Final Plan
Final Plan
Final Plan
ARCHITECTURAL
PERSPECTIVE
SITE DEVELOPMENT PLAN
VICINITY MAP
GROUND FLOOR PLAN
SECOND FLOOR PLAN
ROOF PLAN
1.000
5.000 2.200 5.000 2.000 FRONT ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION
RIGHT SIDE ELEVATION
SCHEDULE OF DOORS
..\..\..\..\CMPM\FINAL CMPM\432373427_1628461991240008_5036271003471857898_n.jpg SCHEDULE OF WINDOWS
STRUCTURAL
CONSTRUCTION NOTES GENERAL NOTES
FOUNDATION PLAN
SECOND FLOOR FRAMING PLAN
COLUMN FOOTING DETAILS
PROPOSED BUILDING
WALL FOOTING DETAILS
FOOTING SCHEDULE
ROOF BEAM PLAN
BEAM DETAILS
ELECTRICAL
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT PERSPECTIVE
CMPM 402 PROPOSED TWO-STOREY APARTMENT
A-1
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
1.775
1.775
1.775
W3
W3
T&B DN T&B
W1
UP
W1
D2 D2
3.950
3.950
3.950
W2
W2
D1 D1
B B B
D1 D1
W2
W2
4.000
4.000
4.000
D2 D2
W1
W1
1.800
1.800
1.800
W3
T&B T&B
W3
C C C
1.800
1.800
1.800
W3
W3
T&B T&B
W1
W1
D2 D2
4.000
4.000
4.000
W2
W2
D1 D1 SLOPE
24.150
24.150
24.150
D D D
D1 D1
W2
W2
4.000
4.000
4.000
D2 D2
W1
W1
1.800
1.800
1.800
W3
T&B T&B
W3
E E E
1.800
1.800
1.800
W3
W3
T&B T&B
W1
W1
D2 D2
4.000
4.000
4.000
W2
W2
D1 D1
F F F
D1 D1
W2
W2
3.950
3.950
3.950
D2 D2
W1
W1
1.775
1.775
1.750
W3
T&B T&B
W3
G G FIRE G
1.175
EXIT
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR PLAN
CMPM 402 PROPOSED TWO-STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
3.000m
2.800m
1ST F.L.
0.200m N.G.L.
ROOF APEX
0.800m TOP OF R.B.
3.000m
2.800m
1ST F.L.
0.200m N.G.L.
0.500
0.500
1.200
2.100
2.000
1.600
1.600
0.900
F.F.L.
0.200
F.F.L.
0.200
N.G.L. D1 D2 N.G.L. W1 W2 W3
12 12 12 12 12
PANEL DOOR SWING TYPE PVC DOOR SLIDING WINDOW ALUMINUM SLIDING ALUMINUM SLIDING
ON 150mm. X 50mm. & JAMB SET WINDOW WINDOW
WOOD FRAME/JAMBS
5
A-3
SCHEDULE OF DOORS 6
A-3
SCHEDULE OF WINDOWS
SCALE NTS SCALE NTS
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT FRONT ELEVATION SCHEDULE OF DOORS
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 A-3
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: LEFT SIDE ELEVATION SCHEDULE OF WINDOWS
REAR ELEVATION 3 11
BSCE- 4B RIGHT SIDE ELEVATION
AJE CONST.
A. GENERAL NOTES
C. REINFORCING STEEL E. FORMWORKS
NOTES ON FOOTINGS
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT
CMPM 402
S-1
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: CONSTRUCTION NOTES GENERAL NOTES
4 11
AJE CONST. BSCE- 4B
1 2 2' 3 1 1' 2 3
0.25 8-20 mm
7.025
10.250 10.250
dia. bar 100 mm
3.300 6.950 3.300 6.950 F.F.L. THK. R.C.
2.000 1.250 1.500
1.500 FTB1.500 SLAB ON
C1-F1
C1-F1
C1-F1
A A 2B-3
N.G.L.
FTB 2B-2 GRADE
1.200
1.750
0.40
FTB
0.400
WF-1
50 mm THK.
0.820
DN
UP GRAVEL
3.950
3.950
2B-1
2B-2
FTB
FTB
WF-3 S-2
2B-2 2B-4 BEDDING
50 mm THK.
1.975
2B-2
GRAVEL
2B-2
1.640
S-2 S-2
0.900
BEDDING
C1-F1 C1F1
C1-F1
B B
1.200
FTB 2B-4 2B-3 2B-1 COLUMN BARS
1.200 (See Sched)
0.100
2B-2
2.445
S-1
4.000
4.000
2B-1
2B-3
2B-2
0.300
FTB
FTB
WF-3
4.000
S-1 S-2
1.325
WF-2
1.800
2
B-
C1-F1
C1-F1
2
2.1
C C
60
FTB 2B-4 2B-1
COLUMN FOOTING DETAILS
1.800
WF-2
4.000
4.000
100MM THK.
2B-1
2B-2
2B-2
FTB
FTB
WF-3 S-1 S-2
SLAB ON GRADE
W/ 10MM Ø RSB
@ 0.50M B.W. O.C.
24.150
24.150
C1-F1
C1-F1
D D
FTB 2B-4 2B-1
4.000
4.000
2B-1
2B-2
2B-2
FTB
FTB
1.800
C1-F1
C1-F1
E E
FTB 2B-4 2B-1
1.800
WF-2
4.000
4.000
2B-1
2B-2
2B-2
FTB
FTB
C1-F1
F
FTB
F
2B-4 2B-1 WALL FOOTING DETAILS
3.950
3.950
2B-1
2B-2
2B-2
FTB
FTB
1.750
1.000
C1-F1
C1-F1
2B-2
1.150 S-2
G' 2B-2
1.750
1 FOUNDATION PLAN
SCALE NTS
2 SECOND FLOOR FRAMING PLAN
SCALE NTS
S-2 S-2
FOOTING SCHEDULE
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT FOUNDATION PLAN
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 SECOND FLOOR FRAMING PLAN S-2
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: COLUMN FOOTING DETAILS
WALL FOOTING DETAILS 5 11
BSCE- 4B FOOTING SCHEDULE
AJE CONST.
1 1' 2 3
10.250
3.300 6.950
1.200 1.500
A 250 250 250 250
RB-1 RB-3 RB-1
300
300
350
350
3.950
RB-4
RB-2
RB-2
B 250 250 250 250
COLUMN DETAILS
RB-3 RB-1
300
300
350
350
4.000
RB-2
RB-2
RB-4
250
400
250 250 250 250
C
300
300
RB-3 RB-1
350
350
4.000
RB-2
RB-2
RB-4
300
300
350
350
RB-3 RB-1
4.000
RB-2
RB-2
RB-4
250 250
350
350
E
RB-3 RB-1
4.000
RB-4
RB-2
RB-2
RB-2
RB-4
9.235
G RB-3 RB-1
2"X3"X1.5MM THK. 10MM Ø ROUND BAR
C-PURLINS SPA. @ 0.60M TRUSS DETAILS
O.C.
1 ROOF BEAM PLAN
SCALE NTS
S-3
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT ROOF BEAM PLAN
CMPM 402
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT ONE WAY SLAB PLAN & SECTION
PROPOSED TWO STOREY APARTMENT
CMPM 402 TWO WAY SLAB PLAN & SECTION
S-4
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: TYPICAL BEAM SECTION, ELEVATION
& STIRRUPS SCHEDULE
STAIRS DETAIL 7 11
BSCE- 4B
AJE CONST.
RISER DIAGRAM
M
40AT
15AT 2P 20AT 2P
1 2
SPARE SPARE
3 4
GROUND
1 2 3 1 2 3 1 2 3 1 2 3
1.750
1.750
1.750
2 2
DN r DN r
UP UP p p Sr
3.950
3.950
3.950
3.950
a Sq Sr a Sq
Sp Sp
q q
PB1 PB7 PB1 PB7
B PB2 B PB8
B PB2 B PB8
Sp q Sp q
4.000
4.000
4.000
4.000
Sq Sq
a p a p
Sr Sr
1.800
1.800
1.800
1.800
r r
2 2
C C C C
1.800
1.800
1.800
1.800
2 2
r r
p Sr p Sr
4.000
4.000
4.000
4.000
a Sq a Sq
Sp Sp
q q
24.150
24.150
24.150
24.150
PB3 PB9 PB3 PB9
D PB4 D PB10
D D PB10
PB4
Sp q q
Sp
4.000
4.000
4.000
4.000
Sq Sq
a p a
Sr p Sr
1.800
1.800
1.800
1.800
r r
2 2
E E E E
1.800
1.800
1.800
1.800
2 2
r r
p Sr p Sr
4.000
4.000
4.000
4.000
a Sq a Sq
Sp Sp
q q
PB5 PB11
F PB5
PB6 F PB11
PB12
F PB6 F PB12
q q
Sp Sp
3.950
3.950
3.950
3.950
Sq Sq
a a p
p Sr Sr
1.750
1.750
1.750
1.750
2 2
r r
G G FIRE G G FIRE
EXIT
EXIT
1 GROUND FLOOR POWER LAYOUT 2 SECOND FLOOR POWER LAYOUT 3 GROUND FLOOR LIGHTING LAYOUT 4 SECOND FLOOR LIGHTING LAYOUT
E-1 SCALE NTS E-1 SCALE NTS
E-1 SCALE NTS E-1 SCALE NTS
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR POWER LAYOUT
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 SECOND FLOOR POWER LAYOUT E-1
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT 8 10
BSCE- 4B
AJE CONST.
1 2 3 1 2 3 1 2 3 1 2 3
4" Ø PVC
4" Ø PVC
D1 D1 D1
CB DS DS
B B DS B B
DS D1
D1 D1 D1
W2 W2
KS KS KSF KS
D2 LAV D2 LAV D2 LAV
F D2 LAV
WC W3 WC W3 WC WC
SHW FD DS F
CB SHW FD DS C C SHW FD C SHW FD
C DS SHW FD DS SHW FD SHW FD SHW FD
W3 W3 F
WC WC WC WC
D2 LAV D2 LAV D2 LAV D2 LAV
F
4" Ø PVC
3" Ø PVC
4" Ø PVC
KS KS KSF KS
W2 W2
D1
24.150
D1 D1 D1
24.150
23.900
CB DS DS
4" Ø PVC
4" Ø PVC
D D DS D D 24.150m
DS KS
D1 D1 D1 D1 KS
W2 W2
KS KS KSF KS
D2 LAV D2 LAV F
D2 LAV D2 LAV
WC W3 WC W3 WC WC
F
CB SHW FD DS E SHW FD DS SHW FD SHW FD
E DS SHW FD E E
DS SHW FD SHW FD SHW FD
W3 W3 F
WC WC WC WC
D2 LAV D2 LAV D2 LAV D2 LAV
F
3" Ø PVC
KS W2 KS W2 KSF KS
D1 D1 D1 D1
CB DS DS
F F DS F F
4" Ø PVC
4" Ø PVC
DS D1
D1 D1 D1
W2 W2
KS KS KSF KS
D2 LAV D2 LAV D2 LAV
F D2 LAV
WC W3 WC W3 WC WC
F
SHW FD SHW FD SHW FD SHW FD
G DS DS G DS FIRE DS G G
FIRE
4"
3
CB CB EXIT
WATER PIPE
EXIT
SEPTIC
TANK
CV
WM
GV
TAPPED TO
WATER MAIN
4" Ø PVC STORM DRAIN SOURCE
1 GROUND FLOOR SANITARY LINE LAYOUT 2 SECOND FLOOR SANITARY LINE LAYOUT 3 GROUND FLOOR WATER LINE LAYOUT 4
P-1
SECOND FLOOR WATER LINE LAYOUT
SCALE NTS
P-1 SCALE NTS P-1 SCALE NTS P-1 SCALE NTS
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR SANITARY LINE LAYOUT
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png CMPM 402 SECOND FLOOR SANITARY LINE LAYOUT P-1
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: GROUND FLOOR WATER LINE LAYOUT
SECOND FLOOR WATER LINE LAYOUT 9 10
BSCE- 4B
AJE CONST.
PLUMBING NOTES LEGEND
2
P-2
SEPTIC TANK PLAN
SCALE NTS
600 600
0.10 m
600
600
0.10 m
10 mm Ø REBARS @
200 mm.o. c. BOTHWAYS
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT PLUMBING NOTES
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 LEGEND P-2
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: SEPTIC TANK PLAN
SEPTIC TANK SECTION
CATCH BASIN DETAILS 10 10
BSCE- 4B