e-ISSN :

INTERNATIONAL JOURNAL OF PROGRESSIVE 2583-1062


RESEARCH IN ENGINEERING MANAGEMENT
AND SCIENCE (IJPREMS) Impact
Factor:
www.ijprems.com
Vol. 04, Issue 06, June 2024, pp: 739-741 5.725
editor@ijprems.com

REVIEW OF ENHANCING CONSTRUCTION EFFICIENCY: REAL-TIME


PROGRESS MANAGEMENT WITH BIM
Sanjeev Kumar1, Bhupender Malik2, Ravikant Sharma3
1
M. Tech Scholar, Department of Civil Engineering, GITAM, Kablana, Jhajjar, India.
2
Assistant Professor, Department of Civil Engineering, GITAM, Kablana, Jhajjar, India.
3
Assistant Professor, Department of Mechanical Engineering, Amity University Haryana, Gurgaon, India.
ABSTRACT
There are many Construction Sites and Infrastructure Projects going on in India, which provides facilities (luxury) to
their clients whiling to invest on such projects; and as a project manager it is necessary to monitor progress work
correctly on sites as per the plan; as well execute a plan on time. Different departments in the construction field
require safety for which safety rules and regulations play an important role. For Safety measures, the Traditional
Method is adopted, which is tedious and time-consuming but could be improved with ease that can reduce time as well
as Cost with latest tools and technologies in the market. For example: BIM 360, Radio Frequency identification
devices, Virtual reality, 3D Scanning, etc. In this Study, the exact elaboration is mentioned as to how this updated
tools and techniques cut down the maximum time consumed as well as provides collecting accurate data from site and
also looks after maximum safety which is important at the same time. Integrated technology is proved as the best
combinations for better results and monitoring purpose. Aim of the paper is to review the availability of resources and
methodology which can be helpful for the Indian Construction Industry and compete with other countries worldwide
(Same Industry). Access various technologies suitable for the construction industry, for real-time progress, monitoring
and safety management; also find the most suitable one pertaining to Indian Construction Industry. Access the
different Personal Protecting Equipment (PPE) and safety measures for the employee doing fieldwork in this industry.
Keywords: BIM, real-time, management, feasibility, progress, RFID, 3D scanning, latest technology
1. INTRODUCTION
The infrastructure sector is the largest sector, encompassing numerous activities, tasks, and substantial information
management. Achieving better performance requires accurate, real-time access to project data. Managing
infrastructure projects is challenging, with a high risk of errors. Thus, it is crucial for everyone on-site to report
progress, address problems, and ask questions promptly and efficiently. Insufficient information can lead to poor
productivity and rework, contributing to time and cost overruns. A revolutionary technology Building Information
Modeling (BIM) can mitigate, the need for re-formatting, re-gathering, and reworking data (Matthews, 2015). Several
factors hinder performance improvements in the infrastructure sector: the competitive bidding system, project-specific
nature of construction, the temporary and nature of relationships.
The integration of real-time data capturing using the lacheck mechanism alongside BIM holds substantial promise in
enhancing resolution-making processes within the infrastructure sector. This approach not only enhances automation
levels, as evidenced particularly in mechanical, electrical, and plumbing (MEP) sectors, but also presents opportunities
for more efficiency and accuracy. However, despite its potential benefits, numerous factors impede the broad
implementation of these mechanisms in most infrastructure projects, as highlighted by Yitmen (2018). Nevertheless,
there has been noticeable growth in recent years, indicating a gradual shift towards embracing new mechanism within
the Indian construction sector. This trend indicates an increasing acknowledgment of the threshold and potential of
modern mechanism in enhancing project outcomes and overall industry performance.
2. LITERATURE REVIEW AND METHODS
Leung [1] presented a money-saving construction area observation system adapted farsighted cameras, an online
collaborative platform, and a wireless network. And also, it concentrates on scheming a observation framework to
convey a money-saving solution on quality assurance for construction plans by using technology. The approach
assimilates IP cameras, wireless communication technology, and joint systems to configure a extensive observing and
connecting atmosphere for project group applicants. The process is examined in real construction area and
investigation of photo quality and dependability are more than acceptable until now.
Golparvar-Fard et al. [2] explained visualization method for monitoring development by presenting that envisage
advance alteration by superpose four-dimensional (4D) as-designed on evident time-lapsed images in one visual

@International Journal Of Progressive Research In Engineering Management And Science Page | 739
e-ISSN :
INTERNATIONAL JOURNAL OF PROGRESSIVE 2583-1062
RESEARCH IN ENGINEERING MANAGEMENT
AND SCIENCE (IJPREMS) Impact
Factor:
www.ijprems.com
Vol. 04, Issue 06, June 2024, pp: 739-741 5.725
editor@ijprems.com
portrayal. It conveys a compatible visual system and a common technology of designed construction that could be
stretched out to observing stage.
Bryan [3] indicated the starting proof of concept on merging RFID mechanism with DRONE mechanism to expand
construction site logistics delivery management. This research provides concept validation and highlights
technological challenges like the continuous exchange uniting RFID transponder frequencies & drone telemetry.
Experimental findings show that an RFID transponder mounted at drone can recognize and show the geolocation of
targeted items. Significant mechanical limitations comprehend the mass of the RFID transponder and the distance
between the transponder and the tags. The experimental findings of this proof of concept stipulate that drones
equipped with RFID accomplishable to supply details for logistics delivery management processes and can be
integrated with Building Information Models (BIM).
Yiannis [4] found out through his study that the penalty and claims for reimbursement to the contractors and builders
for the delay in time which could be more than normal cost. Hence innovative technology and machinery should be
used to alleviate time delay and cost overrun. This proof of concept covers modern usage of Building Information
Modeling (BIM) and drone mechanism within infrastructure sector for data collection and monitoring. It highlights
how usage of drones & BIM can lead efficient data gathering and tracking of a project's progress throughout its
lifecycle, resulting in more accurate record keeping, task management, and later analysis.
Matthews [5] found out through his study the persuasiveness of cybernetical BIM for quick transmission. It indicates
how steps can be better prepared to upgrade the transfer of information and permit the time-management (4D) and
money-part (5D) over integrating mechanism (as RFID tags /Ray tags, AR and frame by frame Camera’s) with BIM in
real-time by using cloud based BIM collaboration. Jane and peter used data gathering method in this paper which were
amorphous examination and document recording sources. This method was adopted to ensure that the suggested
system could be combined with existing process.
Fan-Xue [6] stated a certain RFID accustomed recognise materials and improves quick transmission of information
evident and detectable, for the time being progressively attached to BIM as a central detail system. This proof of
concept delivers experts by five-step instruction by attaching BIM to RFID for numerous customer satisfaction
management needs. Further it delivers experts with a place to begin for detailed investigation of advance towards
improving the importance of RFID, BIM, and the assimilation of the other with one.
Jing [7] used BVRS process, which relies upon an inventive centralized computing BIM data cite clarification &
correspondence process. BVRS empower customers towards revive BIM mechanism changes in (VR) mouthpiece.
Moreover, BVRS is attempted within variable of arrangement new conditions including new article estimations, target
regions, and thing types. Results affirmed the ease of use and capability of BVRS. This exploration intends to advance
a creative information exchange convention that mechanizes the updates of plan data in VR shows continuously,
called BVRS. To succeed this objective, we utilized a metadata elucidation framework and a Cloud based foundation.
Shuang [8] gave a successful strategy to consequently perceiving PPEs abuse conducts with incorporating situating
innovation and weight sensor and assesses the individual security execution of labourers agreeing their reaction to
threat takes note. This included the improvement of a supporting multiuser stage to acquire the constant position of
labourers in connection to virtual unsafe zones. As now a days manually safety management is very tough because of
various reasons like, (One) they depend on very much expert and profoundly learned wellbeing spectators, (Two)
abstract perceptions or studies required that outcome in oversights or inclinations, (Three) they don't allow constant
watching for early enough input (Four) The results found that gathering level appraisal can unduly hide individual
performance. Numerous related innovations alike RFID and digital substantial framework had been utilized for PPEs
utilization checking, however mentioned techniques can just distinguish in case labourers convey the PPEs with
themselves with no end on if they utilize the PPEs accurately at spot required.
Yitmen [9] created a mechanism for BIM-based site information catching mechanism and investigate the effect of site
information catching advances at robotized venture advance checking looking at 3-dimension model and BIM work
processes. The basic condition demonstrating process was utilized to check the speculations and mature the aptitude
model. This investigation affirms the significance of utilizing the field information catching innovations with BIM in
two fundamental stages to improve mechanized task advancement checking execution. Then, the purpose of the
current examination abide propel a model or structure to extend dissimilar points within use of data field getting
advances and BIM jointly as thorough mechanized development checking system. Methodologies used are 1) data
sampling 2) data collection 3) measures.

@International Journal Of Progressive Research In Engineering Management And Science Page | 740
e-ISSN :
INTERNATIONAL JOURNAL OF PROGRESSIVE 2583-1062
RESEARCH IN ENGINEERING MANAGEMENT
AND SCIENCE (IJPREMS) Impact
Factor:
www.ijprems.com
Vol. 04, Issue 06, June 2024, pp: 739-741 5.725
editor@ijprems.com
Zhen [10] gave a short survey to assess and illuminate the condition of-workmanship for the incorporation of BIM and
sensor innovation. An orderly survey approach was embraced. The outcome unveils that albeit much work has guided.
The data furnished by the sensors acclimatizing with the structure data winds up important in changing the structure
data into significant and full state data that is increasingly precise and modern. There are two procedures to screen
building essentialness use. One is to introduce a couple of sensors into structures to assemble related data, for instance,
get temperature, wetness, CO2, and power use data; another is to lead external checking to work to get its warm
conditions.
3. CONCLUSION
Many researches have taken place for using BIM for real-time progress monitoring and management in other countries
but not in India. The various mechanisms have not found any implementation in the Indian construction sector. No
feasibility study has been carried out for assessing the requirement and usage of various mechanisms utilizing BIM for
real time progress management.
ACKNOWLEDGEMENT
I would like to express my sincere thanks to My Guide Mr. Bhupender Malik, Assistant Professor, GITAM, Kablana
for his valuable guidance in my research journey. I would like to acknowledge the assistance of Mr. Ravikant Sharma,
Assistant Professor, Amity University in writing this research paper.
4. REFERENCES
[1] Sze-wing Leung, S. M. (2008). Using a real-time integrated communication system to monitor the progress and
quality of construction works. Automation in Construction 17, 749-757.
[2] Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., and Lee, a. S. (2009). Visualization of Construction
Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs. Journal of Computing
in Civil Engineering, 44 - 56.
[3] Bryan Hubbard, H. W. (2015). Feasibility Study of UAV use for RFID Material Tracking on Construction
Sites. 51st ASC Annual International Conference Proceedings, 288 – 302.
[4] Yiannis Vacanas, K. T. (2015). Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV)
technologies in infrastructure construction project management and delay and disruption analysis. Proceedings
of SPIE - The International Society for Optical Engineering, 76 - 91.
[5] Jane Matthews, P. E. (2015). Real time progress management Re-engineering processes forcloud-based BIM in
construction. Automation in Construction 58, 38-47.
[6] Fan Xue, K. C. (2018). Linking radio-frequency identification to Building Information Modeling Status quo,
development trajectory and guidelines for practitioners. Automation in Construction 93, 241 - 251.
[7] Jing Du, Z. Z. (2018). Zero latency Real-time synchronization of BIM data in virtual reality for collaborative
decision-making. Automation in Construction 85, 51 - 64 .
[8] Shuang Dong, H. L. (2018). Building information modeling in combination with real time location systems and
sensors for safety performance enhancement. Safety Science 102, 226–237.
[9] Yitmen, S. A. (2018). Modeling and analysis of the impact of BIM-based field data capturing technologies on
automated construction progress monitoring. International Journal of Civil Engineering, 555 - 582.
[10] Zhen Liu, Z. D. (2018). Integration of Building Information Modelling (BIM) and Sensor Technology A
Review of Current Developments and future outlooks. Proceedings of the 2nd International Conference on
Computer Science and Application Engineering, 436 - 446.

@International Journal Of Progressive Research In Engineering Management And Science Page | 741