Nodal Demand Calculations
Nodal Demand Calculations
Nodal Demand Calculations
l/s Z Z=(q/0.25)2
447
total poulation
er demand in m^3
D (mm)
52.51707
51.43366
52.51707
51.43366
47.45453
47.21546
47.45453
46.47556
41.41281
normal parcel Z Q to waste 90%
1 6 0 1 376 4.8477
2 6 0 2 327 4.5208
1 6 3 3 376 4.8477
2 7 0 4 374 4.8348
4 6 0 5 379 4.867
4 6 0 6 379 4.867
4 6 0 7 329 4.5346
4 6 0 8 354 4.7037
2 6 0 9 327 4.5208
2 6 0 10 377 4.8541
26 61 3
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
UR FBT Z Q D (mm)
0 0 504.64 5.616048 84.58251
0 0 504.64 5.616048 84.58251
452.8 5.319774 82.32122
452.8 5.319774 82.32122
0 504.64 5.616048 84.58251
0 504.64 5.616048 84.58251
51.84 1.8 47.88521
51.84 1.8 47.88521
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
79
0.5
0.25
UR FBT Z Q D (mm) D
0 4 9.84 0.784 31.60705 32
0 0 5.25 0.572822 27.01314 32
0 0 1.5 0.306186 19.74959 25
0 0 2 0.353553 21.22231 25
0 1 3.46 0.465027 24.33908 25
0.84
5.04
15
3900
78000
78
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
UR FBT Z Q D (mm)
0 0 11.5 0.847791 32.86318
0 0 4 0.5 25.23772
6 0.612372 27.93013
6 0.612372 27.93013
0 4 0.5 25.23772
0 11.5 0.847791 32.86318
10 0.790569 31.73476
4.710897
2.138361
9.2 84.64
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
#REF!
taking an average daily demand of 60l/c/d
no of block =530
avg no of family per block =25
avg no family member per family =5
residence
UR FBT Z Q D (mm)
0 0 51.84 1.8 47.88521
0 0 763.2 6.906519 93.79826
424 5.147815 80.97979
103.68 2.545584 56.94544
0 445.632 5.277499 81.99347
0 429 5.178079 81.21748
429 5.178079 81.21748
51.84 1.8 47.88521
51.84 1.8
136.6403 2.922331
0
9.2 84.64
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
#REF!
taking an average daily demand of 60l/c/d
no of block =530
avg no of family per block =25
avg no family member per family =5
residence
UR FBT Z Q D (mm)
0 0 2996.16 13.6843 132.0312
0 0 1269.6 8.907862 106.5251
169.28 3.252691 64.37046
129.6 2.84605 60.21247
0 445.632 5.277499 81.99347
0 429 5.178079 81.21748
429 5.178079 81.21748
64.8 2.012461 50.63245
64.8 2.012461
64.8 2.012461
0
RATE OF FLOW FOR FIXTURES
l/s Z Z=(q/0.25)2
447
BLOCK Fixtures
TYPE SH/ESH WC HWB KS/JS/LT LAU
WS1 0 3 1 0
0 3 5 0 0
0 3 1 0 0
1 0 0 0 0 0
0 6 3 0 0
0 2 2 0 0
2 1 0 0 1 0
0 3 3 0 0
0 42 46 2 0
3 0 66 67 0 0
0 3 3 0 0
4 0 4 4 0 0
0 3 0 0
Q Unit
Main Line 10 l/s 0.01
velocity 2 m/s 0.075 0.005625
Q=VA 0.00140625
A= 3.14*D6^2/4 0.004415625
0.01= 2*3.14*D^2/4 2.2646850672
D^2= 0.01/(3.14/2)
0.006369427
D = 0.079808688 m
79.8 mm 10l/s
take 75mm HDPE pipe Q
25 total poulation
1500
1.5water demand in m^3
14.4
UR FBT Z Q D (mm)
0 0 11.75 0.86 33.04035 main line
0 0 2.5 0.40 22.43986 W1
0 0 4 0.50 25.23772 W2
0 0 4 0.50 25.23772 W3
0 0 2.5 0.40 22.43986 W4
4 0 41.5 1.61 45.29468 Take 50mm main line
0 0 5.5 0.59 27.32913
0 0 2.5 0.40 22.43986
UR FBT Z Q D (mm)
0 0 1 0.25 17.84577 W1
0 0 2 0.35 21.22231 W2
0 0 1 0.25 17.84577 W3
0 0 0 0.00 0 W1
0 0 2.25 0.38 21.85651 W2
0 0 1 0.25 17.84577 W3
3 0 2.75 0.41 22.98097 W1
0 0 1.5 0.31 19.74959 W2
4 0 25 1.25 39.90434
33 0 41.5 1.61 45.29468 W1
0 0 1.5 0.31 19.74959 W2
0 0 2 0.35 21.22231 W1
0 0 0.75 0.22 16.60736 W2
7l/s
Q1 3/4Q 45000lit Ground reservoir
6428.5714 seconds
1.7857143
Q2
1/3Q
3l/s
10000 litt
Mojo
INLET PIPE SIZING CONSIDERING SINGLE INLET PER BLOCK
BLOCK Fixtures
TYPE SH WC HWB KS/JS/L LAU UR FBT
office clinik and
guard house 1 1 2 0 0 0
Z Q D (mm)
D
1 0.25 17.846 20
3.5 0.468 24.409 25
0.75 0.217 16.607 20
2 0.354 21.222 25
3 0.433 23.486 25
3 0.433 23.486 25
Z Q D (mm)
D
9.5 0.771 31.33 32
1 0.25 17.846 20
Z Q D (mm)
D
3.5 0.468 24.409 25
1. Ground Storage Capacity Calculation
19.5
17.83 m3
2.6745 m3
20.5045 m3
125.16
25.032
150.192
2. Fire Fitting calculation
Option One Option Two
Rate of flow(Q)l/s 2 Rate of flow(Q) l/s 4
Volume of water Volume of water
Reqired 1hr 3600 Reqired in 1 hr 3600
Unit 2 Unit 2
l/s
M3
M3
3.PUMP CAPACITY
Static Head 10 m