Landing Slab Details
Landing Slab Details
Landing Slab Details
1000
A A
1000
IMPORTANT DETAILS:
1. CLEAR COVER TO MAIN REINFORCEMENT AS FOLLOWS:
* FOOTING - 75 MM * COLUMN ABOVE GL - 40 MM
* COLUMN BELOW GL - 50 MM
2. THE COVER BLOCKS SHOULD BE PREPARED BY M25 CONCRETE MIX.
3. LAP LENGTH FOR ALL BARS SHALL BE 50 TIMES OF THE DIA OF THE BAR
UNLESS OTHERWISE SPECIFIED.
4. ALL REINFORCEMENTS SHALL BE PLACED AND MAINTAINED IN THE POSITION
SHOWN IN THE DRAWING (CROSS SECTION) BY PROVING PROPER COVER
BLOCKS, SPACERS AND SUPPORTING BARS.
5. NOT MORE THAN HALF OF THE COLUMN BARS SHALL BE LAPPED AT A
SECTION.
6. ALL CONCRETE WORKS SHALL BE MACHINE MIXED AND MACHINE VIBRATED.
400
CLIENT :
PROJECT :
DRAWING TITLE: