 60% 80% 100% 0% 20% 40% 60% 80% 100%
Many respondents complained about the cleanliness of the hospitals especially toilets. Those in the inpatient
department required fan and drinking water facility. Also, insufficient stock of medicine in the pharmacy
was pointed out. At the same time, they would like health personnel to improve the attitude to the patients
both for doctors and paramedical staff. Some of them have observed that the number of doctors was not
sufficient especially in CDH. Time for consulting was less than 15 minutes in almost all of the CHDs and
80% of MCH.
According to the local experts, rural people tend to hesitate to meet with health personnel because doctors
and nurses are not kind enough to tell their concerns or symptoms. In addition, women and their family
would like to see female doctors because of cultural context, but the number is limited. Therefore,
2-14
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
community health volunteers, ASHA, encourage such women and girls to have access to health services
and convince male family members to let women seek healthcare in public health facilities.
Health Personnel
Overview
In addition to insufficient number of public hospitals, human resource for health in the public sector is one
of the critical challenges in the referral system in India. As for the urban-rural distribution, 66% of
physicians worked in the urban areas, and 80% of physicians and surgeons were in the private sector
although more than 50% of doctors are produced by government medical colleges [Karan A, Negandhi H,
Nair R, et al., 2019].
Although India achieved the World Health Organization (WHO) recommended doctor-population ratio in
2018 [Raman Kumar and Ranabir Pal, 2018], it still varies among the states. According to WHO, the
number of allopathic doctors per 100,000 population is one of the worst in the five states in India (Figure
2-15). According to an estimate using the National Sample Survey (NSS) 2016 and Registry Data [Karan
A, Negandhi H, Nair R, et al., 2019], the number of qualified doctors (allopathic, AYUSH, and dental
practitioners) per 10,000 population in Assam State (1.8) was the lowest in India4.
WHO’s report in 2016 points out several challenges in the human resources for health in India [WHO,
2016].
There are 15 major professional categories including 53 professions in allied and healthcare streams as
shown in Table 2-12.
2-15
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The National Health Policy 2017 by MoHFW recommends that medical and para-medical education be
integrated with the service delivery system, so that the students learn in the real environment and not just
in the confines of the medical school.
The National Medical Council (NMC) was established to maintain minimum standards of medical
education in India. NMC has made it mandatory for doctors to complete 30 hours of Continuing Medical
Education (CME) once in every five years to renew their license by attending workshops and seminars,
which are organised by various healthcare institutions in India. For nurses, Continuing Nursing Education
(CNE) is applied after the registration at each state nursing council.
2-16
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Medical education in India comprises about 554 medical colleges [National Medical Commission, 2021]
including both public and private across the country. These medical colleges have a capacity of producing
83,125 Bachelor of Medicine and Bachelor of Surgery (MBBS) graduates at present. Figure 2-14 shows
the system of medical education in India. Undergraduate medical education (MBBS course) in India takes
about five-and-a-half years, including one year of compulsory internship. The period of four-and-a-half
years (nine semesters, six months each) is divided into three phases. Each semester consists of
approximately 120 teaching days of eight hours each college working time, including one hour of lunch.
The MBBS course is divided into three phases, viz., Pre-clinical, Para-clinical, and Clinical Phase.
Super Specialty
Under Graduate Education Postgraduate Education
There are two main routes into nurse training in India. One is a three-year diploma training in the School
of Nursing to become a General Nurse Midwife (GNM). Another one is a four-year training in a College
of Nursing to obtain a B.Sc. degree. Some nursing colleges also offer post-registration B.Sc. courses and
M.Sc. courses. There are six levels of nursing education in India as summarised in Table 2-13.
Assam
Assam HFWD pointed out that due to the limited intake capacity of medical colleges, many students seek
medical education opportunity in other states. Also, around 30% of doctors in government hospitals move
to the private sector or other states for better working condition annually [HFWD, Assam, 2018].
2-17
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
300.0
250.0
200.0
All India
150.0
100.0
50.0
0.0
Karnataka
Kerala
Chandigarh
Manipur
Mizoram
Orissa
Gujarat
Tamil Nadu
Tripura
Maharashtra
Jammu & Kashmir
Goa
Himachal Pradesh
Haryana
Delhi
Sikkim
Chhattisgarh
Madhya Pradesh
Nagaland
Meghalaya
Assam
Andhra Pradesh
Lakshadweep
Uttarakhand
Pondicherry
Rajasthan
Uttar Pradesh
Bihar
Jharkhand
Punjab
West Bengal
According to the National Health Profile 2020, Assam’s density of medical doctors was 0.77 per 1,000
population, and that of nurses and midwives was 0.72 per 1,000 population, while WHO recommends one
doctor for every 1,000 population. Compared with Kerala, which has a similar population size as Assam,
and Tamil Nadu, which has better health indicators, the number of doctors and number of nurses and
midwives are inadequate in Assam (Figure 2-16 and Figure 2-17).
*Total Population is based on 2011 Census and number of registered *Total Population is based on 2011 Census and number of registered
Medical Doctors is based on the data in 2019. nurses and midwives are based on the data in 2018.
Source: National Health Profile 2020, Central Bureau of Health Source: National Health Profile 2020, Central Bureau of Health
Intelligence, Ministry of Health and Family Welfare Intelligence, Ministry of Health and Family Welfare
Figure 2-16 Density of Registered Medical Figure 2-17 Density of Nursing and
Doctors Midwifery Personnel
There are seven medical colleges in Assam, and they have the capacity of producing 1,000 MBBS graduates
while Kerala State has four times as large. The number of seats for postgraduate education is also less
compared with the other states which have better heath profile.
Regarding nursing education, there are three government nursing college for B.Sc. Nursing and 22 GNM
School of Nursing in Assam. Medical and Health Recruitment Board is responsible for recruitment of
professionals of government health facilities except directors who are appointed by Chief Secretary of
Health.
2-18
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
While the healthcare delivery system has remained focused on the strengthening of doctors, nurses, and
frontline workers, numerous other healthcare workers have been identified. In order “to provide for
regulation and maintenance of standards of education and services by the allied and healthcare professionals
and the maintenance of a Central Register of Allied and Healthcare Professionals and for matters connected
therewith or incidental thereto5, the Allied and Healthcare Professions Bill, 2018, was introduced.
The estimated vacancy rate of doctors is much higher than nurses as estimated in Table 2-14. Fulfilment of
the health workforce varied among the districts. Vacancy rates in Barak Valley were generally higher than
in the other divisions.
Table 2-14 Estimated Vacancy Rate in Secondary and Primary Health Institute in Assam
(2020)
Doctors Nurses
Secondary Primary Health Secondary Primary Health
Hospitals Facilities Hospitals Facilities
Dhemaji 25.0% 34.0% 19.0% 0.0%
Lakhimpur 41.3% 33.3% 0.0% 0.0%
North
5 Ministry of Health and Family Welfare, India. (2018) The Allied and Healthcare Professions Bill.
2-19
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
In the medical college hospitals, the vacancy rate of medical doctors was the highest in Jorhat MCH.
Fakhrudding Ali Ahmed MCH and Sichar MCH had more than 50% vacancy of co-medical staff (Table
2-15).
Table 2-15 Vacancy Rate of Health Personnel in Medical College Hospitals in Assam (2021)
Medical Doctors Co-medical staff
Assam MCH 19.2% 25.6%
Fakhruddin Ali Ahmed MCH 17.2% 58.0%
Dipih MCH 13.5%
Jorhat MCH 36.0% 9.5%
Silchar MCH 27.5% 54.6%
Note: Guwahati and Tezpur MCHs did not submit the data.
Source: JICA Survey Team
Level of Satisfaction
The general characteristics of the respondents are summarised in Table 2-16. The average age of medical
interns was 24.1 years and that of nursing students was 23.2 years.
Table 2-16 General Characteristics of Respondent for the Staff Satisfactory Survey
No
20's 30's 40's 50's 60's+ Total
Answer
MCH Senior Medical Doctors Female 12 7 8 8 104
Male 12 16 28 13
No answer 63
Medical Teachers Female 11 17 19 27 3 164
Male 1 24 42 17 3
No answer 81
Medical Doctors Female 15 7 5 80
(≦5 years working) Male 12 31 9 1
No answer 56
Nurses Female 26 47 32 33 140
Male 1 1
No answer 43
Paramedical Staff Female 16 5 8 1 135
Male 27 25 28 25
No answer 6
Medical Interns Female 47 165
Male 50
No answer 68
Nursing Students Female 90 90
CDH Senior Medical Doctors n.a. 50
Nurses n.a. 100
Source: JICA Survey Team
As shown in Figure 2-18, most of the respondents in MCH were satisfied with the working environment.
However, around 30% of medical interns were not satisfied. They would like to improve the facilities and
services during the night shift, such as a 24-hour canteen, doctors’ room, and safety and security especially
during night-time. Medical doctors and interns also wanted to reduce the workload, especially among the
young doctors. In CDH, 90% of senior doctors were satisfied and 96% of nurses were happy to work there.
2-20
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Paramedicals
Nurses
Medical Interns
Medical Doctors
Medical teachers
Senior Doctors
Both senior and young doctors wanted to strengthen the specialised services in terms of human resources,
equipment, and facilities. They also would like to establish 24/7 laboratory services and increase efficiency
of patient management and procedure by introducing information and communications technology (ICT).
Senior doctors seemed to have wide range of concerns about the working environment such as involvement
in decision-making process, gender consideration, relationship with patient and administrative staff, quality
of patient services, multidisciplinary cooperation, improvement of management policy, etc.
Figure 2-19 illustrates the major factors for satisfaction with workplace. Human relationship seems to be
the biggest factor followed by working hours/days. Medical interns and young doctors also prioritise
professional development such as opportunity of domestic and international training or workshops on
advanced technology. Teachers also prioritise laboratory and library.
Paramedicals
Nurses
Medical Interns
Medical Doctors
Medical teachers
Senior Doctors
2-21
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Figure 2-20 shows the factors considered when they choose the workplace. They value facility and
equipment as much as employment condition. Also, medical doctors, interns, and nursing students may
want to work with respectful senior doctors.
Paramedicals
Nursing Students
Nurses
Medical Interns
Medical Doctors
As for the learning environment, almost half of the senior doctors were not satisfied (Figure 2-21).
Nurses
Medical Interns
Medical Doctors
Senior Doctors
As shown in Figure 2-22, satisfaction with the learning environment depends on the curriculum and the
quality of on-the-job training (OJT) and mentoring. However, medical teachers pointed out that the number
of mentors/ teachers was not sufficient. Young doctors mentioned that post-graduate research, both
domestic and international, as well as pre-service education curriculum should be improved.
2-22
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Paramedicals
Nursing Students
Nurses
Medical Interns
Medical Doctors
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Curriculum of Continuous Medical Education (CME) Quality of OJT (On Job Training)
SMART Education facilities Availing education/training with international medical institution
Quality of mentoring Other
Source: JICA Survey Team
Figure 2-22 Determinants of Satisfaction of Learning Environment (Multiple Answers)
(MCH)
Relevant to human resource shortage, interns and nursing students were more willing to work in the rural
areas than nurses and young doctors (Figure 2-23). Most of the positive reasons were that they were from
rural areas, and they wanted to serve the poor who really needs medical services. In addition, medical
interns expect to gain knowledges and experiences by working in the rural areas. On the other hand, the
respondents are concerned with their security and that of their families in the rural areas. Also, basic
infrastructure such as electricity and safe water, as well as education opportunity for their children hindered
them to work in the rural areas. Doctors also pointed out that in rural areas, they could not utilise and
improve their specialty.
Paramedicals
Nursing Students
Nurses
Medical Interns
Medical Doctors
When they have to work in the rural areas, they wish to be provided with appropriate medical equipment,
facility, and supporting staff, proper living environment, as well as sufficient allowance.
2-23
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
National Level
India’s current health expenditure (CHE) is comparable to countries of similar income levels, both in per
capita terms and as a share of gross domestic product (GDP). In per capita terms, India’s CHE was USD
73 in 2018. As a share of GDP, India’s CHE was 3.5% in 2018 (Table 2-1710). All the indicators related
to government health expenditure (GHE) were also lower than the average of lower-middle income
countries (LMICs). OOPE as a share of CHE was 62.7%, which was much higher than average of LMICs
(Table 2-17). GHE as a share of general government expenditure (GGE) has been slightly increased over
the past two decades, while OOPE as a share of CHE has been slightly decreased at the same period (Figure
2-24).
20%
0%
Domestic general gov. health exp. (% of general gov. exp.)
4%
3%
3.3% 3.4% India
3.0% 3.1%
2%
The Modi
1% The Singh administration administration
0%
2000 2005 2010 2015
Source: [World Bank, 2021]
Figure 2-24 Trends of Out-of-pocket Expenditure and Domestic General Expenditure, India
Both breakdowns of OOPE by healthcare functions and by healthcare providers are shown in the following
figures (Figure 2-25 and Figure 2-26). Prescribed medicines were the highest burden of OOPE (42.4%),
followed by general and specialised inpatient curative care (18.3% and 12.8%). Other than pharmacies,
OOPE in private general hospitals was the highest (28.1%), whose amount was about four times higher
than in the government general hospitals (7.4%).
2-24
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Pharmacies 44.2%
2-25
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Bihar 6.4%
Uttar Pradesh 6.1%
West Bengal 4.7%
Odisha 4.6%
Kerela 4.5%
Andhra Pradesh 4.2%
Jammu and Kashmir 4.1%
Punjab 4.0%
Chhattisgarsh 4.0%
Jharkhand 3.5%
Madhya Pradesh 3.4%
Rajasthan 3.4%
Assam 3.3%
Himachal Pradesh 3.1%
Maharashtra 2.9%
Karnataka 2.8%
Tamil Nadu 2.8%
Uttarakhand 2.3%
Haryana 2.2%
Gujarat 2.1%
0% 1% 2% 3% 4% 5% 6% 7%
Total Health Expenditure (% of Gross State Domestic Product)
Kerela 7.4%
Gujarat 7.2%
Himachal Pradesh 6.8%
Maharashtra 6.2%
Chhattisgarsh 6.0%
Assam 6.0%
West Bengal 6.0%
Rajasthan 5.9%
Punjab 5.7%
Karnataka 5.7%
Tamil Nadu 5.7%
Uttar Pradesh 5.5%
Andhra Pradesh 5.4%
Uttarakhand 5.3%
Odisha 5.0%
Haryana 4.8%
Bihar 4.7%
Jharkhand 4.6%
Madhya Pradesh 4.3%
Jammu and Kashmir 4.1%
0% 2% 4% 6% 8%
Government Health Expenditure (% of General Government Expenditure)
2-26
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Out-of-pocket expenditure (OOPE) in Assam was relatively low, both as a share of THE and in per capita
terms, compared with other states in FY 2016-17 (Figure 2-30 and Figure 2-31). However, 53.8% for
OOPE/THE is far beyond the target of less than 15-20%, which is suggested by WHO [WHO, 2010].
Bihar 77.6%
Punjab 77.3%
Uttar Pradesh 74.8%
West Bengal 74.1%
Andhra Pradesh 72.2%
Madhya Pradesh 68.9%
Odisha 68.9%
Kerela 67.0%
Jharkhand 66.0%
Uttarakhand 62.2%
Tamil Nadu 62.1%
Jammu and Kashmir 58.5%
Maharashtra 56.7%
Rajasthan 56.7%
Haryana 56.6%
Chhattisgarsh 55.9%
Assam 53.8%
Karnataka 49.2%
Gujarat 48.1%
Himachal Pradesh 46.4%
0% 20% 40% 60% 80%
Out of Pocket Expenditure (% of Total Health Expenditure)
Mathematically, GHE can be described as follows [Teo, Hui Sin; Bales, Sarah; Bredenkamp, Caryn; Cain,
Jewelwayne Salcedo, 2019]:
2-27
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
𝐺𝐺𝐸 𝐺𝐻𝐸
𝐺𝐻𝐸 = 𝐺𝐷𝑆𝑃 × ×
𝐺𝑆𝐷𝑃 𝐺𝐺𝐸
Each of these elements implies that GHE will increase when: 1) GSDP increases, which would be a result
of growth in the state’s economy, 2) GGE share of GSDP increases, which would come from increase in
aggregate government fiscal resources such as revenues and debt financing, and 3) GHE share of GGE,
which would be attributed to prioritisation of health within the government policy.
Economic Growth
A first key element of overall fiscal space as well as of fiscal space for health is economic growth.
According to the statements laid before the Assam Legislative Assembly as required under the Assam Fiscal
Responsibility and Budget Management Act, 2005 (2021-2022), GSDP over the last seven years for Assam
has seen an upward trend moving from INR 1,777 billion in 2013-14 to INR 3,513 billion in 2019-20. It
has grown at a compound annual growth rate (CAGR) of 12.0% between FY 2013-14 to FY 2019-20, while
CAGR for India (i.e., GDP) has been 10.4% for the same period. Consequently, the states’ contribution
towards the GDP has slightly increased.
Growth Rate (%)
20%
16.5%
GSDP (Assam)
15% 11.4%
10%
10.7%
5% 7.8%
GDP (India)
0%
State's Contribution toward GDP (%)
2.0%
1.5% 1.73%
1.58%
1.0%
0.5%
0.0%
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Source: [Finance Minister, Assam, 2021]
Figure 2-32 Growth Rate of GSDP and State’s Contribution toward GDP
Although growth prospects in India have been downgraded following the unprecedented COVID-19
outbreak, IMF sees India’s GDP growing by 8.5%, which is 160 basis points higher than its earlier
projection, in FY 2022-23. If that happens, India will become the most rapidly expanding large economy
in the world. The economic outlook of Assam, in a similar way, might be expected to be positive with
steady recovery from the setback.
2-28
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
25%
23.1% 23.9% 23.5%
20% 21.3% 22.6% 22.1% 22.8% 22.4%
20.9%
18.4%
15%
10%
5%
0%
Expendiures
Expendiures
Expendiures
Expendiures
Expendiures
Receipts
Receipts
Receipts
Receipts
Receipts
2015-16 2016-17 2017-18 2018-19 2019-20
The overall composition of Receipts in Consolidated Fund has not been changed significantly in the recent
past; on the other hand, there has been structural change to India’s tax system (i.e., introduction of Goods
and Services Taxes (GST)) and shifts in the composition of tax revenue (Figure 2-34 and Figure 2-35).
Introduction of GST has brought about a paradigm shift in the taxing power of both the central and the state,
and the state’s tax revenue has now been pooled into GST leaving little scope with the state government to
augment its revenue from GST by way of tweaking of GST rate since such power is vested in the GST
Council. However, according to the Analytical Statement 2021-22, the implementation of GST is expected
to have a positive impact on the state government’s finances in the medium to long term. After introducing
the GST in FY 2018-19, the state’s own tax revenue increased at least at the same speed of the GSDP
growth (11.4%). Moreover, the other factors behind the increase of the state’s own tax are explained as
follows, which implies that the tax collection capacity of the state government has improved.
The introduction of the online system of revenue collection, vis-a-vis amendment in the rules, has
made excise acts and rules more stringent and this has led to stepping up of innovative enforcement
activities resulting to increase in the collection of excise duty in the state.
Increase in the collection of stamp and registration fee is due to the enhancement of the registration
fee and stamp duty in some documents via marriage, trust, will, release of adoption deed, revocation
deed, security bond, etc.
2-29
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Source: [Finance Minister, Assam, 2021] and [Finance Department, Government of Assam, 2021]
Figure 2-34 Composition of Government Revenue in Assam
40%
3.3% 3.4% Stamps & Registration
2.7% 2.5%
20% Sales Tax
1.4%
State GST (SGST)
0%
2015-16 2016-17 2017-18 2018-19 2019-20
Source: [Finance Minister, Assam, 2021] and [Finance Department, Government of Assam, 2021]
Figure 2-35 Composition of the State’s Own Tax Revenue in Assam
In addition to aggregate government revenue, other fiscal indicators such as Gross Fiscal Deficit as a
percentage of GSDP, Debt-to-GSDP ratio, and Interest Payment to Total Revenue ratio have also shown
favourable financial conditions in Assam. Those fiscal indicators have mostly met the targets set by the
Assam Fiscal Responsibility and Budget Management Act (AFRBM) during the past seven years. Although
the Debt-to-GSDP ratio has been increasing recently, which is mainly due to the increase in Open Market
Borrowings (OMBs) and institutional loan, the ratio itself is still below the targeted ceiling and the burden
on interest payment has not shown a sharp growth (Figure 2-36 and Figure 2-37).
2-30
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
19.5%
20%
15.5% 16.2%
0% 3.3%
2.1% 2.3%
AFRBM Target for Gross Fiscal Deficit: Below 3.5%
-10%
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
0%
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Prioritisation of Health
The third key source of fiscal space for health is an increase in the share of government expenditure that
goes to health. As a share of total government expenditure, government expenditure on health in Assam
has been stably maintained at around 6% in recent years (Figure 2-38), which is relatively higher than in
the other states in comparison as mentioned above. This desirable trend is expected to continue, since the
Budget Speech 2021-22 clearly articulated that adequate provision of affordable and quality healthcare to
the population has been a priority.
2-31
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
100%
Others
80%
Grant No. 25: Miscellaneous
General Services & others
To summarise, given the moderate prospects of economic growth and the upward trend of the government
revenue and expenditure with the context of relatively favourable fiscal conditions of GOA, as well as the
sustainable prioritisation of health in government expenditure, fiscal space for health in Assam is expected
to be secured in the short to medium term.
ICU Packages
Trauma
Critical Care Paediatrics
Paediatric Surgery
Japanese Encephalitis and Acute Encephalitis Syndrome
Supplementary Packages
So far, a total of 145,220 people have received benefits under this scheme, of which 4,860 have been
covered under the Vistarita Atal Amrit Abhiyan scheme.
2-32
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
1. The prevailing structure of HIS at Directorates and the National Health Mission;
2. The implementation of Hospital Information Systems in the medical college hospitals (work in
progress now) and the suitability of NIC’s e-Hospital software for large-scale state-wide
implementation;
3. The GOI’s National Digital Health Mission and how best to hasten digitisation of hospital operations
and its integration into the Mission; and
4. General recommendations for strengthening of the information system in Assam.
The ICT plan will strengthen the hospital operations and medical records management of medical
college/DHS and other sub-district hospitals by implementing the Government of India’s e-Hospital system
developed by NIC or other appropriate software vendors. The aim is to generate online data for appropriate
decision-making at hospital level, directorate, and government level. Additionally, the ICT plan proposes
to recommend database driven management systems in HR, equipment management, drug procurement and
distribution. The ICT plan also aims to integrate the Assam medical system into the National Digital Health
Mission of GOI over a period of five years, thereby improving the quality and ease of care. The ICT plan
will bring in more transparency and reduce the cost of care.
Conservative timelines of three years for medical colleges and four years for district/CHC hospitals are
proposed with a budget outlay of INR 45.54 crores; and five to seven years’ timeline for PHC and other
hospitals with a budget of INR 56.6 crore. Hardware, software, implementation, HR, and operational
expenses are provided over five years.
Present Situation
2-33
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 2-18 Summary of HIS Implementation Status of the Target Medical College Hospitals
Name of the hospital System Remarks
Assam Medical College & Amtron, Guwahati developed Non – compatible for NDHM – local server
Hospital, Dibrugarh system. Functional for OPD and based. It needed to be moved to cloud based e-
billing and several other modules Hospital software to include medical records
Guwahati Medical College Amtron, Guwahati developed Non – compatible for NDHM – local server
& Hospital system. Functional for OPD and based. It needed to be moved to cloud based e-
billing and several other modules Hospital software to include medical records
Silchar Medical College & e-Hospital (GOI’s NIC Basic modules of e-Hospital system are well
Hospital developed) implemented. Full modules to be implemented
FAA Medical College & Amtron Guwahati Basic modules OPD and billing implemented
Hospital Barpeta
Tezpur Medical College & Amtron Guwahati Basic modules OPD and billing implemented
Hospital
Jorhat Medical College & Amtron Guwahati Basic modules OPD and billing implemented
Hospital
Diphu Medical College & Amtron Guwahati Basic modules OPD and billing implemented
Hospital
Note: The following assessments are made through site visits, facilities survey data, interviews, observations by technical experts
in NIC, luminous, CDAK, NIC, Pune, luminous info way along with present and past teams of NHM.
Source: JICA Survey Team
NHM since 2007 has been connecting the rural hospitals, getting the data entry, validation, and report
preparation. It continued to upgrade its tools, processes, and hardware (deployed even Very Small Aperture
Terminal (VSATS) and gained experience of connectivity even 13 years ago).
NHM is strong in terms of systems (established over the last 15 years) data collection and validation
practices, hardware, training mechanisms, quality of teams in house, and even good budget support.
At present NHM operates mainly through the Swasthya Sewa Dapoon – Integrated MIS GIS System
(Annex III).
2-34
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The fairly proven and increasingly accepted HIS has been developed by the National Informatics Center,
Delhi as a standardised HIS application in hospitals across India (www.ehospital.gov.in). It consists of all
useful modules starting from outpatient department (OPD) to inpatient department (IPD) to e-prescriptions,
medical records, and blood bank.
e-Hospital has been implemented in 678 hospitals (most of them are the basic modules) but is robust as it
has handled the AIIMS, Delhi, and other top hospitals’ patient’s load and requirement with complete
modules. e-Hospital is in the process of upgrading their modules to the next level by incorporating the GOI
digital health mission standards. Detailed modules of e-Hospital and site visit to TRIPURA are presented
in Annex V.
Brief comparative states of e-Hospital and other software are summarised in Table 2-19.
2-35
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
GOA may evaluate the implementation of e-Hospital in medical college and district hospitals as it is already
underway whether to implement the full modules under this project or to seek a private top software vendor
to integrate fully with the national digital health mission.
GOI’s Massive Plan and Digital Health Records of Indians through National Digital Health
Mission
The National Digital Health Mission is a digital health ecosystem being implemented by GOI in the Union
Territories (to be extended to all states soon) now under which every Indian citizen will have unique health
IDs, digitised health records as well as a registry of doctors and health facilities (Annex V).
A unique health ID will be provided to every citizen, which will contain details of their diseases, diagnoses,
report, medication, etc., in a common database through a single ID. This will essentially be a digitised
version of all their health records. This digital database will be linked to the registry of doctors and health
facilities across the country [Gov of India, 2021].
Digital data/records will help medical college professors’ conduct/publish quality research articles, secure
funding from national bodies, and improve their professional knowledge through submission of research
papers in national and international conferences.
2-36
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
2-37
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
2-38
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Hospital Management
According to HFWD, every medical college hospital as a hospital management society. It is autonomous
in functions and decision making to provide support to operation of the medical college hospital. A principal
takes chair and superintendents are the members. Also, Director of Medical Education of HFWD, and
representatives from other government agencies and public are involved. The governing board is headed
by a public representative, such as local member of legislative assembly. Financial sources of the society
are donations and government grants, which is usually Rs. 30 to 50 million per year per society. Also, user
funds are generated from patient registration fee and other medical services to be deposited in the society’s
bank account. The user funds are utilized to hire contractual staff, operation and maintenance of hospital
functions, purchase of consumables.
Also, in district/civil hospitals have hospital management society chaired by directors. Since introduction
of the free diagnostic initiative, deposit from user fund has been decreased. The society also receives funds
from the National Health Mission.
Under the subcontracted survey, the JICA Survey Team inquired about the management vision and
commitment of the target hospitals, as well as concrete tools for management review. Six out of seven
MCHs and four from six CDHs responded to the questionnaire. All the hospitals stated their management
2-39
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
vision and mission, but the commitment of the hospital to realise the management vision seemed not clear.
According to the questionnaire survey to the hospital staff, there were some comments that decision-making
procedure had not been opened to the staff but it was just limited to some personnel.
Mid-term and long-term development plans seemed to focus on infrastructure development such as
installation of new facilities, and renovation and/or upgrade of the existing facilities.
The Plan-Do-Check-Action (PDCA) cycle seemed not to be familiar in most of the hospitals, except two
in each of the MCHs and CDHs which stated that they use PDCA cycle in management. Regarding risk
management, three MCHs and one CDH opened about incident report or risk management information, and
one MCH out of those provided periodic training on risk management. Another MCH seemed to prepare
an incident report, but it is closed to hospital staff.
2-40
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
According to the Population Projection Report, the total population of Assam in 2011 was 31.2 million and
projected to be 39.4 million in 2036. Figure 3-1 shows Assam’s population pyramid in 2011 and 2036. In
2011, the proportion of teenagers and twenties is high. However, in 2036, the shape of the pyramid is
projected to be changed to a hanging bell shape, which indicates that the number of children will be
declining while the overall population, including working age population and the people aged 65 or older,
will be growing.
2011 2036
80+ 80+
70-74 70-74
60-64 60-64
50-54 50-54
40-44 40-44
30-34 30-34
20-24 20-24
10-14
10-14
0-4
0-4
12% 8% 4% 0% 4% 8% 12%
12% 8% 4% 0% 4% 8% 12%
Male Female
Male Female
Source: [National Commission on Population, Ministry of Health & Family Welfare, Mirman Bhawan, 2020]
Figure 3-1 Population Pyramid in Assam
3-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
40%
India 39%
30%
31%
20%
Assam
17%
10% 14%
0%
2011 2016 2021 2026 2031 2036
Projected Urban Population to Total Population (%)
Source: [National Commission on Population, Ministry of Health & Family Welfare, Mirman Bhawan, 2020]
Figure 3-2 Projected Urban Population to Total Population
Economy
In FY 2019-20, Assam’s Net State Domestic Product (NSDP) per capita was INR 86,801, or approximately
USD 1,200 (Figure 3-3), which was the fifth lowest among the states. According to the statistics, other than
the service sector, the percentage contribution of agriculture and industry sector is more or less static (Figure
3-4). The tea industry occupies an important place in Assam and plays a very special role in the state
economy. Assam tea has maintained its international reputation and keeps significant share in the world tea
market. The total area under tea cultivation in Assam is accounting for more than half of the country’s total
area under tea. In addition, the tea industry in Assam also provides average daily employment to more than
68,600 persons in the state, which is around 50 percent of the total average daily number of labourers
employed in the country, according to the Economic Survey.
Goa 435,959
Sikkim 403,376
Delhi 376,221
Chandigarh 330,015
Haryana 247,628
Telangana 233,325
Karnataka 223,175
Kerala 221,904
Puducherry 221,493
Andaman & Nicobar Islands 218,649
Gujarat 213,936
Tamil Nadu 213,396
Uttarakhand 202,895
Maharashtra 202,130
Himachal Pradesh 190,407
Mizoram 187,327
Arunachal Pradesh 169,742
Andhra Pradesh 168,480
Punjab 155,491
All-India 134,186
Tripura 125,675
Nagaland 120,518
Rajasthan 115,492
West Bengal 113,163
Orissa 110,434
Chhattisgarh 105,089
Madhya Pradesh 103,288
Jammu & Kashmir 102,789
Meghalaya 87,170
Assam 86,801
Manipur 84,746
Jharkhand 77,739
Uttar Pradesh 65,704
Bihar 45,071
0 100,000 200,000 300,000 400,000 500,000
Per Capita Net State Domestic Product (At Current Prices, INR)
3-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
100%
80%
47% 46% Services
50%
Climate
Assam State has a tropical monsoon climate, with an annual precipitation of around 2,100 mm and
maximum temperature in summer (May-August) of around 35-38 °C and a minimum of 6–8 °C in winter
(November-February). Figure 3-5 presents the annual distribution of precipitation, and the maximum and
minimum temperatures at Dispur. The state gets the highest rainfall (28.7%) due to the southwest monsoon
in July followed by June (28.6%). August and September receive 23.8% and 18.9% of southwest monsoon
rainfall, respectively. Also, more than 66% of the annual rainfall is received during the southwest monsoon
season only. The variability of monsoon or annual rainfall is also very low (12%).
3-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
(Dispur)
Agro-Climatic Division
Considering climate, topography, soil characteristics, and the cropping pattern, the state is divided into six
agro-climatic zones, namely: Barak Valley Zone, Hill Zone, Upper Brahmaputra Valley Zone, Central
Brahmaputra Valley Zone, Lower Brahmaputra Valley Zone, and North Bank Plain Zone. The
characteristics of each zone are described as follows:
Upper Brahmaputra Valley Zone: The zone includes Tinsukia, Dibrugarh, Sibsagar, Jorhat, and Golaghat
districts, where season-wise average rainfall ranges between 74.4 mm in winter and 1,060 mm in summer.
Rice is the principal crop and sugarcane and mustard are the other important crops that are grown in the
region.
3-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Central Brahmaputra Valley Zone: The zone encompasses Kamrup, Nagaon, and Morigaon districts.
Season-wise average rainfall of the Central Brahmaputra Valley varies between 31 mm in winter and 1,271
mm in summer. Rice, mustard, jute, and pulse are the main crops of the zone.
Lower Brahmaputra Valley Zone: The zone stretches over Goalpara, Dhubri, Kokrajhar, and Bongaigaon
districts. In this zone, rainfall mainly occurs due to the summer monsoon that originates from the Bay of
Bengal and ranges from 89 mm during winter to 1,203 mm during monsoon in summer. The climate is
suitable for rice, mustard, potato, wheat, and jute cultivation, because of fertile soils.
Hill Zone: It includes Karbi Anglong and N C Hills. The average seasonal rainfall during the monsoon
season is about 719 mm, and shifting cultivation is practised in this region. Crops such as rice and sugarcane
are cultivated in the zone mainly for sustenance.
Barak Valley Zone: Cachar, Hailakandi, and Karimganj districts are included in Barak Valley Agro-
Climatic Zone. The average seasonal rainfall during the monsoon season is about 1,957 mm. This region is
also known for the cultivation of rice and sugarcane.
North Bank Plain Zone: This agro-climatic zone stretches over the districts of Dhemaji, Lakhimpur,
Sonitpur, Darrang, Nalbari, and Barpeta (newly formed districts like Udalguri, Baska, and Chirang are
included here). While rice is the main crop of the region, mustard and sugarcane are also grown. The
temperature varies from 22 oC to 35 oC, and annual rainfall varies from 1,500 mm in the western part to
3,400 mm in the northeastern part of the zone.
Geology
A major part of the state is covered by the recent alluvium of the east-west trending Brahmaputra floodplain
(BFT), which is said to be tectonic in origin, in which the valley portion was formed by the compression
between the European and the Indian plates and also led to the formation of the Himalayan Mountains [N
Das, et al., 2017]. Sediment characteristics vary based on the origins and features of the northern and
southern tributaries. The larger northern tributaries, of Himalayan origin, have greater sediment discharge,
3-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
consisting mainly of silt fractions. The beds and the banks of the southern tributaries were formed by non-
alluvial sediments. The Karbi Anglong Hills and North Cachar Hills located at the central portion consist
of gneisses, schists, and granite, while transported soils were formed through the weathering of rocks of the
Himalayas and the Assam Plateau [Mahanta C, 1995]. Cachar Plain in the south comprises recent alluvium.
Hydrology
Assam is endowed with enormous water resources. The large perennial rivers and other water bodies with
rich aquifer speak about the vastness of its water resources. Surface water is available in the form of river,
stream, lake, swamp, pond, etc. Groundwater is available at low to moderate depths in almost the entire
state. Although there is seasonal and regional variation in the availability of water resources, the annual
availability of water resource remains almost the same.
Surface Water
Apart from the annual rainwater received, thanks to the good monsoon and low pressure in the Bay of
Bengal, the state is endowed with several perennial rivers and lakes. The state is drained by the river systems
of Brahmaputra and the Barak rivers. There are about 73 important tributaries of the Brahmaputra River
and 11 tributaries of Barak River. The vast potential surface water resource of the state is not yet properly
utilised in the state. In the last few decades, the rate of consumption of water in the agricultural sector,
industrial sector, and in the urban centres has increased significantly. The discharges of untreated domestic
3-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
wastewater, industrial wastewater, runoff from the agricultural fields, and urban sewage water are posing
threat to the water bodies of the state.
Source: WWF
Figure 3-10 Major River System
Groundwater
Assam is one of the rich states of the country in terms of the groundwater development potentiality. The
entire Brahmaputra Valley, covering more than 70 percent of the total geographical area of the state,
contains prolific aquifer system with water table lying within 5 m of land surface. The Barak Valley also
has a good potentiality for the development of groundwater. In some parts of the state, there is a problem
of groundwater contamination such as Fluoride, Iron, and Arsenic as shown in Table 3-1
Protected Areas
Out of the five national parks in Assam, two are designated as World Natural Heritage Sites by the United
Nations Educational, Scientific and Cultural Organization (UNESCO). Assam has rich biodiversity and is
endowed with rich topography covering lush hills and valleys dissected by the majestic Brahmaputra and
its many tributaries. It is home to over 180 species of mammals, including rare and endangered species like
the great Indian one-horned rhinoceros, the royal Bengal tiger, the golden langur and hoolock gibbon, and
3-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
a spectacular range of avifauna. Assam's most famous parks are Kaziranga and Manas. Both were conferred
World Heritage Status in 1985. There are 18 notified wildlife sanctuaries spread across the state. It is
expected that none of the candidate project site is located within 10 km from protected area.
Natural Disasters
Seismology
The NER of India including Assam State is an earthquake prone area. The region has experienced many
earthquakes of tectonic origin. The risk probabilities of earthquake are less over the entire Brahmaputra
Valley. Two major earthquakes in history, one with magnitude 8.7 that occurred in 1897 and another with
magnitude 8.6 in 1950, both caused large-scale damage in lives and properties in the region. Sir Edward
Gait (1933) has mentioned that the occurrence of destructive earthquakes in this region since 1500
happened once or twice every century. In the last century, destructive earthquakes occurred in
1918, ’23, ’30, ’32, ’38, ’43, ’47, ’50, and in ’88.
As indicated in the previous section, much of Assam lies in the Brahmaputra River Valley, except for a few
southern districts. The northern and eastern parts of this valley are bounded by the Himalayan Frontal
Thrust (HFF). In the eastern parts along with the HFF, there is the Lohit and Naga thrusts. Among the large
earthquakes in this region were the events in 1869 and 1897. The 1897 earthquake is well known for the
dramatic accounts of violent upthrow during the shock. The northeast Himalayan region of India is one of
the most seismically hazardous zones in South Asia. GSI has determined the 3-D seismic velocity (Vp)
structure of the crust of that region using selected arrival time data from two groups of shallows to
intermediate-depth local earthquakes recorded by two different seismic networks by applying the 3-D
tomography method of Zhao et al. (1992).
3-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Annual Floods
The State of Assam has a total surface area of about 78,438 km 2, which forms part of the Brahmaputra
basin. The basin lies within the monsoon rainfall regime receiving an annual rainfall of about 2,300 mm,
60-70% of which is observed during the monsoon season from June to September. The Brahmaputra River,
along with its host tributaries, causes devastating floods almost every year with colossal loss and damage
to infrastructure and environment in the state. The unique environmental setting, i.e., the eastern Himalayas,
highly potential monsoon regime, and accelerated rates of erosion, rapid channel aggradation, deforestation,
intense land use pressure, and high population growth especially in the floodplain belt, are some of the
dominant factors that cause recurrent floods in the State of Assam with the extent of risk hazard as indicated
in Figure 3-13 (Goswami, 1998, Kotoky et.al., 2003).
The flood prone area of the state as assessed by the Rastriya Barh Ayog (RBA) is 31.05 lakh hectares
against the total area of the state of 7,852,300 ha, i.e., about. 40% of the total land area of Assam, and 9.4%
of the total flood prone area of the country. Average annual loss due to flood in Assam is estimated to be
around two billion Indian rupees.
3-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
3-10
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The hospital has all the basic specialties and super specialties like Cardiology, Cardiovascular, Neurology,
Nephrology, and Neurosurgery. A new block of super specialty hospital across the road is under
construction.
The distance from the nearest airport, Lokapriya Gopinath Bordoloi Airport, Guwahati to GMCH is 24.3
km (Driving time is approx. 49 min).
The distance from Guwahati to Assam MCH is 448.0 km (Driving time is 9 hours and 56 minutes). The
distance from the nearest airport, Mohanbari Airport, to Assam MCH is 10.4 km (Driving time is approx.
25 min) via NH-15.
3-11
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The nearest airport from the college is Silchar Airport, which is about 31.2 km away from the college and
well connected to Guwahati, Kolkata, and New Delhi.
3-12
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The JMCH is located at Swahid Kushal Kownar Path, KB Road, Barbheta, Jorhat Assam, India. The
distance from Guwahati to Jorhat MCH is 304.0 km (Driving time is 6 hours and 51 minutes). The distance
from the nearest airport, Raraiyah Airport, to Jorhat MCH is 3.6 km (Driving time is approx. 10 min), the
land is adjacent to the MCH compound. Again, the distance from Jorhat Town to Jorhat MCH is 3.0 km
(Driving time is approx. 8-10 min).
The distance from Guwahati to Tezpur MCH is 159.6 km (Driving time is 3 hours and 37 minutes). The
distance from the nearest airport, Salonibari Airport, to Tezpur MCH is 16.9 km (Driving time is approx.
29 min) via NH-15. Distance from Tezpur Town to Tezpur MCH is 15.3 km (Driving time is approx. 26-
30 min).
3-13
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The shortest distance from Guwahati to FAA MCH is 98.8 km (Driving time 2 hours and 29 minutes) via
Hao-Doulashal. The distance from the nearest airport, Lokapriya Gopinath Bordoloi Airport, Guwahati to
FAA MCH is 110.0 km (Driving time is approx. 2 hour 45 min).
Table 3-8 Fakhruddin Ali Ahmed Medical College and Hospital (FAAMCH)
Address: Jania Road, Joti Gaon, Barpeta Assam 781301
Site Area: Approx. 167,225 sqm
Establishment: Year 2011
MBBS Course: 100 students / year
Bed Strength: 500
OPD Patients: More than 1,000 patients/day
Operation Cases: No Data
Diagnostic Imaging: No Data
Clinical Departments: Medicine, Surgery, Orthopaedics, Obstetrics, Gynaecology, Paediatrics,
ENT, Ophthalmology, Dermatology, Psychiatry, T.B. and Chest,
Rehabilitation, Community Medicine
Facilities under Construction: Cancer Hospital, Mother and Child Hospital
Observations on Existing Although the buildings are constructed only ten years ago, all department
Facilities: buildings are deteriorated. Some inpatients are bedded in the floor due to
the scarcity of beds. ICU is not functional because of the outdated
environment.
Source: JICA Survey Team
3-14
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Diphu is a small well-known town in the hilly natural beautiful district of Assam. The natural ambience of
the college campus attracts all people. The distance from Guwahati to Diphu MCH is 247.3 km (Driving
time is approx. 4 hours and 54 minutes) via NH-27. It is the only referral hospital in Karbi Anglong District,
Assam, and also for the other neighbouring districts of Lumding and Hojai. There is no airport in Karbi
Anglong District. The nearest airport from the college is Dimapur Airport (DMU), Nagaland which is about
62.9 km away from the college.
3-15
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
There are several buildings in the compound including administrative building and staff quarter. Sewage
treatment plant, oxygen generation plant, RO purifier room, incinerator and power backup generator are
functional, whilst electricity Sub-station needs to be maintained as water logging is a major issue.
The hospital is equipped with oxygen generation plant. There are several power backup generators, some
are functional.
The hospital is equipped with an oxygen generation plant. The access road is quite busy. The hospital
building is old, and ruined roof and structure are partly observed. The access road is wide enough to
accommodate two-way traffic.
3-16
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Water leakage is commonly observed in the roof of the hospital buildings. Maintenance of the oxygen
generation plant and cleanliness of the surrounding area are needed. Electricity sub-station needs to be
maintained as water logging is a major issue. Power backup generators are fully functional.
The criteria for designing buildings will basically conform to the following. Other building codes and
standards referred shall be from the National Building Code (NBC).
Guidelines for District Hospitals / Community Health Centres (CHC), Indian Public Health Standards
(IPHS)
Design Guidelines, National Accreditation Board for Hospitals and Health Care Providers (NABH)
Standard Requirements for Medical Colleges, National Medical Council (NMC)
Design Guidelines of the Healthcare Engineering Association of Japan (HEAJ): To ensure the quality
required as international standard, OT rooms and ICUs will conform to this.
Assam Notified Urban Areas Other than Guwahati Building Rules 2014
Guwahati Building Construction By-laws 2014 March (Amendment 05.05.2020)
3-17
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 3-17 Excerpts from the Guidelines for Indian Public Health Standards (IPHS)
Issues Contents
Hospitals with more than 500 beds should have a site area of at least 65,000 sqm (45,000
Standards sqm for hospitals, 20,000 sqm for residential areas).
related to Teaching hospitals should be sized at 100-110 sqm/bed.
Facility Size A minimum of 2,500 sqm of facilities for short-term stays should be planned adjacent to
the hospital.
The opening area (area of windows) for ventilation should be at least 20% of the floor
area.
Corridors should be at least 3 m wide to allow stretchers with IVs to pass each other.
The slope of the ramp should be 1/15 to 1/18 to allow beds and stretchers to change
direction.
The roof height should not be less than approximately 3.6 m measured at any point from
Standards for
floor to roof.
the Entire
Facility It should have a high boundary wall, at least two exit gates.
There shall be dedicated parking space separately for ambulances, hospital staff, and
visitors.
For easy access to non-ambulant (wheelchair, stretcher), semi-ambulant, visually disabled,
and elderly persons infrastructure.
Rainwater harvesting, solar energy use and use of energy-efficient bulbs/ equipment
should be encouraged.
The area of the outpatient waiting area should be at a minimum of 38 sqm, calculated at
0.093 sqm/outpatient per day. (1 sq ft/per average daily patient with minimum 400 sq ft of
area.)
Standards for A waiting area for 4-5 doctors (about 12 sqm) should be provided.
Outpatient A consultation room for infectious diseases should be located away from the general
Departments outpatient department independently.
(OPD) All examination rooms must be equipped with examination tables, Schaukasten (X Ray
view box), curtains, and hand wash basins.
There should be one male toilet (urinal) for every 100 people and two female toilets for
every 100 people; there should be one urinal for every 50 people.
3-18
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Issues Contents
Potable drinking water, Functional and clean toilets with running water and flush,
Fans/Coolers shall be installed.
The area of general wards shall be 15-18 sqm/bed, with a minimum of 7 sqm per bed.
It is recommended that 10% of the total number of beds should be private rooms and 20%
should be day care beds.
One nursing unit should have 40-45 beds, half of which should be for acute care and half
of which should be for chronic care.
Standards for One toilet and shower should be provided for every six beds.
Inpatient One urinal should be provided for every 20 beds.
Departments Two hand wash basins should be provided for every 24 beds.
(Ward) There should be one additional hand-washing facility for every 24 beds.
All wards shall have positive pressure, except for infected beds.
Minimum area for apertures (windows/ Ventilators opening): 20% of the floor area (if on
same wall), 15% of the floor area (if on opposite walls)
Minimum distance between centres of beds: 2.5 m (minimum)
Clearance at foot end of each bed: 1.2 m (minimum)
Number of operation theatres to be the ratio of one OT per 50 general hospital beds and
Standards for one OT per 25 surgical beds shall be established.
Operation ICU beds: 5 to 10 % of total beds
Theatres (OT) Floor space for each ICU bed: 25 to 30 sqm (this includes support services)
Floor space for Paediatric ICU beds: 10 to 12 sqm per bed
Intermediate
Care Area
10% of the total bed strength is recommended as private wards beds.
Imaging The room shall have a sub-waiting area with toilet facility and a change room facility.
Room size: The laboratory shall have adequate space from the point of view of workload
Clinical
Laboratory
Storage space: It shall be adequate (10% of total floor space) with separate storage space
for inflammable items.
Location: Conveniently accessible from all clinics.
Size: Adequate to contain 5 percent of the total clinical visits to the OPD in one session.
Pharmacy For every 200 OPD patients daily/ one dispensing counter.
Components: Pharmacy should have component of medical store facility for indoor
patients and separate pharmacy with accessibility for OPD patients.
Source: JICA Survey Team
3-19
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
3-20
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
To achieve universal health coverage (UHC), the nearest health facility should be reliable for the people.
For that, interventions in both health service providers and users should be taken. Regarding health service
providers, referral system should function appropriately, i.e., primary and secondary health facilities could
provide proper diagnosis and treatment, then decide regarding referral with sufficient communication with
patients and other health facilities. In addition, when the patients have careful and clear explanation on
treatment or referral, they may seek care at the same health facility, the nearest from their community, from
next time.
However, according to the results of the survey, medical doctors are too busy to give time for the patients.
Because the number of doctors in the public sector is not enough to cover the increasing population, they
are overloaded. Also, as there is limited number of specialised doctors, specialised or advanced services
could be provided in limited hospitals. Therefore, patients who want quality and reliable services would
access directly to the tertiary hospitals, MCH. As a result, MCH would always be congested by patients
with minor illness and make the doctors busy. Then, the doctors get tired and leave for better opportunity.
And patients must wait for long time. In addition, hospital staff could not consider the mental aspects of
the patient.
The Government of Assam (GOA) has been increasing medical student seats aiming at 1,200 per year.
Then, a strategy to attract them to public health facilities and improve retention rate could be required.
According to the results of the questionnaire survey to the doctors, they value facility and equipment when
they choose a workplace, and human relationship and professional development opportunity may affect
their satisfaction. Therefore, upgrade of facility and equipment, as well as providing attractive training or
workshop opportunities, could be effective to improve the retention rate of medical doctors. Then, the
people might be attracted to such health facilities and doctors.
At the same time, effective intervention to improve health literacy of the people should be made. When the
people have a certain level of health literacy, people could choose appropriate care-seeking behaviour. In
addition, they could prevent diseases as they obtain healthy lifestyle and hygiene practice.
4-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 4-1 Major Facts and Issues in the Health Sector in Assam
* = To be expected to take measures in the project
Facts Existing Efforts by GOA Issues *
Sufficient number of health Increasing annual Strategy to retain health
personnel are not hired/ retained in production of heath personnel in public sector
public health facilities, especially personnel by should be developed.
in specialised medicine, rural areas, establishing new MCHs Behaviour of hospital staff ✓
and female doctors. and a paramedical to patients should be more
Student intake of medical training institution kind.
education institutions are not Strengthening training Workload of doctors should
enough to provide necessary capacity by integration be declined.
number to cover the population. of training and education Mental health and
Human Resource for Health
4-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
People do not trust cheap or free Mobilising ASHA to Quality of diagnostic and
service. facilitate community treatment, and patient
People tend to seek care directly to people to seek care to services should be improved
tertiary hospitals. public health facilities. to gain trust of the people to
Cultural and Social Context
4-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Developing an environment that can ensure qualified medical personnel (Regarding the quantitative
expansion, the project will develop an environment where high-quality clinical education can be
provided in medical college hospitals);
Strengthening cooperation among each level of medical institutions (establishment of referral systems,
system of dispatch of doctors, provision of technical guidance and training, etc.).
As shown in Chapter 1 and Chapter 2, the population of Assam is 312,000, wherein 50.6% of the population
uses public medical institutions, which is higher than the national average of 32.5%. In the rural areas,
especially in the respirational area and around the Brahmaputra River, the percentage of the population is
as high as 30%, and the percentage of the poor is 32.0%. Therefore, the provision of quality medical services
by public medical institutions is indispensable.
The development of medical personnel is essential for the provision of quality medical services. However,
in countries with global standards, medical education is usually provided through clinical training in
hospitals, rather than in classrooms (theoretical lessons). Therefore, the basic concept of the project is to
5-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
establish clinical training in tertiary medical institutions, and at the same time, by developing district
hospitals, to strengthen the medical services base in the catchment area, to receive patients from primary
medical institutions and to establish a technical support system for primary medical institutions. For this
reason, the project concept goes beyond the mere provision of hardware, such as facilities and equipment,
to include technical interventions with soft components.
Component 1 Candidate facilities: Silchar Medical College, Cachar Hospital (SMCH), Tezpur
Medical College Hospital (TMCH), Jorhat Medical College
Hospital (JMCH), Fakhruddin Ali Ahmed Medical College
Hospital, Barpeta (FAAMCH), Diphu Medical College
Hospital (DMCH) and Lakhimpur Medical College Hospital
(LMCH)
Component 2 Candidate facilities: Same as above
Component 3 Candidate facilities: Gauhati Medical College Hospital (GMCH), Assam Medical
College Hospital (AMCH)
Component 4 Candidate facilities: See table below (Considerable collaboration between tertiary
and secondary medical institutions) (Table 5-2)
5-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
On the other hand, the existing facilities will be used to increase the knowledge of establishing a system
for the improvement of medical skills, from tertiary to secondary and secondary to primary level medical
institutions, as well as for awareness-raising and health promotion activities in the community.
The following is an image of the collaboration between tertiary medical institutions and secondary medical
institutions in the short-term period (Figure 5-1), and the establishment of the UHC system through
collaboration among primary, secondary, and tertiary institutions, aiming to establish a model around the
area enclosed by the circle (the area covered by tertiary medical institution).
Project Targets
Based on the survey and the requests from the Government of Assam (GOA), soft components (component
6-9) are planned. The outline of each component is shown in Table 5-3.
5-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
5-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
5-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Facility Plan
These are the new norms which stipulate the minimum requirements for medical colleges (MC) and medical
college hospitals (MCH) of their facility, equipment, and staffing requirements in India. These guidelines
have to be strictly followed for their establishment.
The Japan International Cooperation Agency (JICA) Survey Team analysed this aiming to propose a facility
development policy.
Table 6-1 shows the major requirements set for an MCH catering to 100 MBBS, 150 MBBS, and 200
MBBS.
The minimum required departments for MC and MCH are shown in Table 6-2.
6-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
6-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
For optimal utilisation, the following super medicine and surgical super specialty departments were
requested:
1. Cardiology; 2. Nephrology; 3. Neurology; 4. Cardio-thoracic Surgery; 5. Neurosurgery; and 6. Urology.
In general, it is reasonable to set up such super specialty departments in tertiary level hospitals which require
urgent and immediate treatment. In the case of Assam, considering the geographical and demographical
situation, it is reasonable to set up such super specialty hospital in each medical college hospital.
As for the hospital volume and type, the JICA Survey Team proposed two types of hospitals. One is a
general 150-bedded hospital and the other is an emergency department hospital without beds, and these
were accepted by GOA.
Location
The following Table 6-4 shows the six district hospitals initially proposed by GOA for facility improvement
under the JICA project. After internal discussion within GOA, Goalpara Civil Hospital and Sivsagar Civil
Hospital were excluded from the request list due to their plan of new MCH establishment. Geographical
location and vertical integration with existing and upcoming medical college hospitals have been taken into
consideration.
6-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Analyse the gap between the number of beds needed and the actual number of beds based on the
hospital coverage area.
For those bed numbers that are below the requirement, a hospital with inpatient ward is proposed. The
proposed bed strength shall be limited to 150 beds, taking into consideration the available management
resources (Type 1).
For those already meeting the bed requirement, plan an emergency centre (Type 2).
Table 6-5 shows the considerations made for the proposal of the two types of district hospitals.
The facility is focused on training, capacity development, management personnel and digitalisation, and
creating a central administrative hub. It will act as command, control, and integrated training and
administrative centre for all health-related activities and bring together all verticals for much better co-
ordination.
Consolidating administrative and training functions, which are currently dispersed and inefficient in various
locations, is appropriate from the perspective of human resource development.
6-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Basically, the access roads shall be no problem; as for electricity, power back-up is preferred to be arranged.
For water supply, own source is suggested to be arranged by GOA since there is no proper water supply
system in any of the locations. (General facility infrastructure equipment such as transformer, generator,
STP and ETP which fulfil the capacity of the planned facilities shall be considered as facility development.)
For optimal utilisation, the following super medicine and super specialty departments were requested:
It is rational for a tertiary level hospital to have such super specialty departments, and considering the
geographical and demographical cases in Assam, it is a logical plan.
6-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The proposed site shall be altered as per GOA decision and it is required to make site available by
demolishing existing old structures. Site acquisition shall be a prerequisite for this project.
6-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The proposed site by GOA is lying in the northeast corner of the compound and is adjacent to the existing
main hospital building. Site acquisition shall be a prerequisite for this project.
6-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
6-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
A lot of land on the east side of the compound is proposed by GOA. Currently, the proposed land is occupied
by some facilities formerly used as Jorhat District Hospital, which is currently used as a facility for the
medical college. Site acquisition shall be a prerequisite for this project.
The airport at Jorhat shares boundary wall with the medical college; the maximum permissible height may
not be more than 21 m, depending on the location of the site with respect to the airport runway.
Therefore, the proposed building shall be planned lower than 21 m. This height limit includes lift machine
room, lightning arrestor, DG chimney, and any other structure that may stick out over the building.
6 During the public consultation, there was an opinion that the name would like to be “Jananayak Deveshwar Sharma Civil
Hospital”.
6-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The lot of land proposed by GOA in the compound is currently occupied by the Nursing School and
Superintendent Quarter. Site acquisition shall be a prerequisite for this project.
6-10
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
GOA proposed a lot of government site outside of the hospital compound, adjacent to the medical college.
Site acquisition shall be a prerequisite for this project.
6-11
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Currently, the proposed land by GOA is occupied by some facilities. Site acquisition shall be a prerequisite
for this project.
6-12
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
In general, the number of beds in hospital is an important factor in setting the scale of the hospital
management; a rapid increase in the number of beds may burden the hospital. Therefore, the JICA Survey
Team has set the recommended size of bed increase by 150 beds, and GOA has accepted this idea.
The basic specification of the Building Type 1: 150-bed hospital shall be shown in Table 6-13.
6-13
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The district hospitals shown in Table 6-15 are proposed by GOA for infrastructure improvement under the
JICA project. The geographical location and vertical integration with existing and upcoming medical
colleges have been taken into consideration. As for Goalpara CH and Sivasagar CH, medical college is
upcoming and therefore these are excluded from the list by GOA.
For S.M Dev Civil Hospital, Silchar and S.K Roy Civil Hospital, Hailakandi, the process of demolition is to be
initiated in phase-wise manner by GOA prior to the construction so that the functioning of the hospital services
is not affected during the construction.
As for Haflong Civil Hospital, Dima Hasao, the existing building to be demolished is an abandoned training
school. Hence, it is confirmed by GOA that it will not affect the functioning of the hospital services.
6-14
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
From the analysis of the above requested locations, four blocks of Type 1 building and two blocks of Type
2 building shall be planned as shown in Table 6-16.
6-15
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
6-16
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
6-17
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
6-18
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
From a medium- to long-term perspective, hospitals are often required to update their
facilities in response to updates in the medical technology. In order to realise this,
Skeleton Infill Facility
installation of dry-structure partition walls and lowering the structural slab floor in
Structure that Enables to
advance to accommodate future changes in water supply and cable pit for diagnostic
Accommodate Future
imaging and plan facilities that are easily adaptable to future changes.
Changes
Planning the hospital facility under these principles from the design stage enables the
facility to flexibly respond to future changes.
Cardiovascular operation theatres require a much larger column-free space than
normal operation theatres due to the large number of medical devices used. It is same
Long-span Structure that
for the hybrid operation theatres where CT and angiography are used during surgery.
can Accommodate
In such rooms that require large flat plan, pre-stressed concrete can be adopted to
Future Changes
reduce the number of columns. It is very significant to adopt such long-span structure
to accommodate a plane large floor plan for providing advanced medical care.
Assam has one of the world's highest rainfall and is known for its high agricultural
productivity such as tea, but it is also prone to frequent natural disasters such as
cyclones, major floods, and cliff collapses. The facility must be able to continuously
Knowledge of Back Up provide medical care and treatment to the injured and sick in the event of such
Functions as Disaster disaster. Considerations may be taken for receiving infrastructure from two supply
Base Hospital sources is a minimum requirement, installing a private power generation system that
can supply power for at least 72 hours (or a week when limiting the function area),
planning a rainwater reservoir when the city water supply is cut off, and reusing of
water.
Regarding flood, the major problem shall be the artificial flood during rainy seasons
due to lack of proper stormwater drainage system. In general, it is advisable to have
the finished ground level of the proposed locations to be kept at about 1.0 m above
Flood Water the Highest Flood Level.
Generally, a good construction period in Assam is from end-September to mid-May.
Major constructions like foundation and structural work should be completed during
this period.
In India, large hospitals in high-risk areas for earthquakes have begun to use seismic
Seismically Isolated isolation, and in Assam, there is a hospital currently being planned. Introducing
Structure seismic isolation structures in Assam enabled to ensure that medical activities
continue even in the event of a major earthquake.
Green Hospital regarding To reduce the energy consumption in the event of a disaster, as for the building
Sustainable facade, appropriate insulation materials shall be placed, air-tight window frames and
Development Goals pair glass shall be introduced, exterior louvers to reduce heat load, rooftop and wall
(SDGs) greening, and solar panels shall be considered.
Source: JICA Survey Team
6-19
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Equipment Plan
For example, Gauhati Medical College & Hospital provides undergraduate and post-graduate education in:
Medicine, Nursing, Midwifery, Pharmacy, Orthopaedics, Cardiology, Otorhinolaryngology, General
Surgery, Anatomy, Pathology, Biochemistry, Ophthalmology, Paediatrics, Microbiology, Obstetrics and
Gynaecology, Psychiatry, Dentistry, Neurology, Pharmacology, Forensics, Anaesthesiology, Dermatology,
Plastic Surgery, Radiology, Physiology
As for patient care, it runs outpatient departments in General Medicine, General Surgery, Orthopaedics,
Ophthalmology, Dermatology, Pulmonary Medicine, Geriatric Medicine, Obstetrics and Gynaecology,
Dentistry, Paediatrics, Physiotherapy, and Psychiatry. Special outpatient departments for Rheumatology,
Diabetes, Neurology, Nephrology, Cardiothoracic and Vascular Surgery, Plastic Surgery, Paediatric
Surgery, Urology, Cardiology, and Neurosurgery run on specified days of the week. Emergency services
run in Casualty, Paediatric Medicine, Obstetrics, and Psychiatry.
The availability of human resources who can operate the equipment, such as specialist doctors and
medical radiologists, etc.
For equipment that needs to be installed to the facilities, space for installation and ancillary facilities
such as power supply, air conditioning, X-ray shielding, load-bearing capacity, etc., must be available.
Maintenance services are available both in and outside of the target medical college & hospital.
Procurement of consumables necessary for the operation of the equipment is secured (budget and
procurement routes).
The equipment must be suitable for clinical, educational, and research purposes.
Equipment Plan
【Expected cooperation components for medical equipment, request-wise】
The following table indicates the major planned equipment to be procured under the yen loan project.
7-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Component 1: Super Specialty Wing in Medical College & Hospital for Tezpur, Cilchar, Jorhat,
Diphu, Fakhruddin Ali Ahmed, and Lakhimpur (Total six Medical College & Hospital) *No.
of beds depends on the hospitals
The medical equipment is considered and planned based on the facility architectural design (refer to Chapter
6 Facility Plan). Table 7-2 presents the major medical equipment by each service department / section.
Component 2: To Improve Diagnostic / Curative Facilities for 8 Medical College & Hospitals
The medical equipment is necessary for the existing medical college & hospitals and was planned in view
of the requests from the respective medical college & hospitals and the availabilities of the existing
resources and infrastructure status. The items to be procured for the existing service departments / sections
are designed in order to start standard essential diagnosis and treatment. Details are shown in Table 7-3.
7-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
No new facilities are planned to be constructed at Assam Medical College & Hospital and Guwahati
Medical College & Hospital due to the presence of existing super specialty wings. Therefore, it was
necessary to investigate the equipment plan for all the existing departments / sections and the following
diagnostic imaging equipment (Table 7-4) has been planned.
Table 7-4 Contents of the Equipment for Diagnostic Imaging Department of Assam
Medical College & Hospital and Guwahati Medical College & Hospital
Department Major Medical Equipment
Diagnostic Imaging CT 256 slices, MRI 3T, Digital X-ray unit, Mobile X-ray unit, Ultrasound scanner colour
doppler, Portable colour doppler unit, CR system, Mammography unit
Source: Prepared by the Consultant (Based on questionnaire and interview survey)
The availability of human resources who can operate the equipment, such as specialist doctors and
medical radiologists, etc.
For equipment that needs to be installed to the facilities, space for installation and ancillary facilities
such as power supply, air conditioning, X-ray shielding, load-bearing capacity, etc. must be available.
Maintenance services are available both in and outside of the target medical college & hospital.
7-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Procurement of consumables necessary for the operation of the equipment is secured (budget and
procurement routes).
The equipment is clinically relevant.
The equipment that contributes to improve IMR, U5MR, and MMR (e.g., paediatrics, obstetrics and
gynaecology) is prioritised.
Equipment Plan
The facilities to be covered by the project are listed in Table 7-5.
Two types of secondary hospitals were designed: facilities with 150 beds (Type 1) and facilities with
emergency and no beds (Type 2). Medical equipment was planned into the facility design.
7-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The availability of human resources who can operate the equipment, such as general physicians (GPs),
midwifery staffs and nurses, etc.
For equipment that needs to be installed, utilities such as electricity, water supply, etc. must be available.
Maintenance services are available by equipment suppliers of the pilot primary health centres.
Procurement of consumables necessary for the operation of the equipment is secured (budget and
procurement routes).
Equipment Plan
The facilities to be covered by the project are listed in Table 7-8.
7.4 Others
Table 7-9 to Table 7-11shows other equipment to be planned for the project.
7-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The above equipment is expected to be procured under the yen loan project as of Preparatory Survey time. In
addition, due to budget ceiling, some component which is not high priority for the Assam side might not be
covered by the yen loan.
7-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Routine inspections include visual inspections that can be carried out without the use of tools or measuring
instruments, checking of alarm operation, imaging accuracy checks using phantoms, etc., to ensure the safe
and proper use of the medical equipment.
Periodic inspections include cleaning, calibration, replacement of consumable parts, etc. These inspections
are carried out by the equipment supplier or distributor, who dismantles and inspects the equipment
regardless of whether it is faulty or not, then, replaces deteriorated parts if necessary. In Assam, the
authorised technicians of the distributors in Kolkata and Guwahati are ready to take immediate action.
In the Indian government tender, the Comprehensive Maintenance Contract (CMC) costs for three years
will be included in the purchase price of the equipment. In addition, the bidder will be required to submit
an estimate of the lifetime maintenance cost for ten years from the date of delivery, and the amount of
maintenance is committed and paid in the fourth year and every year thereafter.
The roles of the DME, end-users (respective healthcare facilities) and equipment distributors in common
maintenance (routine and periodic) and repair are generally divided as shown in Table 7-13.
The following measures have been taken in terms of maintaining and developing the skills and knowledge
of the equipment users.
Generally, Guwahati Medical College & Hospital and Assam Medical College & Hospital, where many
advanced medical equipment (such as CT, MRI, PET scanners, radiotherapy machines, etc.) are introduced
in the facilities, have established a multifaceted personnel exchange and network with other medical college
& hospitals in the state.
As a part of this, training of doctors and para-medical staff such as radiologists and laboratory technicians,
etc. are also conducted at Guwahati Medical College & Hospital and Assam Medical College & Hospital
to acquire skills through hands-on and attachment training, for example, when new medical equipment is
introduced in the facilities.
7-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
It is also recommended to limit procurement range with Development Assistance Committee (DAC)
member countries in order to guarantee the accuracy and quality of such precision equipment.
Procurement of general medical equipment, educational equipment or furniture, and ICT system from local
manufacturers may apply local competitive bidding (LCB) procedures.
The image diagnostic equipment procurement cost consists of turnkey works, warranty, and Comprehensive
Maintenance Contract (CMC), and also includes the cost of installation, initial operational fees, and UPS.
It is necessary to consider adequate packaging in terms of feasible maintenance and management system,
as well as cost saving.
7-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The postgraduate (PG) students who have completed their PG courses have to serve under the State
Government for a mandatory period of one year as Senior Resident / Post PG Resident with a provision of
further extension of ten years, as and when required by the government. The number of doctors and students
will be determined based on the “Postgraduate Medical Education Regulations, 2000, Medical Council of
India” to establish the super specialty hospital. According to the regulations, one Professor, one Associate
Professor, one Assistant Professor, one Senior Resident, and two Junior Residents will be required in the
first unit. The required numbers of doctors for the proposed super specialty hospitals are presented in Table
8-1.
8-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The number of nurses and other medical workers will be calculated based on the “Minimum Standard
Requirements for the Medical College for 100 Admissions Annually Regulations, 1999” by the Medical
Council of India. Figure 8-1 presents the recommended norms for hospital nursing service.
Source: Minimum Standard Requirements for the Medical College for 100 Admissions Annually Regulations, 1999, NMC
Figure 8-1 Recommended Norms for Hospital Nursing Service
8-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Civil Hospitals
Based on the proposed departments of civil hospitals (Type 1), the numbers of doctors, nurses, and
paramedics as listed in Table 8-2 will be required as per the Indian Public Health Standards (IPHS),
promulgated in 2012.
The details of the staffing plan will be discussed as soon as the clinical departments and the number of beds
of each proposed hospital are determined. According to Assam HFWD, 3,148 vacant posts are already
advertised for filling up. Necessary steps are being taken to fill up another 5,707 vacant posts under different
directorates. Further, about 1,100 doctors pass every year from the existing medical colleges and with the
establishment of new medical colleges.
8-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
9-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Organisation Committee
Digital health records under the national digital health mission will give tremendous opportunity and also
sufficient challenges in implementation. A suitable committee may be formed with medical/IT/legal to
oversee, coordinate, and propagate the system. This committee may also decide the continuation of e-
Hospital or seek other vendor services.
9-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
1. Doctors/clinicians need to be supported with forms filling (e-prescription data); the process has to
start gradually and increase over one year. May need a medical assistant in the initial days.
2. Having a tablet type of interface which allows the doctors to scribble will be much more
acceptable to the doctors.
3. Nurses at workstations need motivation and training in using/inputting the data.
4. Less paid/undertrained outsourcing staff can be a big bottleneck.
5. Latest hardware always helps the quicker inputting of the data.
High Cost and Complexity of Local Area Network and Possible Solution
Medical colleges/hospitals are spread over several buildings and floors and in vast campuses. Guwahati
Medical College & Hospital (GMCH), which is six times larger and more complex than the rest of the
newly built colleges which have better building design and work flow, has been assessed and attempted
to provide a local area network with cabling, nodes, routers, and switches. Average cost of this networking
for a typical medical college is coming to INR 60 lakhs (by NIC estimates) to INR 3.8 crores to GMHC.
This cost is prohibitive and even entails a continuous maintenance of the system with several stages of
Uninterruptible Power Supply (UPS). Due to the proliferation of internet providers, the government may
ask them to provide wireless routers in hospital buildings at their own cost so that wireless internet is
available to each desktop/laptop thus reducing network investments and complexity of the system. This
is now possible as the system proposed is totally cloud based and each desk/computer needs basic internet.
Until 2016, the procurement was with the rate contract mechanisms as notified by Digital Content
Technologies (DGCT) and fairly smooth. The present system of GEM portal and overload of vendors are
delaying, if not blocking, the procurement of hardware.
Command and Control System has been Created for COVID-19 Management
It should be with state of the art hardware, software, and processes including the HR efforts may be made
to continue using the system by expanding data items in the normal times also. This way, the sophisticated,
well refined system may continue to be in use for normal and emergency management.
The important modules (Table 9-3) are developed under GOI/NHM guidelines and in use. (There are
several other modules for use in NHM-related activities.)
9-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
9-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
in the hospital waiting area through a dedicated councillor (to begin with). Gradually, they may be able
to do it even before they go to the hospital.
7 Landine
9-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Institutional Setting
The ministry in charge of ESC in India is the Ministry of Environment, Forest and Climate Change (MoEF),
which has institutions at both central and state levels. Under MoEF, the Central Pollution Control Board
(CPCB) is established to formulate the policy, regulations, and guidelines for environmental conservation.
It also operationalises international agreements such as the Montreal Protocol, Ramsar Convention, and
Washington Convention.
At the state level, there are departments responsible for environmental protection and the State Pollution
Control Board (SPCB), which plays the principal role in pollution control in practice.
10-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The government issued the draft of EIA Notification in March 2020, which includes more exemptions and
dilutes the environmental standards. As a result, the draft received around 1.7 million comments by the end
of the public consultation period.
Gap Analysis
This section provides the gap between the JICA Guidelines for Environmental and Social Considerations
(2010) and the relevant laws in India. Overall, there is no fundamental gap between them; nonetheless,
some minor gaps arose, such as: 1) timing of conducting EIA study, 2) target of information disclosure, and
3) criteria for public consultation. The result of the gap analysis is presented in Table 10-1.
10-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 10-1 Gap Analysis between Indian Laws and JICA Guidelines
JICA Guidelines on Environmental and Social Gap between JICA Guidelines and Government
Relevant Law in India
Considerations 2010 Law / Actions to be Taken
Underlying Principles
Environmental impacts that may be caused by projects EIA Notification (2006) There is no major gap between the underlying
must be assessed and examined in the earliest possible The objectives are to impose certain restrictions and principles, but with minor gaps as follows:
planning stage. Alternatives or mitigation measures to prohibitions on new projects or activities, or on the expansion Timing of EIA study assumed in the JICA guidelines
avoid or minimize adverse impacts must be examined or modernization of existing projects or activities based on is during the basic design stage or before concluding
and incorporated into the project plan. their potential environmental impacts as indicated in the agreement documents between project proponents
schedule to the notification. and JICA in case EIA is required; whereas, EIA study
for projects categorized under area development
should be conducted after the detailed design phase
in India.
10-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
JICA Guidelines on Environmental and Social Gap between JICA Guidelines and Government
Relevant Law in India
Considerations 2010 Law / Actions to be Taken
public libraries or panchayats.
Social Acceptability
For projects with a potentially large environmental The Member-Secretary of the concerned SPCB or UTPCC The projects categorized into “Building/Construction
impact, enough consultations with local stakeholders, shall finalize the date, time, and exact venue for the conduct of projects” are exempted from public consultation
such as local residents, must be conducted via disclosure public hearing within seven (7) days of the date of receipt of process as per EIA Notification, 2006.
of information at an early stage, at which time the draft Environmental Impact Assessment report from the Still in compliance with the JICA guidelines, it is
alternatives for project plans may be examined. The project proponent and advertise the same in one major national recommended to conduct public consultation during
outcome of such consultations must be incorporated into daily and one regional vernacular daily. A minimum notice preparatory survey and the comments should be
the contents of the project plans. period of thirty (30) days shall be provided to the public for incorporated into planning and implementation of the
- In preparing EIA reports, consultations with furnishing their responses; project. *Considering the situation related to
stakeholders, such as residents, must take place after ➢ The advertisement shall also inform the public about the COVID-19 at the time of the preparatory survey
sufficient information has been disclosed. Records places or offices where the public could access the draft where mass gatherings are not allowed, interviews to
of such consultations must be prepared; Environmental Impact Assessment report and the community representatives were conducted instead
- Consultations with relevant stakeholders, such as Summary Environmental Impact Assessment report before of a meeting. Result of the interview is described in
residents, should take place if necessary throughout the public hearing. section 10.10, and record of interviews is attached to
the preparation and implementation stages of a ➢ No postponement of the date, time, venue of the public the report.
project. Holding consultations is highly desirable, hearing shall be undertaken, unless some untoward
especially when the items to be considered in the emergency occurs and only on the recommendation of the
EIA are being selected, and when the draft report is concerned District Magistrate; the postponement shall be
being prepared; notified to the public through the same national and
regional vernacular dailies and prominently displayed at
all the identified offices by the concerned SPCB or
UTPCC
10-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
JICA Guidelines on Environmental and Social Gap between JICA Guidelines and Government
Relevant Law in India
Considerations 2010 Law / Actions to be Taken
of land and local resources, social institutions such as Land Acquisition Act 1894 (Amended in 1984) and The Right
social capital and local decision-making institutions, to Fair Compensation and Transparency in Land Acquisition,
existing social infrastructures and services, vulnerable Rehabilitation and Resettlement Act, 2013.
social groups such as poor and indigenous peoples, The Provision of the Panchayats (Extension to the Scheduled
equality of benefits and losses and equality in the Areas) Act, 1996.
development process, gender, children’s rights, cultural The Madhya Pradesh Panchayat Raj Act, 1993.
heritage, local conflicts of interest, infectious diseases For Environment Survey> Environmental Impact Assessment
such as HIV/AIDS, and working conditions including Guidance Manual for Building, Construction, Townships
occupational safety. and Area development projects provides the following items
In addition to the direct and immediate impacts of to be assessed:
projects, their derivative, secondary, and cumulative ➢ Land environment
impacts as well as the impacts of projects that are ➢ Water environment
indivisible from the project are also to be examined and ➢ Air environment
assessed to a reasonable extent. It is also desirable that ➢ Noise environment
the impacts that can occur at any time throughout the ➢ Biological environment
project cycle should be considered throughout the life ➢ Socioeconomic Environment
cycle of the project. ➢ Solid waste
Monitoring
Project proponents should make efforts to make the As per EIA Notification, 2006, There are some gaps regarding availability of
results of the monitoring process available to local (i) It shall be mandatory for the project management to submit monitoring results to local project stakeholders.
project stakeholders. half-yearly compliance reports in respect of the stipulated prior
When third parties point out, in concrete terms, that environmental clearance terms and conditions in hard and soft <Actions to be/have been taken>
environmental and social considerations are not being copies to the regulatory authority concerned, on 1st of June and Project proponent should consider the method of
fully undertaken, forums for discussion and examination 1st of December of each calendar year. unveiling the result of monitoring stipulated under
of countermeasures are established based on sufficient (ii) All such compliance reports submitted by the project the environmental clearance to the general public,
information disclosure, including stakeholders’ management shall be public documents. Copies of the same such as uploading to the website and to show the
participation in relevant projects. Project proponents, shall be given to any person on application to the concerned solution for issues pointed out under the
etc. should make efforts to reach an agreement on regulatory authority. The latest such compliance report shall environmental management plan.
procedures to be adopted with a view to resolving also be displayed on the website of the concerned regulatory
problems. authority.
10-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
JICA Guidelines on Environmental and Social Gap between JICA Guidelines and Government
Relevant Law in India
Considerations 2010 Law / Actions to be Taken
Ecosystem and Biota
Projects must not involve significant conversion or Forests (Conservation) Act, 1980 and Rules 1981 as amended No major gap observed.
degradation of critical natural habitats and critical 2004.
forests. The Act restricts the powers of the State in respect of de-
reservation of forests and the use of forestlands for non-forest
purposes. An advisory committee has been created to oversee
the implementation of the statute.
10-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
1) The projects require to conduct EIA study to obtain EC by State Level Environment Impact Assessment
Authority (SEIAA), which falls under category 8(b): Townships and Area development projects covering
an area larger than 50 ha and/or build up area larger than 150,000 m2;
2) The project falls under category 8(a): Building and Construction projects, build up area between 20,000
and 150,000 m2, which requires Environmental Clearance by SEIAA;
3) The project of smaller scale compared with category 8(b) and 8(a), which do not require EC.
Figure 10-1 presents the flow of EC application related to 1) and 2) types of projects. The procedure needs
to be initiated by the project proponent after the detailed design is approved by the project management
unit (PMU), and hand-in-hand with the approval of the building design by the municipality and the
guideline values of emission approved by the pollution control board. It is estimated that the entire process
from application to acquisition of EC may take around six months. This needs to be incorporated into the
implementation schedule of the project and the terms of reference (ToR) for the consultant.
10-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The procedure for 8(b) projects The procedure for 8(a) projects
10-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 10-2 Summary of the Project Components that May Affect Environment by Institute
Applicable
Total area Floor area Facilities that may cause environmental
Proposal for Various institutions EIA
(sqm) (sqm) impacts, Remarks
category
Super Specialty wing in Medical colleges.
Total 170 beds (including ICU 50 beds),
*applicable EIA procedure should be checked with
SEIAA after detailed design phase as facilities to be
Silchar Medical College assisted under the project is completely within
1 844,116 29,500 8(b)*
Hospital, Cachar existing compound.
Demolition is required for existing structure
(510.78 m2), which does NOT contain Asbestos
NOR biosafety level 3 facility.
Tezpur Medical College Total 200 beds (including ICU 50 beds)
2 147,158 32,500 8(a)
Hospital, Tezpur Demolition is not required.
Total 260 beds (including ICU 20 beds)
Jorhat Medical College Demolition is required for existing structure (app.
3 194,985 37,500 8(a)
Hospital, Jorhat 12,000 m2), which does NOT contain Asbestos
NOR biosafety level 3 facility.
Fakhruddin Ali Ahmed ICU 50 beds
Demolition is required for existing structure (3,924
4 Medical College Hospital, 167,225 19,000 - m2), which does NOT contain Asbestos NOR
Barpeta biosafety level 3 facility.
Diphu Medical College ICU 50 beds
5 308,698 19,000 -
Hospital, Diphu Demolition is not required.
ICU 50 beds
Lakhimpur Medical College Demolition is required for existing structure (3,000
6 7,700 19,000 -
Hospital, Lakhimpur m2), which includes facilities built with Asbestos
(2,600 m2),
Infrastructure improvement in District Hospital
Type 1 (At six locations) 25,000 18,000 - Total 150 beds (Include ICU 10 beds)
Type 2 (At two locations) 10,000 6,000 - Emergency Centre
Dedicated Training, monitoring, administrative centre, Swasthya Bhawan
6,870 8,047.6 - Training Health Centre
Source: JICA Survey Team
10-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10.4 Scoping and TOR for Environmental and Social Consideration Study
The purpose of scoping and drafting of ToR of the EIA study is to properly select the environmental and
social impact items, on which the project potentially impacts through its implementation activities, and to
decide the parameters and methodology of the survey. The result of the scoping is shown in Table 10-4 and
the ToR is shown in Table 10-5.
10-10
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Rating
Impact Item Construction Operation Reason
Phase (CP)/ Phase (OP)
operation of power generator in case of emergency power supply.
Water Pollution ✓ ✓ CP: There is a risk of temporary water pollution due to discharge of turbid
water and leakage of oils from the construction activities.
OP: Impact on water quality caused by the operation of the hospital and
increased residents (staff and students) is expected.
Solid Waste ✓ ✓ CP: Increase of solid waste amount due to construction waste and general
waste from workers is expected.
OP: Increase of various solid wastes is expected due to medical and
research activities (biomedical and radioactive waste, hazardous waste), and
increased number of residents such as staff and inpatients (general waste).
Soil ✓ ✓ CP: There is potential risk of soil contamination due to oil leakage from the
Contamination construction activities.
OP: There is potential risk of soil contamination by improper management of
fuel and leakage of waste liquid.
Noise and ✓ ✓ CP: Temporary increase of noise and vibration levels due to the operation of
Vibration construction machineries and traveling of construction vehicles is expected.
OP: Increase of noise and vibration levels due to traveling of vehicles
associated with the operation of the hospital, and operation of back-up power
generator and air system is expected. Operation of medical equipment may not
generate noise and vibration.
Ground ✓ ✓ CP: Ground subsidence is expected due to the usage of groundwater for
Subsidence construction activities.
OP: There is risk of ground subsidence due to over abstraction of
groundwater; however, it can be avoided if water will be provided from the
public water system.
Offensive ✓ ✓ CP: No construction activities are expected that would cause offensive odour,
Odour but improper management of construction waste may generate it.
OP: Improper management of waste (general/bio-medical) generated at the
project site would cause offensive odour.
Bottom CP/OP: No impact is predicted as there will be no direct discharge of
Sediment wastewater to water body.
Natural Environment
Protected Area CP/OP: There are not any protected areas in and around the project sites.
Flora/ Fauna CP/OP: It is assumed that impact on flora/ fauna/ ecosystem by the
and Ecosystem development of the project is minimal, as most of the project areas are already
developed.
Hydrology ✓ ✓ CP: Earthwork by filling excavated soil would cause modification of
hydrology in and around the site especially during flash flood.
OP: Alternation of land surface may cause modification of hydrology in and
around the site.
Topography ✓ CP: Topography of the site needs to be adjusted for levelling.
and
Geographical
Features
Social Environment
Involuntary CP/OP: Involuntary resettlement is not required for the project, as the land for
Resettlement the project development is already secured by the local government.
The Poor CP/OP: Any activities that might impact on the poor are not planned in the
project.
Indigenous, or CP/OP: No impact on indigenous or ethnic people is expected, because there
Ethnic People are no indigenous or ethnic people residing in and around the project site.
Local Economy ✓ ✓ CP: Job creation for construction workers is expected during the construction
(e.g., period because it includes construction work.
Employment OP: Positive impact on local economy is expected by the operation of the
and Livelihood) hospital.
10-11
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Rating
Impact Item Construction Operation Reason
Phase (CP)/ Phase (OP)
Land Use and ✓ ✓ CP/OP: Impact of the project is expected as the land use is modified for the
Utilisation of project, although the intensity of impact is expected to be small considering
Local Resources the relatively small scale of the project component in comparison to the
existing facilities.
Water Usage ✓ ✓ CP/OP: Some impact is expected as the project plans to utilise groundwater
and public water. Intensity of the impact needs to be assessed by studying the
current condition of groundwater and water supply.
Existing Social ✓ ✓ CP/OP: Impact on traffic condition is expected due to increase of traffic for
Infrastructures construction activities and operation of hospital. The extent of impact needs to
and Services be assessed comprehensively considering ongoing road expansion and housing
(including area development around the site.
Traffic
Condition)
Misdistribution CP/OP: The project may not cause misdistribution of benefits and damages in
of Benefits and the surrounding area considering the characteristics of the project.
Damages
Local Conflicts CP/OP: In consideration of the project characteristics, the project will not
of Interest cause conflicts of interest in the surrounding area.
Cultural CP/OP: No impact on cultural heritage is expected since there is no cultural
Heritage heritage in and around the project site.
Landscape ✓ ✓ CP/OP: Some modification on landscape is expected as the building height
will be up to 5 floors in some project sites.
Gender CP/OP: No impact on gender is anticipated by the project.
Children’s CP/OP: No impact on children’s rights is anticipated by the project.
Rights
Health and Safety
Occupational ✓ ✓ CP: Some impacts are anticipated due to large-scale construction works.
Health and OP: Some impacts are anticipated due to handling of infectious diseases and
Safety hazardous materials for medical activities.
Community ✓ ✓ CP: Some negative impacts on public health are anticipated due to the influx
Health and of construction workers and discharge of pollutants caused by the construction
Safety activities.
OP: Positive impact is expected due to the improvement of medical service by
the project.
Other
Transboundary ✓ ✓ CP: Greenhouse gases (GHGs) would be emitted from the construction
impacts machines and vehicle.
including OP: Emission of GHGs is expected due to the operation of the air
Climate Change conditioning system and traveling of vehicles associated with the operation of
the hospital.
✓: positive/negative impact is expected to some extent.
Source: JICA Survey Team
10-12
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 10-5 Draft ToR for the Environmental and Social Consideration Study
Environmental
Survey Items Survey Methods
Factors
Air Pollution Current condition of air quality around the To review existing reports/data
project site and nearby monitoring station To confirm relevant regulations in India
as available To survey situations and measures taken by other
Environmental standards of air quality in similar institutions
India and other related international
standards if necessary
Estimation of impact, proposed mitigation
measures and monitoring plan
Water Pollution Current condition of water quality in and To review existing reports/data
around the project site To confirm relevant regulations
Environmental standards of water quality, To conduct the field survey, to review existing
effluent and licensing system in India and reports/materials
other related international standards if To survey situations and measures taken by other
necessary similar projects
Current condition of wastewater collection
Estimation of impact, mitigation measures
and monitoring plan
Solid Waste Regulations related to medical/ hazardous To confirm relevant regulations in India
waste management in Assam state To review existing reports/materials
Current situation of waste management in To survey situations and measures taken by other
Assam state similar projects
Estimation of impact, propose mitigation
measures and monitoring plan
Soil Environmental standards of soil quality in To confirm relevant regulations in India
Contamination India and other related international To review existing reports/materials and similar
standards if necessary projects
Potential risk of soil contamination caused To survey situations and measures taken by other
by the project activities similar projects
Estimation of impact, proposed mitigation
measures and monitoring plan
Noise and Environmental standards of noise and To confirm relevant regulations in India
Vibration vibration in India and other related To conduct the field survey around the project site
international standards if necessary To survey situations and measures taken by other
Current situation of the surroundings of similar projects
the project site (Distance to the residential
areas, school, etc.)
Estimation of impact, proposed mitigation
measures and monitoring plan
Ground Current ground condition around the To review existing reports/materials
Subsidence project site To survey situations and measures taken by other
Current situation of groundwater usage similar projects
around the project site
Estimation of impact, proposed mitigation
measures and monitoring plan
Offensive Odour To identify possible source of the To review construction plan and operation plan
offensive odour during the project To survey situations and measures taken by other
implementation similar projects
Estimation of impact, proposed mitigation
measures and monitoring plan
Hydrology Current condition of hydrology in the To conduct the field survey around the project site
surrounding area To review construction plan and operation plan
Drainage plan during project To survey situations and measures taken by other
implementation similar projects
Estimation of impact, proposed mitigation
measures, and monitoring plan
10-13
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Environmental
Survey Items Survey Methods
Factors
Local Economy Employment plan during the construction To examine the construction plan
(e.g., Employment phase To review similar projects
and Livelihood) Prediction of impact on local economy
caused by the operation of the hospital
Water Usage Current situation related to water usage To conduct the field survey, to examine the results of
Water usage plan during the project the field survey, to review similar projects
implementation period To examine the usage of water necessary for project
implementation
Existing Social Existing social infrastructures around the To conduct the field survey around the project site
Infrastructures and project site To examine the construction plan, to review similar
Service Operation plan of the construction projects
machinery and vehicles during the
construction phase
Occupational Potential risks related to occupational To review the project activities
Health and Safety health and safety To review existing documents, reports, and materials
Guidelines related to occupational health
and safety in India and other related
international guidelines
Community Impact on the public health in To review construction plan and activities
Health and Safety consideration of types of activities during
construction phase
Global Warming Relevant policies for global warming in To confirm relevant policies in India and to review
India and current situation of emission of existing reports/materials
greenhouse gases (GHGs) To examine the construction plan and operation plan,
Project activities that might emit GHGs to review similar projects
Source: JICA Survey Team
10-14
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 10-6 Result of Environmental and Social Impact Assessment of the Project
Parameters Result of Survey CP: Construction Phase, OP: Operation Phase
Pollution
Air Pollution • In current condition, the annual average values of SO2 and NO2 in all the stations were well below the
permissible annual average standard values. The values of SO2 ranges from 5-8 μg/m3. The highest
values of NO2 ranges from 10-18 μg/m3, based on the results of National Air Quality Monitoring
Programme by CPCB(2019).
• All medical facilities are connected to public line, therefore power generator will be necessary only
when there is no power supply from the source.
<Impacts and proposed mitigation measures>
CP: Impact on air quality due to operation of construction machineries and traveling of the construction
vehicles is expected. During construction phase, particulate matter will be main pollutant followed by
SOx, NOx and CO from construction machineries and vehicles. These may be reduced by spraying
water, periodical maintenance of machineries and vehicles, and reducing idling time for machinery
operation. Considering the duration of construction activities and present air pollution status which is
within standard values, air pollution quality during construction phase is estimated to be within national
standards.
OP: Impact on air quality due to diesel generator (DG) sets and increased project related transportation are
expected. The overall air quality considering emission of air pollutants from DG while operated, and
baseline air quality is confirmed to be within national standard values.
- In addition, to prevent dispersion of contaminated air, HEPA(High Efficiency Particulate Air) filter
will be installed to the air conditioning system and the system will be maintained by engineering
department of each medical facility.
Water Pollution Based on the interview to managers in charge of maintenance and operation of each MCH, no
significant water pollution issues are reported.
There is no law or regulation regarding management of medical effluent that would be generated from
the project activities during operation phase. Instead, medical institutions and hospitals are obliged to
install its own Effluent treatment facilities onsite under instruction of SPCB, and typical design of such
facilities are provided. Effluent management plan will be developed and submitted to SPCB after
detailed design stage for those facilities to go through EC procedure. The effluent management plan
should include estimated amount of effluent and its characteristics, capacity of effluent treatment plant
(ETP), and expected quality of treated effluent. In general, ETP should consist of primary, secondary
and tertiary treatment. The tertiary treatment should include ultra-filtration system, ultraviolet
disinfection system. The electromagnetic flow meter at the inlet and outlet of ETP as instructed by
SPCB. During operation phase, the quality of treated effluent will be tested, and necessary measures will
be taken if required to meet the standard specified by SPCB.
<Impacts and proposed mitigation measures>
CP: Impact on water quality due to leakage of oil from machineries and construction chemical is expected.
The impact can be minimized by limiting oil handling area and applying impermeable material on the
ground of the area.
OP: Treated wastewater to be discharged through rainwater drainage will be main source of pollution from
project operation. However, as the quantity of wastewater to be treated by water treatment unit and
discharged into surrounding environment via rainwater drainage is estimated to be small. In addition,
the quality of wastewater will strictly comply with SPCB standards, therefore the negative impacts are
expected to be minimum. Another potential impact would be medical effluent, which may contain
hazardous elements. The effluent should be treated by ETP designed to fit expected medical activities
so as to avoid contamination of water environment of surrounding area.
Solid Waste Major regulations that stipulate waste management are Municipal Solid Wastes (Management and
Handling) Rules (2000), Hazardous and other wastes (Management and Transboundary Movement)
Rules (2015) under responsibility of the Ministry of Environment, Forest and Climate Change.
In addition, for demolishing existing facilities the waste shall be handled in compliance with
Construction and Demolition Waste Management Rules, 2016.
General and medical wastes are segregated at source, collected by category, treated on site disposed or
handed over to authorized third party depending on the type of waste.
<Impacts and proposed mitigation measures>
CP: The excavated solid waste as well as construction related waste will be main component of solid waste
10-15
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-16
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-17
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-18
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-19
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Scoping Evaluation
Item Reason
CP OP CP OP
adequate measures, such as installation of confined oil handling area and
effluent treatment facilities.
Noise and ✓ ✓ B- B- CP: Temporary impact on noise and vibration levels due to operation of the
Vibration construction machineries and traveling of the construction vehicle are
expected, and these can be mitigated by applying temporally fence. Also,
considering limited time period for construction, overall impact is estimated
to be within acceptable level.
OP: Impact on noise and vibration levels due to traveling of vehicles
associated with the operation of the hospital, operation of back-up power
generator and air system are expected. These can be mitigated by
periodically maintaining project related machineries and equipment. Also,
operation of medical equipment may not generate noise and vibration as the
project apply high specification for these to minimize noise generation.
Ground ✓ ✓ B- D/ CP: Impact on ground subsidence is expected to be limited because amount
Subsidence B- of groundwater used for construction work will be limited, and the impact
can be limited by monitoring ground level and ground water.
OP: D) For the facilities which utilise public water supply as main source,
impact on ground subsidence is estimated to be minimal or almost negligible
as the project will not use ground water as water source and rainwater will
be recharged to aquifer.
B-) For the facilities that will utilize ground water as main source, the
management units for each facility should monitor the groundwater level
and ground subsidence (ground level). In case there is sign of rapid
depletion of groundwater level or/and ground level, contractor should seek
for other source to avoid worsening the situation.
Offensive ✓ ✓ B- B- CP: No construction activities are expected that would cause offensive
Odour odour, but improper management of construction waste may generate cause
odour generation.
OP: There is possibility to generate offensive odour if waste and sludge
generated from wastewater treatment facility are improperly managed.
Natural Environment
Hydrology ✓ ✓ B- B+/ CP: Earth works for construction and modification of land use of the sites
- would cause modification of hydrology in and around the project sites.
OP: Modified hydrology may cause worsening of flood occurrence, while
in some facilities that has clogging issues in current status, installation of
additional drainage may improve the seasonal flood flows in and around
project site.
Topography ✓ D N/A CP: No adverse impact is expected as the required earth work would be
and minimal.
Geographical
Features
Social Environment
Involuntary N/A N/A CP/OP: There is no impact in terms of involuntary resettlement as the
Resettlement project does not require land acquisition nor involuntary resettlement.
Indigenous, or N/A N/A CP/OP: No impact on indigenous or ethnic people are expected, because
Ethnic People there are no indigenous or ethnic people residing in and around the project
site.
The Poor ✓ N/A B+ CP: Any activity that might impact on the poor are not planned in the
project.
OP: Improvement of universal health coverage in the project area will
contribute improvement of livelihood of the poor.
Local Economy ✓ ✓ B+ B+ CP: Job creation for non-skilled construction related workers is expected.
(e.g., This is expected to be temporal for construction period.
employment OP: Increased job opportunity for office staff, surrounding retails and small
and livelihood) businesses are expected, and they would revitalize local economy.
Land use and ✓ ✓ D D CP/OP: Land use may be converted into structure from vegetation/bare
utilization of ground or vice versa due to project implementation in some facilities. The
local resources impact of land use modification and usage of local resource are estimated to
10-20
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Scoping Evaluation
Item Reason
CP OP CP OP
be negligible as the surface area to be modified is relatively small compare
to entire land area for each medical facility.
Water Usage ✓ ✓ B- D/ CP: It is planned that water necessary for construction will be abstracted
B- from groundwater. This may adversary impact water use of surrounding
area; therefore, the contractor shall monitor ground water level to avoid over
abstraction.
OP: D) For the medical facilities that will utilize public water as primary
source, no significant impact is expected during operation phase.
B-) For the medical facilities that utilise groundwater as primary water
source, increase of groundwater extraction will be expected due to increased
medical activities during operation phase. It is assumed that it would not
impact water usage of surrounding community of each project site
considering water rich nature of the region.
Existing social ✓ ✓ B- D CP: It is estimated that the project activity during construction would
infrastructures impact traffic condition of surrounding area due to increased traffic volume
and services for activities. The contractor shall employ traffic guide and plan the
(including operation not to cause concentration of activities as possible.
Traffic OP: No significant impact is expected.
Condition)
Landscape ✓ ✓ B- D CP: Some modification on landscape is expected during construction phase;
however, no impact is expected as those are minimal considering duration of
construction.
OP: No impact on landscape during operation phase is expected.
Health and Safety
Occupational ✓ ✓ B- B- CP: Some impacts are anticipated due to construction works. These can be
Health and avoided or minimized by applying best practices for construction works such
Safety as safety and health training to workers, usage of protection gears and so on.
These should be applied especially for demolition of existing building with
Asbestos and other hazardous materials.
OP: Some impacts to health workers are anticipated due to handling of
infectious diseases, radioactive and hazardous materials for medical
activities. These risks will be minimized by facility design that separates
flow of patients and medical staff to minimize the chance of contact,
formulating safety manual, and accident preparedness plan.
Community ✓ ✓ B- A+ CP: Some negative impacts on public health are anticipated due to influx of
Health and construction workers and possibility of discharging pollutants caused by
Safety construction activities. These would be mitigated by providing training and
education to workers for safe operation and behaviour to the community.
OP: Positive impact is expected due to improvement of medical service to
surrounding communities by the project implementation.
Other
Transboundary ✓ ✓ D D CP: Greenhouse gases (GHGs) would be emitted from operation of
impacts construction machines and vehicle. The impact is estimated to be limited
including considering the duration of construction.
Climate Change OP: Emission of GHGs is expected predominantly due to operation of
generator, wastewater treatment system, air conditioning system and
traveling of vehicles associated with operation of the hospital. The extent of
impacts would be minimized by applying mitigation measures proposed to
other items. In addition, adopting fuel effective/high performance equipment
further contribute reduction of emission of GHG. Overall, considering the
nature and scale of project, impact on global warming is expected to be
minor.
Source: JICA Survey Team
10-21
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-22
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-23
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
(Stack PM, SOx, NOx, HC and CO Outlet of stack Once in a month (half year after
Emissions from construction, while generator is
DG set) operated)
Water Pollution pH, BOD, TSS, COD, TN, TP, and total Outlet of STP Monthly
Coliform Outlet of ETP Monthly
Solid Waste Amount of generated waste by each Project Site (waste Monthly
category storage)
Status of waste storage (if there is no Project Site (waste Monthly
leakage, contamination with other storage)
categories, etc.)
Soil Oil leakage (daily maintenance record of Project Site Monthly
Contamination relevant facilities, record of oil leakage
accidents etc.)
Leakage of chemical/hazardous liquids Project Site Monthly
Noise and Implementation status of periodic check of Project Site Monthly (while facilities are
Vibration noise generating facilities and the operated)
emergency power supply
10-24
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Figure 10-2).
10-25
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
10-26
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
As mentioned above, the Project is accepted by surrounding community of Jorhat MCH, and it is expected
to be positively accepted in sites other than Jorhat MCH. However, considering the varying environmental
and social conditions of project sites, the additional measures to invite some public opinions in other project
locations shall be conducted by the HFWD to ensure the social acceptability of the Project in the local
community.
10-27
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Governing Body & Executive Committee: Composed of representatives from the Government of India
(GOI) and HFWD, Government of Assam, with a state-wide management perspective as required, to
supervise the PMU. The committee is the highest authority in the project and is responsible for final
decisions and approvals on the most important matters relating to the project. Meetings are held once
a year, although extraordinary meetings may be held if necessary.
Project Management Unit (PMU): the PMU is expected to consist of a representative from the HFWD
in the Government of Assam, the Director General of Health Services, the Director General of Medical
Education, the National Health Mission, and the Director General of each hospital; in addition, it
comprises experts in finance, healthcare management, information technology (IT), facilities and
equipment, and personnel training. The PMU is the actual management body of the project. The main
responsibilities of the PMU are implementation of the project, which are the development of the
project’s implementation plan and annual plan, progress management, coordination of relevant
institutions, procurement management, risk management, and quality control. It will also provide
management and supervision to the PIUs at the candidate facilities and communicate with the
management of the candidate facilities to keep their development strategies and policies when required.
At the end of each year, an evaluation report is prepared and presented to the S/C. It will also report
regularly to the HFWD Principal Secretary through meetings and written correspondence.
Project Implementation Unit (PIU): PIU is organised in each of the medical institution covered by the
project and is responsible for the implementation of the project in the hospital. The PIU is led by the
director of each hospital and consists of the deputy directors in charge of medical service and
administration, as well as head of accounting, facilities and equipment, and human resources
developments. The main responsibilities of the PIU are the development of implementation and annual
plans for the project in each hospital, the management and monitoring of progress, the annual
evaluation of achievement based on the plan, and the reporting to the PIU on quarterly basis. Each PIU
will also be responsible for the collaboration across tertiary, secondary, and primary level's medical
institutions in order to establish the Universal Health Coverage (UHC) model, which is the goal of this
project. The PIU is responsible for coordinating the improvement of the referral system with higher
and lower-level institutions, and coordinating human resource development (providing guidance to
lower-level institutions, dispatching medical personnel, etc.).
11-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Government Budget
Budgetary Flow
The budgetary flow in the health sector in Assam is shown in Figure 11-1.
NATIONAL LEVEL
Government of India
thru Ministry of Health &
Family Welfare
Annual Budgetary
allocations for health
Funds
sector including NHM
STATE LEVEL
Government of Assam
REGIONAL LEVEL
Medical College
Secretariate/ Medical Directorate Hospital
DISTRICT LEVEL
Princpal
Secretary
DISTRICT Hospital
Principal
Head of College
Funds - annaul budgetary allocations Mission Hospital
Director NHM
11-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Based on the understanding developed through the discussions with the Government of Assam (GoA) as
well as studying the available material, the budgetary fund flow from the Government of India (GoI) to the
State Government (Assam), and further to the implementation level in the health sector has been prepared
as illustrated in Figure 11-1.
At the national level, the annual budgets are approved and allocated by the Ministry of Health and Family
Welfare to the State Government. The budgets are released mainly through the National Health Mission
(NHM) and other central government schemes.
State Government makes allocations in the annual budgets for various schemes/programs implemented
under the health sector. The Principal Secretary (Health) puts forward proposals to the State Government
for budget allocations for various heath sector schemes/programs at the time of annual budget preparation.
The budget needs to be approved by the Legislative Assembly. Later approvals are granted by the State
Government for the budget releases as per the allocations. The Secretary & Commissioner (Health) assists
the Principal Secretary in this process.
The budgets are released to the respective department heads/ heads of program, namely, Director (Health
Service), Director (Medical Education), and Mission Director (NHM). The budgets are further released by
the authorities viz., Directors or the College Principal or the Joint Director, who are responsible for the
operations/implementation of the scheme and programs. The expenditures are made at the college hospital
(tertiary level) or at the secondary/ primary hospitals as per the prior approvals from the State Government,
and later, utilisation certificates are submitted to report the expenditures made against the allocated budgets.
Every Medical College Hospital has established a ‘Hospital Management Society’ that is autonomous in
functions and decision making. Principal of MCH is Chairperson of the Executive Committee (EC) of the
society whereas Superintendent of MCH is member-secretary to the EC of the society. The executive
committee is constituted by the state government that includes DME, government and public
representatives etc. The society also has a Governing Board that is headed by some public representative
e.g. minister, MLA. The society can receive funds from various sources including the donations and grants
from the government and other institutions as well as CSR funds. Regularly, the society receives around 3-
5 Cr. from the state government as Grant-in-Aid annually. The ‘User funds’ that is generated by way of
patient registration and other treatment/ diagnostic services performed for patients in deposited in society’s
bank account. The fund is being utilized for engaging contractual staff, operation and maintenance of
hospital functions, purchase of consumables like x-ray films, medicines etc. The funds utilization by the
society is subject to the CAG audit as well. Statutory audits are also conducted hiring the auditors from
open market.
The budget cycle normally starts from the first week of August of the current year and lasts until April
of the next financial year.
11-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The commencement of the budget process takes place with the issue of the Budget Circular, which is
normally issued in the month of August each year.
The Drawing and Disbursing Officers (DDOs) are responsible for estimating the receipts and
expenditure for all the Detailed Heads of Accounts under the Minor Heads operated by them.
The Estimating Officer will fill in the forms and send two copies to the Controlling Officer through
the prescribed channel or otherwise to the Finance Department, retaining one copy for record in his
office. The estimates of revenue and receipts should be prepared based on the existing rates of taxes,
duties, fees, etc.
The estimate of expenditure should be for charges which will be paid during the year, including arrears
from previous years and not for liabilities falling due during the coming years.
Subject to any orders that may be passed by the Finance Minister, the Annual Financial Statement of
receipts and expenditure which are to be credited to, or made out of the Consolidated Fund, may be
laid before the Assembly in three parts.
The Finance Minister presents the budget to the Assembly on a day fixed for the purpose with a written
speech explaining the salient features of the budget, the fiscal health of the government, changes in tax
revenues, if any, relief provided in the existing rates of taxes, and important projects and schemes to be
undertaken during the ensuing financial year.
Budget
Calling
Letter Budget Intimation of
(1st week) Estimates savings by
from the DDOs to
Controlling the
Offices Controlling
(latest by Officers (by
15th) Detailed Jan 15th)
estimates of
Compilations
the Sixth
sent of the State
Schedule
to estimates
(Part A) sent Despatch of Grants to be
GOI (Nov last Synopsis of
to Press all Budgets Surrender of communicate
week) discussions
(Dec 3rd and Budget savings and d to
of the Sixth
week) literature (a submission Controlling
Revised Schedule
Estimates Autonomous day prior of of statement Officers (by
from Districts (by presentation (by Feb 15th) Apr 2nd
Controlling Jan 25th) of budget) week)
Offices
(latest by
15th)
Budget,
explanatory
memorandu
m for
printing (by
Jan 31st)
11-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
100%
30.6%
20% DoAYUSH Capital Exp.
21.3% 21.8% 20.4% 19.4%
17.5%
DoAYUSH Revenue Exp.
Construction
The construction cost of the project will be financed through the Japan International Cooperation Agency
(JICA) official development assistance (ODA) loan and Assam government’s own fund. The JICA ODA
loan’s ratio is determined as 85% of the total project cost. The JICA ODA loan will be borrowed by the
central government and allocated to the Government of Assam for disbursement of the construction and
consulting services for the project.
The other borrower portion such as land acquisition and administration cost will be covered by Assam
government’s own fund through its budgetary appropriation. (Please refer to Chapter 13 “Project Cost” for
the construction cost estimation.)
Medical Equipment
The procurement cost of the medical equipment planned in this project (including primary to tertiary
healthcare facilities) is financed by JICA ODA loan and Assam government’s own fund.
As described in Section 2.2.2, given the moderate prospects of economic growth and the upward trend of
the government revenue and expenditure with the context of relatively favourable fiscal conditions of the
Government of Assam, as well as the sustainable prioritisation of health in government expenditure, the
fiscal space for health in Assam including this project is expected to be secured at least in the short to
medium term. The Government of Assam has analysed its own fiscal performance and fiscal space and
11-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
concluded that there will be enough funding source for the counterpart (non-eligible part) fund for the
project. According to the Government of Assam, there has not been any project in the past that has been
delayed or stopped due to shortage of budget.
Facility
The new facility shall be planned and designed with minimum use of advanced and complicated systems
such that it is easy to maintain by local technicians. Furthermore, to keep the facility in good condition for
long term, daily maintenance and inspections of facilities and machineries are important in accordance with
the operation instruction manuals and by knowledgeable technicians.
Blood bank shall practice first in first out policy for reduction of waste. Adequate measures shall be taken
to prevent expiry of blood or blood components.
11-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Segregation of Waste
Segregation of waste should be done at each site of generation of biomedical waste, e.g., all patient care
activity areas, diagnostic services areas, operation theatre labour rooms, treatment rooms, etc. The
responsibility of segregation should be with the generator of biomedical waste, i.e., doctors, nurses,
technicians, etc. The biomedical waste should be segregated as per the applicable categories.
The trolleys which are used to collect hospital waste should be designed in such a way that there should be
no leakage or spillage of biomedical waste while transporting to the designated site.
Storage of Waste
Storage refers to the holding of biomedical waste for a certain period of time at the site of generation till its
transit for treatment and final disposal.
11-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Biomedical Waste
Monitoring of incinerator/autoclave/microwave shall be carried out once a month to check the performance
of the equipment. Table 11-2 shows the method of biomedical waste treatment.
Hazardous Wastes
These include wastes from medical, dental, and veterinary practices during treatment or research activities,
which may contain either inorganic or organic constitutions. These wastes need to be treated in accordance
with Hazardous and Other Wastes Management Rules (2016) by segregating at source duly collecting in
containers, stored safely, and transported separately, then handed over to the authorised third party for
proper disposition. Also, the project proponent should periodically report the status of waste management
to the State Pollution Control Board.
Radioactive Wastes
These include cotton, paper, metal, glasses, plastic objects, and other materials that are used for radioactive
treatment. These wastes need to be treated in accordance with the guidelines provided by the Atomic Energy
Regulatory Board. Generally, radioactive wastes need to be stored in a storage designed exclusively for
radioactive material for half-life period for inactivation, then buried in the ground.
Facility
Each hospital has a Hospital Management Society who also looks after the general management. The funds
for the operation and maintenance are being managed through the users’ charges collected and budget-
11-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
allocated funds from GoA. Timely action, proper management, and periodical inspection shall be essential
for the facility maintenance.
It is required to implement regular check and periodic maintenance based upon the annual maintenance
plan and keeping the maintenance records. The daily cleaning will encourage people to use the facilities
carefully as well as ensure early detection of damages and/or malfunctions. Regular major inspections/
actions that may need to be carried out are shown in Table 11-3.
Medical Equipment
All equipment shall have warranty and/or CMC renewed from time to time as per the life of the equipment.
For equipment that requires complicated maintenance checks, it can be managed by local agents located in
Assam or Guwahati located around one (1) hour drive from the centre of New Delhi. All equipment should
have annual maintenance contract for regular servicing and repair to ensure that they are in optimum
working conditions and no equipment/instruments should remain non-functional for unreasonably long
time. Outsourcing of services such as laundry, ambulance, dietary, housekeeping and sanitation, waste
disposal, etc. should be preferably arranged by the hospital itself. Manpower and outsourcing work could
be done through local tender mechanism. (Also refer to Section 7.6 for the details.)
11-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Project Implementation
Governing Body & Executive Committee: Governing Body & Executive Committee shall consist of a
representative from the Government of India (GOI) and HFWD of the Government of Assam, consisting
of the perspective of state-wide management if necessary and supervising the PMU.
12-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
PMU: A Project Management Unit (PMU) will be set up within the HFWD as the executing agency for
project implementation. It will consist of representatives from HFWD of the Government of Assam, such
as from the Directorate of Health Services, the Directorate of Medical Education, the National Health
Mission, and each hospital director. PMU is responsible for the implementation of the project. PMU will
communicate with the management of each hospital to know updates regarding its development strategy
and direction, and reflect them in the project implementation if necessary. It will have responsibility to
report the project to JICA and GOI. For daily administrative and technical project management, the PMU
will be supported by the Project Management Consultant (PMC) accordingly to ensure the conceived
management plan and implementation, and act as a decision makers and supervisor for daily activities of
the project.
PIU: Project Implementation Unit (PIU) is organised in each of the medical institution covered by the
project and is responsible for the implementation of the project in the hospital. The PIU is led by the director
of each hospital and consists of the deputy directors in charge of medical service and administration, as
well as head of accounting, facilities and equipment, and human resources developments. The main
responsibilities of the PIU are the development of implementation and annual plans for the project in each
hospital, the management and monitoring of progress, the annual evaluation of achievement based on the
plan, and the reporting to the PIU on quarterly basis. Each PIU will also be responsible for the collaboration
across tertiary, secondary, and primary level's medical institutions in order to establish the Universal Health
Care (UHC) model, which is the goal of this project. The PIU is responsible for coordinating the
improvement of the referral system with higher and lower-level institutions and coordinating human
resource development (providing guidance to lower-level institutions, dispatching medical personnel, etc.).
PMC: Project Management Consultant (PMC) shall be hired by PMU. It is supposed to assist PMU in
making necessary reports to the authorities such as JICA and GOI, and coordinate submissions, approvals,
and concurrences including communication with all internal and external parties concerned (municipality,
authorities, etc.). PMC will consist of a Project Management Expert, Construction Management Expert,
Financial Management Expert, Monitoring and Evaluation Expert, Procurement Expert and Supporting
Staff, etc. and will support facility design, construction supervision, equipment design, and equipment
procurement and installation supervision.
Prerequisites
The overall project implementation schedule is devised based on the prerequisites in Table 12-1. The
procurement method of the construction will be EPC mode (Design Build).
12-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
In this report, the overall construction period is estimated as in the following Table 12-2
Regarding the EIA procedures in the following schedule, it is assumed that the schematic design is detailed
enough to be submitted for building permits and EIA procedures.
12-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Appraisal Re Re
Basic Design
Pledge by PWD vie vie
L/A w w
Detailed
Design Project Implementation (construction & procurement works) Defect Liability Period / Warranty Period
FRAME SCHEDULE PMC Selection
Bidding Procedure (Construction Work) Bidding Procedure (Other Packages, ie. furniture, medical
Project Completion
EIA study for Env. Clearance
Soft Component
Building Permit
PROJECT MANAGEMENT
UNIT (PMU)
JICA Concurrence
Contract
Negotiation
Construction Supervision,
Consultant Equipment, Furniture and ICT System Procurement Supervision
Agreement
CONSULTING SERVICE BY
PROJECT MANAGEMENT Re
CONSULTANT (PMC)
Re
Proposal vi vi
e e
Procurement Scheme: w w
QCBS (80:20) One-year
Inspection
Bidding Assistance (Construction
Work) Bidding Assistance (Other Packages, ie. furniture, medical equipment)
Contract
COMPONENT 1-2 Construction (24 months) Defect Liability Period
Facility Improvement in Bidding
District Hospital ・6 District Hospitals
Procurement Scheme: ICB
12-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Appraisal Basic Re Re
Pledge Design by vie vie
L/A PWD w
Detailed
w
Design Project Implementation (construction & procurement works) Defect Liability Period / Warranty Period
PMC Selection
FRAME SCHEDULE
Bidding Procedure (Construction Work) Bidding Procedure (Other Packages, ie. furniture, medical
Project Completion
EIA study for Env. Clearance
Soft Component
Contract
ICB P/Q
Equipment: Hospital Warranty Period (period depending on each item)
- Outpatient equipment such as Ventilator, Patient monitor, Examination lamp,
LCB Bidding
Procurement Work
Sphygmomanometer
- Imaging diagnostic equipment such as MRI, CT, Angiography, G-X ray, Mobile X-ray
Contract
- OT equipment /CSSD equipment ICB P/Q
Procurement Scheme: ICB/LCB Warranty Period (period depending on each item)
LCB Bidding
Procurement Work
Contract
Warranty Period
COMPONENT 1-4 Furniture: Hospital
- Medical furniture Bidding Procurement Work
EQUIPMENT & FURNITURE - General/Admini. Furniture Contract
Procurement Scheme: LCB Warranty Period
Bidding Procurement Work
Procurement
Contract Work
Warranty Period
Furniture: Other Facilities
Bidding Procurement Work
Procurement Scheme: LCB Contract
Warranty Period
Bidding Procurement Work
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Contract
ICT (Hospital Management Information System): Hospital
Contract Warranty Period
- Application including training Negotiation
Assumed Procurement Scheme: LCB HMIS Work
Contract
ICT (Network Infrastructure): Swastha Bhawan
Warranty Period
- Passive components: wiring such as CAT 6A cables, fibre optic cables, patch cords,
Bidding
patch panels, server room UPSs, ultrasonic survey etc. ICT Work (Passive)
- Active components: core/distribution/access switches, wireless access points,
wireless acess controller, firewall, etc.
ICT Work (Active) Warranty Period
Procurement Scheme: LCB
Contract
ICT (Computer hardware): Swastha Bhawan Warranty Period
Bidding ICT Equipment Work
Procurement Scheme: LCB
Contract
ICT (School Management Information System): Swastha Bhawan
Warranty Period
Assumed Procurement Scheme: LCB Bidding SMIS Work
Source: JICA Survey Team
Figure 12-3 Project Implementation Schedule (Medical Equipment, Furniture, and ICT)
12-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Appraisal Re Re
Pledge Basic Design
by PWD vie vie
L/A w w
Detailed
Design Project Implementation (construction & procurement works) Defect Liability Period / Warranty Period
PMC Selection
FRAME SCHEDULE Bidding Procedure (Other Packages, ie. furniture, medical
Bidding Procedure (Construction Work)
Project Completion
EIA study for Env. Clearance
Soft Component
I-c.Conduct refresher training for staffs (Introduce the latest technology and
research which can be useful for their daily operation.)
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
II-a.Improve existing
basic training courses
(Basic trainings for
hospital management
such as Infection Control,
Medical Waste
Management, Fire safety,
Disaster preparedness,
etc.)
Component 3
Soft Component II: Improvement of II-b.Conduct trainings
the Hospital Management and activities of 5S-
KAIZEN and Total Quality
Management (TQM). The
trainings will be divided
based on the target group
(management,
administration officers,
doctors and nurses who
are in charge of the
department)
Component 3
Soft Component Ⅲ Improve III-a.Conduct trainings on eHospital and Management Information System (MIS)
Hospital Management Information management at targeted facilities including Swastha Bhawan
System
Year 2022 2023 2024 2025 2026 2027 2028 2029
Fiscal Year FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029
Month 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
IV-a.Strengthen cooperation
among primary, secondary, and
tertiary.
Component 3
Soft Component IV: Establish IV-b.Strengthen referral system from
Regional UHC System in Selected primary to secondary, secondary to
Areas tertiary, and vice versa.
12-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Procurement Plan
Upon construction of a new hospital, the tender for civil construction work shall include civil, structural,
architectural, mechanical, electrical and plumbing (MEP), interiors and site development works, and fixed
furniture items. Medical equipment and bought out furniture items shall be separated from the construction
tender.
Facility Construction
Procurement System
Procurement for hospital facility construction will be EPC mode (Design Build), conducted through
international competitive bidding (ICB). The proposed construction work is relatively large scale, and both
functional and technical requirements are high. This requires that the contractor’s workmanship and
construction management expertise also be high. It is therefore implement reviews of the candidate
contractor’s technical capabilities and financial viability.
Procurement for Swasthya Bhawan facility construction will be conducted through local competitive
bidding (LCB).
Normally, a government agency, a nodal agency, manages the project on behalf of the HWF Ministry in
Assam. The state's Public Works Department (PWD) has a dedicated department that handles most
government healthcare projects in Assam, which acts as the nodal agency. The HFWD will be the client of
the nodal agency. The nodal agency will appoint in-house consultants and issue tenders for the construction.
PWD is responsible for all procurements related to construction, and issues the RFP and makes the award.
PWD shall be the executing agency.
On the other hand, infrastructure requirements for MCH are provided by DME and those for CH are
provided by DHS. Thus, the HFWD accords the administrative approvals.
Procurement Condition
All necessary construction equipment are available in Assam as currently, similar sized or bigger projects
than medical colleges are being executed. Necessary materials including finishing materials are available
locally and can also be easily sourced from all over India.
12-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
12-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
12-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Public Works Department Cost Norms and Unit Cost Applied to the Project
In India, the unit cost for public buildings is defined by the “Plinth Area Rates” set by the Public Works
Department (PWD). Each of the central government PWD (CPWD) and Assam PWD (APWD) has its own
12-10
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
cost. Despite of the above, in June 2021, a notification from the Government of Assam on Schedule of
Rates (SOR) for Construction has been issued that all norms and guidelines of the Central Public Works
Department (CPWD) (All India) SOR will be followed by the Assam Public Works Department (Building
Wing).
The base cost is calculated based on the Plinth Area Rates 2021 published by the Central Public Works
Department, which covers the basic construction cost of non-residential buildings. In this base cost, items
such as medical gas supply systems are not included. These additional functions that are not listed in the
Plinth Area Rates are added considering market price.
Especially because the development of each facility block will be implemented during the operation of the
existing facilities, consider safe accessway for the patients, their attendants, visitors, and medical staff
during each construction phase. Separate user access route from that of construction vehicle to be planned.
12-11
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Project Cost
13-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
13-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
The annual O&M cost including the above is roughly estimated as INR 400,000 per bed on average from the
average expenditure in the past four years (2016-2020) of Assam Medical College & Hospital (AMCH) and
Gauhati Medical College & Hospital (GMCH) including salaries and wages calculated from the four-year
expenditure data of MOHFW (Table 13-6). The reason for adopting the past expenditure of AMCH and
GMCH is that their records for the hospital were clearly separated from those of the medical colleges.
13-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 13-7 shows the estimated O&M cost of the proposed facilities.
13-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
(3) Strengthening the organizational and management capabilities for provision of the medical
services
In this section, operation and effect indicators are established for each component above, in order to monitor
the achievement of the project goals. In establishing the indicators, clearness and simplicity, which support
reliable and sustainable monitoring by the implementing agencies, are taken into account.
14-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Table 14-1 shows the operation and effect indicators proposed for the project. The baseline values are those
which are achieved in 2021 (or the latest available data) and the target values are expected values in the
two years after project completion (2029).
The operation indicators for the above component (1) includes the “number of newly installed beds”, “bed
occupancy rate”, “number of OPD patients”, “number of angiography”, and “number of delivery (including
normal delivery and LSCS)”. As for the effect indicators, infant mortality rate (IMR) and maternal mortality
rate (MMR) could be proposed because those indicators are closely related to one of the overall goals of
the project. However, such mortality rates would be affected not only by the outputs of the project but also
by a variety of external factors. Thus, those mortality rates are not included for evaluation of the project.
The operation indicator for the above component (2) is the “cumulative total number of medical staff who
have participated in the training(s) related to patient-centered care, improved internship program and
refresher training(s)”.
The operation indicators for the above component (3) are the “cumulative total number of staff who have
participated in the training(s) and activities of 5S-KAIZEN and Total Quality Management (TQM),
training(s) on eHospital and Management Information System (MIS) management” and “cumulative total
number of trainers to be trained regarding strengthening referral system and promotion of health awareness
of local residents to change their medical behavior”.
14-2
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
14-3
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Qualitative Effects
The qualitative effects envisaged by the project implementation are as follows:
Improvement of patients’ satisfaction and comfortableness with healthcare services in terms of hospital
facility, hospital staff, doctor’s behaviour, etc. The public hospitals provide affordable services equally
to any individuals of the general public including women and socially vulnerable people; so at least a
half of those patients are envisaged to be female.
Improvement of living environment in the target areas such as enhancement of advanced healthcare,
improvement of access to healthcare services among residents. Likewise, the residents in the target
areas include women and vulnerable people.
Improvement of health personnel’s satisfaction with working environment, learning environment, etc.
Development of high-quality health personnel and provision of qualified health personnel in the state
through clinical trainings. Likewise, health personnel include women.
General Assumption
Economic analysis is an evaluation method of economic viability of a project by comparing economic
benefit, which is calculated by comparing benefit using the “With and Without” case, and economic cost.
The economic viability of the project will be evaluated through estimation of economic internal rate of
return (EIRR), cost benefit ratio (CBR) and economic net present value (ENPV) in the present analysis.
Since the project consists of several components, which comprehensively cover health sector in Assam and
are mutually dependent on each other (refer to Chapter 5), EIRR, CBR and ENPV of the project as a whole
are calculated and evaluated rather than component-by-component or facility-by facility. In fact, it would
be difficult to estimate EIRR, CBR and ENPV component-by-component or facility-by facility, and it might
be also difficult to interpret those fragmented indicators in order to properly evaluate the project with
complex setting.
Most of the soft components of the project are not the direct target of economic analysis, because the
economic benefit of them is difficult to converted to monetary value. However, it should be noted that the
soft components of the project will play an important role to realize the outcome/benefit of other
components and of the project as a whole by contributing for improvement of quality and quantity of health
personnel and organizational and management capabilities.
The “without” case is set as the case where the public hospitals in the target area are maintained in their
current status.
Healthcare services at public hospitals in Assam are basically free of charge, except for some medical
services (such as initial consultation (registration) fees and some tests and treatments) and medicines, which
are funded by the government tax revenues (in the form of government subsidies). Thus, the hospital service
revenue is minimal compared with the project cost. In addition, the government of Assam is planning to
expand the coverage of the public health insurance system in the future, which will further reduce the
14-4
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
patient's co-payment (payment at the hospital counter). Moreover, in this survey, it was unable to obtain
financial data such as financial statements of public hospitals, as well as information on the public health
insurance system in Assam, such as coverage, expenditure and the share of government subsidies in the
financial resources. Based on this situation, financial analysis is not implemented because it cannot be said
that public hospitals necessarily collect fees from users (patients), and it is difficult to analyze and forecast
the fee revenue at the same time.
General assumptions made for the economic analysis are described as per Table 14-2.
Economic Cost
Table 14-3 shows the construction cost as well as the O&M cost of the project, which are mentioned in
Chapter 13 and converted to the economic cost.
Economic Benefit
14-5
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
in super specialty wings in six medical college hospitals will enable both investigation and treatment
surgery to cope with such diseases. The economic benefit in this regard is estimated based on the following
assumptions:
Usage capacity of angiography devices is assumed at nine times per day per unit: of which, use for
catheter treatment surgery operation accounts for a third (33%), and medical test usage accounts for
the other two thirds (67%). Treatment surgery is operated at 250 days per year.
Survival rate after the catheter treatment surgery using angiography is assumed at 60%.
The patients are 45-65 years of age and their economic activities up to 65 will be prolonged for ten
years on average. The economic effects are quantified through long-term projection of Assam’s income
per capita. Since data on long-term projection of the growth rate of Assam’s income per capita was not
available, the long-term projection of real GDP growth for India, which was published by OECD, was
used instead in order to estimate Assam’s income per capita in future periods8.
The costs of providing the same healthcare service are assumed to be the same in public hospitals and
private hospitals. The costs are not included in the calculation of economic benefit of this project
because it is necessary whether the service is provided in a public hospital or a private hospital.
In private hospitals, patients pay for the fee of healthcare service, which is the sum of the costs and
profits. This is equivalent to the revenue of private hospital. On the other hand, public hospitals are not
for profit, so they do not add profits to their costs. Therefore, it is assumed that this project will reduce
the patients’ expense on health equivalent to the amount of profit for private hospitals.
The benefit of reducing patients’ expense after the project implementation is calculated as follows:
Benefit of reducing patients’ expense = “Profit margin of private hospitals per patient” * “Number of
patients at the targeted MCHs and DCHs”
8 The compound annual growth rates (CAGR) of GDP per capita both for Assam and for India over the past nine years have
been almost the same (9.8%), and the growth rates of GDP per capita and GNI per capita for India over the past ten years
have been staying at the same level.
14-6
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
Since data on sales and profits of private hospitals for the entire state of Assam or the entire country was
not available, data of an individual hospital is used instead. Table 14-5 shows the healthcare service rates
at a typical private hospital operated in Assam, namely Apollo Hospitals 9 . According to the Apollo
Hospitals Investor Presentation, average EBITDA margin is 22% in the past 12 years. The profit margin of
private hospitals per patient is calculated by multiplying the average service rate by EBITDA margin rate.
Reducing transportation and accommodation costs for inpatients’ families to accompany the inpatients
= “Transportation and accommodation costs per family of inpatient to the nearest MCH” * “Number of
patients who would receive medical services at tertiary public hospitals instead of the secondary hospitals
unless the project would be in place”
It is assumed that the patients, who would need to receive proper medical services at secondary public
hospitals, would have to directly go (bypass) to tertiary public hospitals due to insufficient quality or
quantity of services provided by their nearest secondary public hospitals, in the absence of the project. The
economic benefit in this regard is estimated based on the following assumptions:
At least one family member accompanies the inpatient and stays for four days.
Average distance from where patients live to the nearest tertiary hospitals is 50 km and they use taxi.
This benefit is closely related to the components of “Infrastructure Improvement in DCHs” as well as the soft
components. Although the benefit of reducing travel costs for inpatients’ families could be arisen not only from
the above assumed situation but also other cases such as eliminating travels to private hospitals, etc., those
benefits are not included due to the difficulty of collecting reliable data and making logical assumptions.
Estimation of EIRR
Results of the economic analysis of the entire projects is shown in the following table. Each indicator is
calculated based on the following method:
9 https://www.apollohospitals.com/
14-7
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
CBR (B/C) = (Net Present Value of Economic Benefits) ÷ (Net Present Value of Economic Costs)
ENPV = (Net Present Value of Economic Benefit) – (Net Present Value of Economic Costs)
Table 14-8 shows the economic cash flow projection of the project. Table 14-9 shows the results of the
sensitivity analysis. It indicates that O&M cost increase is less sensitive to the EIRR results than
construction cost increase. Also, EIRR will be higher than the hurdle rate in case of 20% decrease in hospital
services at MCHs and DCHs (OPD, IPD, and advanced medical care) and benefit from transportation and
accommodation costs reduction.
14-8
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
14-9
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
JICA's scheme for this purpose may include soft components, the incidental technical cooperation projects
related to this project, and regular technical cooperation projects. On the other hand, it is also possible to
utilize the experience and knowledge of Japanese universities, hospitals, and private companies. Therefore,
the following approaches are required for project implementation in order to collaborate with Japanese
universities, hospitals, and private companies.
15-1
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
References
Anup Agarwal, et al., 2020. Guidance for building a dedicated health facility to contain the spread of the 2019
novel coronavirus outbreak. Indian Jornal of Medical Research, April .
Assam Cancer Care Foundation, 2021. Assam Cancer Care Foundation. [Online]
Available at: https://www.assamcancercarefoundation.org/
[Accessed: 31 7 2021].
Bikash Singh, 2017. Assam and Tata Trusts are working on setting up a unique cancer care grid: Himanta Biswa
Sarma. [Online]
Available at: https://economictimes.indiatimes.com/industry/healthcare/biotech/assam-and-tata-trusts-are-
working-on-setting-up-a-unique-cancer-care-grid-himanta-biswa-sarma/articleshow/61055487.cms
[Accessed: 31 7 2021].
CDDEP, 2020. COVID-19 in India : State-wise estimates of current hospital beds, intensive care unit (ICU) beds
and ventilators. [Online]
Available at: https://cddep.org/wp-content/uploads/2020/04/State-wise-estimates-of-current-beds-and-
ventilators_24Apr2020.pdf
[Accessed: 21 4 2021].
Census Organization of India, 2011. Population Census 2011. [Online]
Available at: https://www.census2011.co.in/
[Accessed: 12 4 2021].
Directorate of Economic and Statistics, 2017. Statistical Handbook Assam 2016, HFWD Schemes. [Online]
Available at: https://hfw.assam.gov.in/
[Accessed: 31 7 2021].
Finance Department, Government of Assam, 2021. Analytical Statement, :
Finance Minister, Assam, 2021. Statements laid before the Assam Legislative Assembly as required under the
Assam Fiscal Responsibility and Budget Management Act, 2005, : Finance Department, Government of
Assam.
Gauttam, P, et al., 2021. Public Health Policy of India and COVID-19: Diagnosis and Prognosis of the
Combating Response. , Basel: Sustainability 2021, 13, 3415.
GOA and NHM Assam, 2016. Study on Contributing Factors f IMR and MMR in Tea Gardens of Assam.
Guwahati: GOA.
Google, 2021. COVID-19 Statistical Information. [Online]
Available at:
https://www.google.com/search?q=COVID+Assam&rlz=1C1GCEU_jaKG833KG833&oq=COVID+Ass
am&aqs=chrome..69i57j0i19l5j69i60l2.5151j0j4&sourceid=chrome&ie=UTF-
8#wptab=s:H4sIAAAAAAAAAONgVuLVT9c3NMwySk6OL8zJecSYwC3w8sc9YanwSWtOXmMM5B
L3TU3JTM7MS3XJLE5NLE71yU9OLMnMzxOS
[Accessed: 14 9 2021].
Gov of Assam, 2017. Birth and Death Annual Report, 2016. [Online]
Available at: https://dhs.assam.gov.in/portlets/birth-death-annual-report
a
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
[Accessed: 15 8 2021].
Gov of Assam, 2021. Assam Budget 2021-22. [Online]
Available at: https://finance.assam.gov.in/portlets/assam-budget-2021-22
[Accessed: 20 9 2021].
Gov of Assam, 2021. COVID-19 Advisory. [Online]
Available at: https://covid19.assam.gov.in/
[Accessed: 13 4 2021].
Gov of India, 2021. National Digital Health Mission. [Online]
Available at: https://ndhm.gov.in/
[Accessed: 2 9 2021].
Gov of India, 2021. National Health Miission. [Online]
Available at: http://nhm.gov.in/index1.php?lang=1&level=2&sublinkid=972&lid=139
[Accessed: 15 9 2021].
Government of Assam, 2021. COVID-19 Advisory. [Online]
Available at: https://covid19.assam.gov.in/
[Accessed: 14 4 2021].
Government of Assam, 2021. Open Budgets India Beta. [Online]
Available at: https://openbudgetsindia.org/dataset?q=assam
[Accessed: 1 9 2021].
Gwmsath Mushahary & Manjil Basumatary, June 2020. Health Facilities in Kokrajhar District of Assam, India,
Bhopal: International Journal of Management and Humanities (IJMH) ISSN: 2394 – 0913, Volume-4 Issue-
10.
Health and Welfare Department, Assam, 2021. Health and Welfare Department, Assam. [Online]
Available at: https://hfw.assam.gov.in/
[Accessed: 15 9 2021].
Health Data, 2017. Assam: Disease Burden Profile, 1990 to 2016. [Online]
Available at: http://www.healthdata.org/sites/default/files/files/Assam_-
_Disease_Burden_Profile%5B1%5D.pdf
[Accessed: 12 4 2021].
HFWD Assam, 2021. Schemes. [Online]
Available at: https://nhm.assam.gov.in/schemes
[Accessed: 31 7 2021].
HFWD, Assam, 2018. Concept Note on Strengthening Health Systems and Excellence of Medical Education in
Assam. :Health and Family Welfare Department, Government of Assam.
HK Nath, 2018. Heterogeneous Climatic Impacts on Agricultural Production: Evidence from Rice Yield in
Assam, India, Delhi: Asian Journal of Agriculture and Development, Vol. 15 No. 1.
IIPS, 2017. National Family Health Survey (NFHS-4), 2015-16. [Online]
Available at: https://dhsprogram.com/pubs/pdf/FR339/FR339.pdf
[Accessed: 12 4 2021].
India Today, 2021. Starlink satellite broadband service could soon launch in India, hints SpaceX CEO Elon Musk.
b
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
[Online]
Available at: https://www.indiatoday.in/technology/news/story/starlink-satellite-broadband-service-could-soon-
launch-in-india-hints-spacex-ceo-elon-musk-1848272-2021-09-02
[Accessed: 20 9 2021].
JMWEA, 2013. Planning and management direction for hospital air-conditioning facility ( HEAS-02-
2013). :Japan medical welfare equipment association.
Karan A, Negandhi H, Nair R, et al., 2019. Size, composition and distribution of human resource for health in
India: new estimates using National Sample Survey and Registry data.. 9[e025979].
Mahanta C, 1995. Distribution of nutrients and toxic metals in the Brahmaputra River Basin., Delhi: Ph.D thesis
Jawaharlal Nehru University, India.
meteoblue, 2021. [Online]
Available at: Meteoblue.com
[Accessed: 8 2021].
MHFW, GOI, 2017. National Health Policy 2017. Delhi: GOI.
MHFW, 2012. India Public Health Standards Revised 2012. Delih: MHFW.
Ministry of Earth Sciences, 2021. Indian Meteological Department. [Online]
Available at: https://www.imdpune.gov.in/
[Accessed: 9 2021].
MINT, 2020. How Assam improved its maternal mortality ratio at a fast pace. [Online]
[Accessed: 13 4 2021].
N Das, et al., 2017. Seasonal disparity in the co-occurrence of arsenic and fluoride in the aquifers of the
Brahmaputra flood plains, Northeast India. , Delhi: Environmental Earth Sciences, 76(4).
National Commission on Population, Ministry of Health & Family Welfare, Mirman Bhawan, 2020. Population
Projections for India and States 2011-2036, New Delhi: Report of the Technicak Group on Population
Projections.
National Health Mission, Assam, 13 March 2019. MoU between MHFW and GOA regarding continuation of
NHM for the period of 1 April 2017 to 31 March 2020. Guwahati, GOA.
National Health Systems Resource Center, 2019. National Health Accounts Estimates for India (2016-17), New
Delhi: Ministry of Health and Family Welfare, Government of India.
National Medical Commission, 2021. College and Course Search. [Online]
Available at: https://www.nmc.org.in/information-desk/college-and-course-search
[Accessed: 30 8 2021].
NHM Assam, 2021. Swasthya Sewa Dapoon. [Online]
Available at: http://nhmssd.assam.gov.in/
[Accessed: 31 8 2021].
NHM, GOA, 2021. OPD & IPD. [Online]
Available at: https://nhm.assam.gov.in/information-services/detail/opdipd
[Accessed: 19 4 2021].
NITI Aayog, 2018. Aspirational Districts Baseline Ranking Map. [Online]
Available at: https://niti.gov.in/aspirational-districts-baseline-ranking-map/
c
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
[Accessed: 11 2 2021].
NITI Aayog, 2019. SDG India, Index & Dashboard. [Online]
Available at: https://niti.gov.in/sites/default/files/SDG-India-Index-2.0_27-Dec.pdf
[Accessed: 19 4 2021].
NITI Aayog, 2021. Maternal Mortality Ratio. [Online]
Available at: http://niti.gov.in/content/maternal-mortality-ratio-mmr-100000-live-births
[Accessed: 13 4 2021].
NSO, 2019. Generating Human Development, A Working Paper for Computing HDI, GDI, and GII for States of
India. [Online]
Available at:
http://mospi.nic.in/sites/default/files/publication_reports/Report%20on%20Gendering%20Human%20De
velopment.pdf
[Accessed: 13 4 2021].
NSO, 2020. Health in India. Delih: National Statistical Office.
Raman Kumar and Ranabir Pal, 2018. India achieves WHO recommended doctor population ratio: A call for
paradigm shift in public health discourse!. J Family Med Prim Care. , Sep-Oct[7(5)], p. 841–844..
Reserve Bank of India, 2021. Handbook of Statistics on Indian Economy. [Online]
Available at:
https://www.rbi.org.in/Scripts/AnnualPublications.aspx?head=Handbook%20of%20Statistics%20on%20I
ndian%20Economy#
[Accessed: 15 9 2021].
Rottingen, J.-A., Ottersen, T., Ablo, A., et al., 2014. Shared Responsibilities for Health: A Coherent Global
Framework for Health Financing, London, UK: Chatham House.
Teo, Hui Sin; Bales, Sarah; Bredenkamp, Caryn; Cain, Jewelwayne Salcedo, 2019. The Future of Health
Financing in Vietnam : Ensuring Sufficiency, Efficiency, and Sustainability, Washington, DC.: World Bank.
The Commonwealth Fund, 2020. International Health Care System Profiles. [Online]
Available at: https://www.commonwealthfund.org/international-health-policy-center/system-profiles
[Accessed: 15 9 2020].
The Enterprise of Healthcare, 2019. Assam Making Healthcare Accessible and Affordable Despite Challenges.
[Online]
Available at: https://ehealth.eletsonline.com/2019/03/assam-making-healthcare-accessible-and-affordable-
despite-challenges/
[Accessed: 13 4 2021].
Times of India, 2021. OneWeb on track to offer services in India from May 2022: Sunil Mittal. [Online]
Available at: https://timesofindia.indiatimes.com/business/india-business/oneweb-on-track-to-offer-services-in-
india-from-may-2022-sunil-mittal/articleshow/84047131.cms
[Accessed: 20 9 2021].
UIDAI, 2020. State/UT wise Aadhaar Saturation (Overall) - All Age Groups. [Online]
Available at: https://uidai.gov.in/images/state-wise-aadhaar-saturation.pdf
[Accessed: 13 4 2021].
d
Preparatory Survey for the Assam Health System Strengthening Project in India
Final Report (Advanced Version)
UNAIDS, 2013. Abuja +12 Shaping the future of health in Africa, Geneva: UNAIDS.
Unique Identification of India, 2020. State/UT wise Aadhaar Saturation (Overall) - All Age Groups. [Online]
Available at: https://uidai.gov.in/images/state-wise-aadhaar-saturation.pdf
[Accessed: 21 4 2021].
WHO/UNICEF, 2019. Data, statistics and graphics, WHO/UNICEF Joint Reporting Process. [Online]
Available at: https://www.who.int/immunization/monitoring_surveillance/data/en/
[Accessed: 22 4 2020].
WHO, 2010. Exploring the thresholds of health expenditure for protection against financial risk, Geneva: World
Health Organization.
WHO, 2016. The health workforce in India. Geneva: WHO.
World Bank, 2021. World Development Indicators. [Online]
Available at: https://databank.worldbank.org/source/world-development-indicators#
[Accessed: 15 4 2021].
Yamashita Sekkei Hospital Project Team, 2020. Hospital Design for After Corona. [Online]
Available at: https://www.yamashitasekkei.co.jp/cms/wp-content/uploads/2020/07/5c225d
3a58b96a3161fc950971d1c6d8.pdf
Yamashita Sekkei Inc, 2015. Path to hospital architecture planning specialist. Tokyo: Kenchiku Gijutsu.
e
Annex I Methodology of the Subcontracted Survey
1. EXECUTIVE SUMMARY
The Team Leader of JICA Survey Team – Mr. Hiroshi Abo on behalf of Koei Research & Consulting Inc. Japan (KRC)
entered in to a contract with United Engineers Alliance (UEA) Pvt. Ltd. (the Sub-Consultant) on 2nd day of the month of June
2021 for the execution of the Preparatory Survey for Health System Strengthening Project in Assam State, India (the Project)
under the contract dated 24th March 2021 between JICA & KRC Consortium.
The assignment commenced from 16th June 2021 is to provide to carry out the Field Survey of the Public Hospitals that
includes 7 MCHs and 6 DCHs and 6 PHF (Target Hospitals) for the Survey to support KRC Consortium to effectively design
the Project. The services delivered by a team of surveyors with short term inputs in different MCHs and DCHs (Target
Hospitals) on priority. The survey aims to find out bottleneck or the challenge in patient services in government hospitals and
teaching/learning environment of education in the medical college & hospitals under Level of Satisfaction and Care seeking
behaviour. Subsequently, the field survey team will be conducting the survey activities on (i) management & satisfaction and
(ii) Facility & Medical Equipment of Target Hospitals.
The main object of the progress report is to highlight the assessment of the current situation of the project parameters, as
originally envisaged in the Terms of Reference (TOR), after their findings during the progressive phase. The report also
includes the Surveor’s approach and methodology towards successful completion of the project and perception of the work
schedule, personnel deployment and the timelines for the project.
Figure -1
A1-1
2. INTRODUCTION
2.1 Purpose of the Progress Report
The main purpose of this Final Report is to bring out the field level existing status for planning the Project and to provide
information of the services to be completed based on existing scenario.
The final phase has been completed close liaison with KRC, GOA, MCHs and other key stakeholders enabling greater clarity
in determining the Survey areas of work and approach to conducting the services.
It is important for the contents of the Final Report to be understood and agreed by the stakeholders in order to be accurate
and to accomplish the work.
2.2 Project Background
For universal health coverage (UHC) of Assam people with no one left behind, the State Government requested JICA for
assistance on strengthening of health service network through improvement of public hospitals. To formulae of Japanese
ODA loan project, JICA will conduct the preparatory study for health system strengthening in Assam State (the study) aiming
to identify the scope and prepare the implementation plan. To ensure effectiveness and sustainability of the project, the study
will cover not only the health facilities but also the health system, provision and utilization of health services in Assam State.
Especially, human resources might be one of the priorities to ensure quantity and quality.
2.3 Overall Objectives
Under the study, the field survey on public hospitals (the survey) will be conducted with the following objectives:
Collect data and information on facility, medical equipment, as well as operation and management of public hospitals in
Assam State
Collect and analyse information on level of satisfaction and possible determinants of patients and hospital staff
Target Hospitals:
7 medical college and hospitals
The final list of target hospitals included 6 numbers of District Civil Hospitals and One Primary Health Facility
nearby each District Civil Hospital. The list is shown below:
A1-2
The List of Target Medical College & Hospitals and District Civil Hospitals:
Table - 1
A1-3
2.4 Stakeholders and Beneficiaries
2.4.1 Stakeholders
The main stakeholders are the Health Department, Government of Assam, all the 7 MCHs and Target Hospitals (DCHs/
PHFs), the Project Development Partners (KRC, Yamashita Sekkei Inc., and Nippon Koei India Pvt. Ltd.). The funded and
promoted partner is JICA.
2.4.2 Beneficiaries
The main beneficiary is the Health Department and its various organizational units involved in planning and developing the
Health System maintenance and improvement project. Benefits also spread to service providers, patients, medical students
and the society impacted by strengthening of Health System.
2.5 Team mobilization
The Field Survey Consultancy Service agreement was executed on 02nd June 2021 and the date of commencement of
services was declared as 16th June 2021.
There are members in the team who were actively involved in the development of Questionnaires for Level of Satisfaction
and Care seeking behavior survey. The team under the leadership of Mr. Dipon Ghosh, Director-UEA, Dr. Nibedita Paul,
Team Leader- Survey and Mr. Santanu Hazarika, Civil Engineer together with Mr. Bhopendra Madar, Coordinator and Mr.
Rituparna Borkakoti, IT; developed questionnaires for different medical cadres and patients in any MCH/ DCH/ PHF.
The present status of mobilized Surveyors has been represented as tabular form as follows.
Table -2
Sl. No. Position Name
1 Team Leader – Field Survey Dr. Nibedita Paul
2 Surveyor (Coordinator) Mr. Bhopendra Madar
3 Surveyor (Coordinator & IT) Mr. Rituparna Borkakati
4 Surveyor Mr. Abhijit Banik
5 Surveyor Md. Aakib Ahmed Rezbi
6 Surveyor Mr Sailodhar Gohain
7 Surveyor Mr. Krishna Gopal Banik
8 Civil Engineer Mr. Partha Pratim Sarma
9 Sr. Civil Engineer Mr. Santanu Hazarika
10 Communicator Ms. Surabhi Agarwal
11 Surveyor Mr. Sujal Bhowal
12 Civil Engineer Md. Wasim Ahmed
13 Surveyor Md. Rafiqul Haque Ahmed
14 Surveyor Mr. Ramakant Goala
15 Surveyor Mr. Pradip Debnath
16 Surveyor Mr. Chandan Hazarika
17 Civil Engineer Mr. Nileem Kalita
18 Surveyor Mr. Suraj Banik
A1-4
3. THE APPRAISAL OF THE SERVICES PROVIDED.
3.1 General
The Field Survey Consultancy Services are intended to assist KRC and the consortium (Yamashita Sekkei Inc., and Nippon
Koei India Pvt. Ltd.) in conducting the field survey for all the 7 MCHs and 6 DCHs/ 6 PHFs (Target Hospitals) our appraisal of
the field survey services to be provided, has been formed by:
v. Meeting with the Stakeholders (JICA, HFWD -GoA, DME, DHS, NHM, etc)
Under the overall guidance of KRC & the Consortium, the Field Survey teams are required to work closely with the Health
Department, GoA, all the & MCHs and the Target Hospitals. We also anticipate involvement of the representative from each
MCH and the Target Hospitals for coordination and support during entire survey activities.
At this current (COVID-19) Pandemic situation and under strict SOP from ASDAMA –The coordination and support from the
stakeholders and GoA will finally result in achieving broad goals against defined timeframe.
There are four different departments that are looking after the MCHs, Target Hospitals and Various Government Schemes.
The departments are:
Directorate of Medical Education (DME): Looks after all the operations of Medical College & Hospitals in Assam
Directorate of Health Services (DHS): Looks after all the operations of District Civil Hospitals and Primary Health Facilities in
Assam
Directorate of Health and Family Welfare (DHFW): Generally Directorate of Health and Family Welfare is the Department of
Assam for implementation of programmes like small family norms, universal immunization programmes and also to
implement the PC PNDT# act. All programmes are funded by Govt. of India as under RCH-II programme##.
National Health Mission (NHM), Assam: NHM supports to provide healthcare to rural population throughout the State Assam
with special focus on districts which have weak public health indicators and for weak infrastructure to bring about reduction in
child and maternal mortality. NHM also supports to improve universal access to public services for food and nutrition,
sanitation and hygiene and universal access to public health care services with emphasis on services addressing women’s
and children’s health and universal immunization. Also to support to improve access to integrated comprehensive primary
health care to bring about population stabilization. Generally NHM supports to promote healthy life styles.
Hence, our field survey activities are directly linked to and supported & coordinated by, DME and DHS.
Note: (1) # The PC-PNDT Act [The Preconception and Prenatal Diagnostics Techniques (Prohibition of Sex Determination)] was enacted
on 20 September 1994 with the intent to prohibit prenatal diagnostic techniques for determination of the sex of the fetus leading to female
feticide.
(2) ## Reproductive and Child Health (RCH) programme is a comprehensive sector wide flagship programme, under the umbrella of the
Government of India's (GoI) National Health Mission (NHM), to deliver the RCH targets for reduction of maternal and infant mortality and
total fertility rates.
The Field Survey services are being carried out in two phases under the three Components listed in the Terms of Reference
(TOR) and shown as below,
Component 1: Level of Satisfaction and Care Seeking Behaviour
1. Level of satisfaction of MEDICAL EDUCATION /TRAINING/ CME;
A1-5
2. Level of satisfaction of MEDICAL SERVICE PROVIDERS;
3. Level of PATIENT SATISFACTION; and
4. Care seeking behavior of people in Assam.
Component 2A: Management and Satisfaction
A1-6
List of Task Description
other staff in MCH/ DCH SMS to the person concerned. The Surveyor shall follow up and guide the stakeholder for
any confusion during the interview session using his/her Android mobile phone or iPad or
Laptop/ Desktop.
10: Communication & All communication to any stakeholder of GOA/ KRC has to be reported from Director-
Reporting UEA.
There has been What’s App group formed within the team of surveyors to report daily
activities to the Team Leader- Survey. The team will also take note of the local situation
and appraise accordingly to all the team members for their movement and during any
adverse situation in relation to the security issue, if any, the concerned team member
shall intimate the Team Leader- Survey immediately for necessary decision.
11: Meetings & representations Director – UEA and Team Leader – Survey shall attend all the necessary meetings that
only after requested/invited by KRC. Again the meetings with GOA/ MCHs/ DCHs may be
attended by Director-UEA/ Team Leader/ Coordinator on behalf of KRC on the approval
of KRC only.
12: Data Filtering and Analysis After collection of sample data from various stakeholders as per ToR, the data shall be
scrutinised, filtered and analysed using Microsoft Excel, SPSS and Python Programming.
13: Preparation of Reports The draft final report shall be prepared based on the requirement of project need and the
sample data. The report shall highlight the various parameters that require for decision
making in the development of the project.
The field survey activity started on 19th July 2021 from Diphu MCH and Silchar MCH.
Due to current COVID-19 situation, preparedness for 3rd Phase of Pandemic, restrictions from travelling at night in curfew
and strict SOP from ASDAMA, GoA, the progress of the survey gets affected. Again there is inter-state border dispute
between Assam & Mizoram that created security issue for the surveyors’ movement. So, to keep the momentum of the
survey activities, the surveyors are to keep moving at the places where the security and safety issues are minimum or nil.
A1-7
Preparatory Study For Healthh System Strengthening Project IIn Assam State In The Republic of India
Assam JICA
Government
Headquarters
Health & Family
INDIA Office
Welfare
A1-8
5. APPROACH & METHODOLOGY
After initial discussion with KRC on 24th May 2021, UEA initiated and started in-house perceptive and assessment on the
approach for conducting the survey activities. The first meeting on 8th June 2021 with the entire Survey team, JICA and the
Government of Assam showed the light on the concept of the project, the purpose and the objective.
UEA then communicated the initial team members for preparing the work plan, methodology and questionnaires for
conducting the survey activities during COVID-19 situation when the infection rates were very high in Assam as compared to
other Indian States. Moreover, there was strict SOP from ASDMA, GoA.
The first point rose in the group that we have to avoid direct contacts while interviewing the medical cadres and patients.
Accordingly, planning for web application software App was incorporated in the methodology.
After attending series of meetings and discussions with the Survey Team, JICA and HFWD, GoA, we finally able to develop
11 numbers of Questionnaire for Level of Satisfaction and Care seeking behavior and One each set of questionnaire for
Facility & Equipment and Management & Satisfaction for all 7 MCH.
There shall be separate set of questionnaires for DCHs/ PHFs for Level of Satisfaction and Care seeking behavior and one
each set of questionnaire for Facility & Equipment and Management & Satisfaction.
There are groups of surveyors formed in viewing the current security scenario for conducting the survey activities where the
preference of surveyors is from the same district or area to avoid night travelling during curfew for security reasons.
However, there are Surveyors (team leader, coordinators and demonstrators) who have to travel to all the selected hospitals
for initiating, communicating the stakeholders and conducting the survey activities.
The details of sample size for Level of satisfaction and Care seeking behavior of MCHs are as follows:
A1-9
II. Level of satisfaction of medical service providers
Stakeholder Name Sample Size Survey Item Output
Doctor (year of experience > 15 number (covering all the
5) departments)
Doctor (year of experience < 10 number (covering all the
=5) departments)
Nurse 15 number (covering all the
Working environment/ Needs for medical
departments)
condition, facility, equipment, personnel and incentives
Nursing Student 10 number (covering all the
retention strategy, etc. to retention
departments)
Other Paramedical Staff (e.g. 10 number (covering all the
Pharmaceutical, Laboratory, departments)
Medical Equipment operators,
etc.)
Proportionately we collected the information of the sample size of DCH/ PHF as per ToR,
A1-10
There were another 6 Surveyors, mobilized for conducting the survey activities of IPD & OPD in DMCH, GMCH, FAA MCH
and SMCH. At the same time they were involved in following up with the Doctors, Nurses, etc. for assisting in filling up the
online questionnaires. UEA also engaged a communicator who is supporting the Doctors, Nurses, etc. remotely and
clarifying all their queries and curiosities on the project. E.g. (a) what is JICA? (b) Will it affect my career, if not answering
any question? (c) How is the project helping me as I am retiring shortly? etc. Some were even deleting the SMS that
generated after registration of the concerned medical cadre as they are afraid of software hacking of their bank account.
Here the communicator plays a very good role to clarify and in boosting their confidence.
After inclusion of 6 DCHs and 6 PHFs, we engaged 9 more Surveyors for expediting the activities.
There are total 18 Surveyors and Engineers engaged in this Survey for conducting the survey activities within the
time limit.
In the mean while, UEA met the Principal, GMCH on 12th July 2021 for initiating the Survey activities, Prof. (Dr.) Achyut
Baishya then explained to the survey team on the positions of the Medical College & Hospitals. He pointed that there is no
such Senior Doctor or Junior Doctor concept in the MCH. The positions are Professor, Associate Professor, Assistant
Professor and all of them are involved in teaching as well as in medical service too. He also mentioned that the Nursing
College and Paramedical Institute are excluded from GMCH. So, he can support only for those items which are available
with GMCH. A separate letter was submitted to him on 13th July 2021 with modified sample size and questionnaires were
then modified accordingly.
On 16th and 22nd July 2021, UEA communicated to all 7 MCHs, informing list of Surveyors to be present at the concerned
MCH for conducting the survey activities.
Again on 31st July 2021, UEA communicated to all 7 MCHs and shared the questionnaires for (i) Management & Satisfaction
and (ii) Facility & Medical Equipment.
Again to acknowledge, UEA received the list of contacts for Doctors, Nurse, Interns, Other Paramedical staffs, etc. from all
the MCHs except JMCH and GMCH. However, UEA wrote a letter on 22nd July 2021 to JMCH for further submission of the
list as requested.
Again, on the confirmation of DCHs on 4th August 2021 by HFWD, GoA and JICA; a letter from UEA was submitted to
Dr. Rathindra Bhuyan, Director of Health Services, Assam for informing the concerned DCHs for survey activities and
selection of nearest PHFs that attached to DCHs.
The Surveyors were mobilized in phase manner as the target hospitals are selected and finalized for sample survey by JICA
and GoA on 4th August 2021. The initial survey preparation activities were started in the month of June (8th June 2021) for
planning & preparation of questionnaires and converting those into web application. The field survey started for Level of
satisfaction and Care seeking behavior on 19th July 2021 from DMCH and SMCH and then subsequently FAA MCH.
A1-11
Preparatory Study For Healthh System Strengthening Project IIn Assam State In The Republic of India
UEA also engaged Surveyors for (i) Management & Satisfaction and (ii) Facility & Medical Equipment with effect from 29th
July 2021 initiated from SMCH.
Controlling involves taking management actions, whereas the Evaluation process deals with the comparison of performance
with what was planned and drawing appropriate conclusions. At the same time UEA management is monitoring the entire
survey activities and its progress.
A1-12
Preparatory Study For Healthh System Strengthening Project IIn Assam State In The Republic of India
Figure -3
The survey application saved data to the Server through internet which will be retrieved by the system admin as
and when require for further analysis of the data.
Desktop View
Figure -4
Kindly refer our earlier progress report for details of Web application methodology.
A1-13
5.3 Status of Survey Activities
The survey activities are completed despite the COVID situation and shortage of time; however, after
several pursuance’s, we are yet to receive the documents from GMCH. The team faced lots of difficulties
to enter into the GMCH premises for the collection of photos of the various infrastructure facilities due to
COVID situation. We also found the non availability of some of the stakeholders (e.g. nursing student,
academic experts, etc.) in some of the MCHs..
5.4 Summary of Correspondences with KRC and Health Department of Government of Assam
A1-14
5.6 Detailed List of Representatives from Health Department of Government of Assam
A1-15
NAME AND CONTACT DETAILS OF PRINCIPAL, MEDICAL COLLEGES AND HOSPITALS, ASSAM
Sl. Name of MCH Name of The Principal Mobile E-mail ID
No. Phone
(+91)
1 Assam Medical Dr. Sanjeeb Kakati 87230 51445 principalamch@rediffmail.com;
College & Hospital
superintendentamc@rediffmail.com
2 Guwahati Medical Dr. Achyut Baishya 99540 75427 gmch-asm@nic.in
College & Hospital
A1-16
Annex II Important Modules in the National Health Mission
The following important modules are developed under GOI/NHM guidelines and in use. (there are several
other modules for use in NHM related activities)
Sl Important modules in NHM Access to
DHS/DFW/DME
1 Swasthya Sewa Dapoon Yes
1 (a) HR – MIS Yes
1 (b) Inventory Management Yes
1 (c) Civil Works Monitoring System Yes
1 (d) Maternal Death Reporting System Yes
1 (e) Child Death Reporting and Review System Yes
1 (f) ASHA Payment and Performance Monitoring System Yes
1 (g) Wage Compensation Scheme for pregnant women of tea gardens Yes
1 (h) HWC-CHO Performance Monitoring System Yes
1 (i) VHND (Village Health & Nutrition Day) Monitoring System Yes
3 Government of India Portals
3 (a) RCH portal Yes
3 (b) Health Management Information Management System (HMIS) Yes
3 (c) AB-HWC Portal Yes
3 (d) NIN Portal At present only with
NHM
3 (e) IHIP – IDSP Yes
3 (f) Nikshya – NTEP Yes
3 (g) e-Hospital
3 (h) DVDMS – CDAC
4 Other Portal
4 (a) 24 X 7 Command and Control Centre Yes
4 (b) Bio medical equipment maintenance program Yes
4 (c) 108 – Emergency Referral Transport System Yes
4 (d) Chief Minister’s Free Diagnostic Service – X-Ray Services Yes
4 (e) Chief Minister’s Free Diagnostic Service – CT Scan Services Yes
4 (f) Chief Minister’s Free Diagnostic Service – Laboratory Services Yes
A2-1
Annex III NHM - MIS PLAN 2021-22
よ
合 GUIDELINESFORIMPLEMENTATIONOFH
MIS,RCHPORTAL/MCTS ド
び
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021-22
Index
S
I Content PageNo
1 P
ref
ace 3-7
2 Summaryofa
llo
cat
ionfort
heyear2021・22 8
3 GeneralG
uid
eli
nes 9
A Gui
delinesforTra
ini
ngcumr β &MCTS
eνiewmeetingforH M 10-14
atDis
tri
ctlevel
B G
u i
deline
sforTr
ain
ingcumreviewmeetingforHMIS& MCTS 15-21
。tBlockle
vel
C G
uidel
ine
sforM obil
itySupportforHMIS& MCTSatD
ist
ric
t 22-25
l
eve
lfortheyear2021・22
D G
uid
eli
nesforP
rin
tin
gofHMISFormats 26-28
E G
uid
eli
nesforo
per
ati
ona
lco
stforHMIS&MCTS 29-35
F G
uid
eli
nesforo
per
ati
ona
lco
stforAN
MOL 36-37
G G
uid
eli
nesforimplementationofe
-Ho
spi
tals
olu
tio
n 38・4
1
d
N
ati
ona
lHe
alt
hMi
ssi
on,Assam P
age2
dy
A
/
u
A3-1
GUIDELINESFORIMPLEMENTATIONOFH
MIS,RCHPORTAL/MCTS 色
れ
~
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・2
2
P
ref
ace
:
N
ati
ona
lHe
alt
hPo
liy2017emphasizet
c oensured
ist
ric
t-l
eve
lel
ect
ron
icdatabase
o
fin
for
mat
ionon h
eal
thsystemcomponents.S
tat
ePP2
I 0
21-
22ofAssamfocusedon
b
uil
din
gel
ect
ron
icdatabaseofa
l
lhe
alt
hprogrammes.However,theremays
lig
htchanges
i
nthes
tra
teg
iesa
fte
rimplementationo
fNa
tio
nalD
igi
talH
eal
thM
iss
ionwhichw
il
lbe
communicatedonduecourseo
fti
me.
F
oll
owi
nga
cti
vit
iesa
rep
rio
rit
ize
dinthef
ina
nci
alyear2
021
-22
:
1
. H
eal
thManagementInformationSystem(
HMI
S):
N
ati
ona
lHe
alt
hMi
ssi
on,Assam hasimplemented HMISsystemi
ntheS
tat
efrom
2
008
-09.100%f a
cil
itywisedatai
suplo
adin
geverymonthintheHM15WebP o
rta
l.
Intheyear2020-21,States
hif
tedtonewHMISP or
talprovidedbyN
ation
alHe
alt
h
M
iss
ion
,Assam.
HMISdatai
swidelyusedf
orp
lan
nin
g,programmeimplementationandm
oni
tor
ing
&reviewpurposes.Dis
tri
ctw
ise
,h e
althblockwiseandf a
cil
itywiseana
lysisofHMISdata
i
scar
riedouta tStat
eHQandthea nal
ysisrepo
rtissharedwitha l
lst
akeholde
rsforta
king
c
orr
ectivemeasures.HMISdataisalsousedduringpreparatio
no fDi
stri
ctHealt
hActio
n
P
lanandS
tat
ePI
P.Reviewmeetinga
tSt
atel
eve
l,d
ist
ric
tle
velandb
loc
kle
vela
rebased
on HMISd
ata
.Intheyear2
021
-22
,iti
sproposedt
oco
nti
nue useo
fHMISdataf
or
p
lan
nin
g,programmeimplementationandm
oni
tor
ingp
urp
ose
s.
F
oll
owi
ngp
rio
rit
yac
tiv
iti
esa
reproposedi
nthef
ina
nci
alyear2
021
-22
:
i
) ntheyear2
I 021
-22
,iti
sproposedt
oensureu
plo
adi
n f100%f
go aci
lit
ywisedatai
n
theHMISP
ort
al.Timelyu
plo
adi
ngo
fda
ilyr
epo
rt, monthlys
erv
iced
eli
ver
yda
ta,
monthlyi
nfr
ast
ruc
tur
edataandd
ist
ric
tHQformats
hal
lbep
rio
rit
yinthef
ina
nci
al
year2
021
-22
.
i
i
) ThoughnewHMISpo仕 a n2
limplementedi 0
20-
21,propert
rai
nin
gupt
ope
rip
her
y
l
eve
lco
uldnotbecompletedduet
ore
str
ict
ion
sofc
ovi
dpandemic.O
rie
nta
tio
non
monthlyi
nfr
ast
ruc
tur
eformats
hal
lbeconductedt
oensuredataq
ual
ity
.Intheyear
2021-
22,i
tisproposedtopro
video
rie
ntati
onofa
l
ldatahan
dle
rs.
i
i
i) Focusonda
t aqu
alityis
sue
swil
lbepri
ori
tize
din2
021
-22.
i
v) Asperd
eci
sio
ntakenbyGovernmento
fIn
dia
,nowR
ura
lHe
alt
hSt
ati
sti
csw
illbe
p
ubl
ish
edbased ondatauploadedi
nth
eIn
fra
str
uct
ureand HRformato
fHMIS.
S
pec
ialf
ocu
ssh
allbeg
ive
nonthed
ataq
ual
ityo
fIn
fra
str
uct
ureandHRrepo同
.
v
) Withano
bje
cti
vet
oimproved
ataq
ual
ityi
nHMlSandRCHP
ort
al,mandatorydata
v
ali
dat
ionsystemunderN
ati
ona
lHe
alt
hMi
ssi
on,Assamw
illcontinuei
ntheS
tat
e.
N
ati
ona
lHe
alt
hMi
ssi
on,Assam Page3
;
ルf
パt
ヤ十
l U
A3-2
付
﹀
GUIDELINESFORIMPLEMENTATIONOFH
MIS,RCHPORTAL/MCTS
事
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・22
A
lld
atapersonsa
tSt
ate
,Di
str
ictandB
loc
kwi
llv
is
ita
tle
ast10f
aci
lit
iespermonth
t
ova
lid
ated
atauploadedi
nth
eHMISwebp
ort
al.
v
i) P
eri
odi
cre
vie
wofHMISdataelementsl
ink
edw
ithS
tat
eHe
alt
hIn
dexo
fNI
TIAayog,
SDGI
ndi
cat
ors
,Ru
ralH
eal
thS
tat
ist
ics
,Di
str
ictH
osp
ita
lRa
nki
ng,PHCG
rad
ing
,CHC
G
rad
ing
,SDCHGradings
hal
lbeundertakena
tSt
ateandD
ist
ric
tle
vel
.Th
isw
illbe
anotherf
ocu
sar
eaf
ort
hef
ina
nci
aly
ear2021・2
2.
2
. RCHPo同a
l,ANMOL,K
ilk
ariandMobileAcademy:
S
tat
ehasa
lsoimplementedReproductive& C
hil
dHe
alt
h(RCH}P
ort
alaugmented
v
ers
io fMother& C
no hil
dTr
ack
ingSystem(MCTS)i
nth
eSt
ate
.St
ateh
astakens
pec
ial
f
ocu
sfo
rti
mel
yupdatingo
fdatai
ntheRCHandu
til
iza
tio
nofd
ata
.Ve
rif
ica
tio
nofWork
p
lanw
ithRCHR
egi
ste
rand byv
isi
tin
ghouseof2 pregnantwomen/motherhasbeen
mademandatoryf
ora
llmonitoringo
ffi
cia
ls.
Fromthemontho
fNovember2018,RCHP
ort
alhasbeenimplementedi
ntheS
tat
e.
F
oll
owi
nga
cti
vit
iesa
rep
rio
rit
ize
dinthef
ina
nci
alyear2021-22:
i
) I
nthe FY2
021
-22
,iti
senvisagedt
oro
lloutRCH P
ort
alwith 100%coverageo
f
日igi
bleC
ouple,PregnantWomenandCh
ildr
en.
i
i
) Re
gularupdatingofs erv
icede
liv
erydata and u
til
iza
tio
nofwork-plan s
hal
l be
f
ocu
sareaf
or2021
・22f
orRCHP
ort
al.
i
i
i) ANMOL(ANM o
nli
ne)T
abl
etbasedv
ers
iono
fRCH P
ort
al has beens
tar
tedi
n7
a
spi
rat
ion
ald
ist
ric
tso
ftheS
tat
e.ANMOLw
illber
oll
edouti
nal
lSubC
ent
reso
fth
e
S
tat
eal
ongw
ithNCDa
ppl
ica
tio
n.
i
v) Implementationofv
ers
ion2
.0o
fRCHR
egi
ste
rdevelopedbyM
ini
str
yofH
eal
th&
F
ami
lyW
elf
are
, Governmento
fIn
diaw
ill be another major f
ocu
sar
eaf
orthe
f
ina
nci
alyear2021-22.T
rai
nin
gofANMandf
iel
dle
vels
taf
fwi
llbecompletedw
ith
in
znd qua同e
rofthef
ina
nci
alyear2
021
-22
.Tr
ain
ingo
fANMsonthenewRCHR
egi
ste
r
w
illbetakenupd
uri
ngB
loc
kle
velt
rai
nin
gs.
v
) F
or smooth implementation o
f RCH R
egi
ste
r2.
0,i
tis proposed t
opr
ovi
de
"
Ins
tru
cti
onManualf
orANMsonRCHR
egi
ste
r2.
0”t
oal
lANMsi
nthef
ina
nci
al
y
ear2
021
-22
.In
str
uct
ionmanuals
hal
lbemadea
vai
lab
lewitha
llANMsandf
iel
d
l
eve
lst
affa
fte
rthef
ina
lve
rsi
ono
fin
str
uct
ionmanualr
ece
ive
dfromGovernmento
f
I
ndi
a.O
rie
nta
tio
n onthe i
nst
ruc
tio
n manual i
sal
so proposed t
o be c
arr
iedout
d
uri
ngmonthlyb
loc
kle
velr
evi
ewmeetingcumt
rai
nin
gs.
v
i) F
oll
ow up o
f pregnant women and c
hil
drn through ”
e Assam E
arl
y Childhood
DevelopmentC
allCentre"w
illbecontinuedi
n20
21-
22.Assam MCTSC
allCentre
d
N
ati
ona
lHe
alt
hMi
ssi
on,Assam Page4
dv
/
ho
A3-3
W
﹁ UV
/
︶
GUIDELINESFORIMPLEMENTATIONOFH
MIS,RCHPORTAL/MCTS
V
司
ANDM&EA CT
IVITIE
SFORTHEFINANCIALYEAR2021・22
wasmadee
sta
bli
shdon1
e stA
prl2
i 0
13.AssamMCTSC
allCentrewasupgradedt
o
Assam E
arl
yChildhood DevelopmentC
allCentreon 1
stJanuary2020toprovide
s
erv
ice
stot
he pregnant women and c
hil
dre
nas per g
uid
eli
nesc
irc
ula
ted by
Governmento
fIn
dia
.
v
ii
) V
eri
fic
ati
onandv
ali
dat
ionofphonen
u!'
"be
rofANMandASHAw
illbefocused
a
reai
nthef
ina
nci
alyear2
021
-22
.
v
ii
i)K
ilk
ari and Mobile Academys
erv
ice
sofM
ini
str
yofH
eal
th& F
ami
lyW
elf
are
,
Governmento
fIn
diahasbeenr
oll
edouti
ntheS
tat
e ntheyear2021
.I ・22
,iti
s
proposed t
ofo
cus on awareness a
cti
vit
ies on K
ilk
ari and Mobile Academy.
Awarenessi
sproposedt
obec
arr
iedouti
nthemonthlyb
loc
kle
velreviewmeeting
cumt
ra川n
i gsandb
loc
k/s
ect
ora
lle
velASHAm
eet
ing
s.Emphasizew
illbeg
ive
nto
c
apt
urec
orr
ect phone number o
f pregnant women. Pregnant women w
ill be
informedabouttheK
ilk
arimessagesa
tthetimeo
fre
gis
tra
tio
nofANCt
oav
ailf
ul
l
b
ene
fitofthes
erv
ice
.
3
. D
ist
ric
tVaccineD
ist
rib
uti
onManagementSystem(DVDMS):
S
tat
e has a
lre
adys
tar
ted the p
roc
esso
f implementation o
f "Drugs Vaccine
D
ist
rib
uti
o ”
n Management System (DVDMS) developed by ’
℃en
tre f
or
DevelopmentofAdvanceComputing(
C-D
AC)
" underM
ini
str
yofE
lec
tro
nic
sand
I
nfo
rma
tio
nTechnology(
Mei
tY)
.Inthey
ear2021・22i
tisproposedt
oro
lloutthe
DVDMSsystemupt
oHe
alh&WellnessC
t ent
res
.
4
. e
-Ho
spi
tals
olu
tio
n:
P
roc
essf
orimplementationo
fe-
Hos
pit
als
olu
tio
nofNICi
n25D
ist
ric
tHo
spi
taland
MedicalUnito
fAssamSec
ret
ari
athasbeensta
rte
d.
Inthef i
nan
cilyear2
a 0
21-22,i
tisproposedtoimplemente
-Ho
spi
tals
olu
tio
nin3
newD
ist
ric
tHo
spi
tal
satM
aju
li,H
oja
iandCharaideod
ist
ric
ts.
ntheyear 2021
I ・22
,iti
s proposed theO
per
ati
ona
lco
sto
fe-
Hos
pit
als
olu
tio
n
i
ncl
udi
ngI
nte
rne
tco
nne
cti
vit
y,AMC,Maintenance,O
ffi
ceConsumablese
tc.f
or29
H
osp
ita
ls(
26e
xis
tin
g+3new).
Implementationo
f"MeraA
spa
taa
l"a
ppl
ica
tio
nisanotherp
rio
rit
yar
eaf
ortheFY
2021・2
2.
N
ati
ona
lHe
alt
hMi
ssi
on,Assam Page5
も:}J.11-·~ ψ A3-4
仰し
GUIDELINESFORIMPLEMENTATIONOFHMIS,RCHPORTAL/MCTS
’ ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・22
5
. Implementationofe-Governancei
nit
iat
ive
sofGovernmentofI
ndi
a:
i
) NINPo同a
lhasbeenimplementedi
ntheS
tat
eal
lph
ysi
calp
ubl
ich
eal
thf
aci
lit
iesh
as
beenv
eri
fie
dandc
onf
irm
ed.I
nthef
ina
nci
alyear2
021
-22
,iti
sproposedt
ofo
cuson
100%updatingo
fda
t ntheNINpo同a
ai l.
i
i
) D
ail
yandmonthlyr
epo
rti
n ntheAB-HWCPo同a
gi lsh
allbecontinuedi
nthef
ina
nci
al
year2021・2
2.
i
i
i} S
tat
e has a
lso developed one i
n-h
ous
e web a
ppl
ica
tin "CHO・HWC P
o ort
al’
F t
o
monitorPerformanceBasedI
nce
nti
veo
fHe
alt
hWellnessCentreteams.Thesystem
i
s proposed t
o be continued i
n the f
ina
nci
al year 2021・22 f
or monitoring and
paymento
fteambasedi
nce
nti
veo
fHWCteami
ncl
udi
ngCommunityH
eal
thO
ffi
cer
,
i
v) I
tis proposed t
o continue the other e
xis
tin
gon
lin
e systems l
ikeo
nli
ne SNCU
m
oni
tor
ings
yst
em, PMSMAP
ort
al, NCDP
ort
al,MCDSRs
oft
war
e underSUMAN
i
nit
iat
ive
s,RBSKPo内a
l,DBTP
ort
al,F
P-L
MIS
,et
c.
6
. SwasthyaSewaDapoon-I
nte
gra
tedMISGISSystem:
S
tat
ehasa
lsoimplemented”
SwasthyaSewaDapoon-I
nte
gra
tedMISG
ISSystem”
whichhasbeendevelopedu
sin
gopensourcetechnologybyu
sin
gin
-ho
usec
apa
cit
y
o
f NHM, Assam. Important modules l
ik W件 MlSぺ
e’ ”Inventory Management
ぺ
System"ASHAPaymentandPerformanceMonitoringSystemぺ
, Mate「『、 alDeath
Reporting Systemぺ"Ir】f
ar 「
t Death Rep
】 。ting Systemぺ
ぺ
Monitoring System, CHO-HWC Performance Monitoring System"
,
”Civil Works
MonitoringSystem"
,
” WageCompensationSchemeforPregnantWomenofTea
Gardens"e
tc.havebeenimplemented.
・M
HR ISsystemhasbeenf
ull
yimplementedi
ntheS
tat
eand HRdataupdatedf
or
bothreg
ula
randemployeesunderNHM. Now,a
l
lt r
ansf
er,posti
ng,re
leaseand
joi
nin
gofal
lemployees(
bot
hR e
gula
randNHM)a redonethroughtheonl
ineHR-
MISsystemo
nly
.Pa
y-s
lipo
fNHMemployeesgeneratedthrought
hissystemo
nly
and100%s
ala
rypaymenti
smadethroughPFMSu
sin
gtheHR-MISs
yst
em.
S
imi
lar
ly, 100% paymento
fASHA i
nce
nti
ve made through "ASHA Payment and
.
PerformanceMonitoringSystem”
A
llthesea pp
lic
ationsareproposedt
obecontinuedi
nthef
ina
nci
alyear2
021
-22
.
7
. e
-Pr
ast
uti-S
tan
dar
diz
ati
onofNHM,Assamw
ebs
ite
:
Websiteo
fHe
alh& F
t ami
lyWelfareDepartmentandi
tsc
ons
tit
uen
tor
gan
iza
tio
ns
d
i
ncl
udi
ng NHM, Assam has been developed and hosted under e
-Pr
ast
uti
N
ati
ona
lHe
alt
hMi
ssi
on,Assam Page6
d
v
/AV
A3-5
九い︶
:G
t UIDELINESFORIMPLEMENTATIONOFH
MIS
,RCHPORTAL/MCTS
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021-22
S
tan
dar
diz
ati
ono
fwebsitea
sperg
uid
eli
nesc
irc
ula
tedbyWebDevelopmentTeam
o
fNI
C ntheyear2021・2
.I 2,i
tisproposedt
ore
gul
arl
yupdatethewebsitea
spere
-
P
ras
tut
igu
ide
lin
es.
8
. C
apa
cit
yBu
ild
ingonHMISandRCHPo同a
l:
F
oll
owi
ngc
apa
cit
ybu
ild
ingworkshopsa
reproposedi
nthef
ina
nci
aly
ear2
021
-22
:
i
) S
tat
ele
vel workshop c
ove
rig HMIS, RCH Po同a
n l, ANMOL and other I
T
i
nit
iat
ive
s
i
i
) D
ist
ric
tle
velq
uar
ter
ly review meeting cum t
rai
nin
gco
ver
ing HMIS, RCH
P
ort
al,ANMOLandotherI
Tin
iti
ati
ves
i
i
i) B
loc
kle
velmonthlyreviewmeetingcumt
rai
nin
g
9
. C
apa
cit
yBu
ild
ingonAdvanceDataA
nal
ysi
s-Newproposali
nco
lla
bor
ati
onwith
UNICEFandWHO:
I
n the y
ear2
021
-22
,iti
s proposed t
oor
gan
izet
rai
nin
g programme o
f
advance d
ataa
nal
ysi
sfo
rSt
ate
,Di
str
ict and B
loc
kle
vel data managers i
n
c
oll
abo
rat
ionwithUNICEFandWHO.
Thet
rai
nin
gisproposedt
obeconducti
nvi
rtu
alp
lat
for
m.Resourceperson
fromUNICEFandWHOw
illp
rov
idethet
rai
nin
g.
N
ati
ona
lHe
alt
hMi
ssi
on,Assam Page7
仇
JY
八守
Jy
A3-6
、
t
Summaryofa
llo
cat
ionf
ortheyear2021-22:
Fundallo
catio
nfo
r
New ApprovedBudget ResponsibleOff
ice
rofthe Fundal
locat
ionfor
D
ist
ric
tandBlockle
vel
FMR 2021・22 acti
vit
y Stat
eleve
lacti
vit
y
A
cti
vity/
Sub-
A c
tivity a
cti
vit
y
(
a sper
Fin
.
RoP, Budget At At Fi
n.
(
inclu
dingP Mact
ivi
ties
) Quantity/ AtS
tate Q
u an
tity/ a
llocat
ion Q
uanti
ty/
2021- (Rs. DPMU BPMU allo
cati
on
Target HQlev
el Target (Rs.in Ta
rget
22
) Lakhs) lev
el lev
el (
Rs.inla
kh)
l
akh)
T
a b
let
s:softwaref
orimplementation Manager-
6
.1.
2.S
.2 10714 257.140 DDM BDM 7955 190.
920 2759 66.
220
ofANMOL MIS
9
.5.
26.
1
T
raini
ngcumreviewmeetingf
& MCTSatS
tat
eL ev
el
orHMIS
1 4.710
Manage
MIS
『
・
1 4.
710 。 0.
000
9
.5.
26.
2
T
raini
ngcumreviewmeetingf
& MCTSatD
ist
ric
tLevel
orHMIS
132 72.420
Manager-
MIS
DDM 。 0.000 132 72.420
9
.5.
26.
3
T
raini
ngcumreviewmeetingf
orHMIS
1836 101.070
Manager-
DDM 。 101.070
A3-7
1
2.9
.1 P
rin
tin
gofHMISFormats 2897952 28.980
Manager-
MIS
DDM BDM 。 0.000 2897952 28.980
12.
9.4
Any Other (P
rin
tingo fIns
tru
ctio
n
12500 12.500
Manager-
12500 12.500 。 0.
000
1
4.2
.2
ManualsofRCHReg
Implementationo
i
ste
rve
fDVDMS
r
sion2.
0)
1 68.470
MIS
1 68.
470 。 0.
000
Manager-
1
6.3
.2 M
obi
lit 代 f
ysuppo orHMISandMCTS 4080 50.
520 DDM BDM 120 3.000 3960 47.
520
MIS
Operat
i o
nalc o
stforHMIS& MCTS
(i
nc
l.Internetcon
nect
ivity;AMCof Manager-
1
6.3.
3 34 464.000 DDM BDM 1 398.150 33 65.
850
Laptop,pri
nter
s,computers,U
PS; MIS
Mobilereimbursement)
16.
3.S C
allCentre(Capex/Opex) 1 456.000
Manager-
MIS
1 456.000 。 0.
000
Implementationo
fHo
spi
tal Manager-
1
7.6 29 102.340 HA 3 33.300 26 69.040
ManagementSystem MIS
TOTAL: 2927280 1618.150 20582 1167.050 451.100
NationalHealthMission,Assam Page8
ミ
(
〆 GUIDELINESFORIMPLEM凹 TATIONOFH
MIS,RCHPORTAL/MCTSQ
_1
'1
苛
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・22
e
-Ho
spi
tals
olu
tio
nofNICi
sbe
ing.
implementedi
nal
lDi
str
ictH
osp
ita
lsandMedicalU
nito
f
AssamS
ecr
eta
ria
t.
I
n theyear 2
021
-22
,iti
s proposed to implemente
-Ho
spi
tals
olu
tio
nin 3 new D
ist
ric
t
H
osp
ita
lsa
tMa
jul
i,H
oja
iandC
har
aid
eo.
F
oll
owi
ngmodulesa
rec
urr
ent
lya
vai
lab
lei
nth
ee-
Hos
pit
ala
ppl
ica
tio
n:
i
) P
ati
entR
egi
str
ati
on(OPD&C
asu
alt
y)
i
i
) IPD(
Adm
iss
ion
,Di
sch
arg
e&T
ran
sfe
r)
i
ii
) B
ill
ing
,LabI
nfo
rma
tio
nSystem
i
v) R
adi
olo
gyI
nfo
rma
tio
nSystem
v
) C
lin
ic
v
i) D
iet
ary
v
ii) Laundry
v
iii
) S
toe&Pharmacy
r
i
x) OTManagement.
1
. One-timec
ost(Onlyf
orD
ist
ric
tHo
spi
tala
tHo
jaiandM
aju
li)
:
a
) Anamounto
fRs
.7.00l
akh
seachi
sapprovedf
oronetimec
ostf
orimplementationo
f
e
-Ho
spi
tals
olu
tio
natD
ist
ric
tHo
spi
talo
fHo
jaiandM
aju
liwhichi
ncl
ude
sprocurement
o
fComputer,P
rin
ter
,UPSande
sta
bli
shm
ento
fIn
ter
netc
onn
ect
ivi
ty,e
tc.
b
) 10numberso
fComputers
etsw
ithP
rin
terandUPScanbeprocuredf
oreachd
ist
ric
t
h
osp
ita
l.
c
) Anamounto
fRs
.6.00l
akh
searmarkedf
orprocuremento
f10numberso
fComputer
s
etswithP
rin
terandUPS.
d
} The a
llo
tme
nto
fthe Desktop ComputerandUPSalongwith P
rin
tercan bedone
p
rio
rit
ywisedependingonnumbero
fBe
ds,OPDl
oad
s,I
PDl
oad
s,numbero
fNu
rsi
ng
S
tat
ion
/Warde
tc.
e) 仁omputer,P
rin
terandUPSprovidedf
orimplementationo
fe-
Hos
pit
als
olu
tio
nshould
bei
nst
all
edi
nther
esp
ect
ivel
oca
tio
nsl
ikeOPDR
egi
str
ati
onC
oun
ter
,IPDR
egi
str
ati
on
C
oun
ter
,EmergencyR
egi
str
ati
onC
oun
ter
,La
bor
ato
ry,S
tor
e,D
isp
ens
ingRoom,e
tc.
f
) I
nte
rne
tco
nne
cti
vit
yshouldbee
sta
bli
she
dina
llcomputers.D
ist
ric
tHo
spi
talmayt
ake
I
nte
rne
tCo
nne
cti
vit
yofanymode based on f
eas
ibi
lit
y/a
vai
lab
ili
tyi
nthe l
oca
tio
n
w
ith
inthebudgetl
imi
t.
g
) I
tissuggestedt
obuyDataCard(
Don
gle
)wi
thminimum1yearwarrantyt
oovercome
thei
ssu
eofLAN(
Loc
alAreaNetwork)C
onn
ect
ivi
tγa
tDi
str
ictH
osp
ita
l.Dongleshould
workf
ora
llI
nte
rne
tSe
rvi
ceP
rov
ide
r.Based on a
vai
lab
ili
ty and f
eas
ibi
lit
yofthe
N
ati
ona
lHealthM
iss
ion
,Assam Pag
e38
政〆 A3-8
v
/
b
手t
内ν
.
GUIDELINESFORIMPLEMENTATIONOFHMIS,RCHPORTAL/MCTS
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021-22
I
nte
rne
tco
nne
cti
vit
y/bandwidth c
onn
ect
ion (4G SIM)tobetakenfrom I
nte
rne
t
S
erv
iceP
rov
ide
r.TheSIMconnectionshouldbeonp
re-
pai
dba
siss
oth
ati
tco
uldbe
easyt
ochanges
erv
icep
rov
ide
rift
her
eisanyC
onn
ect
ivi
tyi
ssu
e.
h
) Fund a
llo
cat
ionf
orD
ist
ric
tHo
spi
tala
tCharaideos
hal
lbecommunicated a
fte
rth
e
D
ist
ric
tHo
spi
tali
smadef
unc
tio
nal
.
2
. OperationalC
ost
:
a
) O
per
ati
ona
lco
stf
orimplementationo
fe-
Hos
pit
als
olu
tio
nhasbeenearmarkedf
or
eachh
osp
ita
lbasedonOPD,I
PDl
oado
fthef
aci
lit
y.
b
) Monthlyc
osto
fIn
ter
netc
onn
ect
ivi
ty,andothero
per
ati
ona
lco
sti
ncl
udi
ngc
osto
f
p
ape
r,tonner/c
art
rid
ge,e
tc.maybei
ncu
rre
dfromt
hisheadf
orimplementationo
fe-
Hos
pitalsolu
tio
n.
c
) Maintenanceofcomputer,p
rin
tere
tc.maya
lsobei
ncu
rre
dfromt
hish
ead
.Th
isw
ill
bea
ppl
ica
blef
ori
tem
sno
tunderw
arr
ant
y.
d
) S
tat
uso
f warranty p
eri
odo
fth
eit
ems should be a
sse
sse
dbe
for
ein
cur
rin
g
e
xpe
ndi
tur
e.I
nca
seo
fit
emsa
reunderwarrantyp
eri
od,thesames
hou
ldber
ect
ifi
ed
throught
her
esp
ect
ivev
end
ors
. 270numberso
fDesktopComputer,P
rin
terandUPS
p
rov
ide
dfromNHMS
tat
eHQi
nthef
ina
nci
alyear2020-21a
reunderwarrantyp
eri
od.
D
eta
ilso
fSe
rvi
ceSupportf
orDesktopComputer,P
rin
terandUPS:
N
ati
ona
lHealthM
iss
ion
,Assam Page39
A3-9
GUIDELINESFORIMPLEMENTATIONOFHMIS,RCHPORTAL/MCTS
‘
、
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・22
P
rin
ter Lexmark, Nameo
ftheOEM:M/sLexmarkI
nte
rna
tio
nal
(
3yea
『S B2236DW (
Ind
ia)P
riv
ateL
imi
ted
.
w
arr
ant
y) ToolF
reeNo:0008-0005-01018
i
stL
eve
l:
Name:Ms.S
hib
ani
/Mr.Perumal
E
-ma
il:l
exs
upp
ort
@in
spi
ris
vs.
com
,
pe
rum
al.
sR.
@in
soi
ris
vs.
com
2
ndL
eve
l:
Name:M仁川jayakumarS
rin
iva
san
E
-ma
il:v
iia
Ya.
sri
niv
asa
n@l
exm
ark
.co
m
3
rdL
eve
l:
Name:Mr.R
aje
shOnkar
ιmail:raiesh.onkar@lexmark.com
Nameo
ftheS
upp
lie
r:M/sChandraE
nte
rpr
ise
s
ContactNo:96780
・65006,96780
・65001
E
-ma
il:mschandrainfocom@gmail.com
m
sch
and
rae
nte
r12
ris
es@
red
iff
mai
l.c
om
U
A
L
3 F
ina
nci
al: ?
ー
マ
a
) A
llf
ina
nci
alnormss
hou
ldbef
oll
owe
d.
b
) D
ist
ric
twised
eta
ilfundbreakupmaybeseena
tAnnexure-G
c
) Theexpenditureshouldbebookedundertheheadofaccount(FMRCode:FMR
code17.6-ImplementationofH
osp
ita
lManagementSystem)
d
) T
ota
lexpenditures
hou
ldnotexceedamounta
llo
cat
edf
orthef
ina
nci
aly
ear
.
e
) Paymentr
ela
tedt
oM/sLuminouslnfowaysP
vt.L
td.(empaneledvendoro
fNi
e)
s
hal
lbemadefromNHMS
tat
eHQ.D
ist
ric
tshouldn
otmakeanypaymentt
oM/s
Luminous lnfoways P
vt. L
td. However, concerned Superintendent/ Deputy
Superintendents
hal
lpr
ovi
dethec
ert
ifi
cat
efo
rcompletiono
fworkandg
o-l
iveo
fe-
H
osp
ita
lso
lut
ion
.
山﹀
N
ati
ona
lHealthM
iss
ion
,Assam Page40
A3-10
竺
(L
GUIDELINESFORIMPLEMENTATIONOFH
MIS,RCHPORτAL/MCTS
ANDM&EACTIVITIESFORTHEFINANCIALYEAR2021・22
Annexure-G
Fundbreakupf
orimplementationofe
-Ho
spi
talS
olu
tio
n(H
osp
ita
lManagementSystemO・
fNI
C)
FMRCode:FMRcode17.6-ImplementationofH
osp
ita
lManagementSystem
Amount.all
ocate
df ortheFY
S
I D
ist
ric
t NameoftheD
ist
ric
tHo
spi
tal
202122(
・ Rs
.I nLakhs)
1 Baksa D
r.R
aviBaroC
ivi
lHo
spi
tal 1.
250
2 Barpeta BarpetaCi
vilHo
s p
ital 2.150
3 Bongaigaon BongaigaonCi
vilHos
pita
l 1.250
4 cachar S.M.DevC
ivi
lHosp
ita
l 1.250
5 Chirang JSBCI
VILH
ospit
al 0.500
6 Darrang MangaldaiC
ivi
lHo
spi
tal 4.850
7 Dhemaji DhemajiCiv
ilHospi
tal 1.850
8 Dhubri DhubriCi
vilHosp
ital 4.850
9 DimaHasao HaflongC
ivilH
ospital 0.930
10 Goalpara 200BeddedC
ivi
lHos
pit
al 3.000
SwahidKushalKonwarC i
vil
11 Golaghat 3.500
Hospital
12 H
ailak
and
i S.K.RoyCiv
ilH o
spi
tal 1.850
13 H
oja
i Dist
rictHospi
tal,Hoj
ai 7.900
14 Kamrup(M) MedicalU
nit
,AssamS
ecr
eta
ria
t 0.300
15 Kamrup(M) Dis
tric
tH o
spitalSonapur 1.600
16 Kamrup( R} TRBC i
vilHos
pital 0.930
17 Karimganj KarimganjCi
vilHosp
ital 3.000
18 Kokrajhar RNBCHKokrajhar 1.650
19 M
aju
li D
ist
ric
tHo
spo
tal
,Ma
jul
i 7.900
20 Morigaon MorigaonC
ivi
lHo
spi
tal 3.000
21 Nagaon BPC
ivi
lHospital+MCHwing 4.100
22 Nalbari SMKC i
vilH
ospital 2.300
23 Sivasagar SivasagarC
ivi
lH o
spital 2.300
24 Sonitpur KanaklataCi
vilHospi
tal 2.900
25 Tinsukia LGBC iv
ilHospi
tal 3.000
26 Udalguri UDALGURIC I
VILHOSPITAL 0.930
27 StateHQ 33.302
_
.
,. ・、
ー, .
軍翠彊
5
’
‘
’
』噌
' 宿泊』
’ .
一
===xxx===
問 ト爪け
m
d
ル
m会
A
Page41
ペ
レ
tb
A3-11
Annex IV Hospital Management Information System (HMIS) vendors
sample list
Sr
Provider Name of HIS Nodal Person Coverage
No.
Mr Naveen Kumar, STD NIC
Mob: 9811348896 605 Health Facilities -
1 NIC eHospital Email: naveenkumar@nic.in Onboarded
Mr Praveen Srivastava
Mob -9811622408 122 Health Facilities and
2 CDAC eSushrut Email: pksrivastava@cdac.in Railways hospitals
A4-1
Annex V National Health Digital Mission
The National Digital Health Mission (NDHM), is a Government of India initiative, aimed at developing the
backbone for a unified digital health infrastructure. Among other objectives, NDHM seeks to bridge the
gap amongst multiple stakeholders that are a part of the healthcare ecosystem.
A Unique Health ID will be provided to every citizen which will contain details of their diseases, diagnoses,
report, medication etc., in a common database through a single ID. This will essentially be a digitised
version of all their health records. This digital database will be linked to the registry of doctors and health
facilities across the country.
Digital data/records will help medical college professors conduct/public quality research articles, secure
funding from national bodies and improve their professional knowledge through submission of research
papers in national and international conferences.
a. The implementation of NDHM is expected to significantly improve the efficiency, effectiveness, and
transparency of health service delivery overall.
b. Patients will be able to securely store and access their medical records (such as prescriptions, diagnostic
reports, and discharge summaries), and share them with health care providers to ensure appropriate
treatment and follow-up.
Currently it is rolled out in six Union Territories only i.e., Andaman & Nicobar Islands, Chandigarh, Dadra
& Nagar Haveli and Daman & Diu, Ladakh, Lakshadweep and Puducherry. We are working on rolling this
out nationally.
Participating in NDHM is completely voluntary. There is no fee for registration in the NDHM systems.
Anonymous records can be used by the government to make data driven public policy decisions. However,
no individual’s information and health data shall be shared without their consent.
Records will be shared with the doctor or health facility only after patient consent. In patient consent one can
customize and edit the permissions in terms of duration, type of records visible.
A5-1
The user will have the option to deactivate/reactivate/delete the health ID/PHR address
The Personal Health Record (PHR) will be a longitudinal record for each individual on the system,
comprising all health data, lab reports, treatment details, discharge summaries etc. related to one episode
or a set of episodes, across one or multiple facilities.
User can add their health records on the application. Health records can also be stored in health lockers,
which are integrated with NDHM. As of now there are no health lockers but going forward there will be
multiple health lockers (public and private players)
The data will be stored on a cloud and as the patient will be the owner of all the data, he/she will have all
the rights to manage it. The health lockers integrated with NDHM can also be used for keeping the health
records secure in the lockers and the number of integrated health lockers will keep increasing enabling more
options for the users.
For patients who have not yet created health ID/PHR address can get their health record linked to their
mobile number and can fetch all the linked health records at once, by installing the NDHM health records
application.
A5-2
Also, there are two types of records linking
HIP (Facility initiated linking)- Once an Individual visits the hospital and creates Health ID. Post
individual’s one time consent, the facility will link health records with Health ID. SMS is sent to user
with an option to download the NDHM health records from google play store and view the records.
Individual initiated linking through the NDHM health records mobile app.
The Health Facility Registry (HFR) is a comprehensive repository of health facilities of the nation across
different systems of medicine. It includes both public and private health facilities including hospitals, clinics,
diagnostic laboratories and imaging centres, pharmacies, etc. Enrolling in the Health Facility Registry will
enable them to get connected to India’s digital health ecosystem
The Health Facility Registry is open to registration of all health facilities in India providing healthcare
services across both modern and traditional systems of medicine such as Modern Medicine (Allopathy),
Dentistry, Physiotherapy, Ayurveda, Unani, Siddha, Homeopathy and Sowa-Rigpa systems of medicine.
Applications for enrolment in the registry will be verified by the appropriate officials, and once the facility
details have been verified, approval will be given before they are visible to the public.
The Healthcare Professional ID is an authentication mechanism that allows users to access various
applications in the NDHM, without having the need to enter user credentials at multiple places. It essentially
ensures that no unauthorized person can access the health facility details.
Healthcare Professionals enrolling in HPR will have access to several benefits. Some envisaged benefits
are covered below and more such benefits will be added over time as adoption of the NDHM ecosystem
increases.
Online presence and discoverability: facilities can share about their specialties available and services
offered, address, contact details and geo-location enabling easier access for individuals
Building trust and reputation: Listing on national platform of verified health facilities
Ease of doing business: Paperless registration and renewal of licenses, ease in empanelment with
insurance agencies, TPAs
Digital Health Records: Consented access to electronic medical records with seamless retrieval
Ability to go paperless through e-signature on diagnostic reports, discharge summaries, prescriptions
etc.
Telemedicine: Eligible healthcare facilities can treat individuals remotely through telemedicine
A5-3
Enrolment in Health Facility Registry is voluntary. However, government health facilities would be
required to enroll in the Health Facility Registry, where the respective state/UT government participating
in the NDHM requires them to do so..
National Health Authority (NHA) is implementing the National Digital Health Mission (NDHM). NDHM
focuses on developing the technological backbone for India's digital ecosystem. Health Facility Registry is
a key building block of NDHM under the purview of NHA.
The Health Facility Registry shall act as a single source of truth for all health facilities in the country.
Falsification of information or misuse of account shall carry stringent penalties. Further, these health
facilities will also need to abide by the rules of conduct placed by various services they are utilizing through
the registry.
Information, Education and Communication (IEC) campaigns are being designed and rolled out by NHA
in conjunction with the concerned authorities at the state and national level. Integrations with existing
digital applications managed by various entities will be used to accelerate adoption.
The main aim of the NDHM initiative is to enable the facilities to be part of a national platform. Additional
functionalities will be released in subsequent stages and made available to all facilities equally. In case
specific additional functionality is sought, please contact the technical team for support.
There is a functionality within the Health Facility Registry that will allow facilities to link to healthcare
professionals working with them. The declaration of association can be initiated by either the doctor or the
facility and needs to be approved by the other side.
EMR solution is a digital version of a patient's chart and it contains the patient's medical treatment history
from a health facility. EMR Solution can be used within a health facility such as hospital/clinic/diagnostic
centre to support patient diagnosis and treatment. The application allows doctors to record clinical
information specific to each facility.
NDHM EMR solution is intended to be used as reference application for the HRPs and HIPs to provide
them a 'framework' to digitize patient clinical records and enable sharing these records across the care
spectrum, while integrating their HRPs with NDHM Ecosystem.
This solution is built very specifically to provide EMR functionalities only as a reference model in order to
achieve consent-based Health Record Exchange under the NDHM Ecosystem. Integrators can download
the Source Codes provided by the NDHM to their EMR applications.
A5-4
Annex VI Visit to Tripura National Information Centre (NIC) and study of
eHospital
Introduction:
e-Hospital solution developed by National Informatics Centre (NIC) is being implemented in the existing
District Hospitals of the State of Assam. Ministry of Health & Family Welfare, Government of India
accorded approval for implementation of eHospital solution in 25 District Hospitals and Medical Unit of
Assam Secretariat in the earlier year. At present 15 DHs are using eHospital solution. Training for
remaining hospitals going on with the help of empanelled vendor of NIC. Further, in the RoP 2021-22,
approval for implementation of eHospital solution 3 new District Hospitals namely at Majuli (100 bedded),
Hojai (200 bedded) and Charaideo (100 bedded) received. Further, MoHFW have approved implementation
of e-Hospital solution in 4 District Hospitals namely South Salmara Mankachar, Biswanath, West Karbi
Anglong and Bajali under ECRP-II. Implementation of e-Hospital solution in all District Hospitals have
been approved by Government of India which need to be completed within the financial year 2021-22.
Further, Health System Strengthening Project, JICA is being prepared by Health & Family Welfare
Department, Government of Assam. Implementation of robust Hospital Management Information System
in the Medical College & Hospitals, District Hospitals and other hospitals to be taken up under this project
is one of the main objective of the project.
Government of India is in the process to nationwide rollout of National Digital Health Mission (NDHM)
and implementation of Hospital Management Information System in all hospitals is essential to create
Health Id for all and access health record through NDHM ecosystem.
e-Hospital solution has been developed by National Informatics Centre (NIC), Tripura.
To understand the detail concept of the e-Hospital solution and feasibility to implement the same in the
Medical Colleges of the State, the visit to NIC Tripura was carried out by the following team members:
2. Sri Rahul Dev Chakraborty, State MIS Manager, National Health Mission, Assam
1. Shri Chayan Kanti Dhar, Scientist-G, State Informatics Officer (SIO), National Informatics Centre
(NIC), Tripura
2. Shri Nilkamal Dey Purkayastha, Scientist-C, National Informatics Centre (NIC), Tripura
3. Shri Rudra Pratap Bhattacharjee, Modulist, National Informatics Centre (NIC), Tripura
A6-1
A. Meeting with Shri Chayan Kanti Dhar, Scientist-G, State Informatics Officer (SIO), National
Informatics Centre (NIC), Tripura on 15th September 2021
Small briefing meeting with Shri Chayan Kanti Dhar, Scientist-G, State Informatics Officer (SIO),
National Informatics Centre (NIC), Tripura and Shri Nilkamal Dey Purkayastha, Scientist-C, National
Informatics Centre (NIC), Tripura was held.
It was a very fruitful discussion and SIO, NIC, Tripura briefly described how the e-Hospital project
started in Tripura and subsequently rolled out in all parts of the Country.
The project was initially started in Government Medical College of Tripura and subsequently rolled
out in other hospitals.
More than 600 hospitals in the Country are using e-Hospital solution including big hospitals like
AIIMS Delhi, KGMU Lucknow, Dr. Ram Manohar Lohia Hospital Delhi, Lady Hardinge Medical
College Delhi, AIIMS Rishikesh, AIIMS Bhupal etc.
He also informed that, e-Hospital solution has been implemented in other Countries like Gana.
Integration of e-Hospital with Lab Analyzers is another big achievement.
The e-Hospital application has also adopted various health vocabulary standards recommended by
Ministry of Health & Family Welfare like ICD10 & SNOMED-CT in various modules. Clinicians and
care providers can enter ICD10/SNOMED-CT codification into the clinical data so that the EHR
generated is more meaningful and reduces the variability in the way data are captured, encoded and
used for clinical care of patients and research.
e-Hospital solution is compliance to EHR standard.
E-Hospital is a “Software as a Service (SaS) cloud based solution.
E-Hospital solution is also integrated with National Digital Health Mission (NDHM).
SIO, NIC, Tripura provided the following suggestions during implementation of e-Hospital solution:
All modules of the e-Hospital solution should be implemented to get the actual benefit of the system.
By implementing only 2/3 modules like OPD, IPD and Billing will not serve the purpose.
Small Programme Management Unit (PMU) should be constituted to run the programme.
A6-2
Laundry and OT Management
Online Registration System (ORS)
eBloodBank
Key points noted during the demonstration:
OPD Registration slip are template based. It can be configured for each hospital based on need. It
is a good feature which may solve the issue of prescription audit currently faced by District
Hospitals of the State.
e-Blood Bank module is also available in e-Hospital. The matter to be discuss whether State have
to adopt eRaktkosh of CDAC or e-BloodBank of NIC under e-Hospital.
Telemedicine services is integrated with e-Hospital. It is informed that, advanced technology is
used which is better than eSanjeevani of CDAC.
Online Registration System (ORS) is integrated with e-Hospital. It is a very nice feature and can
be very helpful for crowd management and hassle free service to citizen.
New National Health Id can be generated as per NDHM framework.
Health Id can be generated from NDHM as well as from e-Hospital solution.
Health Id can be linked with Aadhar as well as can be generated without Aadhar.
Option to validate Health Id during registration.
If a patient doesn’t bring Health Id, then Health Id can be retrieved using mobile based OTP
verification.
QR code based Health Id is printed in the OPD slip.
Bar code and QR code based Id is printed in the OPD slip. Just by using Bar code scanner or QR
code scanner, patient can be tracked in other section of the hospital which minimizes data entry and
also reduces error.
Option to configure billing type for BPL, APL etc. Rates for various services can also be configured
for each hospital separately.
During registration, operator can search availability of Doctor and assign a Doctor for each patient.
Option is provided to capture the status of COVID vaccination of the patient during OPD
registration.
Clinic module is very user friendly. Separate template can be prepared for Doctor/ Hospital as per
need. It is very helpful to capture detail information of each patient for specialized services like
Oncology, Cardiology etc. as per need. Open EHR platform is used for creation of the template.
Templates can be created by Doctors with working computer knowledge just selecting the criteria
and functions. It is just like creation of web form.
Drop down menu option is provided for entry. Drop down list automatically filtered based on
characters typed in the box.
Doctor can see the rate of tests during advice for test. He can orient the patient about the cost of the
test.
Doctor can issue special instruction to Laboratory / Technician in the advice to test.
Comprehensive Oncology module with complete work flow is available under e-Hospital solution.
Que management is also available in the e-Hospital solution.
A6-3
Discussion on implementation level points:
24 X 7 support system is available. District NIC can directly contact NIC, Tripura for any technical
issue.
Implementation of e-Hospital has three options:
a) Cloud based: There is no need for internal server. Entire database will be stored in cloud. But,
need Internet connectivity at each computer.
b) Local Server based: Data will be stored in the local server of the hospital. No need for Internet
connectivity at each computer. But, LAN is required to connect all computers.
c) Hybrid Model: Initially data will be stored in the local server and can be synchronized with
the central server using scheduler. Local server and LAN is required. No need to provide
Internet connectivity at each computer, but local server need Internet connectivity.
d) Bar code scanner and bar code printer is required. Bar code scanner should be made available
in each counter for smooth patient flow. Bar code should be used everywhere including OPD
counter, Laboratory etc.
Photo: Presentation and Demonstration on e-Hospital solution by Shri Nilkamal Dey Purkayastha,
Scientist-C, NIC, Tripura
C. Tripura Medical College and Dr. BRAM Teaching Hospital visited on 16th September 2021:
E-Hospital solution is implemented with Local Server. Two servers are used one for Database and the
other for hosting the application. All computers are connected through LAN. Dedicated server room.
System support team is in-position to provide technical support.
e-Hospital solution is implemented in OPD Registration counter, IPD registration counter, Billing
counter, Wards and Laboratories. Store module is also implemented.
Computers are not available in Doctors’ room and Clinic module is not implemented.
A6-4
Separate counter for follow up visit.
On an average 2 minutes take to register one patient including collection of user charge of Rs. 20/-.
For follow up patient less than 1 minute is taken.
Important feedback of users:
Good IT system is need for faster registration. Sometimes keyboard or printers are not working. In
case of small issue with IT hardware, it hampered the process of registration. One of the user give
one example. One key of the keyboard was not working. It results all patient containing character
of the faulty key was missing in the OPD registration slip. It hampered overall implementation till
replacement with the new keyboard. It is a very good lesson and we have to prepare plan to avoid
such issues.
A6-5
OPD Registration Counter Computer used in Indoor Ward
D. Atal Bihari Vajpayee Regional Cancer Centre, Agartala visited on 16th September 2021:
Comprehensive Oncology module with complete patient flow implemented in the hospital.
Tele-consultation system integrated with e-Hospital and used for patient follow up and consultation.
Option to send prescription through email. Option for digital signature of prescription.
Patient can share Blood test report through email also. Schedule for Chemo is fixed based on medical
records.
Teleconsultation helped to reduce the number of visits by patients.
A6-6
Teleconsultation Centre Teleconsultation Centre
E. Agartala Government Medical College & Govind Ballabh Pant Hospital:
e-Hospital solution is implemented in all the counters in the hospital.
Laboratory Information System (LIS) module of e-Hospital is integrated with the Lab Analyzers
A6-7
Annex VII List of Interviewees for ICT Survey Visit
A7-1
Appendix VIII: Record of Public Consultation (interview to community representatives)
No. Results
1 <Profile of interviewee> Gender: Male, Profession: lawyer, Age:80’s
<Comments to the proposed project> Date of Interview: 4-Jan-2022
− There is no objection as the upgradation of the existing hospital to SSH would benefit the
general citizens(poor people) and thus it will be welcomed by the public.
− Local public is sensitive towards the name of the Old Hospital [Jananayak Deveshwar Sharma
Civil Hospital] 1, which is proposed to be demolished. Thus, keeping the sentiments of the
locals the name of the new SSH to be constructed at the same location is preferred to keep the
same name.
− Already railway over bridge is being constructed in the vicinity and that is to benefit the local
citizens in easing out the traffic flow in the area thus impact on traffic during construction of the
hospital would not be a major issue.
− Since the new hospital building would be constructed at the same place after demolition of the
existing old building thus there would not be any major change in the landscape.
− There is no major env or social issue expected still the proposed grievance mechanism is a
welcome measure.
− During demolition of the existing old building as well as during construction hospital need to
take up measures to avoid any inconvenience to the hospitalised patients.
2 <Profile of interviewee> Gender: Female, Profession: Professor, Age: middle
<Comments to the proposed project> Date of Interview: 6-Jan-2022
− There is no objection as the upgradation of the existing hospital to SSH would benefit the
general citizens and thus it is welcomed by the public.
− Noise pollution to be addressed during the construction phase to avoid inconvenience to the
patients in the existing new hospital building within the same campus
− Since the new hospital building would be constructed at the same place after demolition of the
existing old building thus there would not be any major change in the landscape apart from
additional floors, and the positive impacts of the hospital are much more than any landscape
aspect.
3 <Profile of interviewee> Gender: Male, Profession: Civil Service, Age: 50’s
<Comments to the proposed project> Date of Interview: 8-Jan-2022
− The super specialty hospital at JMCH campus would definitely be welcomed by all the sections
of society.
− The proposed double storey basement parking would definitely help in vehicular/traffic
management within and outside the campus.
− In built sewage treatment plant/ waste disposal system would help in waste management in the
hospital/JMCH campus.
− Water quality of the area is not very good in the area so provision should be made for setting up
water purification systems to provide safe drinking water to the patients/staff in the new facility.
− Solar panels may be installed so that alternate/eco-friendly back up power system can be made.
4 <Profile of interviewee> Gender: Male, Profession: Environmentalist, Age: 50’s
A8-1
No. Results
− Since the new hospital building would be constructed at the same campus after demolition of
the existing old building thus there would not be any major change in the landscape apart from
additional floors, and the positive impacts of the hospital are much more than any landscape
aspect.
− Traffic would not be an issue as mostly the construction would be taking place within the
campus, moreover it is not like construction of road/over bridge/flyover where there is
significant impact on the traffic movement.
− It is suggested that Plantation within the Hospital premises should be done as part of
landscaping that would enhance the local environment and ambience as well.
5 <Profile of interviewee> Gender: Male, Profession: Civil Service, Age: 40’s
<Comments to the proposed project> Date of Interview: 7-Jan-2022
− There is no objection as the upgradation of the existing hospital to SSH would benefit the
general citizens and thus it is welcomed by the public.
A8-2