Schedule PT BKM
Schedule PT BKM
Schedule PT BKM
REVISI : Rev.00
Formula :
60
Q=qxkx x E x sf
ct
Q = Production/hours, bcm
q = Bucket Capacity heaped, lcm
k = Fill Factor
ct = Cycle time, menit
E = Working Efisiensi 1
sf = Swell factor 1
74% ###
PC 200
1 Produktivitas PC 200
PC 300
2 Produktivitas PC 300
List Of Equipment
No Mining Activity Excavator Hauler Dozer Grader Fuel Water Vibro Light
Exc. 30 Exc.
T 20 T ADT ZS 700 FM 260 GD 705 Truck Truck Plan
1 OB Removal 3 3 6 2 4
2 Ore Getting and Hauling 1 12 1
3 Ore Clean Up/Trimming 1 1
4 Quarry 1 2 1
5 Barging and Develop Dome 1 2 4
6 Road Maint. Civil Work/General 1 1 1 1 2 1
Working Elevation Over Burden (Wmt) ORE (Wmt) Ni Fe Sio Mgo S/M Al2O3 TMM Prod rate/M Month Schedule
336 -> 340 36,063 6,621 2.07 16.10 42.93 19.25 2.23 6.44
332 -> 336 57,372 15,645 2.08 15.97 43.00 19.61 2.19 6.33
Level 332 to 340 93,435 22,266 2.07 16.00 42.98 19.50 2.20 6.36 115,701 149,270 0.78 PC 300 56,074.53 2.06
328 -> 332 93,176 26,016 2.03 15.77 42.87 19.81 2.16 6.33
324 -> 328 117,043 37,273 2.00 15.66 41.32 19.94 2.07 6.36
Level 324 to 332 210,219 63,289 2.01 15.70 41.96 19.88 2.11 6.35 273,508 149,270 1.83 PC 300 56,074.53 4.88
320 -> 324 106,281 65,832 1.93 18.26 36.62 19.94 1.84 6.20
316 -> 320 113,367 73,258 1.94 16.29 38.29 20.99 1.82 6.35
Level 316 to 324 219,648 139,090 1.94 17.22 37.50 20.49 1.83 6.28 358,738 149,270 2.40 PC 300 56,074.53 6.40
312 -> 316 129,711 95,980 1.92 14.34 40.51 21.71 1.87 6.49
308 -> 312 150,372 115,719 1.79 14.06 40.53 21.87 1.85 6.56
Level 308 to 316 280,083 211,699 1.85 14.18 40.52 21.80 1.86 6.53 491,782 149,270 3.29 PC 300 56,074.53 8.77
304 -> 308 155,335 116,633 1.67 13.57 41.23 22.15 1.86 6.63
300 -> 304 126,704 99,602 1.70 14.16 40.83 22.01 1.86 6.73
Level 300 to 308 282,039 216,235 1.68 13.84 41.05 22.08 1.86 6.67 498,274 149,270 3.34 PC 300 56,074.53 8.89
296 -> 300 73,895 78,875 1.82 14.51 40.79 23.19 1.76 6.00
292 -> 296 24,063 65,809 1.82 13.32 41.70 25.79 1.62 4.86
Level 392 to 300 97,958 144,684 1.82 13.97 41.20 24.37 1.69 5.48 242,642 149,270 1.63 PC 300 56,074.53 4.33
288 -> 292 2,368 26,602 1.62 12.48 41.73 24.47 1.71 5.70
284 -> 288 469 8,906 1.52 10.58 42.98 25.04 1.72 6.31
Level 384 to 292 2,837 35,508 1.59 12.00 42.05 24.61 1.71 5.85 38,345 149,270 0.26 PC 300 56,074.53 0.68
280 -> 284 - 1,406 1.45 10.20 43.66 26.18 1.67 6.10
Level 280 to 284 - 1,406 1.45 10.20 43.66 26.18 1.67 6.10 1,406 149,270 0.01 PC 300 56,074.53 0.03
Total Resources 1,215,908.00 834,587.00 1.82 14.63 40.50 22.01 1.85 6.29 2,050,495.00 13.74
Summary :
OB In Pit : 1,215,908.00 Wmt
Ore in Pit 834,587.00 Wmt
Mining Recovery 85.00 %
Mineable Ore 709,398.95 Wmt
LOM 13.74 Month
Ni Fe Sio Mgo S?M Al2
1 1 1