SOP of Post ABC Governance
SOP of Post ABC Governance
SOP of Post ABC Governance
ISSUE AUTHORITY
Name Designation & Department Date Signature
Farhan Shariff Manager L2 (DNA)
Sakhawat Ali Manager (TPRE)
M. Nouman Khan DGM (TPRE)
Danish Kamil Manager
CFT Shahid Arain DGM
Members Ayaz Mirza DGM CQC
Ali Raza DGM HSED
Tariq Saeed Ghouri DGM HSED
Muhammad Farhan Khan DM (MI)
Habib Ali Khan Manager
Ejaz Ali Mirza GM L2 (DNA)
Sheraz Ahmed GM L2 (HSEQ)
Abdul Khalique Shaikh Regional Head (Gulshan & North)
Faisal Jehangir Regional Head (Bin Qasim & Johar)
Faisal Karamat Regional Head (South)
Haider Ali Regional Head (East)
Reviewed & Sheikh Humayun Saghir Regional Head (West)
Approved By: Bashir Shaikh Head (DNA)
Rizwan Ahmed Ansari Head (TPRE)
Muhammad Taimoor Khan Head (HSED)
Head of Distr. Projects &
Arshad Iftikhar
Coordination
Rehan Sajjad Chief of Corporate HSEQ
Amer Zia Chief Distribution Officer
REVIEW PERIOD
This is a controlled document and shall be reviewed as dictated by the issuing authority but at a period no
greater than 3 years from the last issue date.
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
TABLE OF CONTENTS
1. PURPOSE ............................................................................................................................................... 3
2. OBJECTIVE ............................................................................................................................................. 3
3. ABBREVIATIONS .................................................................................................................................... 3
4. RESPONSIBILITIES .................................................................................................................................. 4
5. PROCEDURE .......................................................................................................................................... 5
6. SECURITY AND SAFETY .......................................................................................................................... 7
7. REPORTING TEMPLATE ......................................................................................................................... 8
8. RELATED DOCUMENTS & RECORDS .................................................................................................... 10
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
1. PURPOSE
a) To establish good working practices, and standards for Post Governance of LT ABC Schemes and
save network for damages through tampering
2. OBJECTIVE
Following are the intended objectives of the SOP
3. ABBREVIATIONS
AM Assistant Manager
DCRC Disconnection/Reconnection
DM Deputy Manager
EOD End of Day
FIR First Investigation Report
IBC Integrated Business Centre
IRB Irregular Bill
IPC Insulation Piercing Connector
LCP Loss Control Project
LT Low Tension
LV Low Voltage
MI Meter Inspection
MIO Meter Inspection Officer
MTL Mobile Transport Ladder
NC New Connection
OSP Outsourced Personnel
HC Hook Connection (or Kunda)
PD Police Drive
PPE Personal Protective Equipment
PMT Pole Mounted Transformer
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
4. RESPONSIBILITIES
4.1 GM/DGM (Commercial)
4.1.1 GM/DGM must be cognizant of all IBC activities, including Post Governance of LT ABC Network.
4.1.2 The role shall be delegated up to the GM, in case of Low Loss IBC, and/or non-functional DGM
hierarchy, briefed as under:
a) The respective GM/DGMs keep close eye on commercial losses of the IBC and especially LT
ABC converted schemes.
b) Cascade and assign slots down the line as per the requirement within IBC sections.
c) Enable all their direct reports to be as productive as possible by identifying impediments and
red tape and focalize effective strategies for post governance.
d) Coordination with GM/DGM Technical for requirement of resources
4.2.1 Manager will act as a Team Lead and will oversee all the functions of AM/DM including
the following roles:
To ensure proper data analysis on monthly basis
Identification of patrolling targets effectively and efficiently.
Ensuring sub-ordinates are aware of all relevant SOPs for scope of work.
Raise critical on-site issues promptly with DGM/GM, HSE and relevant stakeholders
Coordination with projects/technical department for mapping activity during ABC or Post ABC
conversion
Coordination with Smart Grid department for availability/upkeeping of AMR meter
Ensure TBT at center and provide trainings to field staff for regular day to day operation
performed with safety
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
5. PROCEDURE
5.1 AMR Meter Availability
GM/DGM Commercial IBCs shall ensure availability of AMRs Meters on Complete feeder
where ABC is being or has been converted
GM/DGM Commercial IBCs shall ensure upkeeping of AMR meters on regular/day to day
basis
Any transformer where AMR meter is not available or there seems any connectivity issue
same shall immediately be resolved in coordination with smart grid department
Smart Grid Department shall perform troubleshooting within a day
Feeder level AMR shall be monitored continuously
Optionally, IBC can propose and install additional check meter for suspected spans /area to
pin-point the wrongdoers
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
• Two joints per span per phase shall be tolerated however in case of any additional joint
complete span shall be replaced
• In case of illegal connection is tapped using Insulation Piercing Connector (IPC) than illegal
service cable shall be removed up-to maximum possible extent
• ABC deteriorated/punctured spans shall be replaced by technical department (CM/PM)
• ABC spans may also be replaced during preventive maintenance, if required
• Preventive maintenance department shall include LT ABC spans replacement requirement
during their planning/survey activity and same shall be executed with APM shutdown
• In the unfortunate scenario of physical assault on the team or any other KE personnel, the
manager must be immediately intimated, who will further report it to HSE and DGM/GM
promptly.
• While the first aid of the assaulted KE personnel(s) should be paramount, it is also imperative
that an FIR be lodged against the perpetrators at the earliest, which mandates the witness of
the damages and/or wounds of said assault in their full severity, first hand by the Sub
Inspector or Head Constable (minimum) of the concerned Police Station. The FIR procedure
will then generally proceed for the Medical Report (proof), which consequently entails first
aid.
• This not only serves to cement the accurate version of the incident, but also gives legal
precedence to concerned IBC official in case a counter FIR is lodged by the culprits.
• GM/DGM IBC shall coordination with security department for support, if required.
• The team/personal assigned for patrolling shall take precautions before dispatch and during
field activity
• Mobile Phones / mode of contact shall be available and active for maintaining contact with
relevant AM/DM
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
• Line Isolation SOP (KDTP-P602-20-05, latest applicable) shall be followed while performing
any job on HT/LT distribution network
KE approved rubber insulated gloves Class’0’ for Lineman working on LT mains and Meter
installation.
KE approved rubber insulated gloves Class’2’ for Lineman working on HT/Composite
Lines.
Leather Protective Gloves for Lineman.
Working Gloves for Karkun and labor for material handling and ground jobs.
Safety Shoes for all execution labor, Supervisor and site AM/DM.
Front position full body harness along with lanyard to be worn by Lineman for working on
height
Face Shield will be used especially in jobs where flash is a hazard or where needed.
Safety Goggles to be used as and when required.
Safety Helmets to be worn by all KE/PQC personnel on-site.
Live Line Tester and Short & Ground Rods.
KE Standard Uniform.
7. REPORTING TEMPLATE
7.1 Commercial Losses
7.1.1 The purpose of this template is to analyze ABC converted high loss PMTs/SS and selection will be
in descending order for patrolling and other remedial measures.
S. Units Loss
Transformer DTS ID Feeder Name Month Sent Out
No Billed Percentage
7.2.1 The purpose of this template is to analyze ABC converted high loss PMTs/SS and refer
improvements that are being achieved through patrolling, IRBs and Kunda Removal Drive
Execution Post
S. No Transformer DTS ID Feeder Name Pre (Month)
Month (Month)
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
7.3.1 The purpose of this template is to prepare patrolling report of LT ABC converted transformers.
Target of completing whole PMT in one go shall be preferred. This template shall be signed by
the team performing the job
Re Sagging Replacement
ABC Condition Punctured Damage Remarks
Required Required
Span 1
Span 2
Span 3
Span 4
Span 5
Span 6
Span 7
The purpose of this document is to record the change of feeding and its mapping by
technical teams in coordination with commercial team. AM technical to sign this template
for future record and IBC shall update accordingly
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.
SOP For ABC Post Execution Governance
S. # Description SOP #
1 Kunda Removal Drive KDTP-P673-20-00
2 Line Isolation for Working on HT/LT System KDTP-P602-20-05
3 Installation of Service Connection & Meters KDTP-P647-19-00
Installation of Smart Check Meter in KE Distribution
4 KDTP-P654-20-00
Network
© This document is the property of KE DNA & TPRE. It is strictly confidential and may on no account be reproduced, copied or
divulged without prior authorization.