T N

EDGE OF SHOULDER

EDGE OF SHOULDER
40
ground level 230 230

brick headwalls brick headwalls

300 min

300 min
Backfill and compact lightly
FINISHED ROAD LEVEL FINISHED ROAD LEVEL
CROWHILL RD

187
6.00m

315

cover

Carric
300
road surface

min
5.0m 0.600m 0.100m Backfill and compact lightly

150
0.300 road base

220
stand boundary

k Cre
100 E
AL

50
WD D

agh
O NR
ground level RR DO

PIPE DIA

PIPE DIA
stormwater pipe stormwater pipe

750MM
Y

50
road bases ground level direction of flow BO GA
2.5% Crossfall Proposed underground stormwater pipe Ry
municipal grade 15 concrete bedding and haunching 1000 1000 eH
NGL ±1% to 2.5% slope ±1% to 2.5% slope
kerbing Length of kerb 915mm ill

100

100
municipal kerb detail

200
200

SITE
230

230
Stone pitching on inlet
Scale 1:20 Stone pitching on
remove top 600mm waste material 20MPa mass concrete apron 20MPa mass concrete apron
lined trapezoidal drain is=300mm(min) gravel layer outlet of pipe culvert

m 60mm G/block on 50mm crusher dust 350 stone pitching to specifications Typical road pipe culvert/headwall section locality map
R7
Scale 1:20
150mm tested and Approved base 1 quality material compacted to 98%Mod AASHTO density NTS
150mm tested and Approved base 2 quality material compacted to 96% Mod AASHTO density
150mm IMPORTED tested and approved Subgrade quality material compacted to 93% Mod AASHTO density
100mm well compacted
imported fill material
typical driveway cross section xx
IN/OUT Inlet/outlet stone pitching detail
Scale 1:20

prop
osed
lined
trap
ezoid
a l dr
TN
ain 0
R7m

.6m
wide
0.6m
(min
) de
pth
0.7m

x
m
5.00

Land Share 4
0.3m

3m

5m
x

Land Share 2 4m +/-1200sqm


+/-1200sqm

way
prop
osed

Drive
lined
Land Share 1

h
trap

dept
ezoidal
drain

)
0.6m

(min
wide
0.6m
+/-3400sqm

0.6m
(min
) de
pth

wide

0m
.6m
ain 0
al dr

12.0
zoid
trape
lined
osed

ED
prop
prop
osed

POS
lined
trap
ezoid
al dr
ain 0
. 6m
Land Share 5
wide
0.6m
+/-1100sqm

PRO
(min
) de
pth

Land Share 3
+/-1200sqm

R7m
Land Share 6
+/-1200sqm

prop
osed
lined
trap
ezoid
al dr
ain 0
.6m
wide
0.6m
(min
) de
pth

to S
tream

CLIENT DRAWN PROJECT DRAWING TITLE


SCALE designed
VISIONARY ENGINEERING PVT LTD PROPOSED DRIVEWAY drawn
1:500 checked
MR & MRS HWENJERE 996 SANDTON PARK ON STAND 129 DRIVEWAY AND STANDARDS DATE
104 NIGEL PHILLIPS HARARE REM/ OF LOT 1 OF HELENSVALE Drawing No. DEC 2022

EASTLEA, HARARE T/SHIP, HARARE LAYOUT FTC BTM


0773444464 0776446780

You might also like