NO.

DOKUMEN : DISUSUN, DISETUJUI,


STANDAR PARAMETER TGL. EFEKTIF : 30-Sep-17
PRODUKTIVITAS
ALAT MUAT HALAMAN :

REVISI : Rev.00

Formula :
60
Q=qxkx x E x sf
ct

Q = Production/hours, bcm
q = Bucket Capacity heaped, lcm
k = Fill Factor
ct = Cycle time, menit
E = Working Efisiensi 1
sf = Swell factor 1
74% ###

PC 200
1 Produktivitas PC 200

Teknis Penggalian = Free Dig ( No Blasting )

Cycle Time ( Cm ) = 25 Second


( Swell Faktor ( f ) = 1,43 ) 70%
Bucket Fill Factor (K) = 90%
Kapasitas Bucket ( q' ) = 0.9 M3
Faktor effisiensi (E) = 70%
Density loose = 1.5 ton / m3

Produktivitas PC 200 ( Q ) = q x K x 3600 x E x sf


Cm
= 0,9 x 0,9 x 3600 x 0,70 x 0,70
25
= 1428.84
25

= 57.15 Bcm / Jam

= 85.73 Ton / Jam

PC 300
2 Produktivitas PC 300

Teknis Penggalian = Free Dig ( No Blasting )


Material yang digali =
Cycle Time ( Cm ) = 32 second
( Swell Faktor ( f ) = 1,43 ) 0.7
Bucket Fill Factor (K) = 0.9
Kapasitas Bucket ( q' ) = 2.2 M3
Faktor effisiensi (E) = 0.7
Density loose = 1.5 ton / m3

Produktivitas PC 300 ( Q ) = q x K x 3600 x E x sf


Cm
= 2,2 x 0,9 x 3600 x 0,70 x 0,70
32
= 3492.72
32

= 109.15 Bcm / Hours

= 163.72 Ton / Hours


ESTIMATION EQUIPMENT PRODUCTIVITY
PT TIRAN INDONESIA
PLAN FOR OKTOBER 2017

A Jumlah Ketersediaan Waktu Kerja Dalam 1 Bulan C Produktivity


1 Working Hour : 10 Hour / Shift
2 Shift : 2 Shift / Day 1 Produktivity PC 200 1 Unit : 86 Ton / Hours
3 Day : 30 Day / Month 2 Produktivity PC 300 1 Unit : 164 Ton / Hours
Total Working Hour : 600 Hour / Month 3 Produktivity PC 400 1 Unit : Ton / Hours

B Total Lost Time in 1 Month D Productivity for Ore


1 MA Unit 88% : 72 Hour Kondisi Remote area Effective working hour : 343 Hour / Month
2 Asumsi for Rain & Slippery : 60 Hour 2 Est Per days average 1 Produktivity PC 200 1 Unit : 29,363 Ton / Month
3 Day Off dan over shift : 48 Hour 1 One days off Per week 12 Hrs Break 2 Produktivity PC 300 1 Unit : 56,075 Ton / Month
4 Rest & Meal : 60 Hour 2 Hour per Shift 3 Produktivity HINO 1 Unit : 21,259 Ton / Month
5 Change shift + P5M + P2H : 6 Hour 0.167 Hour per Shift
6 Jum'at : 4 Hour 1 Hour per week ( 1 month = 4 week ) E Productivity for OB Removal
7 Refuelling : 7.5 Hour 0.25 Hour per shift Effective working hour : 343 Hour / Month
Total Lost Time : 257.5 Hour 1 Produktivity PC 200 1 Unit : 29,363 Ton / Month
Effective working hour : 342.5 Hour / Month 2 Produktivity PC 300 1 Unit : 56,075 Ton / Month
3 Produktivity TEREX 1 Unit : 26,447 Ton / Month
Production Target Per Month
Quantity UoM
Mining Ore Per Month : 50,000 Wmt 1,667 167 1.02
Stripping OB Per Month : 132,000 Wmt 4,400 440 2.69
Barging Ore : Wmt - - -
Develop Dome : 40,000 Wmt 1,333 133 0.81
Material Civil 15% TMM : 19,800.00 Wmt 660 66.0 0.40
Stripping Ratio Avg. : 2.64 4.92
Total : 241,800 Wmt

Effective working hour : 343 Hour / Month


1 Produktivity PC 200 1 Unit : 29,363 Ton / Month
2 Produktivity PC 300 1 Unit : 56,075 Ton / Month
3 Produktivity PC 400 1 Unit : 21,259 Ton / Month
4 Produktivity Hino 260 1 Unit : 21,259 Ton / Month
5 Produktivity A-400 1 Unit : 26,447 Ton / Month

Excavator Required PC 30 T 3 168,223.58


PC 20 T 3 88,087.99 (Excluded General Requirement)

Excavator. Capacity Per Month 256,312 Wmt


14,512 5.7% Close Capacity

Hauler Required Hino 260 5 106,293.10


ADT 30 T 2 52,894.31

Excavator. Capacity Per Month 159,187 Wmt


(12,813) -8.0% Close Capacity
Pit Information :
Quantity UoM Ni % Fe% Al2O3%
Original Resources (ORE) in Pit : 553,466 WMT
Original OB In Pit 1,468,252 WMT
Mine Recovery : 85% %
Mineable Resources in Pit : 470,446 WMT
Stripping Ratio : 3.12

List Of Equipment
No Mining Activity Excavator Hauler Dozer Grader Fuel Water Vibro Light
Exc. 30 Exc.
T 20 T ADT ZS 700 FM 260 GD 705 Truck Truck Plan
1 OB Removal 3 3 6 2 4
2 Ore Getting and Hauling 1 12 1
3 Ore Clean Up/Trimming 1 1
4 Quarry 1 2 1
5 Barging and Develop Dome 1 2 4
6 Road Maint. Civil Work/General 1 1 1 1 2 1

Total Major Equipment 6 4 3 20 4 4 1 1 2 1 6

Methode Long Shift


07.00 12.00 16.00 22.00

Start Meal Meal End


Shift Break Break Shift
IN PIT RESOURCES - PT TIRAN INDONESIA

Working Elevation Over Burden (Wmt) ORE (Wmt) Ni Fe Sio Mgo S/M Al2O3 TMM Prod rate/M Month Schedule

348 -> 352 313 - 0 0 0 0 0


344 -> 348 7,625 - 0 0 0 0 -
340 -> 344 21,751 410 2.05 16.16 42.69 19.05 2.24 6.52
Level 340 Up 29,689 410 2.05 16.16 42.69 19.05 2.24 6.52 30,099 149,270 0.20 PC 300 56,074.53 0.54

336 -> 340 36,063 6,621 2.07 16.10 42.93 19.25 2.23 6.44
332 -> 336 57,372 15,645 2.08 15.97 43.00 19.61 2.19 6.33
Level 332 to 340 93,435 22,266 2.07 16.00 42.98 19.50 2.20 6.36 115,701 149,270 0.78 PC 300 56,074.53 2.06

328 -> 332 93,176 26,016 2.03 15.77 42.87 19.81 2.16 6.33
324 -> 328 117,043 37,273 2.00 15.66 41.32 19.94 2.07 6.36
Level 324 to 332 210,219 63,289 2.01 15.70 41.96 19.88 2.11 6.35 273,508 149,270 1.83 PC 300 56,074.53 4.88

320 -> 324 106,281 65,832 1.93 18.26 36.62 19.94 1.84 6.20
316 -> 320 113,367 73,258 1.94 16.29 38.29 20.99 1.82 6.35
Level 316 to 324 219,648 139,090 1.94 17.22 37.50 20.49 1.83 6.28 358,738 149,270 2.40 PC 300 56,074.53 6.40

312 -> 316 129,711 95,980 1.92 14.34 40.51 21.71 1.87 6.49
308 -> 312 150,372 115,719 1.79 14.06 40.53 21.87 1.85 6.56
Level 308 to 316 280,083 211,699 1.85 14.18 40.52 21.80 1.86 6.53 491,782 149,270 3.29 PC 300 56,074.53 8.77

304 -> 308 155,335 116,633 1.67 13.57 41.23 22.15 1.86 6.63
300 -> 304 126,704 99,602 1.70 14.16 40.83 22.01 1.86 6.73
Level 300 to 308 282,039 216,235 1.68 13.84 41.05 22.08 1.86 6.67 498,274 149,270 3.34 PC 300 56,074.53 8.89

296 -> 300 73,895 78,875 1.82 14.51 40.79 23.19 1.76 6.00
292 -> 296 24,063 65,809 1.82 13.32 41.70 25.79 1.62 4.86
Level 392 to 300 97,958 144,684 1.82 13.97 41.20 24.37 1.69 5.48 242,642 149,270 1.63 PC 300 56,074.53 4.33

288 -> 292 2,368 26,602 1.62 12.48 41.73 24.47 1.71 5.70
284 -> 288 469 8,906 1.52 10.58 42.98 25.04 1.72 6.31
Level 384 to 292 2,837 35,508 1.59 12.00 42.05 24.61 1.71 5.85 38,345 149,270 0.26 PC 300 56,074.53 0.68

280 -> 284 - 1,406 1.45 10.20 43.66 26.18 1.67 6.10
Level 280 to 284 - 1,406 1.45 10.20 43.66 26.18 1.67 6.10 1,406 149,270 0.01 PC 300 56,074.53 0.03
Total Resources 1,215,908.00 834,587.00 1.82 14.63 40.50 22.01 1.85 6.29 2,050,495.00 13.74

Summary :
OB In Pit : 1,215,908.00 Wmt
Ore in Pit 834,587.00 Wmt
Mining Recovery 85.00 %
Mineable Ore 709,398.95 Wmt
LOM 13.74 Month
Ni Fe Sio Mgo S?M Al2

840.09 6626.01 2671.923055

13705.47 106591.479 284206.425 127421.145 14767.8059236 42622.8629565


32494.665 249772.425 672797.58 306845.385 34303.6547188 99059.6733525
46,200 356,364 957,004 434,267 49,071 141,683

52760.448 410194.272 1115409.984 515350.944 56308.2429199 164627.569968


74546 583546.088 1540232.179 743074.528 77258.8372291 237058.404561
127,306 993,740 2,655,642 1,258,425 133,567 401,686

127319.088 1202289.816 2410767.84 1312558.416 120913.222991 408370.938612


142120.52 1193153.046 2805195.336 1537465.646 133663.474341 465232.950751
269,440 2,395,443 5,215,963 2,850,024 254,577 873,604

183993.66 1375873.3 3888053.82 2083341.88 179123.459873 622589.00293


207484.167 1626777.702 4689628.194 2530774.53 214432.016187 759156.447336
391,478 3,002,651 8,577,682 4,614,116 393,555 1,381,745

194543.844 1582826.443 4808895.223 2583537.583 217096.077965 773306.589731


169124.196 1410563.524 4066849.262 2191941.214 184797.985277 669984.80524
363,668 2,993,390 8,875,744 4,775,479 401,894 1,443,291

143552.5 1144634 3217232.375 1829347.875 138715.663131 473332.9765


119706.571 876707.498 2743906.255 1697148.301 106398.319245 319569.491135
263,259 2,021,341 5,961,139 3,526,496 245,114 792,902

42962.23 331966.358 1110181.266 651004.144 45365.3671952 151547.404185


13510.402 94198.762 382806.598 223015.146 15287.1929236 56188.314693
56,473 426,165 1,492,988 874,019 60,653 207,736

2033.076 14346.824 61387.366 36807.674 2344.90874365 8580.93751


2,033.08 14,346.82 61,387.37 36,807.67 2,344.91 8,580.94 - - - - -
1,520,696.93 12,210,067.55 33,800,221.63 18,369,634.41 1,540,776.23 5,251,228.37
No Mining Activity Excavator Hauler
Dozer Grader
Exc. 30 T Exc. 20 T ADT FM 260
1 OB Removal 1 2 2
2 Ore Getting and Hauling 1 5
3 Ore Clean Up/Trimming 1
4 Quarry 1
5 Barging and Develop Dome 1
6 Road Maint. Civil Work/General 1 1

Total Major Equipment 3 3 2 5 2 1


Fuel Water Light
Vibro
Truck Truck Plan
1
1

1 1 1

1 1 1 2