TABLE OF CONTENTS

ARCHITECTURAL
PERSPECTIVE
SITE DEVELOPMENT PLAN
VICINITY MAP
GROUND FLOOR PLAN
SECOND FLOOR PLAN
ROOF PLAN
1.000
5.000 2.200 5.000 2.000 FRONT ELEVATION

REAR ELEVATION
LEFT SIDE ELEVATION
RIGHT SIDE ELEVATION

SCHEDULE OF DOORS
..\..\..\..\CMPM\FINAL CMPM\432373427_1628461991240008_5036271003471857898_n.jpg SCHEDULE OF WINDOWS

STRUCTURAL
CONSTRUCTION NOTES GENERAL NOTES
FOUNDATION PLAN
SECOND FLOOR FRAMING PLAN
COLUMN FOOTING DETAILS

PROPOSED BUILDING
WALL FOOTING DETAILS
FOOTING SCHEDULE
ROOF BEAM PLAN
BEAM DETAILS

PROPOSED PARKING AREA


COLUMN DETAILS
TRUSS DETAILS

1 PERSPECTIVE ONE WAY SLAB PLAN & SECTION


A-1 SCALE NTS
TWO WAY SLAB PLAN & SECTION & STIRRUPS SCHEDULE
TYPICAL BEAM SECTION, ELEVATION
STAIRS DETAIL

ELECTRICAL

GROUND FLOOR POWER LAYOUT


SECOND FLOOR POWER LAYOUT
GROUND FLOOR LIGHTING LAYOUT
TERY
EME
UBLIC C SECOND FLOOR LIGHTING LAYOUT
RORA P
IA AU
MAR
D
ROA
IN CIAL
ROV PLUMBING
ROR
A- BALE
RP WESLEYAN
UNIVERSITY-
PROPERTY LINE
AU GROUND FLOOR SANITARY LINE LAYOUT
M ARIA PHILIPPINES

2 SITE DEVELOPMENT PLAN SECOND FLOOR SANITARY LINE LAYOUT


A-1 SCALE NTS GROUND FLOOR WATER LINE LAYOUT

SECOND FLOOR WATER LINE LAYOUT


PLUMBING NOTES
LEGEND
SEPTIC TANK PLAN

3 VICINITY MAP SEPTIC TANK SECTION


CATCH BASIN DETAILS
A-1 SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT PERSPECTIVE
CMPM 402 PROPOSED TWO-STOREY APARTMENT
A-1
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png

SITE DEVELOPMENT PLAN


SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: VICINITY MAP
1 10
AJE CONST. BSCE- 4B
1 2 3 1 2 3 1 2 3

10.250 10.250 10.250


3.300 6.950 3.300 6.950 3.300 6.950 0.725
1.500 1.500 1.975 1.500 1.500 1.975 1.500 1.500 1.925
A A A

1.775

1.775

1.775
W3

W3
T&B DN T&B
W1
UP

W1
D2 D2

3.950

3.950

3.950
W2

W2
D1 D1
B B B
D1 D1

W2
W2

4.000

4.000

4.000
D2 D2

W1
W1

1.800

1.800

1.800
W3
T&B T&B
W3

C C C

1.800

1.800

1.800
W3
W3
T&B T&B
W1

W1
D2 D2
4.000

4.000

4.000
W2
W2

D1 D1 SLOPE
24.150

24.150

24.150
D D D
D1 D1
W2

W2
4.000

4.000

4.000
D2 D2
W1

W1
1.800

1.800

1.800
W3

T&B T&B
W3

E E E
1.800

1.800

1.800
W3
W3

T&B T&B
W1

W1
D2 D2
4.000

4.000

4.000
W2
W2

D1 D1
F F F
D1 D1
W2

W2
3.950

3.950

3.950
D2 D2
W1

W1
1.775

1.775

1.750
W3

T&B T&B
W3

G G FIRE G
1.175
EXIT

1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN 3 ROOF PLAN


A-2 SCALE NTS
A-2 SCALE NTS A-2 SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR PLAN
CMPM 402 PROPOSED TWO-STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png

SECOND FLOOR PLAN A-1


SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: ROOF PLAN
1 10
BSCE- 4B
AJE CONST.
ROOF APEX
0.800m
TOP OF R.B.

3.000m

6.800m 2ND F.L.

2.800m

1ST F.L.
0.200m N.G.L.

1 FRONT ELEVATION 2 LEFT SIDE ELEVATION


A-3 SCALE NTS
A-3 SCALE NTS

ROOF APEX
0.800m TOP OF R.B.

3.000m

6.800m 2ND F.L.

2.800m

1ST F.L.
0.200m N.G.L.

3 REAR ELEVATION 4 RIGHT SIDE ELEVATION


A-3 SCALE NTS A-3 SCALE NTS

0.900 0.700 1.200 1.200 0.500

0.500

0.500
1.200
2.100

2.000

1.600

1.600
0.900

F.F.L.
0.200

F.F.L.
0.200

N.G.L. D1 D2 N.G.L. W1 W2 W3

12 12 12 12 12
PANEL DOOR SWING TYPE PVC DOOR SLIDING WINDOW ALUMINUM SLIDING ALUMINUM SLIDING
ON 150mm. X 50mm. & JAMB SET WINDOW WINDOW
WOOD FRAME/JAMBS

5
A-3
SCHEDULE OF DOORS 6
A-3
SCHEDULE OF WINDOWS
SCALE NTS SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT FRONT ELEVATION SCHEDULE OF DOORS
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 A-3
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: LEFT SIDE ELEVATION SCHEDULE OF WINDOWS
REAR ELEVATION 3 11
BSCE- 4B RIGHT SIDE ELEVATION
AJE CONST.
A. GENERAL NOTES
C. REINFORCING STEEL E. FORMWORKS

NOTES ON FOOTINGS

B. REINFORCED CONCRETE NOTES


NOTES ON CONCRETE MASONRY UNITS ( CMU )

NOTES ON BACKFILL & COMPACTION


D. STRUCTURAL STEEL

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT
CMPM 402
S-1
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png

SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: CONSTRUCTION NOTES GENERAL NOTES
4 11
AJE CONST. BSCE- 4B
1 2 2' 3 1 1' 2 3
0.25 8-20 mm
7.025
10.250 10.250
dia. bar 100 mm
3.300 6.950 3.300 6.950 F.F.L. THK. R.C.
2.000 1.250 1.500
1.500 FTB1.500 SLAB ON
C1-F1

C1-F1

C1-F1
A A 2B-3
N.G.L.
FTB 2B-2 GRADE

1.200
1.750

0.40
FTB

0.400
WF-1
50 mm THK.
0.820

DN
UP GRAVEL

3.950

3.950
2B-1

2B-2
FTB

FTB
WF-3 S-2
2B-2 2B-4 BEDDING
50 mm THK.

1.975

2B-2
GRAVEL

2B-2
1.640
S-2 S-2

0.900
BEDDING
C1-F1 C1F1

C1-F1
B B

1.200
FTB 2B-4 2B-3 2B-1 COLUMN BARS
1.200 (See Sched)

0.100
2B-2
2.445
S-1

4.000

4.000
2B-1
2B-3

2B-2

0.300
FTB

FTB
WF-3

4.000
S-1 S-2

1.325
WF-2

1.800

2
B-
C1-F1

C1-F1

2
2.1
C C

60
FTB 2B-4 2B-1
COLUMN FOOTING DETAILS

1.800
WF-2

4.000

4.000
100MM THK.

2B-1
2B-2

2B-2
FTB

FTB
WF-3 S-1 S-2
SLAB ON GRADE
W/ 10MM Ø RSB
@ 0.50M B.W. O.C.
24.150

24.150
C1-F1

C1-F1

D D
FTB 2B-4 2B-1
4.000

4.000
2B-1
2B-2

2B-2
FTB

FTB

WF-3 S-1 S-2


WF-2

1.800
C1-F1

C1-F1

E E
FTB 2B-4 2B-1
1.800
WF-2

4.000

4.000
2B-1
2B-2

2B-2
FTB

FTB

WF-3 S-1 S-2


C1-F1

C1-F1

F
FTB
F
2B-4 2B-1 WALL FOOTING DETAILS
3.950

3.950
2B-1
2B-2

2B-2
FTB

FTB

WF-3 S-1 S-2


WF-1

1.750

1.000
C1-F1

C1-F1

G FTB G 2B-4 2B-2


2B-2

2B-2

1.150 S-2
G' 2B-2
1.750

1 FOUNDATION PLAN
SCALE NTS
2 SECOND FLOOR FRAMING PLAN
SCALE NTS
S-2 S-2

FOOTING SCHEDULE

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT FOUNDATION PLAN
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 SECOND FLOOR FRAMING PLAN S-2
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: COLUMN FOOTING DETAILS
WALL FOOTING DETAILS 5 11
BSCE- 4B FOOTING SCHEDULE
AJE CONST.
1 1' 2 3

10.250
3.300 6.950
1.200 1.500
A 250 250 250 250
RB-1 RB-3 RB-1

300

300
350

350
3.950
RB-4

RB-2

RB-2
B 250 250 250 250
COLUMN DETAILS
RB-3 RB-1

300

300
350

350
4.000
RB-2

RB-2
RB-4

250

400
250 250 250 250
C

300

300
RB-3 RB-1

350

350
4.000
RB-2

RB-2
RB-4

250 250 250 250


24.150

300

300
350

350
RB-3 RB-1
4.000
RB-2

RB-2
RB-4

250 250
350

350
E
RB-3 RB-1
4.000
RB-4

RB-2

RB-2

2∠S 2.5"X2.5"X1/4" THK.


F 3
RB-3 RB-1 2 = 2∠S 2"X2"X16 " THK.
0.700
3.950
RB-2

RB-2
RB-4

9.235
G RB-3 RB-1
2"X3"X1.5MM THK. 10MM Ø ROUND BAR
C-PURLINS SPA. @ 0.60M TRUSS DETAILS
O.C.
1 ROOF BEAM PLAN
SCALE NTS
S-3
NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT
PROPOSED TWO STOREY APARTMENT ROOF BEAM PLAN
CMPM 402
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png

BEAM DETAILS S-3


SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: COLUMN DETAILS
TRUSS DETAILS 6 11
BSCE- 4B
AJE CONST.
TYPICAL BEAM SECTION, ELEVATION &
STIRRUPS SCHEDULE
TOP EXTRA BAR @ LEFT TOP EXTRA BAR @ RIGHT TOP EXTRA BAR CANTILEVER
@ LEFT SUPPORT
TOP BAR CONTINUOUS TOP BAR CONTINUOUS
L L3
L L 2L3 3
4 4

BOTTOM BAR CONTINUOUS L/5 L3/6 BOTTOM BAR


CONTINUOUS
BOTTOM EXTRA BAR
40 x BAR Ø LAPPED SIDE BAR EXTRA
L/5 SPLICE ON COMPRE- OR WEB BARS
SSION BARS
INT GIR SUPPORT CANTILEVER SPAN
EXT COL SUPPORT INT COL SUPPORT
(A)="F" : 10 mm Ø stirrup 3 @ 50, 3 @ 75, 4 @ 100 mm,
5 @ 150 mm to the nearest support the THE SYMBOL "C" REPRESENT TO APPLY STIRRUP
rest is 200 mm o.c. to center span. SPACING OF TO THE FREE END OF CANTILEVER BEAM.

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT ONE WAY SLAB PLAN & SECTION
PROPOSED TWO STOREY APARTMENT
CMPM 402 TWO WAY SLAB PLAN & SECTION
S-4
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png

SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: TYPICAL BEAM SECTION, ELEVATION
& STIRRUPS SCHEDULE
STAIRS DETAIL 7 11
BSCE- 4B
AJE CONST.
RISER DIAGRAM

M
40AT

15AT 2P 20AT 2P

1 2

SPARE SPARE

3 4

GROUND

1 2 3 1 2 3 1 2 3 1 2 3

10.250 10.250 10.250 10.250


3.300 6.950 3.300 6.950 3.300 6.950 3.300 6.950
1.500 1.500 1.925 1.500 1.500 1.925 1.500 1.500 1.925 1.500 1.500 1.925
A A A A
Sa Sa
1.750

1.750

1.750

1.750
2 2
DN r DN r
UP UP p p Sr
3.950

3.950

3.950

3.950
a Sq Sr a Sq
Sp Sp
q q
PB1 PB7 PB1 PB7
B PB2 B PB8
B PB2 B PB8
Sp q Sp q
4.000

4.000

4.000

4.000
Sq Sq
a p a p
Sr Sr
1.800

1.800

1.800

1.800
r r
2 2

C C C C
1.800

1.800

1.800

1.800
2 2
r r
p Sr p Sr
4.000

4.000

4.000

4.000
a Sq a Sq
Sp Sp
q q
24.150

24.150

24.150

24.150
PB3 PB9 PB3 PB9
D PB4 D PB10
D D PB10
PB4
Sp q q
Sp
4.000

4.000

4.000

4.000
Sq Sq
a p a
Sr p Sr
1.800

1.800

1.800

1.800
r r
2 2

E E E E
1.800

1.800

1.800

1.800
2 2
r r
p Sr p Sr
4.000

4.000

4.000

4.000
a Sq a Sq
Sp Sp
q q
PB5 PB11
F PB5
PB6 F PB11
PB12
F PB6 F PB12
q q
Sp Sp
3.950

3.950

3.950

3.950
Sq Sq
a a p
p Sr Sr
1.750

1.750

1.750

1.750
2 2
r r

G G FIRE G G FIRE
EXIT
EXIT

1 GROUND FLOOR POWER LAYOUT 2 SECOND FLOOR POWER LAYOUT 3 GROUND FLOOR LIGHTING LAYOUT 4 SECOND FLOOR LIGHTING LAYOUT
E-1 SCALE NTS E-1 SCALE NTS
E-1 SCALE NTS E-1 SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR POWER LAYOUT
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 SECOND FLOOR POWER LAYOUT E-1
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT 8 10
BSCE- 4B
AJE CONST.
1 2 3 1 2 3 1 2 3 1 2 3

10.250 10.250 10.250 10.250

3.300 6.950 3.300 6.950 3.300 6.950 3.300 6.950


CB DS 3" Ø PVC CB
2" Ø PVC DS CB DS PV
C A 2" Ø PVC DS DS
A A
A Ø SHW FD SHW FD SHW FD
SHW FD 3"
W3 W3 F
WC DN WC WC WC
DN
UP D2 LAV D2 LAV UP D2 LAV D2 LAV
F
3" Ø PVC KS KSF KS
KS W2
W2
D1

4" Ø PVC
4" Ø PVC
D1 D1 D1
CB DS DS
B B DS B B
DS D1
D1 D1 D1

W2 W2
KS KS KSF KS
D2 LAV D2 LAV D2 LAV
F D2 LAV
WC W3 WC W3 WC WC
SHW FD DS F
CB SHW FD DS C C SHW FD C SHW FD
C DS SHW FD DS SHW FD SHW FD SHW FD
W3 W3 F
WC WC WC WC
D2 LAV D2 LAV D2 LAV D2 LAV
F

4" Ø PVC
3" Ø PVC

4" Ø PVC
KS KS KSF KS
W2 W2

D1

24.150
D1 D1 D1

24.150
23.900

CB DS DS
4" Ø PVC
4" Ø PVC

D D DS D D 24.150m
DS KS
D1 D1 D1 D1 KS

W2 W2
KS KS KSF KS
D2 LAV D2 LAV F
D2 LAV D2 LAV
WC W3 WC W3 WC WC
F
CB SHW FD DS E SHW FD DS SHW FD SHW FD
E DS SHW FD E E
DS SHW FD SHW FD SHW FD
W3 W3 F
WC WC WC WC
D2 LAV D2 LAV D2 LAV D2 LAV
F
3" Ø PVC

KS W2 KS W2 KSF KS

D1 D1 D1 D1
CB DS DS
F F DS F F
4" Ø PVC
4" Ø PVC

DS D1
D1 D1 D1

W2 W2
KS KS KSF KS
D2 LAV D2 LAV D2 LAV
F D2 LAV
WC W3 WC W3 WC WC
F
SHW FD SHW FD SHW FD SHW FD
G DS DS G DS FIRE DS G G
FIRE

4"
3
CB CB EXIT

WATER PIPE
EXIT

SEPTIC
TANK
CV
WM
GV
TAPPED TO
WATER MAIN
4" Ø PVC STORM DRAIN SOURCE

TAPPED TO STREET DRAIN

1 GROUND FLOOR SANITARY LINE LAYOUT 2 SECOND FLOOR SANITARY LINE LAYOUT 3 GROUND FLOOR WATER LINE LAYOUT 4
P-1
SECOND FLOOR WATER LINE LAYOUT
SCALE NTS
P-1 SCALE NTS P-1 SCALE NTS P-1 SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT GROUND FLOOR SANITARY LINE LAYOUT
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png CMPM 402 SECOND FLOOR SANITARY LINE LAYOUT P-1
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: GROUND FLOOR WATER LINE LAYOUT
SECOND FLOOR WATER LINE LAYOUT 9 10
BSCE- 4B
AJE CONST.
PLUMBING NOTES LEGEND

2
P-2
SEPTIC TANK PLAN
SCALE NTS

600 600

0.10 m
600

600

0.10 m

10 mm Ø REBARS @
200 mm.o. c. BOTHWAYS

1 CATCH BASIN DETAILS


P-2 SCALE NTS 3
P-2
SEPTIC TANK PLAN
SCALE NTS

NAME OF STUDENTS: SUBJECT: COLLEGE: NAME OF INSTRUCTOR: PROJECT TITLE: SHEET CONTENT: SHEET NO.:
CONSTRUCTION METHOD & PROJECT MANAGEMENT PLUMBING NOTES
PROPOSED TWO STOREY APARTMENT
..\..\..\..\This PC\Documents\4TH YEAR\CMPM\FINAL CMPM\SUPER FINAL\FINAL LOGO.png
CMPM 402 LEGEND P-2
SECTION: AURORA STATE COLLEGE OF TECHNOLOGY ENGR. JIM RYAN DELA PENA PROJECT LOCATION: SEPTIC TANK PLAN
SEPTIC TANK SECTION
CATCH BASIN DETAILS 10 10
BSCE- 4B
AJE CONST.