GENERAL DETAILS :

1. ALL DRAWINGS SHOULD BE READ ALONG WITH THE ARCHITECTURAL


DRAWINGS.
2. GRADE OF CONCRETE MIX SHALL BE M 25 CONFORMING TO I.S. 456 - 2000
UNLESS OTHERWISE SPECIFIED.
3. ALL PLAIN AND REINFORCED CEMENT CONCRETE WORKS SHALL BE STRICTLY
CONFIRMED TO I.S.456 - 2000.
4. REINFORCEMENT SHALL BE Fe 500 CONFORMING TO I.S.1786-2008.
5. ALL DIMENSIONS ARE IN "MM" UNLESS OTHERWISE SPECIFIED.
6. PURPOSE OF THE WATER TANK WAS DESIGNED FOR THE 16M

7. THE SAFE BEARING CAPACITY OF SOIL IS ASSUMED AS 100 KN / SQ.M.


8. STRUCTURAL CONSULTANTS CANNOT TAKE THE RESPONSIBILITIES FOR
ERRORS/LAPSES DURING EXECUTION AS A CONSEQUENCE OF IMPROPER
INADEQUATE OR INCOMPLETENT STUDY OF DRAWINGS.

1000
A A

1000
IMPORTANT DETAILS:
1. CLEAR COVER TO MAIN REINFORCEMENT AS FOLLOWS:
* FOOTING - 75 MM * COLUMN ABOVE GL - 40 MM
* COLUMN BELOW GL - 50 MM
2. THE COVER BLOCKS SHOULD BE PREPARED BY M25 CONCRETE MIX.
3. LAP LENGTH FOR ALL BARS SHALL BE 50 TIMES OF THE DIA OF THE BAR
UNLESS OTHERWISE SPECIFIED.
4. ALL REINFORCEMENTS SHALL BE PLACED AND MAINTAINED IN THE POSITION
SHOWN IN THE DRAWING (CROSS SECTION) BY PROVING PROPER COVER
BLOCKS, SPACERS AND SUPPORTING BARS.
5. NOT MORE THAN HALF OF THE COLUMN BARS SHALL BE LAPPED AT A
SECTION.
6. ALL CONCRETE WORKS SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

7. REMOVAL OF FORM WORKS:


a. FOR FOOTING - 1 DAY
b. FOR COLUMN - 1 DAY
8. BEFORE POURING OF CONCRETE TO ALL STRUCTURAL ELEMENTS LIKE
FOOTING,COLUMNS,BEAMS & SLABS etc.,THE FORMWORK AND
REINFORCEMENT FABRICATION FOR THE RESPECTED MEMBERS SHOULD BE
CHECKED BY AN QUALIFIED CIVIL ENGINEER (OR) STRUCTURAL ENGINEER
FOR THE LATEST DETAIL STRUCTURAL DRAWINGS.

400
CLIENT :

PROJECT :

DRAWING TITLE:

LADDER DETAIL: ISA 60X60X5


STRUCTURAL PLAN

SCALE : NTS DRAWING NO:


DATE : St.P -