SAUDI ARAMCO ID/PIEU-31-December-2018 - REV.2018.12.00 (Standards Cutoff - December 31,2018) Rev.2018.12.

00 31-Dec-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Soil Improvement Vibro Replacement (Stone Columns)
Materials Approval, Specialized Personnel Approval, Testing SAIC-A-1011 4-Mar-19 CIVIL-
& Review of Test Reports Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Vibro Replacement (Stone Columns) Materials

Note: To verify that the area/material being inspected was tested by a SA


approved third party testing agency, the test results attached with this RFI
shall be verified by the relevant PID inspection Unit if copy of the test
results had been received directly from the 3rd party lab. If not available in
the PID inspection Unit, the inspector shall contact the third party lab rep
and request for an explanation. If explanation is not reasonable, NCR
shall be issued to the 3rd party lab through the Batch Plants & Civil
Testing Group.

Gradation - - 1” to 4”. (No specific gradation is required as per ASTM C-


ASTM C 33 Sec.
A1 136)
12

Los Angeles Abrasion Loss @ 1000 revolutions - - 50 % max. (ASTM C- ASTM C 33 Sec.
A2
535) 12

ASTM C 33 Sec.
A3 Soundness Test, Loss by Magnesium Sulfate - - 18% max. (ASTM C-88)
12

ASTM C 33 Sec.
A4 Specific Gravity - - 2.40 min. (ASTM C-127)
12

ASTM C 33 Sec.
A5 Absorption - - 3% max. (As per ASTM C-127)
12

B Testing and Equipment

Saudi Aramco: Company General Use


Schedule "Q"
All equipment shall be calibrated and certified within the 6-month period Section
B1
before use by one of Saudi Aramco-approved calibration agencies. 7.1/SAES-Q-006
Sec. 5.4.4.4

SAES-Q-006
Tests for Saudi Aramco acceptance shall be performed by a Saudi Sec. 5.4.5/ SAES-
B2
Aramco approved independent testing laboratory. A-114
Sec. 5.1.1

Third Party Agency's Quality Personnel assigned to the Work must be


Schedule "Q"
B3 technically competent to perform their duties and shall be approved by
Section 5.5
Saudi Aramco to perform applicable tests.

C Vibro Replacement & Vibro Compaction Specialized Crew

Contractor Vibro Replacement & Vibro Compaction Specialized Crew


performing tests and calibrations shall be trained per applicable
Schedule "Q"
international or manufacturer requirements. Contractor testing and
Section
C1 calibration personnel as well as testing facilities shall be subject to Saudi
7.3/Method
Aramco approval. If Contractor personnel do not perform tests and
Statement
calibrations, contractor shall use Saudi Aramco-approved agencies or the
manufacturer.

Schedule "Q"
Third Party Agency's Quality Personnel assigned to the Work must be
Section
C2 technically competent to perform their duties and shall be approved by
5.5/Method
Saudi Aramco to perform applicable tests.
Statement

REMARKS:

REFERENCE DOCUMENTS:
1- Approved Method Statement for Soil Improvement
2- SAES-A-114 -- Excavation and Backfill, 13 December 2018
3- ASTM C136 -- Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
4- ASTM C535 -- Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate
by Abrasion and Impact in the Los Angeles Machine
5- ASTM C127 -- Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED