MATERIAL SUBMITTAL FOR

AGRICULTURE SOIL
CLIENT
Mr. Hussain Ibrahim Mohammed Al Hammadi
CONSULTANT
AL KHAIL ENGINEERING CONSULTANT LLC
CONTRACTORTORNADO
TORNADO GENERAL CONTRACTING
TABLE OF CONTENST

1 MATERIAL DATA SHEET


2 RALATED DRAWING

3 COMPANY TRADE LICENSE

4 CERTIFIFCATES

5 WARRANTY CERITIFICATES

6 PREVIOUS APPROVAL

7 CATALOGE

8 COMPANY PROFILE
MATERIAL DATA SHEET
SWEET SAND (AL AIN MUNICIPALITY BORROW PIT)
MATERIAL DATA SHEET

PARAMETERS TEST RESULT

PH Value 7.5

Water Soluble Sulfate Content as SO4 (ppm) 130

Water Soluble Cloride Content as Cl (ppm) 100

Electrical Conductivity 654

Exchangeable sodium (%) 12

Boron (ppm) 0.75

Sodium (ppm) 180

Magnesium (ppm) 80

Nitrates (PPM) 65

SIEVE ANALYSIS SOIL

ITEM DESCRITPTION
SIEVE Size
% by Mass Passin
(mm)
5.000 100

2.380 100

1.180 100

0.600 70

0.300 20

0.150 2
0.075 0
RALATED DRAWING
PROJECT:
AL HAMMADI VILLA (NEW VILLA)
MOHAMMAD BIN ZAYED CITY- ABU DHABI VILLA
ABU DHABI, U.A.E.
KEY PLAN:

N
PL
125000 IT

WEDtri

WEDtri
O M
T LI

FICnit

FICnit

FICnit

FICnit

FICnit

FICnit

FICnit

FICnit

FICnit

FICnit
LI T
M O
IT
PL

DELreg DELreg DELreg DELreg DELreg DELreg SUBSTATION BUILDING


MAJLIS PV-02 WALK WAY SLOPE 0.8% PV-02 P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles. P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

PV-02
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles. P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles. P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles. P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

CYCrev
CYCrev

CYCrev
CYCrev
CYCrev
CYCrev
CYCrev
CYCrev
v
CY rev v
CY revv
CYCrev

CYCrev
CYCrev
CYCrev
v
CYCrev
CYCrev

WEDtri
CANi
CANi

CANi

WEDtri

WEDtri

WEDtri

WEDtri

WEDtri

Cre
CYCre
Cre

Cre
CANi
CANi

CANi
CANi

CANi

CANi
+0.45 FFL PERGOLA TO BE
1

C
C
UP SUBMITTED LATER PV-02 REVIEW STATUS
PV-01

CY

CY

CY
nd
nd

nd
nd

nd
nd

nd
nd

nd
A Approved
CYCrev

PLUobt
PLUobt

PLUobt

PLUobt

PLUobt

PLUobt

PLUobt

PLUobt

PLUobt

PLUobt
PV-01 A MANind MANind
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

CYCrev DELreg B Approved subject to comments.

CANi CYCrev WEDtri C Revise and Resubmit

CANi
CANi
CANi

CANi

CANi
CANi
CANi
CANi

CYCrev D Rejected
CANi nd

WD-01
CANi

PV-04 CYCrev P. de Arq. Hugo


Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

CONTRACT REFERENCE DRAWING


nd

nd
nd
nd

nd
LEUphy CYCrev DELreg

nd
nd
nd
nd

LAWN SHADE
nd

Rev. DWG. TITLE DWG. No.


BISnob CANind
BISnob CANind +0.75 FFL COCnuc OLEeur PADEL COURT
CANind PV-02
LEUphy P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.
CANi
CANi
CANi
CANi d

+0.45 FFL
DELreg

01

02

03

04
up
PV-01 PV-04 NOTES:

KIDS POOL
KB-01
nd
nd
n
nd

COCnuc

Seat
05

04

03

P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.
02

01
UP 1. THIS DRAWING IS THE COPYRIGHT OF ACCURACY CONSULTING ENGINEERS
PV-01 A
up
AND MUST NOT BE RETAINED, COPIED OR USED

Bubble bath seating

50300
PV-04 DELreg PASvag THE ABOVE CONSULTANT'S AUTHORITY.
WD-01 2. DO NOT SCALE FROM THE DRAWINGS.
SWIMMING 3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
DRIVEWAY POOL UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
PAVED PLAZA COCnuc SITE & APPROVED BY THE ENGINEER.
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
OPEN SPACE

FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
FICnit
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

ADULT POOL
MAIN VILLA ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS.
DELreg DELreg P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

PV-01 COCnuc 02 27.12.2023 ISSUED FOR APPROVAL JLE JV MA


WD-01
UP 01 30.11.2023 ISSUED FOR APPROVAL GM JV MA
50300

SLOPE 2.14%
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

PV-02 00 18.09.2023 ISSUED FOR APPROVAL MJ JV MA


PV-01 A DELreg Rev. DATE DESCRIPTION By CKD. APR.
+0.75 FFL +0.15 FFL
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles. PV-04 REVISION HISTORY
PV-02 OWNER/ TENANT
DELreg PV-01 A HUSSAIN IBRAHIM MOHAMED
PV-04 PROPOSED NEW VILLA ALHAMMADI
MANind MANind
‫رميسارنا نيسحرحمحمرن محنمسميسارنا نيسح‬
PV-01 GYM BUILDING
‫حمحمرن محنمس‬
CONSULTANT
OUT HOUSE
WALK WAY SLOPE 1.5% PV-03 PASvag
PL
IT 125000 O
M T
LI LI
T M
P LO IT

PROJECT NAME

L E G E N D PROPOSED NEW VILLA


SOFT LANDSCAPE SCHEDULE HARD LANDSCAPE SCHEDULE
MUNICIPALITY: ZONE:
CODE IMAGE SYMBOL BOTANICAL NAME CODE SYMBOL LOCATION DESCRIPTION
MATERIAL : PRECAST CONCRETE PAVERS ABU DHABI MBZ CITY (ABU DHABI)
DRIVEWAY SIZE : 400x400x80MM
MANind ..\..\01 HARD LANDSCAPE\IMAGE REFERENCE\mangifera indica.png

MANGIFERA INDICA PV-01


AREA FINISH : NORMAL FINISH SECTOR NO: PLOT N0:
COLOUR : BEIGE M-16 63-64
MATERIAL : PRECAST CONCRETE PAVERS
DRIVEWAY SIZE : 100x200x80MM PROJECT DESCRIPATION:
DELreg ..\..\01 hard landscape\IMAGE REFERENCE\delonix regia.png
P. de Arq. Hugo
Enrique
Adrian
Francisco
Suárez
A.Guerrero
Romero
Espitia
Ramírez.
Ramos.
Hernández.
Arguelles.

DELONIX REGIA PV-01A


AREA FINISH : NORMAL FINISH
COLOUR : DARK GREY
MATERIAL : PRECAST CONCRETE PAVERS
LEFT WALKWAY SIZE : 200x200x60MM
PLUobt ..\..\01 hard landscape\IMAGE REFERENCE\plumeria obtusa.png

PLUMERIA OBTUSA PV-02


AREA FINISH : NORMAL FINISH
COLOUR : LIGHT GREY MAIN CONTRACTOR:
MATERIAL : PRECAST CONCRETE PAVERS
LEFT WALKWAY SIZE : 200x400x60MM
FICnit FICUS NITIDA PV-02A TORNADO‫ر‬GENERAL‫ر‬CONTRACTING.
..\..\01 hard landscape\IMAGE REFERENCE\ficus nitida.png

AREA FINISH : NORMAL FINISH


COLOUR : MEDIUM GREY TELEPHONE: +971 2 6664110
MATERIAL : PRECAST CONCRETE PAVERS FAX:+971 2 6669929
P.O.Box 52069, Abu Dhabi, United Arab Emirates
LEFT WALKWAY SIZE : 200x600x60MM
OLEeur ..\..\01 hard landscape\IMAGE REFERENCE\olea europea.png

OLEA EUROPEA PV-02B www.tornado-group.com


AREA FINISH : NORMAL FINISH TORNADO GROUP E-MAIL: info@tornado-group.com
COLOUR : DARK GREY
MATERIAL : PRECAST CONCRETE
COCnuc ..\..\01 hard landscape\IMAGE REFERENCE\cocos nucifera.png

COCOS NUCIFERA PV-03 RIGHT WALKWAY DRAWING TITLE


AREA

PLAZA &
MATERIAL
SIZE
: PORCELAIN TILES
: 1200x600x20MM
HAMADI VILLA
BISnob ..\..\01 hard landscape\IMAGE REFERENCE\bismarckia nobilis.png

BISMARCKIA NOBILIS PV-04 EVENT SPACE


AREA FINISH : HONED FINISH
OVERALL GENERAL LANDSCPE
POOL & LAWN
MATERIAL : WPC DECKING LAYOUT
CANind ..\..\01 hard landscape\IMAGE REFERENCE\canna indica.png

CANNA INDICA WD-01


AREA
Coordination Box
MATERIAL : HYDRAULIC PRESS KERB
PADEL COURT SIZE : 100x300x600MM Arch. Structure Mech. Elec. HVAC
LEUphy ..\..\01 hard landscape\IMAGE REFERENCE\leucophyllum.png

LEUCOPHYLLUM KB-01
AREA FINISH : NORMAL
COLOUR : GREY
Name
CYCrev ..\..\01 hard landscape\IMAGE REFERENCE\cycas revoluta.png

CYCAS REVOLUTA Signature


DRAWING NO. REV.

WEDtri ..\..\01 hard landscape\IMAGE REFERENCE\wedelia trilobata.png

WEDELIA TRILOBATA TOR-P560-SDS-S-LP-102 03


Scale Date Sheet
1:200 04.03.2024 01 OF 01
PASvag ..\..\01 hard landscape\IMAGE REFERENCE\paspalum vaginatum.jpg.png

PASPALUM VAGINATUM
Prepared By Drawn By Checked By Approved By
JLE JLE JV MA
COMPANY TRADE
LICENSE
Commercial License ‫ﺭﺧـﺼــــــﺔ ﺗﺠﺎﺭﻳﺔ‬

License No : CN-1139133 : ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‬


ADCCI No : 239759 : ‫ﻋﻀﻮﻳﺔ ﺍﻟﻐﺮﻓﺔ‬
Establishment Card : : ‫ﻭﺯﺍﺭﺓ ﺍﻟﻤﻮﺍﺭﺩ ﺍﻟﺒﺸﺮﻳﺔ ﻭﺍﻟﺘﻮﻃﻴﻦ‬
MOHRE ‫ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬
Establishment Card : : ‫ﺍﻟﻬﻴﺌﺔ ﺍﻻﺗﺤﺎﺩﻳﺔ ﻟﻠﻬﻮﻳﺔ‬
ICA ‫ ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬-‫ﻭﺍﻟﺠﻨﺴﻴﺔ‬
Legal Form : Limited Liability Company ‫ ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺆﻭﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬: ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ‬
‫ﻡ‬.‫ﻡ‬.‫ ﺗﻮﺭﻧﻴﺪﻭ ﺗﻮﺗﺎﻝ ﻻﻧﺪ ﺳﻜﻴﺐ ﺫ‬: ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬
Trade Name : TORNADO TOTAL LANDSCAPE L.L.C.
Establishment Date : 23/01/2008 : ‫ﺗﺎﺭﻳﺦ ﺗﺄﺳﻴﺲ ﺍﻟﻤﻨﺸﺄﺓ‬
Issue Date : 19/07/2022 : ‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‬
Expiry Date : 27/08/2025 : ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬

‫ﺍﻟﺼﻠﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ ﺍﻟﺸﺮﻛﺎﺀ‬/ ‫ﺍﻟﻤﻼﻙ‬ ‫ﺍﻟﺮﻣﺰ‬


Role Nationality Owners / Partners No.
‫ﺷﺮﻳﻚ‬ ‫ﺍﻹﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ‬ ‫ﻧﺠﺎﻩ ﻋﻠﻰ ﺩﺍﻭﻭﺩ ﻣﺤﻤﺪ ﺟﻔﺎﻝ‬ 41211462
Partner United Arab Emirates NAJAT ALI DAWOUD MOHAMMED JAFFAL
‫ﺷﺮﻳﻚ‬ ‫ﺍﻹﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ‬ ‫ﻡ‬.‫ﻡ‬.‫ ﺷﺮﻛﺔ ﺍﻟﺸﺨﺺ ﺍﻟﻮﺍﺣﺪ ﺫ‬- ‫ﺗﻮﺭﻧﻴﺪﻭ ﻟﻼﺳﺘﺜﻤﺎﺭ‬ 41879304
Partner United Arab Emirates TORNADO INVESTMENT - SOLE PROPRIETORSHIP L.L.C
Commercial Activities : : ‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬
- Sports Clubs and Facilities Management and Operation ‫ ﺇﺩﺍﺭﺓ ﻭﺗﺸﻐﻴﻞ ﺍﻻﻧﺪﻳﺔ ﻭﺍﻟﻤﻨﺸﺄﺕ ﺍﻟﺮﻳﺎﺿﻴﺔ‬-
- Agricultural Pest Control ‫ ﺧﺪﻣﺎﺕ ﻣﻜﺎﻓﺤﺔ ﺍﻵﻓﺎﺕ ﺍﻟﺰﺭﺍﻋﻴﺔ‬-
- Landscape And Gardening Services ‫ ﺧﺪﻣﺎﺕ ﺗﺠﻤﻴﻞ ﺍﻟﺤﺪﺍﺋﻖ ﻭﺍﻟﻤﻨﺘﺰﻫﺎﺕ‬-
- Rescue Services In Places Of Swimming ‫ ﺧﺪﻣﺎﺕ ﺍﻹﻧﻘﺎﺫ ﻓﻲ ﺃﻣﺎﻛﻦ ﺍﻟﺴﺒﺎﺣﺔ‬-
- * Afforestation Contracting ‫ * ﻣﻘﺎﻭﻻﺕ ﺍﻟﺘﺸﺠﻴﺮ‬-
- * Irrigation Network Contracting ‫ * ﻣﻘﺎﻭﻻﺕ ﺷﺒﻜﺎﺕ ﺍﻟﺮﻱ‬-
- Management and Operation of Public Beaches ‫ ﺇﺩﺍﺭﺓ ﻭ ﺗﺸﻐﻴﻞ ﺍﻟﺸﻮﺍﻃﺊ ﺍﻟﻌﺎﻣﺔ‬-
- Facilities Management Services ‫ ﺧﺪﻣﺎﺕ ﺍﺩﺍﺭﺓ ﺍﻟﻤﻨﺸﺄﺕ‬-
- * Main Roads, Streets and Related Works Contracting ‫ * ﻣﻘﺎﻭﻻﺕ ﺍﻟﻄﺮﻕ ﺍﻟﺮﺋﻴﺴﻴﺔ ﻭ ﺍﻟﺸﻮﺍﺭﻉ ﻭﺍﻻﻋﻤﺎﻝ ﺍﻟﻤﺘﻌﻠﻘﺔ ﺑﻬﺎ‬-
- Onshore And Offshore Oil And Gas Fields And Facilities Services ‫ ﺧﺪﻣﺎﺕ ﺣﻘﻮﻝ ﻭﻣﻨﺸﺄﺕ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ ﺍﻟﺒﺮﻳﺔ ﻭﺍﻟﺒﺤﺮﻳﺔ‬-

www.adbc.gov.ae ‫ ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺑﺮﺟﺎﺀ ﺯﻳﺎﺭﺓ ﺍﻟﻤﻮﻗﻊ‬.‫ ﺃﺑﻮﻇﺒﻲ‬- ‫ﻭﺛﻴﻘﺔ ﻣﻌﺘﻤﺪﺓ ﻭﺻﺎﺩﺭﺓ ﺑﺪﻭﻥ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ ﻣﻦ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻹﻗﺘﺼﺎﺩﻳﺔ‬
Approved document issued without signature or stamp by the Department of Economic Development - Abu Dhabi. To verify the license kindly
visit www.adbc.gov.ae
Official Email : BASHAR@SEZNAM.CZ : ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﺍﻟﺮﺳﻤﻲ‬
Official Mobile : 971506713166 : ‫ﺭﻗﻢ ﺍﻟﺘﻮﺍﺻﻞ ﺍﻟﺮﺳﻤﻲ‬

*CR-4543969*
www.adbc.gov.ae
The Contractor is not permitted to practice the activities marked ‫ﻻ ﻳﺤﻖ ﻟﻠﻤﻘﺎﻭﻝ ﻣﻤﺎﺭﺳﺔ ﺍﻷﻧﺸﻄﺔ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﺑﻌﻼﻣﺔ )*( ﺇﻻ ﺑﻌﺪ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻰ‬
with sign (*) unless these activities are classified and a .‫ﺷﻬﺎﺩﺓ ﺍﻟﺘﺼﻨﻴﻒ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻣﻦ ﺩﺍﺋﺮﺓ ﺍﻟﺘﺨﻄﻴﻂ ﺍﻟﻌﻤﺮﺍﻧﻲ ﻭﺍﻟﺒﻠﺪﻳﺎﺕ‬
Classification certificate is obtained for the department of
Department of Urban Planning and Municipalities
Address : ‫ ﺍﻟﻤﺎﻟﻚ ﻧﺠﺎﻩ ﻋﻠﻰ ﺩﺍﻭﻭﺩ‬,~ : 0 ,‫ ﺷﺎﺭﻉ ﺍﻟﺪﻓﺎﻉ‬2-19-‫ ﺷﺮﻕ‬,‫ﺟﺰﻳﺮﺓ ﺍﺑﻮﻇﺒﻲ‬ : ‫ﺍﻟﻌﻨﻮﺍﻥ‬

Onwani Address : : ‫ﺍﻟﻌﻨﻮﺍﻥ ﺍﻟﻤﻮﺣﺪ‬

www.adbc.gov.ae ‫ ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺑﺮﺟﺎﺀ ﺯﻳﺎﺭﺓ ﺍﻟﻤﻮﻗﻊ‬.‫ ﺃﺑﻮﻇﺒﻲ‬- ‫ﻭﺛﻴﻘﺔ ﻣﻌﺘﻤﺪﺓ ﻭﺻﺎﺩﺭﺓ ﺑﺪﻭﻥ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ ﻣﻦ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻹﻗﺘﺼﺎﺩﻳﺔ‬
Approved document issued without signature or stamp by the Department of Economic Development - Abu Dhabi. To verify the license kindly
visit www.adbc.gov.ae
Official Email : BASHAR@SEZNAM.CZ : ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﺍﻟﺮﺳﻤﻲ‬
Official Mobile : 971506713166 : ‫ﺭﻗﻢ ﺍﻟﺘﻮﺍﺻﻞ ﺍﻟﺮﺳﻤﻲ‬

*CR-4543969*
www.adbc.gov.ae
CERTIFICATES
WARRANTY
CERTIFICATES
NOT APPLICABLE
PREVIOUS APPROVAL
‫ﻧﻤﻮﺫﺝ ﺍﻋﺘﻤﺎﺩ ﻣﻮﺍﺩ‬
Material Approval Form

Application No: 202200025548 Version: 1 Date: 2022-01-13

Project Details ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ‬


‫ﺗﻄﻮﻳﺮ ﻭﺗﺤﺴﻴﻦ ﺍﻟﻤﻨﺎﻃﻖ ﺍﻟﺘﺮﺍﺑﻴﺔ ﺩﺍﺧﻞ ﺟﺰﻳﺮﺓ ﺍﺑﻮﻇﺒﻲ‬
Project Name Development Enhancement of Sandy Area At Abu Dhabi Island ‫ﺍﺳﻢ ﺍﻟﻤﺸﺮﻭﻉ‬
- C161
Contract No C161 ‫ﺭﻗﻢ ﺍﻟﻌﻘﺪ‬
‫ﻡ‬.‫ﻡ‬.‫ﺗﻮﺭﻧﻴﺪﻭ ﺗﻮﺗﺎﻝ ﻻﻧﺪ ﺳﻜﻴﺐ ﺫ‬
Contractor ‫ﺍﺳﻢ ﺍﻟﻤﻘﺎﻭﻝ‬
.TORNADO TOTAL LANDSCAPE L.L.C
‫ ﺍﺑﻮﻇﺒﻲ‬- ‫ﺩﻭﺭﺵ ﻫﻮﻟﺪﻧﺞ ﺟﻲ ﺃﻡ ﺑﻲ ﺃﺗﺶ‬
Consultant ‫ﺍﺳﻢ ﺍﻻﺳﺘﺸﺎﺭﻱ‬
DORSCH HOLDING G M B H - ABU DHABI
‫ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ ﺃﺑﻮﻇﺒﻲ‬- ‫ﺩﺍﺋﺮﺓ ﺍﻟﺒﻠﺪﻳﺎﺕ ﻭﺍﻟﻨﻘﻞ‬
Client DEPARTMENT OF MUNICIPALITIES AND TRANSPORT- ABU ‫ﺍﺳﻢ ﺍﻟﻤﺎﻟﻚ‬
DHABI CITY MUNICIPALTY

Material Details ‫ﺗﻔﺎﺻﻴﻞ ﺍﻟﻤﺎﺩﺓ‬


Material Type ‫ﻣﻮﺍﺩ ﻣﺪﻧﻴﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻤﺎﺩﺓ‬
Spec. Ref. Vol 3 Section 2900 Clause 4.1 ‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﺮﺟﻌﻲ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ‬
‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﺮﺟﻌﻲ ﻟﻘﺎﺋﻤﺔ ﺟﺪﻭﻝ‬
BOQ Ref Bill No.3
‫ﺍﻟﻜﻤﻴﺎﺕ‬
Material Description
، ‫ﻭﺻﻒ ﺍﻟﻤﺎﺩﺓ )ﻧﻮﻉ ﺍﻟﻤﺎﺩﺓ‬
(One/ make, model Agricultural soil
(‫ ﺍﻟﻤﻮﺩﻳﻞ‬، ‫ﻣﺼﻨﻌﺔ ﻣﻦ‬
etc)
Intended Usage Soft Landscape works ‫ﺍﻟﻐﺮﺽ ﻣﻦ ﺍﻻﺳﺘﺨﺪﺍﻡ‬
Al Ain Municipality Borrow Pit
Manufacturer/ Source ‫ ﺍﻟﻤﺼﻨﻊ‬/ ‫ﺍﻟﻤﺼﺪﺭ‬
Al Ain Municipality Borrow Pit
Saqer Bany Yass General Transporting Co. LLC
Supplier/Applicator ‫ ﺍﻟﻤﻄﺒﻖ‬/ ‫ﺍﻟﻤﻮﺭﺩ‬
Saqer Bany Yass General Transporting Co. LLC
‫ﻡ‬.‫ﻡ‬.‫ﺗﻮﺭﻧﻴﺪﻭ ﺗﻮﺗﺎﻝ ﻻﻧﺪ ﺳﻜﻴﺐ ﺫ‬
Sub-Contractor ‫ﺍﻟﻤﻘﺎﻭﻝ ﺍﻟﻔﺮﻋﻲ‬
.TORNADO TOTAL LANDSCAPE L.L.C

13215 ‫ ﺻﻔﺤﺔ‬1 ‫ ﻣﻦ‬2 ‫ﺭﻗﻢ ﺍﻟﻤﻌﺎﻣﻠﺔ‬


2022-01-13 14:43 202200025548
Conditions ‫ﺍﻟﺸﺮﻭﻁ‬
1) This is a preliminary material approval for Agricultural soil from Al Ain
Municipality Borrow pit (Seih Al Lehma), Supplied by Saqer Bany
Yass General Transporting Co. LLC
2) . Abu Dhabi. For Soft Landscape works.
3) On delivery, random samples shall be collected by the consultant and
to be tested at QCC lab/ accredited third-party lab to confirm that all
parameters comply with the project specifications.
4) The sweet sand shall be free of calcium carbonate, subsoil, refuse,
roots, noxious weeds, phytotoxic materials, rocks, sticks, brush, litter,
construction debris or any other deleterious materials.
5) The mixing ratio for the planting medium shall be as per project
requirements as standard specification, contractor shall apply the
planting sand along with other approved components of planting
medium according to standard specification, approved method
statement under the careful supervision of the consultant.
6) Note: The supervision consultant is fully responsible to ensure that
the necessary ADM “VALID Design Approvals” for the project have
already been obtained through the Smart Hub (IDAS) system, prior to
submission of Material Approval requests during the construction
phase

Final Recommendation: Approved :‫ﺍﻟﺘﻮﺻﻴﺔ ﺍﻟﻨﻬﺎﺋﻴﺔ‬


Technical Reviewer: ‫ﻣﺮﻳﻢ ﺿﺤﻰ ﻋﺒﺪﺍﻟﻠﻪ ﺍﺑﻮﻣﻘﻴﺮﻳﻌﻪ ﺍﻟﻤﻨﺼﻮﺭﻯ‬ :‫ﺍﻟﻤﺮﺍﺟﻊ ﺍﻟﻔﻨﻲ‬

13215 ‫ ﺻﻔﺤﺔ‬2 ‫ ﻣﻦ‬2 ‫ﺭﻗﻢ ﺍﻟﻤﻌﺎﻣﻠﺔ‬


2022-01-13 14:43 202200025548
Employer PMC Supervision Consultant Main Contractor

MATERIAL SUBMITTAL FORM


PROJECT Al HUDARIYAT ISLAND (WEST)- HW2 Infrastructure-Dome Connctivity

Submittal Ref: IP1-02-002-00-11-LA-AGP-MI-000010 Date 09.01.2024 Rev. 0


Submittal Title Material Submittal for Red Sand (Sweet Soil) - Pre Approved submission
Submitted By Muhammed Riyaz Signature
Discipline Landscaping
Material Details
Drawing Reference IP1-02-002-00-11-LA-AGP-SD-000300 Documents Attached
Specification Reference ADM SPECS Chapter 2, Part 2.5.2.7. a. Page 2-27 Technical Data Sheets
Compliance Statement
BOQ Reference Provisional Sum Specifications Extract
Shopdrawings
Material Specified Red Sand (Sweet Soil) Recent Test Report
Commercial/ Trade License
Material Proposed Red Sand (Sweet Soil) ISO Certificates
Previous Approval
Manufacturer/Supplier AL ADRAJ TRANSPORT & CONTRACTING LLC Guarantee/Warranty
Samples with Sample Tag
Remarks Others

The Contractor certifies that the Technical data submitted herewith is in compliance with the Contract drawings and specifications unless specifically
noted / highlighted here or on the attached documents.

Authorised Signatory Hisham Abualeinein Date 09.01.2024

Received Signature Date 09.01.2024

Engineer / Supervision Consultant's Comments


Code A -Approved

Refer to the comments on the DRS sheet. Code B - Approved with


Comments
Magdi Elsabae (ME)
Code C - Revise and Resubmit

Code D - Rejected

Reviewed By Ihab Naffa (RE) Date 09-01-2024

PMC / Client's Comments


The PMC has no objection to the proposed submission subject to full compliance with the consultants comments
and/or with any necessary applicable authorities requirements and specifications.

Reviewed By EllisDon Date 12-Jan-24

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the Contract requirements
and specifications. Any changes from previous revisions of the submittal or contract documents, unless specifically highlighted are not necessarily
reveiwed and hence not necessarily approved.

Received Date

MP-PMP-10.01-023-00
Employer PMC Supervision Consultant Main Contractor

MATERIAL SUBMITTAL FORM


PROJECT CAV 09 SOUTH LANDSCAPE ENHANCEMENT AT HUDAYRIYAT ISLAND, ABU DHABI

Submittal Ref: IP1-02-002-00-11-LA-TOR-MI-000013 Date: 24-Nov-23 Rev. 00


Submittal Title: MATERIAL SUBMITTAL FOR RED SAND (SWEET SOIL)
Submitted By: TORNADO TOTAL LANDSCAPE Signature:
Discipline: LANDSCAPE
Material Details
Drawing Reference: IP1-02-002-00-11-LA-TOR-SD-000013[00] Documents Attached
Specification Reference: ADM SPECS Chapter 2, Part 2.5.2.7 a. Page 2-27 Technical Data Sheets
Compliance Statement
BOQ Reference: Item 1.4 Specifications Extract
Shop Drawings
Material Specified: Red Sand (Sweet Soil) Recent Test Report
Commercial/ Trade License
Material Proposed: ISO Certificates
Previous Approval
Manufacturer/Supplier: AL ADRAJ TRANSPORT & CONTRACTING L.L.C. Guarantee/Warranty
Samples with Sample Tag
Remarks: Others

The Contractor certifies that the Technical data submitted herewith is in compliance with the Contract drawings and specifications unless specifically
noted / highlighted here or on the attached documents.

Authorised Signatory Date


Received Signature Date

Engineer / Supervision Consultant's Comments


Code A -Approved

Refer to the comments on DRS Code B - Approved with


Comments

Code C - Revise and Resubmit

abdalla abbass Code D - Rejected

Reviewed By Abdelrahman (RE) Date


30-11-2023
PMC / Client's Comments
The PMC has no objection to the proposed submission subject to full
compliance with the consultants comments and/or with any necessary
applicable authorities requirements and specifications.

Reviewed By EllisDon Date 01-Dec-23


Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the Contract requirements
and specifications. Any changes from previous revisions of the submittal or contract documents, unless specifically highlighted are not necessarily
reveiwed and hence not necessarily approved.

Received Date

MP-PMP-10.01-023-00
CATALOGUE
NOT APPLICABLE
COMPANY PROFILE

You might also like