GETO Aluminium Formwork System
GETO Aluminium Formwork System
GETO Aluminium Formwork System
Aluminium
Formwork
System
One-Stop Solution Provider to
Make Drawings Happen
COMPANY INTRODUCTION
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Company Profile
Why do I Choose GETO? GETO ① is an A-share listed company (stock code: SZ 300986) specializing in aluminium
formwork and self-climbing platform system. Its headquarters was registered in
Jiangxi and the global operation management center is based in Tsui Hang New
District, heart of the Guangdong-Hong Kong-Macao Greater Bay Area. GETO products
are sold well in over 30 countries and regions. We had set up ten domestic production
bases, and an overseas one in Malaysia. We are one of the first specially qualified
and national high-tech enterprises. With a backbone team of over 2,000 talents, we
are taking the lead in the realization of scale, specialization and intelligentization,
focusing on formwork system R&D, production, leasing, sale, renovation and
technical services, providing customers with a full range of high-quality services.
① GETO: The pronunciation of the brand name is " ".
PAKISTAN CHINA
RUSSIA
HONG
JAMAICA Saint-Martin KONG
FR
BHUTAN
KAZAKHSTAN VIETNAM
PHILIPPINES
UNITED ARAB
PANAMA EMIRATES
INDIA
VENEZUELA
CAMBODIA
MALAYSIA
DJIBOUTI LAOS
CHILE MALDIVES
SINGAPORE AUSTRALIA
SRILANKA
NEW
ZEALAND
Guangchang Factory I Jiangmen Factory Xianning Factory Lingao Factory Tongnan Factory
Jiangxi Province, China Guangdong Province, China Hubei Province, China Hainan Province, China Chongqing Province, China
Guangchang Factory II Weifang Factory Dingxi Factory Nilai Factory Fuzhou Factory
Jiangxi Province, China Shandong Province, China Ganshu Province, China Malaysia Fujian Province, China
10 production bases
20+ subsidiaries
2 3
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
CONTENTS
01
ALUMINIUM FORMWORK INTRODUCTION P5-8
Aluminium Formwork Profile
Comparison of Aluminium Formwork & Steel Formwork & Timber Formwork
Aluminium Formwork Advantages
02 ALUMINIUM FORMWORK
INTRODUCTION
GETO ALUMINIUM FORMWORK SYSTEM P9-21
GETO Aluminium Formwork Systems
System Features
Components
Accessories
Quick-deck System
03
GETO ALUMINIUM FORMWORK SYSTEM ADVANTAGES P22-26
One-stop Comprehensive Solutions
GETO-BIM Automatic Modulation Software
GETO-VR Inspection Software
Quality Assurance
Installation Instruction
04
PROJECT REFERENCES P27-43
Technical Solutions
Projects in Malaysia
Projects in Singapore
Projects in other countries in Southeast Asia
Projects in South Asia
Projects in Hongkong, China, Macao, China, Taiwan, China
Projects in GCC countries
Projects in Americas
Projects in Africa
Projects in Europe
4 5
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
6 7
GETO ALUMINIUM
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Speed
1. Workers can carry and assemble the formwork efficiently without any equipment
due to the light weight;
2. The assembly is simple and flexible like building blocks.
Safety
1. The material of aluminium formwork has the characteristics of high strength, high
bearing capacity, and not easy to deform;
2. After the system is assembled, a whole frame is formed with high stability;
3. No need of cranes or aerial work, decreasing the risk of falling accidents.
Environment Friendly
1. The service life of aluminium formwork can reach 200-300 times, the utilization is
high;
2. The scrap aluminium formwork can be recycled, contributing to environmental
protection;
3. Reduce the construction waste.
8 9
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Tie-Rod System
The forming effect of the tie-rod reinforcement system is very smooth. The tie-rod
reinforcement system is more suitable for the refurbishment project with different
structures and the project with wall thickness structures larger than 400mm.
Flat-Tie System
The formwork with the flat-tie reinforcement system is free of drilling, with the good
vertical casting effect and fewer installation accessories, reducing the installation
workload of workers, which is more in line with the use habits of overseas workers.
Statement:
*It is the normal phenomenon that the dirt spots appear on the surface of aluminium alloy formwork due to
oxidation. It will not affect the quality of the material and the concrete outcome quality.
**In order to reduce the phenomenon of oxidation of aluminium formwork can choose to powder coating
treatment on the surface of aluminium formwork, but due to the differences in actual usage on site, powder
coating aluminium formwork also exists the risk of powder coming off.
10 11
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Developed in 1991 in Cambridge, United Kingdom by The Welding Institute(TWI). 600 W 2400 27.54
During welding, stir welding head will move through the connection joint and turn it 500 W 2400 23.65
to the welding joint. This welding technology applies high pressure between 2 plates 400 W 2400 19.97
and welds them through the heat caused by the friction. 350 W 2400 17.93
300 W 2400 14.89
Reduce distortion. The absence of fusion removes much of the thermal contraction
350 WS 2400 27.01
Workplace friendly. There is no ultraviolet or electromagnetic radiation hazards as the 200 WS 2400 18.26
absence of arc removes these hazards from the process; the process is no noisier than 150 WS 2400 19.79
a milling machine of similar power, and generates virtually zero spatter, fume and other
DESCRIPTION:
Fill up the formwork area, where standard wall panels unable to fit at the horizontal- 125 WS 2400 19.01
pollutants. end sides of the formwork system.
100 WS 2400 18.21
Reduce errors caused by manual operation. As a mechanized process, FSW does not
rely on special welding skills; indeed manual intervention is seldom required.
12 13
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
WALL & COLUMN——External Corner Joint Item EC(H) Weight (kg) BEAM——Beam Soffit Item BSB(HxL) Weight (kg)
DESCRIPTION: REMARKS:
Used to connect wall panels at external 63.5×63.5 EC 2400 4.81 With external corner at both sides.
400 BSB 1100 8.71
corner area.
63.5×63.5 EC 600 1.21 DESCRIPTION: 300 BSB 1100 7.05
Beam soffit issued to support Beam.
250 BSB 1100 6.20
200 BSB 1100 5.39
150 BSB 1100 4.56
125 BSB 1100 4.15
WALL & COLUMN——Internal Corner Joint Item(A1+A2) IC (H) Weight (kg)
100×100 IC 2400 14.12
100×120 IC 2400 15.32
100×125 IC 2400 15.62
BEAM——Beam Prop Head Item BP(HxL) Weight (kg)
100×130 IC 2400 16.30 DESCRIPTION:
100×140 IC 2400 16.51 Panel to support beam and use to join 300 BP 300 2.51
two Beam Bottom with Pin & Wedge.
200 BP 300 1.98
100×150 IC 2400 17.12
200 BP 250 1.72
DESCRIPTION: 100×160 IC 2400 17.33
Internal corner joint is used to connect wall panel and wall end panel at internal 200 BP 200 1.47
corner. The height of IC are equal to the wall panel height. 150×150 IC 2400 20.12
150 BP 300 1.71
150 BP 200 1.26
150 BP 150 1.03
BEAM——Beam Soffit
100×160 LS 200 3.13
Item BS(HxL) Weight (kg) 150×150 LS 200 3.70
14 15
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
BEAM——Beam Side Panel Item B(HxL) Weight (kg) SLAB——Slab End Beam Item EB Weight (kg)
DESCRIPTION:
Use for internal corners usually 400 B 1100 8.71 150 EB 300 2.42
at beams. Connect to other
panels using Pin & Wedge. 300 B 1100 7.05 150 EB 400 3.20
200 B 1100 5.40 150 EB 500 3.97
150 B 1100 4.56 150 EB 600 4.75
100 B 1100 3.73 150 EB 700 5.53
DESCRIPTION:
Use to join the prop head and slab corner, the end beam supports the slab panels. 150 EB 800 6.31
16 17
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Accessories
BOLT,
HOLLOW SECTION Item WALLER BRACKET Item WORKING BENCH Item TIE ROD Item NUT&WASHER
Item
SLAB TRANSFER
PIN &WEDGE Item LONG PIN Item BOX
Item STEEL PROPS Item JOINT BAR Item
18 19
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Reinforcement System
Fast Construction. All components are light enough to erect, assembly & dismantle by
labour without heavy cranes. The 1.2m X 1.8m 36.77kg lightweight aluminium deck panels
are easy and safe to erect using a minimum of only two workers by swiveling the panel
GETO self-developed aluminium formwork edge sealing upwards from below and locking it into our quick release prop heads. Also, the standard
reinforcement system is to reinforce the connection panels are allowed to transfer by small handcart in site which is convenient for site
between panels at hole positions, The reinforcing plate construction.
and aluminium formwork are connected with riveting.
Easy & Compatible. GETO Quick-Deck Formwork System are allowed and easy to
Applicable to the 65 flat-tie system
compatible with other aluminium formwork system, timber formwork system and
Reduce the wear of pin holes
precast concrete components. As quick deck formwork panels are standard sizes and
not specifically designed for one project, they are able to be re-used repeatedly on new
Prolong the service life of aluminium formwork projects without additional design costs by 100%.
*Customers can choose to use the aluminium formwork edge Intelligent Prop Head. The special prop heads and props can be separated. And the
sealing reinforcement system according to project requirements. Applicable to the 63.5 flat-tie system props can be used in traditional aluminium formwork system. The specially designed
quick release prop head allows the panels to drop from the formed surface without
disturbing the prop. The newly developed 2-stage lowering function of the quick release
prop head prevents panels from accidentally falling during dismantling and speeds up the
formwork dismantling process.
High Quality. The concrete surface by aluminium panel will be better than other
formwork.
Characteristics
Its quick installation and dismantling characteristics are realized by adjusting the height
of the adjustable props below its deck formwork, where the props are mounted up for
tightening and installation, and the dismantlement of the formwork only requires the
conduct of manual downward adjustment of the props.
Components
The system is composed of deck formworks, vertical props, quick-release prop heads, as well
as wall-edge and slab-edge prop heads.
20 21
GETO PRODUCT
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
2.Whole-chain Services
GETO's main core product packages also include the whole-chain services offerings.
Pre-sales service
We can offer pre-sale analytics and quote service.
During-sales service
We offer individualized service, drawing detailing, design and on-site engineering services,
including technical briefing, technical training and on-site instruction to ensure on-site
obstacles are cleared during use of the product.
We also provide refurbishment services for customer's formwork system. By adopting
GETO ERP Warehousing System, we simplify the recycling of customers' existing panels
and management process on-site. By refurbishment design, we maximize the turnover
rate of the aluminium formwork system. With the improvement of the exiting panel
turnover rate, the project cost will be minimized.
After-sales service
To enhance customer experience, our Customer Service Department will build and
monitor customer data to track any issues that customers might face during use of the
product.
22 23
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
24 25
PROJECT
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Installation Instruction
REFERENCES
Leveling and structural Wall Panels setup Beam Panels setup Slab Panels setup
line
The site surveyor shall based on the Installation of M&E, plumbing Setup beam panels according to the Fixed the slab corner panels on the
approved construction drawings to components and steel rebar. Then construction drawing for beam soffit top of wall panels. Then the slab
ensure that the structural line and the wall panels setup process shall panels, beam support, beam side panels setup process shall be middle
level of the slab is properly set up. be the inner corner wall panels, inner panels, etc. beam, prop head, end beam, slab
wall panels, flat-tie, external wall panels, etc.
panels, pin and wedges.
Kickers dismantlement Flat ties & PVC sleeves Panels cleansing Transfer Panels
The wall panels are removed to Flat ties are used to ensure the wall All components shall be cleaned Transfer all panels through Slab box
disconnecting the lower kicker from thickness and fixed the wall panels. after dismantlement for a better to large open space.After that, it can
the adjacent formwork and prepared PVC sleeves are used to protect the quality in next floor. be filled with second-time concrete.
for reuse. flat tie so as to reuse it. Both of it can
be removed by special tools.
26 27
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Technical Solutions Podium and typical floors share one aluminium formwork set in one
tower
Two typical floor designs share one aluminium formwork set in one With rich experience and professional strength accumulated from the past, GETO
tower can offer one set of aluminium formwork system that could be turnover and reused
between non-typical floors and typical floors.
For a tower with two types of typical floor design, GETO's solution is to offer one set
of aluminium formwork system for reuse and turn over throughout the tower.
28 29
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Customization for podium with large-size flat deck structure and no Skyscrapers with aluminium formwork and self-climbing platform
beams system integrated
For construction projects that consist of huge and flat structure without beams, GETO By offering integrative design of aluminium formwork system and self-climbing
will introduce them to use Quick-Deck System with 1200 x 1800mm in its formwork platform system, GETO can contribute to improving the efficacy of structural work
size to build podiums. progress for superhigh skyscrapers. Meanwhile, GETO customizes design for several
connecting points of aluminium formwork system and self-climbing platform system,
such as offering extra strengthening accessory parts and steel frame structure.
30 31
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Aluminium formwork system turnover for terrace house projects Unique design throughout the whole building
with mirror-like structure and party walls Even if buildings with unique designs have great floor height, more changes, and
Based on the project characteristics of terrace house project and the budget complex structures, including round columns, arc-shaped beams, decks with special
allocation of relevant client for the number of formwork sets, GETO proposes angles, etc, GETO can still manage to design it with zero-flaw standard by utilizing its
technical solution for aluminium formwork system turnover that takes mirror-like self-developed Intelligent Formwork Modulation System.
structure and party walls into account.
Aluminium formwork used with other formwork system The basement and typical floors of the public buildings completely
We propose solutions of aluminium formwork used with other formwork system to constructed by using aluminium formwork
our clients, such as aluminium formwork with timber, aluminium formwork with With the principle of customer-centric spirit, GETO maximized the turnover and
precast components, as to facilitate our clients in saving up construction material utilization rate of the aluminium formwork for the public buildings like station,
and labour cost, which consequently solve the pain point of our clients in bearing school, etc, by modifying the architectural drawing of the project. The basement and
high cost to procure extra set of formwork for non-typical floor construction. typical floors of the public buildings was completely constructed by using aluminium
formwork, increasing construction efficiency.
34 35
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Bayu Sutera, Malaysia The Trion, Malaysia CANBERRA EC, Singapore Haus On Handy, Singapore
Lake City in KL, Malaysia Marc Residences, Malaysia Tengah Plantation C1, Singapore Toa Payoh, Singapore
D'Vine, Malaysia The Asteria, Malaysia Queen Peak, Singapore Mercedes Benz Center, Singapore
36 37
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
38 39
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
HuaYue City, Taiwan, China New City Public Housing in Section B10, T1210 Villa, Kuwait
Zone A, Macao, China
40 41
Formwork & Scaffolding Expert Formwork & Scaffolding Expert
Projects in Europe
42 43
GETO Group
Headquarters:
Greater Bay Area—No. 13 Heqing Road, Tsuihang New District, Zhongshan City, Guangdong Province
Southern China Production BaseⅠ:
Cuishan Lake Science and Technology Park, Kaiping, Jiangmen City ,Guangdong Province
Southern China Production BaseⅡ:
Huizhou Industrial Transfer Industrial Park, Huizhou City, Guangdong Province
Eastern China Production BaseⅠ:
Guangchang Industrial Park, Fuzhou City, Jiangxi Province
Eastern China Production BaseⅡ:
Baizhong Industrial Park, Minqing , Fuzhou City, Fujian Province
Central China Production Base:
Hi-tech Industry Development Zone, Xianning City, Hubei Province
Northern China Production Base:
China Aluminium Industrial Park, Linqu, Weifang City, Shandong Province
Southwest China Production Base:
Modern Manufacturing Industrial Park, Tongnan High-Tech District, Chongqing City
Northwest China Production Base:
The Circular Economy Park, Anding District, Dingxi City ,Gansu Province
Hainan Production Base:
Gold Medal Port Industrial Park, Lingao County, Hainan Province
ASEAN Production Base:
Negeri Sembilan, Malaysia
GETO INDIA
Regd.Off: C/703, RAAS, VU, Thakur Village, Kandivali East, Mumbai 400101
Operational Office: 8/11 Row House, Suncity Bungalows Shelter Heights, Suncity Rd, Vasai West,
Maharashtra 401202
Mobile: +91 7738091831, +91 9699173295
Email: skp@oxygreen.in; samit@geto.com.cn