Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Eng - Belal CV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Site Project Manager Eng.

Belal Ahmed Khedr

Contact Information:
Name: Belal Ahmed Khedr
Home Address: Cairo, Egypt
Email Address: belalahmedkhedr@gmail.com
Mobile Phone: +2 – 01028520835 -01277436321
I am having 17 years’ experience in various kinds of mechanical filed such as
Cement Plants construction maintenance, workshop fabrication, mechanical equipment (static and
rotating), steel structure work, and piping work), and Pre-Commissioning work background.
Generally, I am highly motivated, communicating, problem solving, quick learning & forward thinking, and leadership
skills, resourceful team player, ability to work with all safety precautions.

# Objective:
My objective is to sustain my career progression and keep my development plan on track by selecting my
next step carefully to ensure achieving my targets and utilizing my Experience and Capabilities in the best
possible approach.
Targeted Jobs: Site Project Manager
Salary Expectations: Negotiable
# Academic background:
Highest degree obtained: Bachelor's degree in power mechanical engineering.
University: Alexandria University, Faculty of Engineering, Mechanical Power Department.
Graduation year: 2005.
Grade: Very Good (80%)
Graduation project: HVAC Design.
# Courses Studied:
1. Introduction and Aspects of Negotiation.
2. Introduction and Principles to SCRUM course.
3. Six Sigma Yellow Belt course.
4. Project Management professional (PMP) Preparation course, Primavera (6) and MS Project
5. OCCUPATIONAL SAFETY & HEALTH STANDARDS (OSHA) general and construction.
6. The Egyptian Welding Academy Certified for "APPLIED WELDING TECHNOLOGY".
Current Job:
Company Name: SUMIT (Technical Office Contracting Company, Eng. Awed Khalifa)
Joining Period: NOV 2022- up to now
Position: Executive Director of Irrigation networks
Project: South Valley Development Project in Toshka Reclamation of 375 thousand feddans
Project Client: The National Company for the Reclamation and Cultivation of Agricultural Lands.
Roles & Responsibilities:
➢ Developing and control execution schedule and Budge.
➢ Managing complete stuff around (engineer, supervisor, machine operator, welder).
➢ Supervise and manage the work execution at site.
➢ Ensure that the Safety Procedures are followed during work.
➢ Daily progress report to my management

| Page1
Site Project Manager Eng. Belal Ahmed Khedr

# History of work experience:


➢ Company Name: ENARA (An infrastructure investment platform operating across the renewables value
chain.)
Joining Period: Feb 2021- up to October 2022
Position: Site Project Manager
Project: Site manager for the implementation of equipping 85 wells in the New Valley to work with solar
energy
Roles & Responsibilities:
➢ Developing and control execution schedule and Budge.
➢ Managing complete stuff around (engineer, supervisor, machine operator, welder, grinder, fitter,
and rigger).
➢ Supervise and manage the work execution at site.
➢ Ensure that the Safety Procedures are followed during work.
➢ Daily progress report to my management

➢ Company Name Advanced Construction Centre (ACC) Riyadh, KSA.


Joining Period: Feb 2018- up to Feb 2019
Position: Project Mechanical Engineer
Project: Sharma North Project in SHARMA, TABUK.
Roles & Responsibilities:
1. Quantity take-off
2. Quantification of Variations as per revised drawings / specification and follow-up with Main Contracts /
Project Managers for Site Work Instruction.

➢ Company Name: Al Bayan Holding Group – Khosam Al Derayah


Steel Construction Co.

Joining Period: From 01/01/2015until 01/01/2018 and from Feb 2019


to JUN 2020 (Saudi Arabia, Riyadh)
Position: Factory Manager
Roles & Responsibilities:
1. Developing production schedule and follow up its execution (Changeover Schedule)
2. Lead the Production & maintenance team (Total Productive Maintenance System)
3. Supervise and manage the Production Process on Daily Basis to eliminate any Barriers.
4. Prepare the Factory Budget and control it within the target
5. Reducing operating costs and allocating resource
6. Track and Control the Process Control Cost.
7. Ensure the delivery of the Business Measures (Productivity, cost, Quality & Inventory Levels)
8. Lead the Reliability improvement process & increase lines efficiency.
9. Define the Team Capability Gap and Build their required Skills
10. Lead communication with project stakeholders
Responsible for project fabrication:
1. STRATAGIC WATER TANK IN RIYADH,3A (12 Steel water tank diameter 52 meter
(50,000 m3))
2. STRATAGIC WATER TANK IN RIYADH, TGSW station – a total volume of 1000000 cubic
meters (6 Steel water tank diameter 110 meter)
| Page2
Site Project Manager Eng. Belal Ahmed Khedr

3. STRATAGIC WATER TANK IN RIYADH Salboukh station – a total volume of 1000000


cubic meters (6 Steel water tank diameter 110 meter)
Project Client: National Water Company "NWC"
Project Consultant: TYPSA

➢ Company Name: Al Bayan Holding Group – Dongho Korean Saudi Limited


Company
Joining Period: From 1/11/2013 until 1/1/2015(Saudi Arabia,
Riyadh)
Position: Senior Mechanical Construction Engineer.
Project: Riyadh Strategic Water Storage Scheme (Phase 1) (Contract No. 3a, 11, 15 & 16),
The project includes construction of main transmission lines with diameters of 300 (mm) to 3,000mm
Project Client: National Water Company "NWC"
Project Consultant: TYPSA
Roles & Responsibilities:
1. Developing and control execution schedule and Budge.
2. Managing complete stuff around 100 laborers (engineer, supervisor, machine operator, welder,
grinder, fitter, and rigger).
3. Supervise and manage the work execution at site.
4. Ensure that the Safety Procedures are followed during work.
5. Daily progress report to my management
➢ Company Name: NLSUPERVISION A\S (Operation & Maintenance)

Joining Period: From 1/7/2012 until 30/10/ 2013

Job Title: Area Mechanical Maintenance Engineer (Cement Mill area and Packing area)
Project: National Cement Company (NCC)
Roles & Responsibilities:
1. Implement the maintenance plan (Preventive & Predictive).
2. Control the Maintenance Budget Within the Target.
3. Reduce the Unplanned down Time to the lowest acceptable limits.
4. Ensure the quality and the Safety of the Daily Maintenance Activities execution.
5. Increase the Equipment’s efficiency.
6. Lead the Maintenance Team.
7. Define the team capability gap and build their required skills

➢ Company Name: Energya steel Comp.


Joining Period: From 1/4/2009 until 1/7/2012(3years and
3 month)
Job Title: Site Mechanical Engineer
Project: Wadi El Nile cements comp.
Design: F.L. Smidth/Denmark
Roles & Responsibilities:
1. Managing complete stuff around 200 labourers (supervisor, machine operator, welder, grinder,
fitter, and rigger).
| Page3
Site Project Manager Eng. Belal Ahmed Khedr

2. Implement Project Plan


3. Daily progress report to my Management
Responsible for Pre assemble:
1. Pre assemble for crashing department (limestone hopper, clay hopper)
2. Pre assemble for additive hopper
3. Pre assemble for all steel bin at raw mill feed
4. Pre assemble for exhaust gas conditioning tower
5. Pre assemble for raw mill cyclones
6. Pre assemble for pre heater (cyclones, chutes, calciner, stack)
7. Pre assemble for all steel bin at cement feed.
Responsible for the installation of:
1. All belt conveyors from limestone storage area to raw mill feed.
2. Assemble steel structure for belt conveyors
3. Installation and alignment longitudinal frame
4. Installation and alignment tail station, discharge station and take up station.
5. Installation OK cement mill
6. Pre-Commissioning for OK mill with all system.
7. Installation all utilities in project (Water pumps station, compressor room
8. All pipe network for water, gas, solar and compressed air in project.
Project: SUZE STEEL Comp
Design: Denali Steel
Responsible for the installation of:
1. Installation flow feeder in reactor.

➢ Company Name: Asec for manufacturing &industrial projects


(ARESCO)
Joining Period: from 1/ 5/ 2007 to 30/3/2009 (1 years 10 months)
Job Title: Mech. Site Engineer
Project: Sinai Cement Plant. (Line2). (Al-Arish, Sinai)
Design: F.L. Smidth/Denmark
Roles & Responsibilities:
1. Managing complete stuff around 50 labourers (supervisor,
machine operator, welder, grinder, fitter, and rigger).
2. Implement Project Plan
3. Daily progress report to my Management
Responsible for the installation of
1. Installation cement mill with all equipment.
Project: National Cement Co. (Upgrading Work)
(From 15/8/2007 to 15/12/2007)
Responsible for:
1. Rehabilitation of Cement Mill 3. (Journal Bearing).
2. Managing and supervising all labourers.
3. Change Trunnion Inlet and Outlet.
4. Cut and change sections of Mill
5. Erect and alignment of the girth gear
6. Assembly the new sections
7. Welding and follow up Heat-treatment activities
| Page4
Site Project Manager Eng. Belal Ahmed Khedr

Project: Beni Suef Cement Co. (Upgrading Work)


(From 1/5/2007 to 15/8/2007)
Responsible for:
∙ Rehabilitation of the Preheater.
∙ Installation of the new ID fans components including motors.
∙ Installation of the gas valve train at the 2 precalciner burners and the main burner.
➢ Company Name: Miser COMP. For Mechanical and Electrical Projects
(Kahromika Factories-Equipment-Transportation)
Mostorod.
Joining Period: From 1/ 1/ 2006 to 30/4/ 2007
∙ Work in fabrication at work shop.
∙ As a Mechanical Engineer for technical office

| Page5

You might also like