ANALISIS HARGA SATUAN PEKERJAAN (AHSP)

PEMERINTAH KABUPATEN JEMBER


TAHUN 2021
HARGA SATUAN SEWA PERALATAN

No Uraian Satuan Kode Harga Satuan (Rp.) Keterangan


1 2 3 4 5 6
1 Alat (Pancang) Hammer (Manual) 0,5 Ton Jam E.01 103.000,00 -
2 Alat (Pancang) Hammer (Manual) 1 Ton Jam E.02 184.885,00 -
3 Alat (Pancang) Hammer (Manual) 2 Ton Jam E.03 267.800,00 -
4 Alat (Mesin Pancang Diesel) Hammer 0,5 Ton Jam E.04 133.900,00 -
5 Alat (Mesin Pancang Diesel) Hammer 1 Ton Jam E.05 195.700,00 -
6 Alat (Mesin Pancang Diesel) Hammer2 Ton Jam E.06 288.400,00 -
7 Alat (Mesin Pancang Diesel) Hammer 3 Ton Jam E.07 422.300,00 -
8 Alat (Mesin Pancang Kompresor Udara) Hammer 3 Ton Jam E.08 324.450,00 -
9 Alat (Mesin Pancang Tenaga Uap) Hammer 3 Ton Jam E.09 324.450,00 -
10 Boat, Speedboat, Motor 10 Hp Jam E.10 157.075,00 -
11 Tug-Boat, Motor 50 Hp Jam E.11 472.770,00 -
12 Bore Pile Machine, Ø 60 Cm Jam E.12 236.900,00 -
13 Bore Pile Machine, Ø 100 Cm Jam E.13 334.750,00 -
14 Bulldozer 50-60 Hp Jam E.14 309.000,00 -
15 Bulldozer 100-120 Hp Jam E.15 352.775,00 -
16 Bulldozer 180-220 Hp Jam E.16 463.500,00 -
17 Chainsaw Jam E.17 31.930,00 -
18 Crane 2.5 Ton Jam E.18 1.866.875,00 -
19 Crane 5 Ton Jam E.19 2.085.750,00 -
20 Crane 10 Ton Jam E.20 669.500,00 -
21 Crane 25 Ton Jam E.21 2.987.000,00 -
22 Dump Truck Jam E.22 334.750,00 -
23 Dump Truck 5 Ton Jam E.23 329.600,00 -
24 Dump Truck 7 Ton Jam E.24 373.375,00 -
25 Dump Truck 10 Ton Jam E.25 592.250,00 -
26 Drilling Rig (Kecil) Jam E.26 108.150,00 -
27 Drilling Rig (Sedang) Jam E.27 200.850,00 -
28 Drilling Rig (Besar) Jam E.28 373.375,00 -
29 Excavator (Kecil)/Backhoe Kecil Jam E.29 221.965,00 -
30 Excavator Jam E.30 288.400,00 -
31 Excavator (Long Arm) Jam E.31 334.750,00 -
32 Excavator Besar (Long Arm) Jam E.32 391.400,00 -
33 Generator Set 5 Kw Jam E.33 87.550,00 -
34 Generator Set 15 Kw Jam E.34 141.625,00 -
35 Generator Set 25 Kw Jam E.35 187.975,00 -
36 Geo Listrik Jam E.36 466.075,00 -
37 Grouting Equipment (Mini) Jam E.37 195.700,00 -
38 Grouting Equipment Jam E.38 977.470,00 -
39 Jack Hammer 1 Pisau Jam E.39 56.650,00 -
40 Jack Hammer 2 Pisau Jam E.40 73.130,00 -
41 Jack Stressing Jam E.41 82.400,00 -
42 Kapal Keruk (Kecil) Jam E.42 1.393.075,00 -
43 Kapal Keruk (Sedang) Jam E.43 1.972.450,00 -
44 Kapal Keruk (Besar) Jam E.44 3.347.500,00 -
45 Las Listrik 250 A Jam E.45 53.045,00 -
46 Lift (Proyek) Sampai Dengan Tinggi Maksimum 12M Jam E.46 453.200,00 -
47 Loader, Wheel Jam E.47 36.050,00 -
48 Loader, Track Jam E.48 45.320,00 -
49 Mistar Ukur Besi/Alumunium Pelat Jam E.49 56.650,00 -
50 Mesin Jahit Geotekstil Jam E.51 53.045,00 -
51 Mesin Potong Rumput Jam E.52 26.265,00 -
52 Concrete Mixer Jam E.53 64.375,00 -
53 Tamper Jam E.54 103.000,00 -
54 Vibro Roller Kecil/Stamper Jam E.55 77.250,00 -
55 Pick Up (Mobil) Jam E.56 36.050,00 -
56 Pompa Air Diesel 2,5 Kw; 3" Jam E.57 21.115,00 -
57 Pompa Air Diesel 5 Kw; 4" Jam E.58 16.995,00 -
58 Pompa Air Diesel 10 Kw; 5" Jam E.59 27.295,00 -
59 Pompa Air Diesel 20 Kw; 8" Jam E.60 45.320,00 -
60 Pompa Lumpur Diesel 2,5 Kw; 3" Jam E.61 16.995,00 -
61 Pompa Lumpur Diesel 5 Kw; 4" Jam E.62 26.265,00 -
62 Pompa Lumpur Diesel 7,5 Kw; 4" Jam E.63 28.840,00 -
63 Pompa Lumpur Diesel 10 Kw; 5" Jam E.64 59.225,00 -
64 Pompa Lumpur Diesel 20 Kw; 6" Jam E.65 73.130,00 -
65 Pompa Lumpur Diesel 50 Kw; 8" Jam E.66 103.000,00 -
66 Pompa Sedot Pasir Diesel 5 Kw; 4" Jam E.67 26.780,00 -

Analisis Harga Satuan Pekerjaan (AHSP), Pemerintah Kabupaten Jember, Tahun 2021 440
No Uraian Satuan Kode Harga Satuan (Rp.) Keterangan
1 2 3 4 5 6
67 Pompa Sedot Pasir Diesel 7,5 Kw; 5" Jam E.68 43.775,00 -
68 Pompa Sedot Pasir Diesel 10 Kw; 5" Jam E.69 45.320,00 -
69 Pompa Sedot Pasir Diesel 20 Kw; 6" Jam E.70 82.400,00 -
70 Pompa Sedot Pasir Diesel 50 Kw; 8" Jam E.71 164.800,00 -
71 Pompa Dan Conveyor Beton Jam E.72 43.775,00 -
72 Perahu Jam E.73 45.320,00 -
73 Perahu Jukung 60 Ton Jam E.74 45.320,00 -
74 Ponton Kecil Jam E.75 45.320,00 -
75 Ponton Sedang Jam E.76 97.850,00 -
76 Ponton Besar Jam E.77 144.200,00 -
77 Rakit Buah E.78 401.700,00 -
78 Roller, Peneumatic Jam E.79 73.130,00 -
79 Roller, Three Wheel 6 - 8 Ton Jam E.80 530.450,00 -
80 Roller, Tire Wheel 6 - 8 Ton Jam E.81 535.600,00 -
81 Roller, Tandem 6 - 10 Ton Jam E.82 401.700,00 -
82 Roller, Vibro 5 - 8 Ton Jam E.83 466.075,00 -
83 Theodolith Jam E.84 28.840,00 -
84 Tongkang Jam E.85 157.075,00 -
85 Tongkang 1000 Ton Jam E.86 293.550,00 -
86 Tongkang 2000 Ton Jam E.87 553.625,00 -
87 Tongkang 4000 Ton Jam E.88 927.000,00 -
88 Truck 3,5 M3 Jam E.89 62.830,00 -
89 Truck 5 M3 Jam E.90 73.130,00 -
90 Truck 7 M3 Jam E.91 77.250,00 -
91 Truck 10 M3 Jam E.92 87.550,00 -
92 Truck 15 M3 Jam E.93 97.850,00 -
93 Truck 20 M3 Jam E.94 103.000,00 -
94 Trawl Ø Lubang 5Mm, Panjang 250 M Jam E.95 56.650,00 -
95 Tripod/Tackle&Handle /Crane 2T Jam E.96 19.570,00 -
96 Tripod Tinggi 5 M Jam E.97 26.265,00 -
97 Tripod Tinggi 7 M Jam E.98 28.840,00 -
98 Water Tank Truck Jam E.99 247.200,00 -
99 Waterpass Jam E.100 19.570,00 -
100 Mesin Amplas Jam E.101 21.630,00 -
101 Bodem Buah E.102 73.130,00 -
102 Bor Listrik jam E.103 31.930,00 -
103 Ember Buah E.104 4.120,00 -
104 Gergaji Besi (Gergaji) Buah E.105 118.450,00 -
105 Gergaji Listrik (Rotator) Besar Jam E.106 28.840,00 -
106 Gergaji Listrik (Rotator) Kecil Jam E.107 14.420,00 -
107 Gunting Pemotong Baja Buah E.108 3.296.000,00 -
108 Kamera Slr Jam E.109 53.045,00 -
109 Kayu Kasut Buah E.110 8.240,00 -
110 Kayu Pemikul + Tampar Unit E.111 3.090,00 -
111 Kereta Dorong Unit E.112 26.265,00 -
112 Ketam Listrik + Aksesoris Jam E.113 16.480,00 -
113 Kotak Adukan (Dolak Kayu) Buah E.114 36.050,00 -
114 Kuas/Kwas 2"-4" Buah E.115 18.540,00 -
115 Kunci Pembengkok Tulangan (Baja Keras) Buah E.116 12.360,00 -
116 Linggis (Baja Keras) Buah E.117 334.750,00 -
117 Pahat Beton (Baja Keras) Buah E.118 303.850,00 -
118 Palu/Godam Buah E.119 334.750,00 -
119 Sheepfoot Roller Jam E.120 195.700,00 -
120 Roll Meter Buah E.121 463.500,00 -
121 Tandem Roller Jam E.122 463.500,00 -
122 Slepan Dan/Atau Gerinda Jam E.123 21.115,00 -
123 Tang / Alat Pemotong Kawat Buah E.124 36.050,00 -
124 Timbris Jam E.125 3.090,00 -
125 Tusuk Bambu Buah E.126 5.150,00 -
126 Geotekstil Mesin Jahit Jam E.127 53.045,00 -
127 Compressor Jam E.128 221.965,00 -
128 Cold Milling Jam E.129 1.722.675,00 -
129 Wheel Loader Jam E.130 383.675,00 -
130 Vibrator Roller Jam E.131 535.600,00 -
131 Three Wheel Roller Jam E.132 391.400,00 -
132 Batching Plant Jam E.133 2.163.000,00 -
133 Motor Grader Jam E.134 818.850,00 -
134 P. Tyre Roller Jam E.135 383.675,00 -
135 Asphalt Distributor Jam E.136 352.775,00 -
136 Asphalt Liquid Mixer Jam E.137 435.175,00 -
137 Pedestrian Roller Jam E.138 175.100,00 -
138 Asphalt Sprayer Jam E.139 221.965,00 -
139 Air Compresor Jam E.140 221.450,00 -
140 Asphalt Mixing Plant Jam E.141 6.592.000,00 -
141 Asphalt Finisher Jam E.142 422.300,00 -

Analisis Harga Satuan Pekerjaan (AHSP), Pemerintah Kabupaten Jember, Tahun 2021 441
No Uraian Satuan Kode Harga Satuan (Rp.) Keterangan
1 2 3 4 5 6
142 Concrete Vibrator Jam E.143 97.850,00 -
143 Flat Bed Truck Jam E.144 271.920,00 -
144 Trailler Jam E.145 391.400,00 -
145 Pile Driver Hammer Jam E.146 383.675,00 -
146 Pipe Support Buah Hari E.147 73.130,00 -
147 Alat Perakitan Baja Iwf Jam E.148 270.375,00 -
148 Potong Pipa T1/Manual (Gergaji) /Saw Jam E.149 45.320,00 -
149 Potong Pipa T2/Mekanik / Cilinder Jam E.150 62.830,00 -
150 Potong Pipa T2/Mekanik / Cilinder Saw Jam E.151 62.830,00 -
151 Beton Mixer Jam E.152 113.300,00 -
152 Water Tanker Jam E.153 247.200,00 -
153 Rock Drill Breaker Jam E.154 494.915,00 -
154 Dump Truck 6-8 M3 Jam E.155 373.375,00 -
155 Jack Hammer Jam E.156 56.650,00 -
156 Cocnrete Cutter Jam E.157 73.130,00 -
157 Vibro Roller Jam E.158 113.300,00 -
158 Track Loader Jam E.159 352.775,00 -
159 Bulldozer Jam E.160 463.500,00 -
160 Power Boom Jam E.161 92.700,00 -
161 Phenumatic Tire Roller Jam E.162 515.000,00 -
162 Aspal Slurriy Seal Truck Jam E.163 445.475,00 -
163 Genset Jam E.164 231.750,00 -
164 Concrete Cutter (0.5 - 1) M/Mnt; 8,6 Hp Jam E.165 73.130,00 -
165 Compressor Ahx-10, 10 Hp Jam E.166 221.965,00 -
166 Koefisien Alat / M3 Jam E.167 180.250,00 -
167 Concrete Cutter (3 - 6) M/Mnt; 8,6 Hp Jam E.168 73.130,00 -
168 Jack Hammer; Tex-21 S; Permukaan 1 M2/5Mnt Jam E.169 56.650,00 -
169 Drilling Machine Jam E.170 64.375,00 -
170 Drill Machine /Gerinda; 3,32 Hp (Dia 20-50 Mm) Jam E.171 43.775,00 -
171 Crack Filling Machine; 12 Ltr/Mnt; 2,92 Hp Jam E.172 435.175,00 -
172 Dril Machine Jam E.173 43.775,00 -
173 Pompa Graut Jam E.174 62.830,00 -
174 Baby Vibratory Roller Jam E.175 103.000,00 -
175 Concrete Mixing Plant Jam E.176 144.200,00 -
176 Truck Mixer Agitator Jam E.177 638.600,00 -
177 Concrete Paver Jam E.178 2.291.750,00 -
178 Concrete Vibrator (For Manual) Jam E.179 73.130,00 -
179 Concrete Truck Mixer Jam E.180 641.175,00 -
180 Batching Plant (Concrete Pan Mixer) Jam E.181 2.163.000,00 -
181 Watertank Truck Jam E.182 247.200,00 -
182 Pulvimixer Jam E.183 540.750,00 -
183 Self Propelled Mixer Jam E.184 563.925,00 -
184 Vibratory Padfoot Roller 25T Jam E.185 383.675,00 -
185 Dump Truck 1 Jam E.186 334.750,00 -
186 Dump Truck 2 Jam E.187 334.750,00 -
187 Dump Truck 3 Jam E.188 334.750,00 -
188 Truck Mixer Jam E.189 638.600,00 -
189 Thermocouple Buah E.190 21.115,00 -
190 Pompa Generator Jam E.191 231.750,00 -
191 Crane On Track (70-100) T; 190 Hp Jam E.192 2.160.425,00 -
192 Stressing Jack; 46--100 Ton; 89 Hp Jam E.193 260.075,00 -
193 Grouting Pump; 100 Hp Jam E.194 216.300,00 -
194 Crane Jam E.195 618.000,00 -
195 Trailer Tronton 30 T; 200 Hp Jam E.196 391.400,00 -
196 Bore Pile Machine, Diameter Maks 2M; 150 Hp Jam E.197 563.925,00 -
197 Crane 10-15 Ton; Pm 36524 S, Crane On Truck; 260 Hp Jam E.198 818.850,00 -
198 Trailer Jam E.199 391.400,00 -
199 Crane 1 Jam E.200 618.000,00 -
200 Crane 2 Jam E.201 618.000,00 -
201 Welding Set Jam E.202 53.045,00 -
202 Pile Hammer, 2,5 Ton; 1 Hp Jam E.203 309.000,00 -
203 Trailer 20 Ton; 320 Hp Jam E.204 391.400,00 -
204 Pile Driver Hammar (3.5-5.0) Ton; 300 Hp Jam E.205 352.775,00 -
205 Crane On Track (10-15) Ton; 260 Hp Jam E.206 2.160.425,00 -
206 Bore Pile Jam E.207 563.925,00 -
207 Ponton + Tug Boat; 40 Ton; 80 Hp Jam E.208 401.700,00 -
208 Silicon Seal Pump Jam E.209 128.750,00 -
209 Drum Mixer Jam E.210 108.150,00 -
210 Tamper; 121 Kg; 1 Km/Jam; T=20 Cm; W 635X500 Mm; 4,7 Hp Jam E.211 97.850,00 -
211 Asphalt Cutter 130 Feet/Mnt; 22 Hp Jam E.212 73.130,00 -
212 Jack Hammer + Air Compressor Jam E.213 64.375,00 -
213 Generator Set Jam E.214 231.750,00 -
214 Jack Hydraulic; 10 Hp Jam E.215 77.250,00 -
215 Hydraulic Jack Jam E.216 77.250,00 -
216 Hydraulic Pump Jam E.217 62.830,00 -

Analisis Harga Satuan Pekerjaan (AHSP), Pemerintah Kabupaten Jember, Tahun 2021 442
No Uraian Satuan Kode Harga Satuan (Rp.) Keterangan
1 2 3 4 5 6
217 Manifold Jam E.218 62.830,00 -
218 Hose Jam E.219 62.830,00 -
219 Jack Hammer; 1 M2 / 5 Menit Jam E.220 56.650,00 -
220 Wheel Loader 1,5 M3; 96 Hp Jam E.221 383.675,00 -
221 Dump Truck 3-4 M3 Jam E.222 334.750,00 -
222 Kunci Torsi Jam E.223 53.045,00 -
223 Pompa (+Mixer) Pengisi Bahan Perekat Epoxy, 600 Watt Jam E.224 36.050,00 -
224 Compressor, 5000 L/Mnt; 75 Hp Jam E.225 221.965,00 -
225 Gerinda Tangan Gws 750-100 4"; 1 Hp Jam E.226 43.775,00 -
226 Concrete Cutter 130 Feet/Mnt; 22 Hp Jam E.227 64.375,00 -
227 Grouting Pump Qz-999, 650W For Epoxy Jam E.228 221.965,00 -
228 Water Jet Blasting Jam E.229 73.130,00 -
229 Hand Mixer Jam E.230 103.000,00 -
230 Gerinda Jam E.231 43.775,00 -
231 Mesin Bor Jam E.232 36.050,00 -
232 Skyliftcrane Truck, 16 M, 1 Ton Jam E.233 206.000,00 -
233 Alat Bahan Grouting (Contrifugal); 50 Ltr; 3 Hp Jam E.234 221.965,00 -
234 Sand Blaster Jam E.235 56.650,00 -
235 Jack Hidrolic; 10 Hp Jam E.236 73.130,00 -
236 Stamper Jam E.237 77.250,00 -
237 Satu Set Alat Pembersihan Dan Pengecatan Ulang Jam E.238 128.750,00 -
238 Flat Bed Truck 4 Ton Jam E.239 337.325,00 -
239 Flat Bed Truck 6-8 M3 Jam E.240 360.500,00 -
240 Water Tanker 3000-4500 L. Jam E.241 329.600,00 -
241 Wheel Loader 1.0-1.6 M3 Jam E.242 260.075,00 -
242 Motor Grader >100 Hp Jam E.243 345.050,00 -
243 Track Loader 75-100 Hp Jam E.244 350.200,00 -
244 Excavator 80-140 Hp Jam E.245 442.900,00 -
245 Crane 10-15 Ton Jam E.246 669.500,00 -
246 Tandem Roler 6-8 T. Jam E.247 463.500,00 -
247 Vibratory Roller 5-8 T. Jam E.248 298.700,00 -
248 Tire Roller 8-10 T Jam E.249 515.000,00 -
249 Compressor 4000-6500 L\M Jam E.250 206.000,00 -
250 Concrete Mixer 0.3-0.6 M3 Jam E.251 73.130,00 -
251 Water Pump 70-100 Mm Jam E.252 64.375,00 -
252 Thermoplastic Road Marking Machine Jam E.253 87.550,00 -
253 Cold Paint Spray Machine Jam E.254 77.250,00 -
254 Mini Excavator Jam E.255 236.900,00 -
255 Alat Bantu Ls - - -
256 - - - - -

Analisis Harga Satuan Pekerjaan (AHSP), Pemerintah Kabupaten Jember, Tahun 2021 443