MTR Overview
MTR Overview
MTR Overview
Public
Disclaimer
The posting of documents on the Web site is done for the convenience of market participants and
other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have
all posted documents conform to the original, changes can result from the original, including changes
resulting from the programs used to format the documents for posting on the Web site as well as from
the programs used by the viewer to download and read documents. The IESO makes no
representation or warranty, express or implied, that the documents on this Web site are exact
reproductions of the original documents listed. In addition, the documents and information posted on
this Web site are subject to change. The IESO may revise, withdraw or make final these materials at
any time at its sole discretion without further notice. It is solely your responsibility to ensure that you
are up-to-date documents and information. This market manual may contain a summary of a
particular market rule. Where provided, the summary has been used because of the length of the
market rule itself. The reader should be aware, however, that where a market rule is applicable, the
obligation that needs to be met is as stated in the “Market Rules”. To the extent of any discrepancy or
inconsistency between the provisions of a particular market rule and the summary, the provision of
the market rule shall govern.
Document ID MDP_MAN_0003
Document Name Part 3.0: Metering Overview
Issue Issue 11.0
Reason for Issue Released for Baseline 28.0
Effective Date September 12, 2012
Part 3.0: Metering Overview Document Change History
Related Documents
Document ID Document Title
N/A
Table of Contents
Table of Contents...................................................................................................... i
Table of Changes
Reference Description of Change
Throughout Replaced IMO with IESO in the document text and in the following diagrams:
document - Figure 3-1: Interrelationships of Procedures within the Metering Market
Manual
- Figure 3-2: Main Steps for Registering a Metering Installation in the IESO-
Administered Market
Section 2 Added Market Manual 3: Metering, Part 3.10 Transmission Grid – High Voltage
Metering.
Section 3.3.9 Added description of Market Manual 3: Metering, Part 3.10 Transmission Grid –
High Voltage Metering..
Section 4 Added reference to Market Manual 3: Metering, Part 3.10 Transmission Grid – High
Voltage Metering.
1. Market Manuals
The market manuals consolidate the market procedures and associated forms, standards, and policies
that define certain elements relating to the operation of the IESO-administered markets. Market
procedures provide more detailed descriptions of the requirements for various activities than is
specified in the “Market Rules”. Where there is a discrepancy between the requirements in a
document within a market manual and the “Market Rules”, the “Market Rules” shall prevail.
Standards and policies appended to, or referenced in, these procedures provide a supporting
framework.
– End of Section –
2.1 Purpose
The metering manual is designed to provide an overview of the metering procedures required for
registering as a metering service provider (MSP) and for registering a metering installation in the
IESO-administered markets.
2.2 Scope
This overview is intended to provide a summary of the steps and interfaces for metering service
providers, metered market participants (MMPs), and the IESO, for metering-related registration
activities. Procedural work flows and steps described in component procedures serve as a roadmap
for metering service providers, metered market participants and the IESO, and reflect the
requirements set out in the market rules and applicable IESO policies and standards.
The information provided in the metering manual is not intended for use as training material for the
above referenced procedures, and specific procedures internal to the IESO are not provided.
2.4 Conventions
The standard conventions followed for market manuals are as follows:
• The word ‘shall’ denotes a mandatory requirement;
• Terms and acronyms used in this market manual including all Parts thereto that are
italicized have the meanings ascribed thereto in Chapter 11 of the “Market Rules”;
• Double quotation marks are used to indicate titles of legislation, publications, forms and
other documents.
Any procedure-specific convention(s) shall be identified within the procedure document itself.
– End of Section –
3. Procedures Summary
3.7: Totalization
Table Registration
MMP assigns/IESO assesses relationships MSP submits/IESO accepts Totalization Table for new DP
(MSP and Transmitter or Distributor) for new IESO enters Totalization Table into meter registry with an effective date
DP MSP and transmitter (where applicable) sign the Site Registration Report
(SRR)
MMP submits starting date for settlement See procedures for more details
IESO accepts MMP for new DP
Figure 3-2: Main Steps for Registering a Metering Installation in the IESO-Administered Market
– End of Section –
4. Applicability of Procedures
The table below summarizes the most common situations or events that are likely to trigger activities
described in this market manual. To use this table, select the event that most closely matches your
area of interest under the “Event” column; then refer to the appropriate Procedures document listed in
the “Procedure” column. A list of all Procedures documents that comprise this market manual is
found in Section 3 of this document.
Event Procedure
Metering organization wishes to register with the Part 3.1: Metering Service Provider (MSP) Registration,
IESO as a metering service provider. Revocation and De-registration
Metering service provider or metered market Part 3.6: Conceptual Drawing Review
participant wishes the IESO to review a single
line diagram for a proposed metering installation,
or proposed changes to a metering installation.
Metering service provider wishes to register a Part 3.0: Metering Overview
metering installation. Part 3.2: Meter Point Registration and Maintenance
Part 3.4: Measurement Error Correction
Part 3.5: Site-Specific Loss Adjustments
Part 3.7: Totalization Table Registration
Part 3.8: Creating and Maintaining Relationships
Part 3.10: Transmission Grid – High Voltage Metering
– End of Document –