HS0131-2999-DW-0510-0004 - 02 地管
HS0131-2999-DW-0510-0004 - 02 地管
HS0131-2999-DW-0510-0004 - 02 地管
petrochem.
N FARABI
industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND
national
ibn Rushd
A A
270° 90°
saudi aramco
YCOTD
YANPET
MAKKAH
SAMREF
180°
B MARAFIQ B
KEY PLAN
C C
D D
TIE-INS
1. LAB
2. C10-C13 (NP)
3. C14-C17 (HNP)
4. C14 BY PRODUCT
5. KEROSENE RETURN
6. FUELGAS
E E
7. BENZENE
8. KEROSENE SUPPLY
9. DIESEL
E:199.500
E:110.850
E:229.000
E:565.000
E:668.500
E:745.000
E:884.000
E:961.600
E:1087.500
E:1317.000
E:1377.000
E:1450.000
E:1518.000
E:1600.000
E:1677.000
E:1881.000
10. HYDROGEN
319000
10850 88650 29500 336000 103500 77000 138500 77600 125900 229500 60000 73000 68000 82000 77000 204000 19000
11850
19000
N2 METERING 115 KV POWER
6000 12500 27000 25000 26000
F UNLOADING AREA UNLOADING AREA STATION PROPERTY LINE SUPPLY LINE N:530.000 F
CAT. 4 FENCE PROPERTY LINE
900-DK-04 900-SL-02
900-DK-02
NOTE-6 DWG.#G446-2814-DW-0290-0001-REV.Z1
N- 496.518
AREA 900-DK-06
BOT. OF EL.98.750
TRENCH BOT. OF EL.99.000
6000 FGL.EL.99850
BUILDING
BOP.OF EL.98.588
CANTEEN
V-N-4
TOP.OF EL.99.000
NE
LIMIT 45 METERS FROM PROPERTYLINE
V-N-14
@ EL.98.900
V-N-18
BOP.OF EL.97.500
HPP
LI
HPP
INSTRUMENT BURIED CABLE INSTRUMENT DUCT BANK
V-N-6
INSTRUMENT DUCT BANK
NE
E&IDUCT BANK
814-PI
HEAVY DUTY ROAD (10m)
RE W ATER LI
BOT. OF EL.98.750 TRENCH TOP. OF EL.98.550
RE W ATER
814-PIV-076
814-PI
814-PI
PROPERTY LINE
ELECTRICAL BURIED CABLE 814-PIV-N-13
814-PI
1900-TK-41A 1900-TK-41B
1900-TK-08 900-TK-01A 900-TK-01B
10"-OW
CAT. 2 FENCE
SANITARY PIT TRENCH BOT. OF EL.98.850 SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE Service Change Service Change
(B-004)
ON CHANNEL
ON CHANNEL
(TYP)
INSTRUMENT DUCT BANK 803-TK-53
813-P-51A
LPP
LPP
AOS DRAIN 11000mmL X 4600mmW X 3650mmH
2"-SW BOT. OF EL.99.000
FI
813-P-51B
BOT. OF EL.99.200 10"-OW
PROPERTY LINE
10"-OW
FI
OIL HOLDING PIT (2.2x2.2x3.5m) AOS DRAIN 813-TK-51
LPP
LPP
VERSI
VERSI
BOT. OF EL.99.200 27500mmL x 7700mmW x 5000mmH 803-P-53A
PETROLAAN
LIMIT 60 METERS FROM PROPERTYLINE
(B-001)
DI
DI
Ø13.5 x 14.4m Ø13.5 x 14.4m
1201-P-05B
1201-P-06B
1201-P-06A
ELECTRICAL CONCRETE CABLE
1201-P-05A
10"-OW
R
LPP
LPP
15
ON CHANNEL
ON CHANNEL
TRENCH BOT. OF EL.98.850 0 E&I DUCT BANK
HPP
0
0
TOP. OF EL.99.000
FGL.EL.99850
1203-P-01B
1203-P-02B
1203-P-01A
1203-P-02A
BOT.OF EL.99.200
SLOPE SLOPE
TOP OF FOOTING AOS DRAIN LPP
VERSI
VERSI
@ EL.98.900
4"-CD
BOT. OF EL.99.200 DIVERSION CHANNEL
HPP
LPP
DI
DI
1814-DVS-004
1203-P-03B 1900-TK-06A
LPP
LPP
(TYP)
N
FGL.EL.99850
16"-FW
AOS DRAI
1201-V-08
LPP
LPP
1203-PW-01
4"-CD
8"-OW
UNIT
8"-OW 8"-OW
1203-P-03A 4"-CD
10"-OW
4"-CD
8"-OW
HPP
HPP
8"-OW
EXISTING
1203-P-07A
1201-V-07
1203-V-02
UNIT
12"-FW
SLOPE SLOPE
202-PR-01
203
1201-E-04 LPP
4"-CD
1203-P-05B SLOPE DIVERSION CHANNEL SLOPE SLOPE SLOPE
GUY WIRE
HPP
LPP
ADMIN
2"-PW
LPP
16"-FW
DIVERSION CHANNEL
OF FARABIYANBU
1203-OS-03
1203-TS-01
704
HPP
8"-OW 1201-P-07A 10"-OW SLOPE SLOPE
LPP
INDUSTRIAL
1203-P-05A
1201-V-01 1701-TK-20
10"-OW
SLOPE SLOPE
UNIT
108-PR-01
4"-CD
1203-P-06A
ON CHANNEL
CL.
DISC. 1203-V-03
1201-P-01A
CH
1203-P-14B
1900- P- 41A
1900- P- 08A
1900- P- 08B
1900- P- 06A
1900- P- 06B
1701- P- 20A
TRENCH
1203-P-06B
LPP
LPP
1201-P-01B 1201-E-05A/B
(SAPU)
8"-OW
1203-P-14A 10"-OW
VERSI
1203-ME-04
G FGL.EL.99850 G
1203-E-09
1201-E-05C
108
176000
SECURITY
FOR W HI
HPP. EL.100000
NG
DI
R
STI
1203-E-07
F.S
15
1203-ME-05
V-N-16
1203-P-04B
EXI
HPP
1201-E-06A/B
HPP
0
1201-E-23
1201-E-22
1201-E-21
1201-ME-02A
10"-OW
1201-E-20
10"-OW
4"-CD
8"-OW
1201-E-19
1900-TK-06B
0
0
8"-OW
SLOPE SLOPE SLOPE SLOPE
1203-E-06
8"-OW
814-PI
8"-OW
1201-ME-02B 1203-P-08A
1201-R-02
1203-P-04A 1203-V-17A/B
1203-P-08B
EXISTING
8"-OW 8"-OW
10"-OW
4"-CD
F.S
1203-P-09A 12"-FW
1203-E-03B 1203-V-05
DVS DVS DELUGE SKIDS
8"-OW
1203-E-11 814-PIV-N-17 12"-FW FGL. EL.99850 814-PIV-N-21
1203-P-09B
UNIT 808
S
8"-OW
F.
1203-E-17
2"-PW
1201-V-20 1201-V-21
1201-V-19 1201-V-22 1201-C-01 1203-E-15
1203-R-01B
104-PR-01
F.S
8"-OW
NOTE-6
1203-P-11A 1203-E-14
2"-SW
1203-R-01A
1201-C-04A
1201-C-04B
16"-FW
702-PR-01
1203-OS-01 1203-P-11B
F.S
8"-OW
1201-ME-01A
1203-P-10A 1203-E-13
4"-CD
CONSOLE
1201-ME-01B
813-SL-01
813-ME-01
D
D
COOLING WATER 1201-E-03
L SKI
L SKI
1203-E-12C
AREA
DROP
AREA
DROP
HPP
LUBE
LUBE
PURPOSE OTHER THAN
1203-E-03A 1203-P-10B
HPP
HPP
F.S
F.S
1203-E-12A/B
8"-OW
OI
OI
4"-CD
105-PR-01
ON CHANNEL
1201-E-02
ON CHANNEL
1201-P-03A
12"-FW
F.S
4 HANDICAP + 11 VIP
16"-FW
6"-CD
1201-P-03B 8"-OW
6"-CD
8"-OW
1203-V-06B
00
FGL.EL.99850
1202-PR-01
803- V- 52
0
1203-OS-02 SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
0
1201-V-09 1203-E-02
1203-V-01
75
ZATI
VERSI
7
1203-TK-01
ON CHANNEL
VERSI
FUEL GAS
1201-P-04A 1814-DVS-006 1203-E-04
R
R
8"-OW
6"-CD
1202-P-02A
DI
1701-P-01A
1701-P-01B
DI
R
803- TK- 52
1201-P-04B 1203-P-13C
UNIT
CURB 1203-E-05
LPP
LPP
LPP
LPP
LPP
LPP
F.S
1201-V-06 1202-P-02B
803- P- 52A
WALL 1203-V-06A
4"-CD
1701-P-02
VERSI
S PROPERTY
1201-V-02 1203-P-13B
90
F.S
FYPC B/L
F.S
1203-E-16
1203-E-01 1203-P-13A
DI
1701-P-03 8"-OW
1201-P-02A
KO DRUM
1202-P-03A
ON CHANNEL
UNLOADING
OFFSITE
00 TEMPORARY
1701-V-01 1201-ME-07
4"-CD F.S
THOUT AUTHORI
702
1202-V-05
CAT. 2 FENCE
HPP
1202-V-02 1202-P-03B
900-TK-95
8"-OW
UNIT 321
VERSI
4"-CD
1900-TK-02B
HPP
F.S
1900-TK-05 Service Change
1701-E-01 1202-TS-01
HPP
DI
1701-ME-01 1202-V-03 1202-V-04
1701- M E- 03
1202-P-04A
F.S
PIG RECEIVERS
SLOPE SLOPE
1202-OS-02 1202-E-04 SLOPE SLOPE
DVS
1701-V-02 1202-P-04B
16"-FW
1701-P-04A
(POLO)
F.S
1202-OS-01 4"-CD Ø15.3 x 15.25m
1202-E-05
1701-P-04B
F.S
1201-H-01
FUEL GAS SKID 1202-P-01A 1202-E-02
DVS
ACID FLARE
1900- P- 05A
1900- P- 02A
1900- P- 95A
1900- P- 05B
1202-V-01A
8"-OW
1203- P- 12
4"-CD
4"-CD
DS
112500
LPP
LPP
LPP
LPP
8"-FW
DELUGE SKI
4"-CD 1202-V-01B 1202-E-01
1202-P-01B
LPP
AREA
4"-CD
R15000
DVS
16"-FW
0 1202-V-01C 1202-E-03
8"-FW
0
E:550.000
0
15
1202-V-01D
UNIT KO DRUM
ON CHANNEL
808-P-51A 1202-E-06
V-N-19
DVS
1701-H-01
1202-V-01E
1201-C-03
808-P-51B
V-N-18
V-N-16
814-PI
NED I
V-N-3
1202-V-01F
VERSI
V-N-9
6"-OW
R
2"-PW
2"-PW
SLOPE SLOPE SLOPE SLOPE
HPP
7
703
814-PI
DVS
HC FLARE
5
16"-FW
HPP
0 1900-TK-95
DI
803-TK-51 808-V-51 1900-TK-02A
814-PI
0
814-PI
1701-C-01A
814-PI
1701-C-02 1201-C-02A 1201-C-02B
1701-C-01B 814-PIV-N-19 814-PIV-077
2"-PW
4"-CD
F.S
AOS DITCH
803-V-51 16"-FW 16"-FW 814-PIV-N-20
R3
N:335.000
814-PIV-N-2 814-PIV-N-09 2"-PW (TYP.)
4"-CD
16"-FW
H
814-TP
-64A/B KO DRUM H
4"-CD
4"-CD
SECONDARY ROAD (6.1m)
ON CONTAI
00
SECONDARY ROAD (6.1m)
SCLOSED W I
NOTE-6
4"-CD 4"-CD 4"-CD
UNLOADING AREA 902-SL-02
430000
00
6"-OW 6"-OW
902-SL-03
T SHALL NOT BE USED FOR ANY
40000
1000
EXISTING PIPING
GHTS RESERVED
902-SL-01
16"-FW
2"-PW
GATE HOUSE 2 EXISTING TRENCH
814-PIV-N-1
FGL. EL.99850 U/G CORRIDOR EXISTING BURIED CABLES
4"-PW DWG.#G446-2814-DW-0290-0001-REV.Z1
N:295.000 N:295.000
NFORMATI
NOTE-6
814-TP
-51A/B
N=317700 STATION
R1
0 R1
00 50
50
5000
SHELTER-2
00
FUTURE
SEMH-026
CAT. 2 FENCE 0
(B-012B/SS02)
R3 FGL.EL.
BUILDING
00
EXISTING SANITARY PIT
CONTROL
15
(B-006)
ALL RI
99850 METERING
(B-012A/SS01)
I
00
MAIN
NOT TO
107-PR-01
AND
CAT. 4 FENCE
UNLOADING AREA
CAT. 2 FENCE
(B-009)
126000
WAREHOUSE 800-SL-01
LOADING &
UNIT UNIT METERING
C
ASU-LIGNITE
TECHNICAL
701 201
BUILDING
WAREHOUSE
(B-013A)
(B-013B)
(B-007)
AL –
(301-SH-01) 0
00
176000
CAT. 2 FENCE
CATALYST & 5 EMERGENCY EXIT 2
(901-SH-04)
UNIT 802
101-PR-01
201-PR-01
R1
DENTI
ISLAND-11
FACILITY LAB
STORAGE UNIT 301 UNIT 810
900E-SL-01
169m x 162m PARKING METERING STATION
MAINTENANCE
(901-SH-02) (B-010)
.CONFI
FIRST
CALS COMPANY
PARKING YAMA
WAREHOUSE 802
810-ME-12 A/B
810-P-12A
810-P-12B
(16 CARS)
PATROL ROAD
810-ME-01
PLATFORM
ACCESS
FGL.EL.99850 UNIT 801 R4 BENZENE
2"-PW
FLUSH
810-ME-16
810-JDA-19
810-JDA-18
60000
x 45m
70m x 20m
UNIT (301-SH-02) 50
SECONDARY ROAD (6.1m) FILLED DRUMS 311 SECONDARY ROAD (6.1m) UNIT BASIN 00 METERING STATION
N:169.000
5000 11000
CSMH
103
ED
0 SUBSTATION H2 METERING
(901-SH-03)
T W AS SUPPLI
00
OPERATIONS
70
UNLOADING
CAT. 2 FENCE
BUILDING
LIMIT 60m FROM PROPERTYLINE 0 ELECTRICAL STATION
(B-002) FUTURE 203m x 45m (B-017) 6 900E-DK-01
AREA
PETROCHEMI
R (B-011/SS00)
6200
SECURITY
69000
R
BUILDING SCRAP GROUND WATER
LIMIT 45m FROM PROPERTYLINE
DE
ACCESS W AY
J J
MONITORING WELL
1 4
WI
5
1550
2
YARD
32M
6
7.
HYDRANT 3
CSMH
N- 134.000
E- 1360.000
N:119.000
23650
THI
19000
CAT. 4 FENCE
11850
11850
WEST LIFTING STATION CAT. 4 INTERNAL FENCE LOADING/UNLOADING SEARCH PROPERTY LINE EMERGENCY EXIT 1 FGL.EL.99850 PROPERTY LINE
E:100.000
58000
OVER WATCH
(B-005A) (B-015B)
(B-003) & SCRAP YARD SHED STORAGE BUILDING
VISITORS WAITING ROOM (B-014) MAINTENANCE GATE
ROYAL COMMISSION CHANNEL ROYAL COMMISSION CHANNEL ROYAL COMMISSION CHANNEL
K K
E:1576.000
E:1373.000
E:1453.000
E:1529.000
E:1900.000
E:1782.000
E:1110.000
E:1262.000
E:1677.000
E:556.000
E:590.150
E:623.000
E:651.500
E:711.000
E:927.000
E:980.000
E:234.750
E:478.000
GATE HOUSE 4
(B-005D)
78000 34150 32850 28500 59500 216000 53000 130000 152000 111000 80000 76000 47000 101000 105000 118000
SUPPORT
FYPC B/L ENTRY POINTS
BUILDING
L OFFSITE 1. SANITARY WATER L
2. INDUSTRIAL WASTE WATER
3. POTABLE WATER
4. PROCESS WATER
M M
DINESH Sivaprak
Digitally signed by DINESH Digitally signed by K.Mugesh Digitally signed by Sivaprakash
KUMAR DN: cn=K.Mugesh, o=Saipem, DN: cn=Sivaprakash,
DN: cn=DINESH KUMAR, o, ou,
email=DINESHKUMAR.THANGA K.Mugesh ou=Piping,
email=mugesh.kunjanpillai@saipe
o=SAIPEM, ou=X-SIGHT,
KUMAR
email=sivaprakash.murugan@s
ash
RAJ@SAIPEM.COM, c=IN m.com, c=IN
Date: 2022.02.11 18:16:08 Date: 2022.02.11 18:18:35 +05'30'
aipem.com, c=IN
+05'30' Date: 2022.02.11 19:11:36
+05'30'
NEW FACILITIES DRAWING NUMBER REFERANCE DOCUMENTS: NOTES: LEGENDS: LEGENDS: LEGENDS: FARABI YANBU 1 Rejected
N Name : N
PETROCHEMICALS COMPANY
AOS DRAIN WITH MEDIUM CAT. 2 FENCE 2 Comments as Noted
LAB UNITS CD LINE Discipline :
SR NO. DOCUMENT NUMBER DESCRIPTION 1. ALL DIMENSIONS ARE IN MILLIMETER(mm) & CO-ORDINATES DUTY GRATING COVER CAT. 4 FENCE 3 No Comments
Date :
1201 UOP PACOL PROCESS WITH DEFINE PROCESS HS0131-21201-DW-0505-0001 1 067401-2000-DW-051-001 GENERAL PLOT PLAN, YANBU ARE IN METER(m) UNLESS OTHERWISE SPECIFIED. OWS LINE AOS DRAIN WITH HEAVY
Signature: 4 Information Only
2 HS0131-21201-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1201 & 1701 PACOL & HOTOIL UNIT DUTY GRATING COVER FENCE
1202 UOP PEP PROCESS UNIT 2. REFERENCE POINT COORDINATES Document Category This approval does not absolve the contractor from meeting their
FW LINE A R I contractual obligations of delivering a complete, safe and efficiently
3 HS0131-21202-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1202/1203 PEP & DETAL UNIT N = 100.000 = 38864.3659 (Use Tick mark) : operating unit/facilities meeting all requirements of the contract.
1203 UOP DETAL PROCESS UNIT HS0131-21202-DW-0505-0002 HUME PIPE
4 HS0131-21900-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1900 NEW TANK FARM E = 100.000 = 25542.8890 PW LINE CULVERT FEED & PMC
AUXILIARY UNITS 5 HS0131-21902-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1902 INTERCONNECTI0N SLEEPERS 3. HPP (HIGH POINT OF PAVING) ELEVATION = 100.000m CORRESPONDS FIRE SEAL IN AOS DRAIN
1701 UOP HOT OIL SYSTEM HS0131-21201-DW-0505-0001 6 G446-2900-DW-0500-0001 EQUIPMENT LAYOUT UNIT 900 TANK FARM TO THE MADINAT YANBU AL-SINAIYAH PORT REFERENCE ELEVATION 9.75m. SANITARY LINE
PIPE BRIDGE
1900 NEW TANK FORM HS0131-21900-DW-0505-0001 7 HS0131-2000-DW-0790-0001 SUBSTATION EQUIPMENT LAYOUT FOR SUBSTATION SS-04 CSW DRAIN WITH RCC COVER
4. FOR ELECTRICAL, INSTRUMNET & CIVIL UG FACILITIES, REFER RELEVANT LAYOUT CD PIT
O 8 HS0131-2999-DW-0640-0005 LAYOUT DRAWING FOR CONTROL BUILDING - ITR-4 DRAWING MENTIONED IN REFERENCE DRAWING LIST. DUCT/TRENCH EMPLOYER O
1902 INTERCONNECTION SLEEPERS HS0131-21902-DW-0505-0002 OWS PIT
9 HS0131-2000-DW-0470-0001 B-017 - ARCHITECTURAL GROUND PLAN FOR OPERATIONS BUILDING UG ELECTRICAL CONCRETE
5. FOR UNDERGROUND PIPING COMPONENTS SUCH AS MANHOLE, CLEANOUT, ETCM,
10 HS0131-2902-DW-0720-0001 Cable Tray / Trench Layout For Unit-902 -Update PW PIT CABLE TRENCH GATE FARABI YANBU PETROCHEMICALS COMPANY
REFER DESIGN PHILOSOPHY-UG DRAINAGE SYSTEM ( G446-2999-PH-0595-0001).
11 HS0131-2000-DW-0720-0001 Cable Tray/Trench Layout for Substation SS-04 UG ELECTRICAL BURRIED YANBU, KINGDOM OF SAUDI ARABIA
SANITARY PIT
12 HS0131-21201-DW-0720-0001 Cable Tray/Trench Layout for Unit -1201 & 1701
6. EXISTING CSW DRAIN TRENCH TO BE MODIFIED, TO SUIT PRESENT CONDITION. EXISTING ROAD
REVAMPING EQUIPMENT LIST CABLE TRENCH LAB#4 PROJECT
13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE SCOPE OF WORK-LAB#4
15 HS0131-2999-DW-0720-0001 Cable Tray/Trench Layout for Overall Street & Fence Area-Update GRAVEL SHOULDER
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE 18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:2000 1/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
petrochem.
N FARABI
industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND
national
ibn Rushd
A A
FOR CONTINUATION REFER DWG. NO. CL. 10M WIDE ROAD
270° 90°
N HS0131-2999-DW-0510-0004-1
saudi aramco
ELECTRICAL DUCT BANK
YCOTD
BOT. OF EL.98.750 YANPET
MAKKAH
SAMREF
814-TP 814-TP
180°
-52A/B -53A/B
814-PIV-N-5
TOP OF FOOTING
V-N-4
@ EL.98.900 KEY PLAN
BOP.OF EL.97.500
V-N-6
INSTRUMENT DUCT BANK
NE
814-PI
BOT. OF EL.98.750
RE W ATER LI
814-PI
SANITARY PIT
NO.
NO.
OIL HOLDING PIT (2.2x2.2x3.5m) AOS DRAIN
FI
BOT. OF EL.99.200
DWG.
DWG.
1201-P-05B
1201-P-06B
1201-P-06A
ELECTRICAL CONCRETE CABLE
1201-P-05A
HS0131-2999-DW-0510-0004-1
HS0131-2999-DW-0510-0004-3
R
15
TRENCH BOT. OF EL.98.850 0
0
0
REFER
REFER
TOP OF FOOTING
D @ EL.98.900 D
16"-FW
CONTINUATION
CONTINUATION
1201-V-08
4"-CD
8"-OW
8"-OW
8"-OW
1201-V-07
E 1201-E-04 E
4"-CD
2"-PW
8"-OW
FOR
FOR
1201-P-07A
1201-V-01
CL.
DISC.
1201-P-01A
1201-P-01B 1201-E-05A/B
F F
ROAD
1201-E-05C
F.S
15
1201-E-06A/B
1201-E-23
1201-E-22
1201-E-21
1201-ME-02A
1201-E-20
4"-CD
1201-E-19
0
ROAD
8"-OW
WIDE
1201-ME-02B
1201-R-02
WIDE
8"-OW 8"-OW
10M
OF FARABIYANBU
CH
G G
W HI
10M
8"-OW
CL.
FOR
1201-V-20 1201-V-21
ON.
THAN
CL.
PROPERTY
AUTHORI
PURPOSE OTHER
8"-OW 8"-OW
2"-SW
S
I
1201-C-04A
1201-C-04B
16"-FW
THOUT
NED
8"-OW
H 1201-ME-01A H
CONTAI
WI
ANY
RESERVED
CONSOLE
SCLOSED
1201-ME-01B
1201-E-03
D
COOLING WATER
L SKI
L SKI
AREA
DROP
AREA
DROP
LUBE
LUBE
FOR
ON
F.S
NFORMATI
OI
OI
4"-CD
1201-E-02
BE DI
1201-P-03A
BE USED
GHTS
1201-P-03B 8"-OW
ALL RI
0
I
TO
0
1201-V-09
AND
5
SHALL NOT
NOT
7
1201-P-04A 1814-DVS-006
8"-OW
PEM
1701-P-01A
1701-P-01B
I I
SAI
CURB 1201-P-04B
AL –
WALL 1201-V-06
T
LTD..I
1701-P-02
BY
1201-V-02
DENTI
DEVELOPED
1701-P-03 8"-OW
ED .CONFI
COMPANY
1201-P-02A
1701-V-01 1201-ME-07
4"-CD F.S
S
I
SUPPLI
CALS
DOCUMENT
PETROCHEMI
J 1701-E-01 J
W AS
1701-ME-01
1701- M E- 03
S
THI
T
I
1701-V-02
F.S
1701-P-04A
1701-P-04B 1201-H-01
FUEL GAS SKID
4"-CD
4"-CD
K K
4"-CD
R15000
16"-FW
0
0
0
15
R
1701-H-01
1201-C-03
V-N-3
V-N-9
R
2"-PW
7
5
0 803-TK-51
0
814-PI
L 1701-C-01A L
814-PI
1701-C-02 1201-C-02A 1201-C-02B
1701-C-01B
F.S
803-V-51
814-PIV-N-2 814-PIV-N-09 2"-PW
16"-FW
4"-CD
4"-CD
DINESH Sivapraka
Digitally signed by DINESH Digitally signed by K.Mugesh Digitally signed by Sivaprakash
KUMAR
K.Mugesh
DN: cn=K.Mugesh, o=Saipem, DN: cn=Sivaprakash, o=SAIPEM,
DN: cn=DINESH KUMAR, o, ou, ou=Piping, ou=X-SIGHT,
email=DINESHKUMAR.THANGA email=mugesh.kunjanpillai@saipem.
KUMAR sh
email=sivaprakash.murugan@saipe
RAJ@SAIPEM.COM, c=IN com, c=IN
m.com, c=IN
Date: 2022.02.11 18:16:41 Date: 2022.02.11 18:19:10 +05'30'
Date: 2022.02.11 20:22:08 +05'30'
+05'30'
10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m
Employer Approval
Employer Document Review Status (by Employer)
13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 2/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
national petrochem.
N FARABI
industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND
ibn Rushd
A CL. 10M WIDE ROAD A
FOR CONTINUATION REFER DWG. NO.
270° 90° HS0131-2999-DW-0510-0004-1
N
saudi aramco
YCOTD
YANPET
MAKKAH
814-TP 814-TP SAMREF
TOP.OF EL.98.588
NE
V-N-18
TOP.OF EL.97.500
KEY PLAN
RE W ATER LI
INSTRUMENT BURIED CABLE INSTRUMENT DUCT BANK
NE
BOT. OF EL.98.750
RE W ATER LI
TRENCH TOP. OF EL.98.550
814-PI
ELECTRICAL BURIED CABLE 814-PIV-N-13
814-PIV-N-13
TRENCH BOT. OF EL.98.850
(TYP)
803-TK-53
813-P-51A
C AOS DRAIN 11000mmL X 4600mmW X 3650mmH C
FI
813-P-51B
BOT. OF EL.99.200 10"-OW
FI
813-TK-51
27500mmL x 7700mmW x 5000mmH 803-P-53A
1203-P-01B
1203-P-02B
1203-P-01A
1203-P-02A
AOS DRAIN
4"-CD
D BOT. OF EL.99.200 D
1814-DVS-004
1203-P-03B
(TYP)
1203-PW-01
8"-OW 8"-OW
1203-P-03A
4"-CD
1203-P-07A
1203-V-02
12"-FW
1203-V-04
E 1203-P-05B E
1203-E-10
8"-OW
1203-P-07B
16"-FW
1203-OS-03
1203-TS-01
1203-P-05A
4"-CD
1203-P-06A
1203-V-03
1203-P-14B
1203-P-06B
8"-OW
1203-P-14A 1203-ME-04
1203-E-09
F F
HPP. EL.100000
1203-E-07
1203-ME-05
1203-P-04B
8"-OW
ROAD
ROAD
1203-E-06
8"-OW
8"-OW
1203-P-08A
1203-P-04A 1203-V-17A/B
WIDE
WIDE
1203-P-08B
F.S
1203-P-09A
OF FARABIYANBU
1203-E-03B 1203-V-05
CH
8"-OW
G G
W HI
1203-E-11
10M
10M
1203-P-09B
S
F.
1203-E-17
FOR
2"-PW
1203-E-15
ON.
THAN
1203-R-01B
F.S
CL.
CL.
ZATI
PROPERTY
8"-OW 8"-OW
AUTHORI
PURPOSE OTHER
1203-V-07
8"-OW
1203-P-11A 1203-E-14
1203-R-01A
S
I
THOUT
1203-OS-01 1203-P-11B
F.S
NED
H H
CONTAI
WI
1203-P-10A 1203-E-13
4"-CD
ANY
RESERVED
SCLOSED
1203-E-12C
FOR
1203-E-03A 1203-P-10B
ON
F.S
1203-E-12A/B
8"-OW
NFORMATI
12"-FW
F.S
BE DI
BE USED
GHTS
16"-FW
8"-OW
1203-OS-02 1202-PR-01 1203-V-06B
ALL RI
1203-E-02
I
TO
1203-V-01
AND
SHALL NOT
NOT
1203-E-04
1202-P-02A
PEM
I 1203-P-13C I
SAI
1203-E-05
1202-P-02B
NO.
1203-V-06A
AL –
4"-CD
T
LTD..I
BY
1203-P-13B
F.S
DENTI
F.S
1203-E-16
DEVELOPED
1203-E-01 1203-P-13A
DWG.
.CONFI
COMPANY
1202-P-03A
HS0131-2999-DW-0510-0004-2
1202-V-05
S
ED
I
1202-V-02
SUPPLI
CALS
1202-P-03B
DOCUMENT
REFER
8"-OW
4"-CD
F.S
PETROCHEMI
1202-TS-01
J 1202-V-04 J
W AS
1202-V-03
1202-P-04A
S
F.S
THI
T
I
1202-OS-02 1202-E-04
CONTINUATION
1202-P-04B
1202-OS-01
1202-E-05
F.S
1202-P-01A 1202-E-02
1202-V-01A
8"-OW
8"-FW
1202-V-01B 1202-E-01
1202-P-01B
K K
1202-V-01C 1202-E-03
8"-FW
1202-V-01D
FOR
808-P-51A 1202-E-06
V-N-19
1202-V-01E 808-P-51B
V-N-16
814-PI
1202-V-01F
6"-OW
2"-PW
808-V-51
814-PI
L L
2"-PW
4"-CD
AOS DITCH
16"-FW
(TYP.)
4"-CD
K.Muges
Digitally signed by K.Mugesh
Sivaprak
Digitally signed by Sivaprakash
DINESH
Digitally signed by DINESH DN: cn=K.Mugesh, o=Saipem,
KUMAR DN: cn=Sivaprakash,
ou=Piping,
DN: cn=DINESH KUMAR, o, ou, o=SAIPEM, ou=X-SIGHT,
email=mugesh.kunjanpillai@sa
h
email=DINESHKUMAR.THANG email=sivaprakash.murugan@s
KUMAR ash
ARAJ@SAIPEM.COM, c=IN ipem.com, c=IN
aipem.com, c=IN
Date: 2022.02.11 18:17:09 Date: 2022.02.11 18:19:48
Date: 2022.02.11 20:23:12
+05'30' +05'30'
+05'30'
10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m
Employer Approval
Employer Document Review Status (by Employer)
13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 3/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
petrochem.
N FARABI
industrial
TRUE NORTH 0° GROUND WATER YANSAB
321° PREVAILING WIND
national
FOR CONTINUATION REFER DWG. NO. CL. 10M WIDE ROAD MONITORING WELL ibn Rushd
A HS0131-2999-DW-0510-0004-1 A
REFER NOTE 8
270° 90°
REFER NOTE 7
N
saudi aramco
UNLOADING AREA
814-TP
YCOTD
YANPET
MAKKAH
-58A/B SAMREF
180°
814-PIV-N-15 814-PIV-005
N- 496.518
B MARAFIQ B
10"-OW E- 868.145
TOP.OF EL.99.000
V-N-14
HPP
HPP
E&IDUCT BANK
KEY PLAN
814-PI
1900-TK-41A 1900-TK-41B
1900-TK-08
10"-OW
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
ON CHANNEL
ON CHANNEL
LPP
LPP
C 10"-OW C
LPP
LPP
VERSI
VERSI
DI
DI
10"-OW
LPP
LPP
ON CHANNEL
ON CHANNEL
HPP
BOT.OF EL.99.200
SLOPE SLOPE
LPP
VERSI
VERSI
DIVERSION CHANNEL
HPP
LPP
DI
DI
D D
1900-TK-06A
LPP
LPP
N
AOS DRAI
LPP
LPP
4"-CD
10"-OW
HPP
HPP
SLOPE SLOPE
HPP
SLOPE DIVERSION CHANNEL SLOPE SLOPE LPP SLOPE
HPP
E LPP DIVERSION CHANNEL LPP
E
HPP
10"-OW SLOPE SLOPE
LPP
1701-TK-20
10"-OW
SLOPE SLOPE
ON CHANNEL
1900- P- 41A
1701- P- 20A
1900- P- 08A
1900- P- 08B
1900- P- 06A
1900- P- 06B
LPP
LPP
10"-OW
VERSI
DI
F F
V-N-16
HPP
HPP
10"-OW
10"-OW
1900-TK-06B
ROAD
SLOPE SLOPE SLOPE SLOPE
814-PI
10"-OW
4"-CD
12"-FW
DVS DVS DELUGE SKIDS
814-PIV-N-17 12"-FW 814-PIV-N-21
OF FARABIYANBU
FGL. EL.99850
10M
CH
G G
FOR W HI
CL.
ON.
PURPOSE OTHER THAN
THOUT AUTHORI
NED I
H H
CONTAI
SCLOSED W I
HPP
T SHALL NOT BE USED FOR ANY
GHTS RESERVED
HPP
HPP
ON CHANNEL
ON CHANNEL
ON
NFORMATI
6"-CD
BE DI
6"-CD
00
803- V- 52
VERSI
1203-TK-01
ON CHANNEL
VERSI
ALL RI
NOT TO
6"-CD
AND
DI
DI
803- TK- 52
PEM
LPP
LPP
LPP
LPP
LPP
LPP
F.S
NO.
NO.
803- P- 52A
I I
SAI
VERSI
AL –
LTD..I
S DEVELOPED BY
DI
DENTI
DWG.
DWG.
ON CHANNEL
HS0131-2999-DW-0510-0004-1
HS0131-2999-DW-0510-0004-3
.CONFI
CALS COMPANY
REFER
REFER
VERSI
ED
1900-TK-02B
S DOCUMENT I
HPP
1900-TK-05
T W AS SUPPLI
HPP
DI
PETROCHEMI
J J
SLOPE SLOPE
SLOPE SLOPE
DVS
CONTINUATION
CONTINUATION
THI
16"-FW
4"-CD
DVS
1900- P- 05A
1900- P- 02A
1900- P- 95A
1900- P- 05B
1203- P- 12
4"-CD
DS
LPP
LPP
LPP
LPP
DELUGE SKI
LPP
DVS
K K
FOR
FOR
ON CHANNEL
DVS
V-N-18
VERSI
HPP
1900-TK-95
DI
1900-TK-02A
L L
814-PIV-N-19
16"-FW 814-PIV-N-20
M M
DINESH Sivaprak
Digitally signed by DINESH Digitally signed by K.Mugesh
KUMAR
Digitally signed by Sivaprakash
DN: cn=K.Mugesh, o=Saipem,
K.Mugesh
DN: cn=DINESH KUMAR, o, ou, DN: cn=Sivaprakash, o=SAIPEM,
ou=Piping, ou=X-SIGHT,
email=DINESHKUMAR.THANGA
KUMAR
email=mugesh.kunjanpillai@saipe
ash
RAJ@SAIPEM.COM, c=IN email=sivaprakash.murugan@sai
Date: 2022.02.11 18:17:40 m.com, c=IN pem.com, c=IN
+05'30' Date: 2022.02.11 18:20:31 +05'30'
Date: 2022.02.11 20:24:22 +05'30'
10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m
Employer Approval
Employer Document Review Status (by Employer)
13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 4/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0