Issue 27 - Errata
Issue 27 - Errata
Issue 27 - Errata
________________________________________
ARBOR VITAE
Finished bust circumference: 76 (83, 93, 101.5, 111.5, 120, 130, 138.5) cm / 30 (32½, 36½, 40, 43¾, 47¼,
51¼, 54½)” – to be worn with 0-7.5 cm / 0-3″ of positive ease.
ATARAXIA ERRATA
RIGHT FRONT
Using larger needles, cast on 73 (77, 81, 83, 89, 95) sts. Work in Seed Stitch until piece measures 13 cm / 5″
from cast-on edge, ending with a RS row.
Next row (WS): Cast off 22 sts, work in patt to end. 51 (55, 59, 61, 67, 73) sts
CHRISTABEL
LEFT FRONT
Shape Armhole
ALL Sizes Again
Dec row (RS): K1, ssk, k to end. 1 st dec
Rep Dec row every RS row a further 2 (6, 9, 12, 8, 7, 7, 8, 11, 11, 12) times. 29 (29, 30, 30, 30, 31, 33, 34,
35, 37, 38) sts
Work straight in St st until Armhole measures 12.5 (13.5, 14, 14.5, 15, 16, 17, 18, 18.5, 19, 19.5) cm / 5
(5¼, 5½, 5¾, 6, 6¼, 6¾, 7, 7¼, 7½, 7¾)”, ending with a RS row.
RIGHT FRONT
Shape Armhole
ALL Sizes Again
Dec row (RS): K to last 3 sts, k2tog, k1. 1 st dec
Rep Dec row every RS row a further 2 (6, 9, 12, 8, 7, 7, 8, 11, 11, 12) times. 29 (29, 30, 30, 30, 31, 33, 34,
35, 37, 38) sts
Work straight in St st until Armhole measures 12.5 (13.5, 14, 14.5, 15, 16, 17, 18, 18.5, 19, 19.5) cm / 5
(5¼, 5½, 5¾, 6, 6¼, 6¾, 7, 7¼, 7½, 7¾)”, ending with a WS row.
SLEEVES
Cuff
Rep rows 3-4 once, then rep row 3 only once more.
Switch to larger needles.
Work 4 (4, 4, 4, 4, 2, 2, 2, 2, 2, 2) rows in St st
SLEEVES
Inc row (RS):[K to marker, M1R, SM] twice, [k to marker, SM, M1L] twice, k to end. 4 sts inc
Sizes 1, 2, 3, 4 & 5 ONLY:Rep Inc row every 4th row a further 2 (3, 4, 4, 4, -, -, -, -, -, -) times.58 (64, 68,
70, 72, -, -, -, -, -, -) sts
Sizes 6, 7, 8, 9, 10 & 11 ONLY:Rep Inc row every RS row a further – (-, -, -,–,5, 6, 7, 7, 8, 8) times. –(-, -, -
, -, 76, 82, 86, 88, 94, 98) sts
Next Row (RS):K to marker, M1R, remove marker, k to last marker, removing markers as you come to
them, M1L, k to end.60 (-, -, -, 74, 78, 84, -, 90, -, -) sts
Removing markers if necessary, work in St st until sleeve measures 35.5 cm / 14” from cast-on edge, ending
with a WS row.
Shape Cap
Cast of 3 (3, 3, 3, 3, 3, 4, 4, 4, 4, 4) sts at beg of next 2 rows. 54 (58, 62, 64, 68, 72, 76, 78, 82, 86, 90) sts
NOTE:
Commence 8-row Corrugated Rib pattern, maintaining pattern throughout shaping
GALEWOOD
Right Gauntlet
When Divide Thumb section is complete, you should have 15 sts between beg of round and first marker, 32
sts between first and third markers, and 16 sts between third marker and end of round.
K to marker, remove marker, k2, place previous 36 sts worked on holder for palm (this will span beg of
round), continuing on next 27 sts only.
Left Gauntlet
When Divide Thumb section is complete, you should have 16 sts between beg of round and first marker, 32
sts between first and third markers, and 15 sts between third marker and end of round.
K to marker, remove marker, k3, place previous 36 sts worked on holder for palm (this will span beg of
round), continuing on next 27 sts only.
Next round: K across 16 sts for Thumb, pick up and knit 2 sts in gap. Join to work in the round, PM to
indicate beg of round. 18 sts
Purl 1 round.
NIGHTINGALE
4/1/4 LPC: Slip 5 sts to cable needle, hold in front, k4, slip left-most st from cable needle to LH needle, p1,
k4 from cable needle.
Sleeve
Inc row B (RS): K2, M1L, k to marker, SM, p2, [k1tbl, p1] twice, M1R (centre increase), k to marker, SM,
p1, [k1tbl, p1] 2 times, k to marker, M1L (centre increase), SM, [p1, k1tbl] twice, p2, Sm, k to last 2 sts,
M1R, k2. 4 sts inc
Work straight in pattern until sleeve measures 46cm / 18″ from cast-on edge ending on a WS row.
NIMUE
Lower Front Next row (RS): Knit across Right Front sts, then knit across held Left Front sts, joining both
fronts. 56 (62, 68, 74, 78, 84) sts Work straight in St st until piece measures 4.5 cm / 1¾" from joining row,
ending with a WS row.
Next row (RS): Work Vikkel Braid.
NONESUCH
Left sleeve
Shape Raglan
Row 1 (RS): Cast off 3 (4, 5, 6, 7, 8) sts, work row 1 of Chart C once (omitting Set-up rows and counting st
rem on RH needle after cast-off as first st of Chart C), patt to end. 67 (70, 75, 80, 83, 88) sts
Row 2: Cast off 3 (4, 5, 6, 7, 8) sts, patt to end (working next row of Chart C as est in previous row). 64 (66,
70, 74, 76, 80) sts
RIGHT SLEEVE
Next Row (WS): P1, work row 1 of Moss Stitch over next 38 (38, 40, 40, 42, 44) sts, PM, work Set-up row
1 of Chart C, PM, work row 1 of Moss Stitch to last st, p1.
Shape Raglan
Row 1 (RS): Cast off 3 (4, 5, 6, 7, 8) sts, work in patt to last 15 (16, 17, 18, 19, 20) sts, work row 1 of Chart
B once (omitting Set-up rows), patt to end. 67 (70, 75, 80, 83, 88)
Row 2: Cast off 3 (4, 5, 6, 7, 8) sts, patt to end (working next row of Chart B as est in previous row). 64 (66,
70, 74, 76, 80) sts
Row 3: K1, work Right-Slanted Decrease, patt to last 14 sts, work Left-Slanted Decrease, patt to end. 2 sts
dec
Row 4: Patt to end.
Rep rows 3-4 a further 5 (6, 8, 10, 11, 13) times. 52 sts.
Next row (RS): Patt to last 14 sts, work Left-Slanted Decrease, patt to end. 1 st dec
SOJOURNER
Row 1 (RS, A): Sl1, [(k1, yo) twice, k1] into 1 st, sl1 wyib. Do not turn, slide sts to other end of needle. 7
sts
Row 3 (RS, A): Sl1, brkyobrk, [sl1yo, brk1] to last 3 sts, sl1yo, brkyobrk, sl1wyib. Slide sts. 4 sts inc.
Lace Section
Row 3: P1, yo, p to last stitch, yo, p1. 317 sts
Row 5: P1, yo, p to last stitch, yo, p1. 323 sts