DRILLING LOG

PERENCANAAN GRADING PLAN DAN JALAN PADA KAWASAN INDUSTRI TERPADU BATANG

BORE HOLE : BH-01 DRILLING RG : KSK


COORDINATE DRILL PLAN COORDINATE DRILL ACTUAL
BEGINNING : 13/11/2021 ENGINE RG : DONGFENG
ENDING : 17/11/2021 EASTING : 383697.415 EASTING : 383697.415 OPERATOR RG : DODI
DEPTH OF DRILL : 30 M NORTHING : 9233926.156 NORTHING : 9233926.115 DESCRIPTION BY : DODI
GWL : - ELEVATION : - ELEVATION : 61 mdpl CHECKED BY : AULIYA SHABRINA
STANDARD PENETRATION TEST (SPT)

SAMPLE (M)
LITHOLOGY
THICKNESS
DEPTH (M)

DEPTH OF
DEPTH OF
N-SPT (M)
SYMBOL

SAMPLE
G.W.L

CR (%)
Blows Penetration
SOIL OR ROCK MATERIAL DESCRIPTION
(M)

(M)

N Value Graph PHOTO OF CORE BOXES SHOWING


Each 15 cm N Blows N2
+ N3 30 cm
N1 N2 N3

0 0 10 20 30 40 50 60
0 0

1
1

2
1.55 - 2.00 2 2 3 5 5
2

3 0.00 - 6.00 m. Lempung berwarna cokelat, dengan


6,00

3
konsistensi teguh. UDS 1 3.00 - 3.50

4
3.55 - 4.00 2 3 3 6 6
4

5
5

6
5.55 - 6.00 3 4 6 10 10
6

7
7
UDS 2 7.00 - 7.50

8 6.00 - 10.00 m. Lempung sisipan tufa berwarna 7.55 - 8.00 4 6 8 14 14


4,00

8
cokelat, dengan konsistensi sangat teguh - keras.

9
9

10
9.55 - 10.00 11 13 14 27 27
10

11
11
DS 1 11.00 - 11.50

12
11.55 - 12.00 12 16 17 33 33
12

13
13

14 10.00 - 18.00 m. Lempung sisipan tufa berwarna 13.55 - 14.00 14 15 18 33 33


8,00

14
cokelat, dengan konsistensi sangat keras.

15
15

16
15.55 - 16.00 15 16 18 34 34
16

17
17
DS 2 17.00 - 17.50

18
17.55 - 18.00 16 18 19 37 37
18

19
19

18.00 - 22.00 m. Lempung sisipan tufa berwarna 19.55 - 20.00 17 19 20 39 39


20
4,00

cokelat keabu-abuan, dengan konsistensi sangat 20

keras.
21
21

22
21.55 - 22.00 18 20 21 41 41
22

23 23

24
23.55 - 24.00 15 22 23 45 45
24

25 25

26
25.55 - 26.00 21 24 26 50 50
26
22.00 - 30.00 m. Tufa kerikilan berwarna abu-abu
8,00

kecokelatan, dengan konsistensi sangat keras.


27 27

28
27.55 - 28.00 26 27 29 56 56
28

29 29

30
29.55 - 30.00 27 29 32 >60 60
30

LEGENDA : UDS : UDS

DS : DS

: SPT
DRILLING LOG
PERENCANAAN GRADING PLAN DAN JALAN PADA KAWASAN INDUSTRI TERPADU BATANG

BORE HOLE : BH-02 DRILLING RG : KSK


COORDINATE DRILL PLAN COORDINATE DRILL ACTUAL
BEGINNING : 23/11/2021 ENGINE RG : DONGFENG
ENDING : 23/11/2021 EASTING : 384127.516 EASTING : 384127.516 OPERATOR RG : DODI
DEPTH OF DRILL : 20 M NORTHING : 9233391.076 NORTHING : 9233391.076 DESCRIPTION BY : DODI
GWL : 14 M ELEVATION : - ELEVATION : 44 mdpl CHECKED BY : AULIYA SHABRINA
STANDARD PENETRATION TEST (SPT)

SAMPLE (M)
LITHOLOGY
THICKNESS
DEPTH (M)

DEPTH OF

DEPTH OF
N-SPT (M)
SYMBOL

SAMPLE
G.W.L

CR (%)
Blows Penetration
(M)

(M)

SOIL OR ROCK MATERIAL DESCRIPTION Each 15 cm N Blows N2


N Value Graph PHOTO OF CORE BOXES SHOWING
+ N3 30 cm
N1 N2 N3

0 0 10 20 30 40 50 60
0 0

1
1

2 1.55 - 2.00 2 2 3 5 5
2

3
3
UDS 1 3.00-3.50

4 3.55 - 4.00 2 3 3 6 6
4
0.00 - 9.00 m. Lempung berwarna cokelat, dengan
9,00

5
konsistensi teguh - sangat teguh.
5

6 5.55 - 6.00 2 3 4 7 7
6

7
7

8 7.55 - 8.00 3 4 6 10 10
8

9
9

10 9.55 - 10.00 6 8 11 19 19
10

9.00 - 13.00 m. Lempung sisipan tufa berwarna


11
4,00

abu-abu kecokelatan, dengan konsistensi keras - 11


DS 1 11.00-11.50
sangat keras.
12 11.55 - 12.00 28 34 60 >60 60
12

13
13

14 13.55 - 14.00 32 60/7 >60 60


14

15
15

16 15.55 - 16.00 60/12 >60 60


16
13.00 - 20.00 m. Lempung lanauan sisipan tufa
7,00

berwarna abu-abu kecokelatan, dengan


17 konsistensi sangat keras. 17

18 17.55 - 18.00 60/11 >60 60


18

19
19

20 19.55 - 20.00 60/9 >60 60


20

21
21

22
22

23
23

24
24

25
25

26
26

27
27

28
28

29
29

30 30

LEGENDA : UDS : UDS

DS : DS

: SPT
DRILLING LOG
PERENCANAAN GRADING PLAN DAN JALAN PADA KAWASAN INDUSTRI TERPADU BATANG

BORE HOLE : BH-03 DRILLING RG : KSK


COORDINATE DRILL PLAN COORDINATE DRILL ACTUAL
BEGINNING : 24/11/2021 ENGINE RG : DONGFENG
ENDING : 25/11/2021 EASTING : 384732.158 EASTING : 384627.635 OPERATOR RG : DODI
DEPTH OF DRILL : 30 M NORTHING : 9233287.256 NORTHING : 9233249.759 DESCRIPTION BY : DODI
GWL : 7M ELEVATION : - ELEVATION : 43 mdpl CHECKED BY : AULIYA SHABRINA
STANDARD PENETRATION TEST (SPT)

SAMPLE (M)
LITHOLOGY
THICKNESS
DEPTH (M)

DEPTH OF

DEPTH OF
N-SPT (M)
SYMBOL

SAMPLE
G.W.L

CR (%)
Blows Penetration
(M)

(M)

SOIL OR ROCK MATERIAL DESCRIPTION Each 15 cm N Blows N2


N Value Graph PHOTO OF CORE BOXES SHOWING
+ N3 30 cm
N1 N2 N3

0 0 10 20 30 40 50 60
0 0

1
1

2 1.55 - 2.00 2 2 3 5 5
2

3
3
UDS 1 3.00 - 3.50

4 0.00 - 8.00 m. Lempung berwarna cokelat 3.55 - 4.00 2 3 3 6 6


8,00

4
kemerahan, dengan konsistensi teguh.

5
5

6 5.55 - 6.00 2 3 4 7 7
6

7
7
UDS 2 7.00 - 7.50

8 7.55 - 8.00 3 4 4 8 8
8

9
9

10 9.55 - 10.00 3 4 5 9 9
10

11
11
8.00 - 15.00 m. Lempung berwarna cokelat DS 1 11.00 - 11.50
7,00

12
kemerahan, dengan konsistensi sangat teguh. 11.55 - 12.00 4 5 6 11 11
12

13
13

14 13.55 - 14.00 4 6 7 13 13
14

15
15

16 15.55 - 16.00 9 11 12 23 23
16

17
17
15.00 - 20.00 m. Lempung berwarna cokelat,
5,00

18
dengan konsistensi sangat keras - sangat keras. 17.55 - 18.00 12 14 15 29 29
18

19
19

20 19.55 - 20.00 16 19 22 41 41
20

21
21

22 20.00 - 24.00 m. Lempung lanauan berwarna 21.55 - 22.00 26 60 60 60


4,00

22
cokelat, dengan konsistensi sangat sangat keras.

23
23

24 23.55 - 24.00 60/9 >60 60


24

25
25

26
26

27
27
24.00 - 30.00 m. Lempung kerikilan berwarna
6,00

cokelat, dengan konsistensi sangat keras.


28
28

29
29

30 30

LEGENDA : UDS : UDS

DS : DS

: SPT
DRILLING LOG
PERENCANAAN GRADING PLAN DAN JALAN PADA KAWASAN INDUSTRI TERPADU BATANG

BORE HOLE : BH-04 DRILLING RG : KSK


COORDINATE DRILL PLAN COORDINATE DRILL ACTUAL
BEGINNING : 19/11/2021 ENGINE RG : DONGFENG
ENDING : 21/11/2021 EASTING : 385677.011 EASTING : 385677.011 OPERATOR RG : DODI
DEPTH OF DRILL : 30 M NORTHING : 9233487.991 NORTHING : 9233487.991 DESCRIPTION BY : DODI
GWL : 17 M ELEVATION : - ELEVATION : 75 mdpl CHECKED BY : AULIYA SHABRINA
STANDARD PENETRATION TEST (SPT)

SAMPLE (M)
LITHOLOGY
THICKNESS
DEPTH (M)

DEPTH OF

DEPTH OF
N-SPT (M)
SYMBOL

SAMPLE
G.W.L

CR (%)
Blows Penetration
(M)

(M)

SOIL OR ROCK MATERIAL DESCRIPTION Each 15 cm N Blows N2


N Value Graph PHOTO OF CORE BOXES SHOWING
+ N3 30 cm
N1 N2 N3

0 0 10 20 30 40 50 60
0 0

1
1

2 1.55 - 2.00 3 3 4 7 7
2
0.00 - 5.00 m. Lempung sisipan bongkah berwarna
5,00

3
cokelat, dengan konsistensi teguh - sangat teguh.
3
DS 1 3.00 - 3.50

4 3.55 - 4.00 4 6 8 14 14
4

5
5

6 5.55 - 6.00 5 6 9 15 15
6

7 5.00 - 9.00 m. Lempung sisipan tufa berwarna


4,00

7
cokelat, dengan konsistensi keras. DS 2 7.00 - 7.50

8 7.55 - 8.00 8 11 12 23 23
8

9
9

10 9.55 - 10.00 13 15 16 31 31
10

11
11

12 11.55 - 12.00 12 16 18 34 34
12

13 9.00 - 17.00 m. Lempung sisipan tufa berwarna


8,00

13
cokelat, dengan konsistensi sangat keras.

14 13.55 - 14.00 16 19 21 40 40
14

15
15

16 15.55 - 16.00 18 20 22 42 42
16

17
17

18 17.55 - 18.00 27 60/12 >60 60


18

19
19

17.00 - 23.00 m. Lempung lanauan dengan sisipan 19.55 - 20.00 29 60/11 >60 60
20
6,00

kerikil berwarna abu-abu, dengan konsistensi 20

sangat keras.
21
21

22 21.55 - 22.00 60/9 >60 60


22

23
23

24
24

25
25

26
26

23.00 - 30.00 m. Breksi berwarna cokelat keabu-


7,00

27 abuan, fragmen andesit, tingkat pelapukan


27
sedang.

28
28

29
29