12390-3
Number of Test Report 188
Project CONGO – BIOFUEL 1st AGRI HUB - INDUSTRIAL START-UP
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Loudima
30A100_RFI_229 EXT
Number notification Date of receipt 10/28/2023
30A100_RFI_262 EXT
Curing by Density Strength (Mpa)
Spec. Tag Crushing date Weight (Kg) Load (kN)
days (T/m3) Unit Average
AH889 15.70 2.44 237.29 11.80
AH890 7 10/30/2023 15.64 2.43 363.07 18.06 15.48
AH891 15.64 2.43 333.44 16.58
AH892 15.74 2.45 388.19 19.31
AH893 28 11/20/2023 15.92 2.48 397.67 19.78 19.30
AH894 15.80 2.46 378.53 18.83