1 151454 Loknete Marutrao Ghule Patil
Distillery
Dnyaneshwar
Unit Project
SSK at
Limited
Bhende, 137.06 Crores
2 147486 Empire Developers Commercial Complex Project at S G Highway, Ahm
3 151446 Assam Cancer Care Foundation
Cancer Care Hospital Project at Dhu135 Crores
4 148229 Great Galleon Ventures Limited
DDGS Maufacturing Unit (Maize, Bro65 Crores
5 147130 Meghmani Organics Limited Caustic Chlorine & Hydrogen Peroxi100 Crores
6 145751 Meghalaya Power Transmission
PowerCorporation
Transmission Limited
Project at Lumj77.69 Crores
7 151471 Cadila Pharmaceuticals Limited
Active Pharma Ingredients Project a10 Crores
8 144466 Binusaria Ispat Private Limited
Steel- Manufacturing
Unit I Unit Project at5 Crores
9 151465 Sobha Limited Residential Complex Project at Kyal 302.66 Crores
10 145046 Tirumala Tirupati Devasthanam
Hostel Project at Tirupati, Chittoor 10.75 Crores
11 151452 Giridhari Infra High Rise Residential Complex Proj 250 Crores
12 134900 Singareni Collieries Company
Singareni
LimitedThermal Power Plant (STP696 Crores
13 137266 Singareni Collieries Company
Singareni
LimitedThermal Power Plant (STPP 696 Crores
14 126603 National Highways AuthorityHighway
of IndiaProject at Gogwan Jalalpur-990 Crores
15 151474 O2 Power Private Limited Solar Based Power Unit Project at Ko 1,400 Crores
16 151473 O2 Power Private Limited Wind Based Power Unit Project at Ko 1,400 Crores
17 151433 ZJSH SPV Private Limited Residential Colony Project at Chan 200 Crores
18 144474 Binusaria Ispat Private Limited
Induction
- Unit Furnance
I Manufacturing U 3 Crores
19 144664 ARMN Pharmaceutical PrivateBulkLimited
Drug & Bulk Drug Intermediates 12.03 Crores
20 151455 Loknete Marutrao Ghule Patil
Distillery
Dnyaneshwar
Unit Project
SSK at
Limited
Bhende, 137 Crores
21 146682 Andhra Pradesh Industrial Infrastructure
National Investment
Corporation
& Manufacturin
Limited 10,859 Crores
22 146347 Andhra Pradesh AerospaceIndustrial
& Defence Park
Electronics
Project atPark
Palasu
Private200
Limited
Crores
23 146284 Avishkar Arista DevelopersCommercial
LLP Complex Project at Kharadi, Pune, Ma
24 151442 DRA Homes Residential Complex Project at Paleripattu, Thiruv
25 58763 National Water Development LowerAgency
Orr Irrigation Scheme Project3,065 Crores
26 4121 NHPC Limited Dam Project at Munli Village, Lower31,876 Crores
27 4097 NHPC Limited Multipurpose Hydroelectric Power Pr 31,876 Crores
28 147026 DDN SFA Limited Rectified Spirit Project Osmanabad, Aurangabad,
29 151449 Aarti Industries Limited R&D Centre Project at Jhagadia, Bh 75 Crores
30 147544 D&C Majestic Plaza LLP Commercial Complex Project at Ellisbridge, Ahmed
31 151427 Honer Estates LLP Residential Complex Project at Gopanpally, Medak
32 151426 Roongta Developers Residential-cum-Commercial Complex 136 Crores
33 151472 Nxtra Data Limited Data Centre Project at Rajarhat, No600 Crores
34 151456 Devbhoomi Casting PrivateSteel
Limited
Plant Project at Kumbra, Sahi 24.97 Crores
35 151459 NBCC India Limited Residential Complex Project at Saro11,660 Crores
36 148151 Tirupati Cements Private Limited
Clinker Grinding Unit Project at Beh7 Crores
37 145415 T R Pharma Active Pharmaceuticals Ingredients 4.9 Crores
38 151395 Venus Sugar Limited Co-generation Power Plant Project 108.75 Crores
39 151432 Kaavyaratna Gift LLP Residential Complex Project at Rand61.25 Crores
40 151447 Assam Cancer Care Foundation
Cancer Care Hospital Project at Siv 135 Crores
41 151450 NBCC India Limited Residential Complex Project at Grea691.15 Crores
42 146166 Express Digital Payments Services
CaptivePrivate
Power Plant
Limited
Project at Ganora, Banswara,
43 146172 Express Digital Payments Services
DistilleryPrivate
Unit Project
Limitedat Ganora, Banswara, Rajas
44 147523 Goyal Infracon Private Limited
Commercial Complex Project at Koyli, Vadodara,
45 148494 Gos Ispat Private Limited Ferro Maganese Plant Project at G 100 Crores
46 151436 Assam Cancer Care FoundationCancer Care Hospital Project at Go 135 Crores
47 151424 GKRS Properties LLP Residential Complex Project at Ban 56 Crores
48 151451 Dosti Realty Limited Residential Complex Project at Sio 123 Crores
49 147258 Dhampur Sugar Mills Limited Sugar Mill Project at Meerganj, Sambhal, Uttar Pr
50 145742 Goyal & Co Construction Private
Commercial
LimitedComplex Project at Ma80 Crores
51 151448 Himachal Pradesh State Electricity
Power Distribution
Board Project at Sirma76.84 Crores
52 151435 Assam Cancer Care FoundationCancer Care Hospital Project at Go 135 Crores
53 147480 Friends Medichem Active Pharmaceutical Intermediates 13 Crores
54 144895 Vaishno Builders Residential Complex with Club House 40 Crores
55 151440 Cochin Shipyard Limited Dry Dock Project at Mangalavanam,1799 Crores
56 145439 Synthopharm Chemicals Dyes & Dyes Intermediates Manufac4 Crores
57 147190 Dhampur Sugar Mills Limited Sugar Mill Project at Asmoli, Sambhal, Uttar Prad
58 151437 Assam Cancer Care FoundationCancer Care Hospital Project at Nal 135 Crores
59 151434 SNN Infratech LLP Warehouse Project at Sarojani Nagar 357.92 Crores
60 151439 SVR Laboratories Private Limited
Active Pharmaceutical Ingredients 9 Crores
61 151431 NK Sharma Hospitality Private
HotelLimited
Project at Bishanpura, Zirakp 212 Crores
62 147450 Orientbell Tiles Debottlenecking Plant Project at Si 11 Crores
63 151423 Angelica Developers Limited Commercial Complex Project at Aero 1,150 Crores
64 151422 Raunak Group Residential Complex Project at Adha500 Crores
65 151419 Symphony Pharma LifesciencesResearch
Private
& Development
Limited Centre Project at Kolthu
66 146181 Pudumjee Pulp & Paper Mills CoalLimited
Based Captive Power Plant at 35 Crores
67 146647 Mundeshwari Multicon PrivateCommercial
Limited Complex Project at Mustafapur, Patna,
68 144177 Vighnahar Environmental Solution
CommonPrivateIntegrated
Limited
Bio Medical Wast
5 Crores
69 151421 Puranik Builders Private Limited
Residential Complex Project at Bha 879 Crores
70 147993 Organozen Chemicals Private Active
Limited
Pharmaceuticals Ingredients 30 Crores
71 145602 NV Distilleries & BreweriesCaptive
Private Power
LimitedPlant Project at Sandh
20 Crores
72 146164 Liberty International Limited
Pesticides Manufacturing Unit Proje25 Crores
73 151428 Canara Bank Administrative Building Unit Projec 90.51 Crores
74 151441 NHPC Limited Teesta Hydel Power Project at Dzong 5,190.21 Crore
75 144809 FMC India Private Limited Chemicals Manufacturing Unit Proj 17.50 Crores
76 151430 NK Sharma Hospitality Private
HotelLimited
Project at Bishanpura, Zirakpu212 Crores
77 151429 Water Resources Department, Irrigation
Madhya UnitPradesh
Project at Suthaliya 838.59 Crores
78 145099 Canis Mines & Minerals LLPWaste Heat Recovery Plant Project at 23 Crores
79 145811 Oriilon India Private Limited
Nylon at Chhamuchhal, Surat, Gujar15 Crores
80 151425 JMK Industries Steel Plant Project at Wazirabad, F 43.56 Crores
81 146309 Vform Technopack Private Polythene
Limited & Plastic Processed Prod6 Crores
82 147795 Venusbidhan Agrotech PrivateDistillery
Limited
Unit Project at Boring Roa 5.0 Crores
83 60885 National Enterprises Iron Ore Project at Adaghat, Sundar20 Crores
84 144980 Nifty Labs Private Limited Active Pharmaceuticals Ingredients 4 Crores
85 148019 Neptune Enterprise Commercial Complex Project at V V Nagar, Anand,
86 147699 Neetu Solvents Formaldehyde Manufacturing Unit Pr 5 Crores
87 147717 Nature Care Association Residential Complex Project at Napad, Nadiad, Gu
88 145264 Wellfare Buildings & EstatesResidential
Private Limited
Complex Project at Bakkannapalem,
89 147116 Laxmi Kripa Ispat Private Limited
Integrated Steel Plant Project at Ur 3 Crores
90 145017 Vision Biotech Bulk Drugs & Drug Intermediates Ma 1.50 Crores
91 145045 Yash Realty Residential cum Commercial Complex 36.46 Crores
92 63438 Yashasvi Yarns Limited Polyester Chips Manufacturing Unit150 Crores
93 146897 Yogeshwar Realty Commercial Complex Project at Pathardi, Nashik,
94 151420 Laxmi Chemical Industries Solvents Distillation Project at Jhagadia, Bharuch,
95 151418 Tezpur University University Project at Tezpur, Sonit 85.15 Crores
96 151415 ACG Worldwide Capsules Unit Project at Dahej, Bha 400 Crores
97 145871 Alokik Group Mall Complex Project at Dhanbad, Jharkhand [Alok
98 151408 Chenab Valley Power ProjectsHydro
Private
PowerLimited
Project at Kiru, Kisht 4,288 Crores
99 151402 Calstar Sponge Limited Coal Based Power Project at Durga 90 Crores
100 136145 Bangalore Metro Rail Corporation
Bangalore
Limited
Metro Rail Project at Ben30,695 Crores
Project Status Completion D Project Type Ownership Industry
Industrial Projects
Approvals Received Expansion Private
Construction Projects
Construction Started December, 20New Private
Construction Projects
Under Approvals New Private
Industrial Projects
Construction Started December, 20New Private
Industrial Projects
Construction Started December, 20New Private
Power Projects
Under Approvals New Government
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Under Approvals Expansion Private
Construction Started December, 20New Private Construction Projects
Construction Started March, 2025 New Private Construction Projects
Construction Projects
Approvals Received New Private
Power Projects
Construction Started March, 2025 New Government
Power Projects
Construction Started March, 2025 New Government
Infrastructure Projects
Construction Started December, 20New Government
Power Projects
Construction Started December, 20New Private
Power Projects
Construction Started December, 20New Private
Construction Projects
Under Approvals New Private
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Approvals Received New Private
Industrial Projects
Construction Started December, 20Expansion Private
Construction Projects
Approvals Received New Private
Construction Projects
Construction Started December, 20New Private
Construction Projects
Construction Started March, 2025 New Private
Construction Projects
Construction Started June, 2024 New Private
Irrigation Projects
Under Approvals New Government
Irrigation Projects
Construction Started December, 20New Government
Power Projects
Construction Started December, 20New Government
Construction Started December, 20New Private Industrial Projects
Approvals Received New Private Construction Projects
Construction Started June, 2024 New Private Construction Projects
Construction Started March, 2026 New Private Construction Projects
Construction Projects
Construction Started December, 20New Private
Construction Projects
Construction Started December, 20New Private
Industrial Projects
Approvals Received Expansion Private
Construction Projects
Approvals Received New Private
Industrial Projects
Approvals Received Expansion Private
Industrial Projects
Nearly Completion April, 2024 New Private
Power Projects
Construction Started July, 2024 New Private
Construction Projects
Construction Started July, 2026 New Private
Construction Projects
Under Approvals New Private
Construction Projects
Construction Started March, 2025 New Private
Power Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Construction Projects
Construction Started July, 2024 New Private
Mining Projects
Construction Started December, 20New Private
Construction Projects
Under Approvals New Private
Construction Projects
Under Approvals New Private
Construction Projects
Construction Started June, 2026 New Private
Industrial Projects
Approvals Received Expansion Private
Construction Projects
Construction Started December 202New Private
Power Projects
Approvals Received New Government
Under Approvals New Government Construction Projects
Approvals Received New Private Industrial Projects
Construction Projects
Approvals Received New Private
Infrastructure Projects
Construction Started March, 2025 New Government
Industrial Projects
Under Approvals New Private
Industrial Projects
Approvals Received Expansion Private
Construction Projects
Under Approvals New Private
Construction Projects
Construction Started March, 2026 New Private
Industrial Projects
Under Approvals Expansion Private
Construction Projects
Under Approvals New Private
Infrastructure Projects
Construction Started December, 20New Private
Construction Projects
Under Approvals New Private
Construction Projects
Construction Started March, 2025 New Private
Construction Projects
Approvals Received New Private
Power Projects
Under Approvals New Private
Construction Projects
Construction Started June, 2024 Expansion Private
Infrastructure Projects
Approvals Received New Private
Construction Projects
Construction Started July, 2025 New Private
Industrial Projects
Construction Started December, 20New Private
Approvals Received Expansion Private Power Projects
Under Approvals New Private Industrial Projects
Construction Started December, 20New Private Construction Projects
Approvals Received New Private Power Projects
Industrial Projects
Under Approvals New Private
Construction Projects
Under Approvals New Private
Irrigation Projects
Construction Started March, 2025 New Government
Power Projects
Approvals Received New Private
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Approvals Received Expansion Private
Industrial Projects
Approvals Received New Private
Industrial Projects
Approvals Received New Private
Mining Projects
Under Approvals New Private
Industrial Projects
Under Approvals Expansion Private
Construction Projects
Construction Started August, 2025 New Private
Industrial Projects
Construction Started December, 20New Private
Construction Projects
Approvals Received New Private
Construction Projects
Under Approvals New Private
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Construction Started December, 20New Private
Construction Projects
Approvals Received New Private
Industrial Projects
Under Approvals New Private
Construction Projects
Construction Started March, 2025 New Private
Industrial Projects
Approvals Received New Private
Under Approvals New Private Construction Projects
Construction Started April, 2024 New Private Industrial Projects
Construction Projects
Construction Started April, 2024 New Private
Power Projects
Construction Started December, 20New Private
Power Projects
Under Approvals New Private
Infrastructure Projects
Construction Started December, 20New Government
Sub Industry Product
Distillery Capacity
Not Disclosed Country State City
Distilleries & Breweries
Commercial ComplexNot Disclosed India Maharashtra Ahmednagar
Business / Commercial Complexes
Hospital Not Disclosed India Gujarat Ahmedabad
Hospitals
India Assam Dhubri
Food & Agro Products
DDGS 65 TPD India Madhya Pradesh Dhar
Chemicals
Hydrogen Peroxide
Power Transmission6 0000
220 KVMT India Gujarat Bharuch
Power Distribution
Active pharmaceutical
64.30ingredients India MTPM
MTPM TO 199.0 Meghalaya Shillong
Drugs & Pharmaceuticals
India Gujarat Bharuch
Ferrous Metals (Iron & Steel)
TMT
BuildBars
Up Area 396000
6.5 Acres India Telangana Rangareddy
Real Estate India Karnataka Bangalore Urban
Hostel Project Not Disclosed
Other Construction Projects India Andhra Pradesh Chittoor
Residential complex
Not Disclosed
Real Estate
Thermal Power 660 MW India Telangana Rangareddy
Thermal Based Power
Thermal Power 660 MW India Telangana Khammam
Thermal Based Power
Highway 44.9 kms India Telangana Khammam
Roadways / Highways
Solar Based Power140 MW India Uttar Pradesh Saharanpur
Solar Based Power
Wind Based Power140 MW India Karnataka Ballari
Solar Based Power
Residential Complex
410 Flats India Karnataka Ballari
Real Estate
Induction Furnance30 TPH India Odisha Bhubaneswar
Ferrous Metals (Iron & Steel)
Bulk Drug 113.6 MT/AnnumIndia Telangana Rangareddy
Drugs & Pharmaceuticals
Distillery 55 KLPD India Haryana Panipat
Distilleries & Breweries
Built Up Area India
14,231 acres (57.59 Maharashtra
sq.km / 5,759 ha.) Ahmednagar
Other Construction Projects
Built Up Area 264 Acres India Andhra Pradesh Prakasam
Industrial / Software / Other Parks
Built Up Area Not Disclosed India Andhra Pradesh Anantapuramu
Business / Commercial Complexes
Residential Complex
Not Disclosed India Maharashtra Pune
Real Estate
Irrigation 110400 hectares India Tamil Nadu Thiruvallur
Other Irrigation Projects
Dam 288 Meter India Madhya Pradesh Shivpuri
Dams
Hydel Power 2,880 MW (12x240) India Arunachal Prades Lower Dibang Vall
Hydel Based Power
Rectified Spirit 45 KLPD India Arunachal Prades Lower Dibang Vall
Distilleries & Breweries India Maharashtra Aurangabad
Build Up Area 50,000 sq. ft.
Other Construction Projects India Gujarat Bharuch
Commercial ComplexNot Disclosed
Business / Commercial Complexes India Gujarat Ahmedabad
Residential Units 1216 Units
Real Estate India Telangana Medak
Real Estate Area 10.5 acres
Residential
Data CentreStories19
25 Stories
MW India Gujarat Surat
Communication Services
Steel Not Disclosed India West Bengal North Twenty Fou
Ferrous Metals (Iron & Steel)
Residential Complex
Not Disclosed India Punjab SAS Nagar
Real Estate
Clinker Grinding 125 MT/day India Delhi South West Delhi
Cement & Asbestos
Active Pharmaceuticals Ingredients India
Not Disclosed Rajasthan Alwar
Drugs & Pharmaceuticals
Co-generation Power
2.2 MW India Gujarat Mehsana
Captive Power
Residential Complex
Not Disclosed India Uttar Pradesh Sambhal
Real Estate
Hospital Not Disclosed India Gujarat Gandhinagar
Hospitals
Residential complex
Not Disclosed India Assam Sivasagar
Real Estate
Captive Power 3.0 MW India Uttar Pradesh Greater Noida
Captive Power
India Rajasthan Banswara
Distillery 90 KLPD
Distilleries & Breweries
Commercial Complex Not Disclosed India Rajasthan Banswara
Business / Commercial Complexes
Ferro Silica 25,200 TPA India Gujarat Vadodara
Other Minerals
Hospital Not Disclosed India Chhattisgarh Balodabazar-Bhat
Hospitals Silicon Manganese14,400 TPA
Residential ComplexNot Disclosed India Assam Golaghat
Real Estate
India Telangana Rangareddy
Real Estate
Residential
Sugar Mill Towers2 Towers
6,500 TCD India Maharashtra Mumbai
Food & Agro Products
Built Up Area 42,367.19 Sq.mt. India Uttar Pradesh Sambhal
Business / Commercial Complexes
Power DistributionNot Disclosed India Gujarat Ahmedabad
Power Distribution
Hospital Not Disclosed India Himachal PradeshSirmaur
Hospitals India Assam Goalpara
Active Pharmaceutical
12 MT/Month
Intermediates
Drugs & Pharmaceuticals
Built Up Area 36996.65 Sq.mt. India Gujarat Rajkot
Real Estate
Cranes with Lifting150
capacity
tonnes India Karnataka Bengaluru
Shipping Infrastructure
869.58 Sq. Meter India
Dyes & Dyes Intermediates Kerala Ernakulam
Chemicals
Sugar Mill 1,500 TCD India Gujarat Ahmedabad
Food & Agro Products
Hospital Not Disclosed India Uttar Pradesh Sambhal
Hospitals
Warehouse Not Disclosed India Assam Nalbari
Storage & Distribution
Active Pharmaceutical Ingredients India
Not Disclosed Delhi South West Delhi
Drugs & Pharmaceuticals
Build Up Area 100,000 sq ft India Telangana Nalgonda
Hotels, Restaurants & Resorts
Debottlenecking 2.4 MSM India Punjab Mohali
Water & Sewerage Pipeline & Distribution, Effluent
Commercial Complex Not Disclosed India Uttar Pradesh Bulandshahar
Business / Commercial Complexes
Residential ComplexNot Disclosed India Delhi South West Delhi
Real Estate
R&D Centre 10 TPM India Maharashtra Thane
Other Construction Projects
Coal Based Captive 16Power
MW India Telangana Rangareddy
Captive Power
Built Up Area 50,638.84 m2 India Maharashtra Raigad
Business / Commercial Complexes
India Bihar Patna
Water & Sewerage Pipeline & Distribution, Effluent
Autoclave
Built Up Area 150 India
liters per batch
Not Disclosed Maharashtra Pune
Real Estate
Active Pharmaceuticals
13117.8Ingredients
TPA India Maharashtra Thane
Drugs & Pharmaceuticals
Captive Power 1 MW India Telangana Kamareddy
Captive Power
Pesticides 2480.0 MT/MonthIndia Punjab Patiala
Fertilisers & Pesticides India Gujarat Bharuch
Administrative Building
Not Disclosed
Real Estate India West Bengal 24 Parganas
Teesta Hydel Power 600 MW
Hydel Based Power India Sikkim North Sikkim
Chemicals 50 tpm
Chemicals
Build Up Area 100,000 sq ft India Telangana Medak
Hotels, Restaurants & Resorts
Storage Terminal 183.70 MCM India Punjab Mohali
Other Irrigation Projects
Waste Heat Recovery6 MW India Madhya Pradesh Rajgarh
Captive Power
Nylon 4320 MT/annum India Meghalaya Jaintia Hills
Textiles
Steel 240,000 TPA India Gujarat Surat
Ferrous Metals (Iron & Steel)
Polythene & PlasticNot
Processed India
DisclosedProducts Punjab Fatehgarh Sahib
Plastic & Plastic Products
Distillery 125 KLPD India Telangana Sangareddy
Distilleries & Breweries
Iron Ore 300300 Tns India Bihar Patna
Other Minerals
Active Pharmaceuticals
135.5 Ingredients
TPM India Odisha Sundargarh
Drugs & Pharmaceuticals
Commercial Complex Not Disclosed India Andhra Pradesh Krishna
Business / Commercial Complexes
India Gujarat Anand
Formaldehyde 100 TPD
Chemicals
Residential Floors8 Floors India Uttar Pradesh Hardoi
Real Estate
Built Up Area 20636.44 Sq.mt. India Gujarat Nadiad
Real Estate Residential Units 302 Units
Steel 23.900 TPA India Andhra Pradesh Visakhapatnam
Ferrous Metals (Iron & Steel)
Bulk Drugs & Drug60.0Intermediates
TPM India Chhattisgarh Raipur
Drugs & Pharmaceuticals
Built Up Area 22592.46 Sq.mt. India Andhra Pradesh Anantapur
Real Estate
Polyester Chips 60,000 TPA India Maharashtra Thane
Plastic & Plastic Products
Floors Not Disclosed India Dadra and Nagar HDadra and Nagar H
Business / Commercial Complexes
Solvents Distillation
Not Disclosed India Maharashtra Nashik
Chemicals
University Not Disclosed India Gujarat Bharuch
Other Construction Projects India Assam Sonitpur
Capsules 4000 MT
Drugs & Pharmaceuticals India Gujarat Bharuch
Built Up Area 1.2 m.sq.ft
Shopping Plazas / Multiplex / Mall
Hydro Power 624 MW India Jharkhand Dhanbad
Hydel Based Power
Coal Based Not Disclosed India Jammu and KashmKishtwar
Thermal Based Power
Metro Rail 73.9 kms India West Bengal Paschim Bardham
Railways
India Karnataka Bengaluru
Location Contact Person - Distillery Manager
Mr. Nimbalkar Tell No 58990
098509
Bhende Mr. Deep Mahendrakumar Patel - Director 090990 99859
S G Highway Mr. Robi Prakash Sarma - Manager-Procurement
098642 15225
Mr. Vinod Singh - Purchase Manager 098260 71184
Sejwaya Mr. Vimal Rana - Purchase Officer 094271 08668
Vagra Mr. J Hynniewta - Superintending Engineer 094361 73157
Lumjingshai
Ankleshwar Mr.
Mr. Gautam Jain - Vice
Sumeet Kedia President
- Director 02646-251519
099890 99900
Teegapur Village Mr. Arun Kumar - Senior Vice President 080 4646 4500
Kyalasanahalli Mr. Ramesh Reddy - Project Incharge 098490 74870
Tirupati Mr. Indrasena Reddy - Managing Director 040 32454666
Bandlaguda Jagir Mr. Srinivas Thummalapalli - General Manager
08744 245651
Kothagudem Mr. Srinivas Thummalapalli - General Manager
08744 245651
Kothagudem Mr. Veerendra Singh - Project Director 095966 61955

Kotturu & Kudligi


Kotturu & Kudligi Mr. Tapan Kumar Mohanty - Director 099370 03400
Chandrasekharpu Mr. Sumeet Kedia - Director 099890 99900
Teegapur Village Mr. Ghanshyam Padey - Director 098188 06189
Seenkh Village Mr. Nimbalkar - Distillery Manager 098509 58990
Bhende Mr. Shri S.S. Prasad - Chief Engineer 095050 15007
Praksasam Mr. Alok Sharma - Director 098803 82000
Palasumudram Mr. Mohnish Advani - Partner 077670 77370
Kharadi Mr. Vinayaga Moorthy - Project Manager 091505 95888
Paleripattu
Didauni
Munli Village Mr. Gobinda Baidya - Executive Director 03803 223009
Munli Village Mr. Gobinda Baidya - Executive Director
Mr. Vijay P. Nade - Managing Director 03803
096047223009
45252
Osmanabad Mr. Kishan Kumar Maurya - Vice President 097251 89987
Jhagadia Mr. Deval Bharatbhai Patel - Director 098987 70005
Ellisbridge Mr. KV Durga Prasad - Managing Director 040 42035588
Gopanpally Mr. Ankit Roongta - Partner 098251 48350
Vesu Mr. Gaurav Singh - Product head 9197177 45802
Rajarhat Mr. Deepak Goyal - Director 099156 99000
Kumbra Mr. K. P. Mahadevaswamy - Chairman & Managing
011 24367314
Director
Sarojini Nagar Mr. Mahesh Pareek - Director 094140 56605
Behror Mr. Vishwas Tribhovanbhai Patel - Partner 097241 49805
Bhalthi Mr. Rakesh Kumar - Cheif General Manager 072538 88099
Gangadharpur Vil Mr. Sureshbhai Patel - Managing Partner 095588 18904
Randesan Mr. Robi Prakash Sarma - Manager-Procurement
098642 15225
Mr. K. P. Mahadevaswamy - Chairman & Managing
011 - 24367314
Director
Mr. Sandeep Agarwal - Director 098111 58695
Ganora
Mr. Sandeep Agarwal - Director 098111 58695
Ganora Mr. Pradip Goyal - Director 098241 53845
Koyli Mr. Ankit Kedia - Director 094313 88449
Ghughuwadih Mr. Robi Prakash Sarma - Manager-Procurement 098642 15225
Mr. Goutham Reddy Baddam - Partner 097013 46172
Bandlaguda Jagir Mr. Deepak Goradia - Vice Chairman & Managing 022 22198500
Director
sion Mr. Pankaj Singh Sisodia - Deputy General Manager
078950 03631
Meerganj Mr. Mukesh Agarwal - Director 096876 10082
Makarba Mr. Lukesh Kumar Thakur - Chief Superintending9418125092/
Engineer9418064884
Mr. Robi Prakash Sarma - Manager-Procurement 098642 15225
Mr. Jignesh Amipara - Partner 098790 17419
Pipaliya Mr. Bhanu Praksh Muppireddy - Managing Partner099166 75089
Sheegehalli Villag Mr. Mohammed Gazel P A - Senior Manager098957 05124
Mangalavanam Mr. Sailesh Patel - Partner 093270 10611
GIDC Naroda Mr. Pankaj Singh Sisodia - General Manager078950 03631
Asmoli Mr. Robi Prakash Sarma - Procurement Manager 098642 15225
Mr. Jairam - Project Proponent 094152 12081
Sarojani Nagar Mr. Pinnenti Nageshwara Rao - Managing Director 098490 04148, 040 - 2370 5300
Dhotigudem
Bishanpura Mr. Amit Khanna - Head 0120 6625500, 6625601
Sikandrabad Mr. Alakesh Mahata - Assistant General
Mr. Tvk Narayanan - Project Officer Manager-
096900
098107Project
06994
01290
Aerocity LP-1B-02Mr. Madhavi Shetya - Projects Manager 097699 63387
Adharwadi Mr. Shrinivas Kanchu - Assistant Manager 085010 76359
Shamirpet MandaMr. Subhash Sancheti - Engineering Manager 078750 94605
MIDC Mahad Mr. Samrendra Singh - Director 094310 11129
Mustafapur Mr. Gaurav S Bankar - Partner 090115 08250
Kandali Village Mrs. Ameeta Ambekar - Assistant Vice President 098672 25222
Bhayander Pada Mr. Nagesh S Walimbe - Managing Director 098494 91454
Talmadla Mr. Sapan Kayat - Director 017623 06001
Sandharshi VillageMr. Saurabh R Shah - Partner 093222 35606
Vagra Mr. Sanjeev Kumar - Deputy Manager 011230 61506
Rajarhat Mr. Jigme Laepcha - Assistant Manager 084362 77552
Dzongu Mr. Venkat Rao - Director 09866 89385
Patancheru
Bishanpura Mr. Amit Khanna - Head (0120)-6625500 / 6625601
Suthaliya Mr. Vikash
Mr. Jinesh Kumar
Saraf -Thakur - Excutive
Vice President Engineer099030
09826 901097
of Commercial 99080
Thangskai Village Mr. Piyush Patel - Manager 098259 43829
Chhamuchhal Mr. Rakesh Kumar Bansal - Partner 098787 24551
Wazirabad Mr. Uday Vanage - Head of Corporate 082911 82469
Kambalpalle Mr. Sanjay Kumar Singh - Director 094731 99590
Boring Road Mr. N Pradhan - General Manager of Purchase 099370 63037
Adaghat Mr. Desireddy Kesava Reddy - Managing Director098661 54075
IDA Kondapalli Mr. Jayantibhai Ranchhodbhai Prajapati - Director 099981 87967
V V Nagar
Mr. Neetu Kheria - Proprietor 098734 52667
Sandila Mr. Manishbhai Ashokbhai Bhavsar - Director
098250 19921
Napad Mr. Srinivasa Rao - Managing Partner 099129 26600
Bakkannapalem Mr. Banke Bihari Agrawal - Director 097520 07701
Urla Mr. Muniraj K - Plant Manager 077021 39405
Gollapuram VillagMr. Yashwant Sitlaprasad Yadav - Partner 098331 82674
Katemanivali VillaMr. Amit Jain - Director 098200 84156
Velugam Mr. Kaushik Kothiya - Managing Director 099608 19111
Pathardi Mr. Meet Patel - Senior Manager 076989 68000
Jhagadia Dr. Asim Datta - Project Co-ordinator 094353 80897
Tezpur Mr. Pinkesh Jasani - Deputy General Manager
098193 12666
Dahej Mr. Ghanshyam Soni - Project Manager 096317 10869
Mr. Ramesh Ojha - General Manager 01995-259505
Kiru Mr. Vikas Agarwal - Director 094330 15995/ 033-22109542 / 9543
Durgapur Mr. Yashavanth Chavan - Chief Engineer 080 22969255
Email Id
dsskltd@gmail.com Fax No. Promoter Contact
theempire2021@gmail.com SH-44, Dnyaneshwarnagar, P.O Bhende Sakhar Karkha
info@accf.in Near Mercedes Benz Showroom, S G Highway, Ahmeda
greatgalleonltd@gmail.com 3rd Floor, VK Trade Centre, GS Rd, Opp to Down Tow
vimal.rana@meghmani.com 308-309, Prince's Business Skypark, Scheme No. 54,
cetranzemeptcl@gmail.com Meghmani House B/h Safal Profitaire, Corporate Roa
Lum Jingshai Short Round Road, Shillong-793001, Meg
gautam.jain@cadilapharma.co.in
binjusariaispat@gmail.com Sarkhej-Dholka Road, Bhat, Ahmedabad-382210, Gujar
arun.kumar@sobha.com C-1, Govt. Industrial Estate, Chandulal Baradari, Ba
eottd@tirumala.org Sarjapur - Marthahalli Outer Ring Road (ORR) Devarab
indu@giridhariconstructions.com Jayant Apartment, United Jain Student Home Road, SIES Ln, Sion West, S
H.No.5-13, Behind Elementary School, Lalpuram, Etukuru, Guntur-52201
gm_pd@scclmines.com, sec01_pd_crp@scclmines.com
Kothagudem Collieries, Bhadradri, Kothagudem Dist-507101, Telangana
gm_pd@scclmines.com, sec01_pd_crp@scclmines.com
tis@nhai.org Kothagudem Collieries, Bhadradri, Kothagudem Dist-507101, Telangana
G 5&6, Sector-10, Dwarka, New Delhi-110 075, India
8th Floor, DLF Square Jacaranda Marg, DLF Phase 2, Gurugram- 122002,
md.zestates@zestates.in 8th Floor, DLF Square Jacaranda Marg, DLF Phase 2, Gurugram- 122002,
binjusariaispat@gmail.com Plot No: M4/34, Acharya Vihar, Bhubaneswar, Khurda
C-1, Govt. Industrial Estate, Chandulal Baradari, Ba
Pandeyghanshyam@gmail.com, purchase@armnpharma.com
dsskltd@gmail.com Plot Number D-11/55 Block D Kasna Luksar Road, Suraj
cgm_p@apiic.in SH-44, Dnyaneshwarnagar, P.O Bhende Sakhar Karkha
anirban@apadepark.com APIIC Towers, Plot No-1 (9th , 10th & 11th floors), IT Park, Mangalagiri, G
info@aristadevelopers.com NH-44, Opp. BEL Campus Palasamudram Village, Goran
draranjit@gmail.com 515 Platinum Square Building, Next to Hyatt Hotel,
New Nos 109, 111 & 113, Lloyds Road, Royapettah, Chennai - 600 014, T
F 24 BJB Nagar, Bhubaneswar, Khurda - 751014, Odisha, India
dmp_nhpc@yahoo.com NHPC Office Complex, Sector-33, Faridabad - 121003, Haryana, India
dmp_nhpc@yahoo.com
nadevijay@gmail.com NHPC Office Complex, Sector-33, Faridabad - 121003, Haryana, India
krishan.maurya@aarti-industries.com Unit No 101, Plot D-265 MIDC TTC, Sagar Ratan Ind Estate, Turbhe Navi
deval.patel@dandc.in 71, Udyog Kshetra, 2nd Floor, Mulund Goregaon Lin
vdpkodali@gmail.com 505, KAIROS, Opp. Mahatma Gandhi Labour Institute, Manav Mandir, M
info@roongtadevelopers.com KRB Towers, Jubilee Enclave, Plot No 1,2,3,4 & 4/A Survey No: 65, 66 & 6
gp.singh@nxtra.in 4th Floor, Roongta Shopping Center, VIP Road, Surat-395007, Gujarat, In
dbcpl2017@gmail.com Bharti Crescent, 1, Nelson Mandela Road, Vasant Kunj Phase - II, New De
ccd@nbccindia.com Village Kumbhra, Near Transport Nagar, Mandi Gobindgarh, Fatehgarh S
pareek3186@gmail.com NBCC Bhawan, Lodhi Road, New Delhi 110 003, India
adm.trpharma@gmail.com Kolhapur Sangli Road, Near Devgiri Petrol Pump, Post
venussugarpa@gmail.com Baldev Nagar, Barmer-344001, Rajasthan, India
smitpatelsrg@gmail.com Shiv Shakti Nagar, Majhawali, Post Narauli, Tehsil Ch
info@accf.in Sanskruti By Kaavyaratna, B/s Shree Rang Pearl, Gift City Road, Randesa
ccd@nbccindia.com 3rd Floor, VK Trade Centre, GS Rd, Opp to Down Town Hospital, Rukmin
sandeepagrawalin@yahoo.co.in NBCC Bhawan, Lodhi Road, New Delhi 110 003, India
F-32/3, Ground Floor, Okhla Industrial Area, Phase II Delhi, South Delhi-1
sandeepagrawalin@yahoo.co.in
pk.goyalenterprise@gmail.com F-32/3, Ground Floor, Okhla Industrial Area, Phase II Delhi, South Delhi-1
akediakoderma051@gmail.com 5/6, Nirdesh Tenament, Vishwamitri Railway Station, Manjalpur, Vadoda
info@accf.in House No.11/229, Opp. Chandra Complex, Shukwari Ba
harshit.s@gkrs.co.in 3rd floor, V.K. Trade Centre, G.S. Road, Opposite Downtown Hospital, G
info@dostirealty.com Flat No. 103 & 104, 1st Floor, Fortune Chambers, Madhapur, Hyderabad
pankaj.dsm@gmail.com Lawrence & Mayo House, 1st Floor, 276, Dr. D. N. Road, Fort, Mumbai -
info@goyalco.com 6th Floor, Max House, Okhla Industrial Estate, Phase I
seshimla@hpseb.in Goyal House, Opp Karnavati Club, S G Highway, Ahmed
info@accf.in Vidyut Bhawan, Shimla-171004, Himachal Pradesh, India
friendsmedichem2020@gmail.com 3rd floor, V.K. Trade Centre, G.S. Road, Opposite Downtown Hospital, G
vaishnobuilders4ec@gmail.com Survey No - 160/P-1. Plot No. 10, 11, 12, 13, 14, Pipaliya, Rajkot, Gujarat
m.gazel@.cochinshiQyard.in Beside Hoodi Flyover, Sy No-86-1A, Hoodi Village, Bengaluru-48, Karnata
synthopharma@gmail.com Perumanoor PO, Kochi-682015, Kerala, India
pankaj.dsm@gmail.com C-1-220-221/3, Phase 2, G I, D C Estate, GIDC Naroda, Ahmedabad-3823
info@accf.in 6th Floor, Max House, Okhla Industrial Estate, Phase III, New Delhi - 110
reciprocalimpex@yahoo.co.in 3rd Floor, VK Trade Centre, GS Rd, Opp to Down Town Hospital, Rukmin
sales@svrdrugs-labs.com S-502, Rohtas Plumeria Apartment Vibhuti Khand, Gomti Nagar, Lucknow
SVSS Nivas, Flat No.507, South Wing, Sanathnagar, Hyderabad, Telangan
amit.khanna@oerlikon.com V.N Bagh, Ambala-Chandigarh Expressway, Zirakpur, Zirakpur, Mohali, R
alakesh.mahata@orienttiles.com Iris House, 16 Business Centre, Nangal Raya, DDA Co
tvk.narayanan@bhartiland.com, eiaangelicadevelopers@gmail.com
info@raunakgroup.com 3rd Floor, Worldmark 2, Asset - 8, Aerocity, NH- 8, New Delhi-110037, In
srinivas.kanchu@sympharma.com Kalyan - Shilphata Rd, Behind Bhoomi Lawns Building-A2, Next to Bhoom
sps@pune.pudumjee.com Plot No 7/A, Biotech Park, Phase - II, Genome Valley, Kolthur (V), Shame
samrendra@mundeshwari.co.in, info@mundeshwa 60, Dr. V B Gandhi Marg, Kalaghoda, Mumbai-400001, Maharashtra, Ind
gaurav.vighnahar@gmail.com 1st Floor, Amitabh Kunj, Main Road, Buddha Colony, Patna-800001, Biha
ameeta@puraniks.in Hno 2515 A/p Wadgaon Anand, Junnar, Pune 412411,
nsw@zengroupindia.com Puraniks One, Kanchan Pushp, Near Suraj Water Park, Kavesar, Ghodbun
sapankayat@nvgroup.co.in, sapan.nv@gmail.com Flat No 207, 2nd Floor, Uday Vensor, Plot No 59 , 60 & 61 , Kothaguda, H
sshah@libertyscl.com 10th Floor, Vandana Building 11, Tolstoy Marg, New D
info@cpwd.gov.in 84 Jolly Maker, Chamber No 2225, Nariman Point, Mumbai 400021, Mah
jigmelepcha1@gmai.com No. 112, JC Road, Bengaluru - 560 002, Karnataka, India
narendra.dharmavarapu@technipfmc.com NHPC Office Complex, Sector-33, Faridabad-121003, Haryana, India
TCG Financial Center, 2nd Floor, C-53, G Block, Bandra Kurla Complex, B
amit.khanna@oerlikon.com 6625699 V.n Bagh, Ambala-Chandigarh Expressway, Zirakpur, Mohali, Rajpura-14
ewrd.biaora@gmail.com
canisproject2020gmail.com Jal Sansadhan Bhawan, Bhopal-462003, Madhya Pradesh, India
info@oriilon.com Thangskai Village, P.O Lumshnong, Dist East Jaintia Hi
jmkindustries631@gmail.com 502-503, 5th Floor, UTC Building Ring Road, Udhana, Darwaja, Surat-395
purchase@secureclosure.com Wazirabad Village, Sirhind, Fatehgarh Sahib-140406, Punjab, India
venusbidhanagrotech@gmail.com Everest Nivara Infotech Park-I, B-201, Plot No.D-3 TTC Industrial Area, N
gapl_sponge@yahoo.co.in Flat No. 3C, Bhagwati Saran Enclave, Boring Road, Patna, Bihar, India
desireddy@niftylabs.com Old Cinema Road, Barbil, Opposite Essel Mining Office, Keonjhar, Kendu
neptuneenterprise2113@gmail.com 203 Satya Sai Residency, Plot No. 7-1-54/1, Dharam
Near Sardar Patel Statue, V V Nagar Railway Station Road, V V Nagar, An
neetusolvents@gmail.com
bhavsarmanish15@yahoo.com F-88, RIICO Industrial area, Khushkhera, Tijara, Alwar,
mvvbuilders.plans@gmail.com Siddhant Shivsrushti, Manajinagar, Narhe, Pune-410041, Maharashtra, I
laxmikripa@ymail.com 126/1, Rabindrapally P.O & P.S : Khardah, North-24 Paraganas, Kolkata -
visionbiotech1@gmail.com 578 & 598, Urla Industrial Area, Raipur-492003, Chhat
yashrealty06@gmail.com Plot No 2B/1, APIIC industrial Park, Gollapuram Village, Hindupur Manda
amit@yashasviyarns.com EFC Business Center, Marisoft - 1, 4th Floor Marigold
Plot No.18, Dokmardi, Village Amli, Silvassa-396230,
yogeshwargroup.nsk@gmail.com, kaushikkothiya2@gmail.com
laxmichemical2017@gmail.com Shivalik Sankalp 1st Floor, S.no.315 Plot.no 1+2+3 , Prashant Nagar, Path
asimdatta2012@gmail.com, asim@tezu.ernet.in Plot No .824/23, GIDC Jhagadia Industrial Estate, Ankleshwar - 393110, G
pinkesh.jasani@acg-world.com Napaam, Tezpur-784028, Assam, India
ghyanshamsoni@alokikgroup.com Scitech Centre, 7 Prabhat Nagar, Patel Estate, S.V.
hopkiru@cvppindia.com 405, Axis Mall, Bhagwan Das Road, C-Scheme, Jaipur, Rajasthan, India
vagarwal71@gmail.com, avranil.calspring@gmail.comChenab Jal Shakti Bhawan, Opposite Saraswati Dham, Rail Head Comple
bmrcl@dataone.in 18, R.N. Mukherjee Road, Kolkata, 700001, West Bengal, India
B.M.T.C Complex, 3rd Floor, Shanthinagar, K.H Road, Bengaluru - 56002
Branch Contact Site Location
SH-44, Dnyaneshwarnagar, P.O Bhende Sakhar Karkhana, Newasa Taluka, Ahmadnagar - 414605, Maharashtra, India
Near Mercedes Benz Showroom, S G Highway, Ahmedabad, Gujarat, India
3rd Floor, VK Trade Centre, GS Rd, Opp to Down Town Hospital, Rukmini Gaon, Guwahati-781022, Assam, India
308-309, Prince's Business Skypark, Scheme No. 54, A.B.Road, Indore - 452010, Madhya Pradesh, India
Meghmani House B/h Safal Profitaire, Corporate Road, Prahaladnagar, Ahmedabad-380015. Gujarat, India
Lum Jingshai Short Round Road, Shillong-793001, Meghalaya, India
Survey No. 1389, Trasad Road, Dholka, Ahmedabad-382225, India
Survey No. 133/A, Teegapur Village, Kothur Mandal, Ranga Reddy District, Telangana, India
Sarjapur - Marthahalli Outer Ring Road (ORR) Devarabisanahalli, Bellandur Post, Bangalore -560103, Karnataka, India
ome Road, SIES Ln, Sion West, Sion, Mumbai-400022, Maharashtra, India
alpuram, Etukuru, Guntur-522017, Andhra Pradesh, India
gudem Dist-507101, Telangana, India
gudem Dist-507101, Telangana, India

LF Phase 2, Gurugram- 122002, Haryana, India


LF Phase 2, Gurugram- 122002, Haryana, India
Plot No: M4/34, Acharya Vihar Bhubaneswar, Khurda - 751013 Odisha, India
Survey No. 133/A, Teegapur Village, Kothur Mandal, Ranga Reddy District, Telangana, India
Khasra No. 57/2,3,4,5,6,7,8,58/1,10 Seenkh Village, Tehsil Israna, District Panipat, Haryana, India
SH-44, Dnyaneshwarnagar, P.O Bhende Sakhar Karkhana, Newasa Taluka, Ahmadnagar - 414605, Maharashtra, India
h floors), IT Park, Mangalagiri, Guntur (Dist)-Andhra Pradesh, India
NH-44, Opp. BEL Campus Palasamudram Village, Gorantla Mandal, Anantapur - 515241, Andhra Pradesh, India
515 Platinum Square Building, Next to Hyatt Hotel, Viman Nagar, Pune-411014, Maharashtra, India
oyapettah, Chennai - 600 014, Tamil Nadu, India
751014, Odisha, India
bad - 121003, Haryana, India
bad - 121003, Haryana, India
Ratan Ind Estate, Turbhe Navi Mumbai-400705, Maharashtra, India
Plot Nos. 801, 801/23, G.I.D.C. Estate, Phase - III, Vapi, Valsad District-396195, Gujarat, India
our Institute, Manav Mandir, Memnagar, Ahmedabad-380052, Gujarat, India
,3,4 & 4/A Survey No: 65, 66 & 67, Madhapur, Serili Ngampally, Hyderabad, Rangareddi-500081, Telangana, India
Road, Surat-395007, Gujarat, India
, Vasant Kunj Phase - II, New Delhi - 110070, India
Mandi Gobindgarh, Fatehgarh Sahib-147301, Punjab, India
10 003, India
Plot No. E-37 & A-18-B, RIICO Industrial Area, Phase I, Behror, Alwar, Rajasthan, India
Survey No. 479, Sadra-Vadhroda Road, Village:- Bhalthi, Dharampur, Ta:- Kadi, Dist:-Mehsana, Gujarat, India
Village Gangadharpur, Tehsil: Chandausi, District: Sambhal, Uttar Pradesh, India
g Pearl, Gift City Road, Randesan, Gandhinagar 382007, Gujarat, India
o Down Town Hospital, Rukmini Gaon, Guwahati-781022, Assam, India
10 003, India
ea, Phase II Delhi, South Delhi-110020, India
ea, Phase II Delhi, South Delhi-110020, India
way Station, Manjalpur, Vadodara-390011, Gujarat, India
Ghughuwadih Village, Simga Tehsil, Balodabazar-Bhatapara District, Chhattisgarh, India
Opposite Downtown Hospital, Guwahati-781022, Assam, India
ambers, Madhapur, Hyderabad-500081, Telangana, India
Dr. D. N. Road, Fort, Mumbai - 400 001, Maharashtra, India
Sugar Mill Compound, Village Asmoli, Sambhal, Moradabad- 244304, Uttar Pradesh, India
Goyal House, Opp Karnavati Club, S G Highway, Ahmedabad - 380015, Gujarat, India
al Pradesh, India
Opposite Downtown Hospital, Guwahati-781022, Assam, India
13, 14, Pipaliya, Rajkot, Gujarat, India
di Village, Bengaluru-48, Karnataka, India

GIDC Naroda, Ahmedabad-382330, Gujarat, India


state, Phase III, New Delhi - 110020, India
o Down Town Hospital, Rukmini Gaon, Guwahati-781022, Assam, India
uti Khand, Gomti Nagar, Lucknow-226010, Uttar Pradesh, India
nathnagar, Hyderabad, Telangana, India
ay, Zirakpur, Zirakpur, Mohali, Rajpura-140603, Punjab, India
8, Industrial Area, Sikandrabad, Bulandshahar Dist, Uttar Pradesh, India
ty, NH- 8, New Delhi-110037, India
wns Building-A2, Next to Bhoomi Road, Padle Gaon, Kalyan, Thane-421204, Maharashtra, India
ome Valley, Kolthur (V), Shameerpet (M), Medchal (Dist.), 500101, Telangana, India
mbai-400001, Maharashtra, India
dha Colony, Patna-800001, Bihar, India
Gat No. 1190 Near Kandali MIDC, A/P Kandali Village Kandali Tal. Junnar Pune Dist. Pune, Maharashtra, India
j Water Park, Kavesar, Ghodbunder Road, Thane (W) 400607, Maharashtra, India
t No 59 , 60 & 61 , Kothaguda, Hyderabad, Rangareddi-500081, Telangana, India
Sandharshi Village, Tehsil Rajpura, District Patiala, Punjab, India
man Point, Mumbai 400021, Maharashtra, India
arnataka, India
bad-121003, Haryana, India
Block, Bandra Kurla Complex, Bandra East, Mumbai-400098, Maharashtra, India
y, Zirakpur, Mohali, Rajpura-140603, Punjab, India
Madhya Pradesh, India
Thangskai Village, P.O Lumshnong, Dist East Jaintia Hills, Meghalaya, India
ad, Udhana, Darwaja, Surat-395002, Gujarat, India
hib-140406, Punjab, India
ot No.D-3 TTC Industrial Area, Navi Mumbai-400705, Maharashtra, India
ing Road, Patna, Bihar, India
Mining Office, Keonjhar, Kendujhar-758035, Odisha, India
Kondapally, Ibrahimpatnam, Krishna Dist-521228, Andhra Pradesh, India
way Station Road, V V Nagar, Anand, Gujarat, India
H-910A, Chopanki Indl. Estate, Teh Tizara, Distt. Alwar-314107, Rajasthan, india
e, Pune-410041, Maharashtra, India
, North-24 Paraganas, Kolkata - 700 117, West Bengal, India
578 & 598, Urla Industrial Area, Raipur-492003, Chhattisgarh, India
puram Village, Hindupur Mandal, Ananthapur District, Andhra Pradesh, India
S. No. 98/4, 99/2, Katemanivali Village, Tal Kalyan, District Thane, Maharashtra
Plot No.18, Dokmardi, Village Amli, Silvassa-396230, Dadra & Nagar Haveli, India
no 1+2+3 , Prashant Nagar, Pathardi, Nashik-422009, Maharashtra, India
l Estate, Ankleshwar - 393110, Gujarat, India

Plot No. D2/CH/149/3, GIDC Dahej, Phase II, Vagra Taluka, Bharuch District, Gujarat, India
eme, Jaipur, Rajasthan, India
aswati Dham, Rail Head Complex, Jammu-180012, Jammu and kashmir, India
01, West Bengal, India
ar, K.H Road, Bengaluru - 560027, Karnataka, India
Consultant Name 1 Contacts Consultant Name 2
05, Maharashtra, India

022, Assam, India


424, Medicine Market, Paldi Cross Road, Ahmedabad-380006, Gujara, India
San Envirotech Private Limited
info@sanenvirotech.com

60103, Karnataka, India

05, Maharashtra, India

ra Pradesh, India

5th Floor, Kailash Building, 26, Kasturba Gandhi Marg, New Delhi - 110 001, India
WAPCOS Limited
ho@wapcos.co.in

Gujarat, India
arashtra, India
Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi - 110001, India
Delhi Metro Rail Corporation Limite SYSTRA MVA Consulting India Privat
info@delhimetrorail.com 011 23417910/12 23417921
Contacts Consultant Name 3 Contacts

006, Gujara, India

w Delhi - 110 001, India


10&11th Floor, Tower-B, 12/3, Vatika Mindscapes Mathura Road, NH2, Sector 27D, Faridabad-121003, Haryana, India

faridabadoffice@systra.com
Contractor Name 1 Contacts
Jadhav House, Tarabai Park, Karvir, Contractor Name 2Maharashtra, India
Kolhapur-416003,
D D Jhadav Infratech Private Limite

14, Pancom Chambers, 6-3-1090/1/A Raj Bhavan Road,Somajiguda, Hyderabad - 500482,


PES Engineers Private Limited 14, Pancom Chambers, 6-3-1090/1/A Raj Bhavan Road,Somajiguda, Hyderabad - 500482,
PES Engineers Private Limited info@peseng.net
D-33 Raj Nagar District Centre, Opposite Gaur Mall, Ghaziabad-201001, Uttar Pradesh, Ind
Raj Shyama Construction Private Li info@peseng.net

Jadhav House, Tarabai Park, Karvir, Kolhapur-416003, Maharashtra, India


D D Jhadav Infratech Private Limite

Sarthi House, 12 Laxmi Bai Colony, MLB Road, Gwalior - 474002, Madhya Pradesh, India
Sarthi Construction Patel Estate, Jogeshwari (W), Mumbai - 400 102, Maharashtra, India
Patel Engineering Limited info@sarthiconstruction.com G R- Infraprojects Limited India
Patel Estate, Jogeshwari (W), Mumbai 400 102, Maharashtra,
Patel Engineering Limited info@pateleng.com G R Infraprojects Limited
info@pateleng.com

W-3 / B, Plot - 455 Adipur Gandhidham Kachchh Gujarat, 370205 India


Mehul Geo Projects LLP
mehulconstruction01@gmail.com

Excel House, Ashirwad, Near Balewadi Stadium, Survey No 22/10B/1m Behind Baner Road
Regreen Excel EPC India Private Lim
md@excelengineering.in
7th Floor, Cgo Complex, Cbd Belapur, Navi Mumbai - 400614
Central Public Works Department
info@cpwd.gov.in
L&T House, Ballard Estate, P. O. Box: 278, Mumbai 400 001, Maharashtra, India
Larsen And Toubro Limited Mott MacDonald
vir@lntecc.com 022-22618181 022-22685858
Contacts
arashtra, India Contractor Name 3 Contacts

majiguda, Hyderabad - 500482, Telangana, India


majiguda, Hyderabad - 500482, Telangana, India
bad-201001, Uttar Pradesh, India

arashtra, India

4002, Madhya Pradesh, India


GR House, Hiran Magri, Sector 11, Udaipur Rajasthan 313 002, India L&T House, Ballard Estate, P. O. Box: 278, Mumbai 400
Larsen And
GR House, Hiran Magri, Sector 11, Udaipur Toubro313
Rajasthan Limited
002, India L&T House, Ballard Estate, P. O. Box: 278, Mumbai 400
info@grinfra.com Larsen And Toubro Limited vir@lntecc.com 022-22618181 022-22685858
info@grinfra.com vir@lntecc.com 022-22618181 022-22685858

22/10B/1m Behind Baner Road, Laxman Nagar, Balewadi, Pune - 411045, Maharashtra, India
703 'A' Wing, Prism Tower, Mind Space, Goregaon West, Mumbai - 400130,
062,Pandurang
Maharashtra,
Budhkar
India Marg, Worli, Mumbai - 40001
Siemens Limited
mumbai@mottmac-india.com 22 3981 0100 022 39677000 022 39677500
Architect Name 1 Contacts Architect Name 2

ate, P. O. Box: 278, Mumbai 400 001, Maharashtra, India


ate, P. O. Box: 278, Mumbai 400 001, Maharashtra, India
2618181 022-22685858
2618181 022-22685858
- -
Contacts Architect Name 3 Contacts
Remark
The project targets a diverse audience, including liquor wholesalers,
The Empire, a high-rise commercial complex situated on S G Highway, Ahm
The proposed initiative holds significant promise for Dhubri and the nei
The DDGS Manufacturing Unit, situated in Sejwaya, Dhar, Madhya Pradesh,
Meghmani Organics Limited's 100-crore Caustic Chlorine and Hydrogen Pe
Foremost among these advantages is the substantial enhancement of power
The expansion aligns strategically with the surging demand for APIs glo
The potential impact of this expansion is substantial, with increased pr
Sobha Victoria Park offers modern amenities such as a clubhouse, swimm
The hostel primarily caters to students enrolled in S.V. Balamandir Sch
Giridhari Infra's anticipated high-rise residential project in Bandlagu
Singareni Collieries Co. is setting up Flue Gas Desulphurisation (FGD)
Singareni Collieries Co. is setting up Flue Gas Desulphurisation (FGD)
The National Highways Authority of India (NHAI) is seeking bids for th
Syngene International, an integrated research, development, and manuf
Syngene International, an integrated research, development, and manuf
Envisioned to redefine modern living, the project is expected to featur
The potential impact of this project includes not only the diversificati
While the specific types of bulk drugs and intermediates to be manufa
The project targets a diverse audience, including liquor manufacturers
The NIMZ project in Prakasam District features plug-and-play infrastruc
This industrial park will feature dedicated infrastructure for aerospac
Emphasizing prime location advantages in Kharadi, the project offers m
Construction for DRA Urbania is underway following the receipt of approv
National Water Development Agency is planning to set up Irrigation Project at Didauni, Shivpuri, Madhya Pradesh.The propos
NHPC Limited is coming up with Dam Project at Dibang River, Lower Diban
NHPC is currently in the process of establishing a 2,880 MW (12x240) hy
The project sets itself apart by incorporating advanced and energy-eff
With a project cost of 75 Crore and a sprawling land area of 50,000 sq.
This ongoing project offers units available for purchase or rent, embrac
Under construction, the project is slated for phase 1 possession by Se
Envisaged to reflect similar successful projects by Roongta Developers
Strategically located in Rajarhat, North 24 Parganas, the data center w
The project, located in Kumbra, Punjab, focuses on installing cutting-
The Sarojini Nagar Redevelopment Project encompasses the construction o
The expansion project caters to construction companies, infrastructure
The API Manufacturing Unit promises modern production facilities adher
Venus Sugar Limited's ambitious Molasses-Based Distillery Unit project
The key features of "The Bougainvillea" include its prime location, mod
Anticipated to alleviate the cancer burden in Sivasagar and surrounding
Centurion Park is anticipated to offer a diverse range of apartment con
The Captive Power Plant project holds the potential to significantly im
Express Digital Payments Services Private Limited is poised to embark o
Goyal Infracon Private Limited's "Radhey Square" Commercial Complex Pro
At the heart of this project lies a robust production capacity of 7000
With an emphasis on cutting-edge medical infrastructure and a dedicated
GKRS Splendora aims to cater to diverse preferences and budgets. Its pl
Dosti Mezzo 22 offers a mix of 2 BHK (532 sq. ft. - 747 sq. ft.) and 3
The initiation of a new mill in Meerganj adds 6,500 TCD to DSM's total ca
The Titanium Business Park boasts premium office environments tailored t
Key Features Driving Change:Potential Societal and Environmental Benef
This modern healthcare facility will boast state-of-the-art medical equ
With a proposed monthly production capacity of 12 metric tons of APIs a
Residents are poised to enjoy an elevated living experience, with modern
CSL's Dry Dock Project is a substantial venture aimed at establishing a
Synthopharm Chemicals will build a cutting-edge Dyes and Dyes Intermed
This expansion initiative by Dhampur Sugar Mills is aimed at meeting
This state-of-the-art medical facility aims to mitigate the challenges
Designed to meet the demands of manufacturers, distributors, e-commerc
However, specific details regarding the current status of the expansion
NK Sharma Hospitality Private Limited is set to introduce a compelling
While the project underscores Orientbell's proactive stance in the face
Foreseen to accommodate a diverse array of commercial units, including
Expect an array of world-class amenities at Raunak City, including a sw
Symphony Pharma Lifesciences Pvt. Ltd upcoming Research and Development
While specific technological details are not publicly available, the pl
The anticipated expansion project promises modernized infrastructure a
This initiative holds the promise of safe and sustainable bio-medical
Expect an array of world-class amenities within Rumah Bali, including a
Organozen Chemicals Private Limited is set to revolutionize pharmaceut
The primary objective of this expansion is to fortify the energy supply
With an investment of 25 Crores, this state-of-the-art facility boasts a
Set amidst the vibrant business and IT hub of Rajarhat, the constructio
NHPC Limited is in the process of planning the Teesta Hydel Power Proj

NK Sharma Hospitality Private Limited is set to redefine hospitality in


The Water Resources Department, Madhya Pradesh, is set to embark on a groundbreaking endeavor, the Irrigation Unit Proje
This sustainable endeavor emphasizes energy efficiency and aligns with
Oriilon India Private Limited is poised for a significant stride in the
Amidst the planning phase and having obtained environmental clearance
This initiative holds promise for Telangana's industrial growth, potent
A key highlight of this initiative is its commitment to minimal environm
National Enterprises embarked on an Iron Ore Mining project in Adagha
This expansion project aims to increase the production capacity by 135.
The development of Neptune Square holds the potential to spur business
The project aims to potentially meet the domestic demand for formaldeh
Nature Care Association's grandiose Sahjanand Nexus 5 residential proj
Envisioned as a residential complex, the project is expected to offer a
Laxmi Kripa Ispat Private Limited is investing 3 crores to expand its
The project's potential focus on manufacturing vital bulk drugs and dru
The project, situated at S. No. 98/4, 99/2 in Katemanivali Village, Tha
Set against the backdrop of a 60,000 Tons Per Annum (TPA) production ca
Yogeshwar Shivalik Solitaire, a Commercial Complex project by Yogeshwar
Laxmi Chemical Industries is apparently starting a New Solvents Distill
Tezpur University coming up with new University Unit Project at Tezpur, Sonitpur, Assam
This initiative holds several key features, including a dedicated focu
The project boasts strategic location advantages, situated in a well-co
At the heart of this venture lies a robust infrastructure: a 624 MW po
While the approved project might contribute to increased power generati
Bangalore (Namma) Metro Phase 2 project with 73.921 km of new routes w
Progress Dissatisfaction
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by April, 2025.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 45% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 35% project work hasDissatisfaction
been completed.LinkProject work will be complete by De
01/2024 : Project is at construction started stage. 20% project work hasDissatisfaction
been completed.LinkProject work will be complete by M
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 45% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 45% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed, Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed, Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at construction started stage. 20% project work hasDissatisfaction
been completed.
LinkProject work will be complete by De
01/2024 : Project is at construction started stage. 20% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work hasDissatisfaction
been completed.LinkProject work will be complete by De
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 70% project work hasDissatisfaction
been completed.LinkProject work will be complete by Ju
01/2024 : Project is at construction started stage. 30% project work hasDissatisfaction
been completed.LinkProject work will be complete by M
01/2024 : Project is at construction started stage. 35% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at nearly completion stage. 75% project work has been completed. Project work will be complete by Apri
Dissatisfaction Link
01/2024 : Project is at construction started stage. 10% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at construction started stage. 20% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at construction started stage. 20% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 35% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at approvals received stage. Project got all the clearances. Project Link
Dissatisfaction work will be start by March, 2024.
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by January, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 65% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 45% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project Link
work will be start by January, 2024.
Dissatisfaction
01/2024 : Project is at construction started stage. 45% project work hasDissatisfaction
been completed.
LinkProject work will be complete by Ju
01/2024 : Project is at construction started stage. 65% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project Link
Dissatisfaction work will be start by February, 2024.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals.
Dissatisfaction Link yet to be decided.
No other details
01/2024 : Project is at construction started stage. 70% project work hasDissatisfaction
been completed.LinkProject work will be complete by De
01/2024 : Project is at approvals received stage. Project got all the clearances. Project Link
Dissatisfaction work will be start by March, 2024.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by January, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 45% project work has been completed. Project work will be complete by Au
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at construction started stage. 70% project work hasDissatisfaction
been completed.LinkProject work will be complete by Ap
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be completed by A
Dissatisfaction Link
01/2024 : Project is at construction started stage. 25% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by De
Dissatisfaction Link